Municipal bridge high pier combined formwork
By designing a modular municipal bridge high-pier combination mold frame, the problem of the inability to use fixed tool racks in combination is solved, modular disassembly and assembly and automatic reset are realized, and the adaptability and assembly convenience of construction scenarios are improved.
Patent Information
- Application Number
- CN202420550687.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-21
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-21
AI Technical Summary
The existing work racks are generally fixed and cannot be combined according to actual conditions, resulting in the inability to flexibly adjust and install in the construction of bridge high piers.
A municipal bridge high pier combination mold frame is designed, adopting a modular structure, including formwork, bracket, connecting parts and adjustable studs, automatic reset through plug-in columns and springs, and the mounting frame and chain fixing pipes are achieved. Stud adjusts the bracket height to ensure easy and stable assembly.
The modular disassembly and flexible assembly of the mold frame is realized, the adaptability of construction scenarios is improved, the assembly process is simplified, and the smooth installation and convenience of components are ensured.
Smart Images

Figure CN222008666U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of formwork, in particular to a municipal bridge high pier combined formwork. Background Art
[0002] The bridge pier is a substructure that supports the span structure and transmits the dead load and vehicle live load. The bridge abutment is located on both sides of the bridge. The bridge pier is between the two abutments. The function of the bridge pier is to support the span structure; when constructing the high bridge pier, a formwork will be used to support the mold so that the concrete can be poured into the mold to shape it.
[0003] In the process of implementing the present application, at least the following problems exist in the technology: the existing tooling racks are generally fixed and cannot be combined and used according to actual conditions. Utility Model Content
[0004] The utility model aims to provide a municipal bridge high pier combined formwork to solve the problem in the above background technology that the existing tooling frames are generally fixed and cannot be combined and used according to actual conditions.
[0005] The utility model provides a municipal bridge high pier combined formwork, which adopts the following technical scheme;
[0006] A combined formwork for a high pier of a municipal bridge comprises a formwork 1 and a formwork 2, wherein the formwork 2 is arranged on the left side of the formwork 1, and connecting parts are fixed at both ends of the side where the formwork 1 and the formwork 2 are close to each other, and the formwork 1 and the formwork 2 are provided in plurality, and the plurality of formwork 1 and the formwork 2 are assembled up and down, and bracket 2 is arranged on both sides at the bottom, and a connecting frame is fixed on the side where the formwork 1 and the formwork 2 are away from each other, and bracket 1 is fixed on the front and rear ends of one side of the connecting frame, and reinforcing plates are fixed on the outer walls of the front and rear ends of the formwork 1 and the formwork 2, and the reinforcing plates are located at a position where the connecting frame is away from the formwork 1 or away from the formwork 2, a connecting tube is fixed at the bottom end of the bracket 1, and a plug-in column is fixed at the top end of the bracket 1.
[0007] By adopting the above technical solution, the formwork is made modular, so that it is easy to assemble and can be installed according to practical conditions.
[0008] Optionally, an L-frame is fixed to the outer wall of the connecting tube, a T-bar is horizontally passed through the upper part of the L-frame, a latch is fixed to the side of the T-bar close to the connecting tube, and the latch passes through the connecting tube.
[0009] By adopting the above technical solution, the latch pin passes through the connecting tube and the plug-in column to fix the upper and lower brackets.
[0010] Optionally, the plug-in column is provided with a transverse plug-in hole for the plug-in, and the bottom end of one side of the plug-in is arranged in an inclined surface.
[0011] By adopting the above technical solution, when the plug-in column is inserted into the connecting tube by extrusion, the plug-in column will squeeze the plug pin. At this time, since one side of the plug pin is set as an inclined surface, the plug pin is squeezed by the plug-in column and displaced.
[0012] Optionally, a spring is provided on the outer sleeve of the T-shaped rod between one side of the latch pin and the L frame, and the other end of the spring is fixedly connected to the L frame.
[0013] By adopting the above technical solution, the spring is used to automatically reset the latch pin, and the latch pin is inserted into the plug-in column and the connecting cylinder without manual processing.
[0014] Optionally, a hanging frame is fixed to both front and rear ends of the two brackets 2, and the hanging frame is L-shaped when viewed from the side.
[0015] By adopting the above technical solution, the cross plate is supported by the hanging frame.
[0016] Optionally, a horizontal plate is placed between the two hanging frames and the second bracket, the bottom end of the horizontal plate is connected to two chains, and the bottom end of the chain is connected to a hook.
[0017] By adopting the above technical solution, the pipeline is hung with hooks and chains to prevent the pipeline from sinking, and it is convenient to take out the pipeline later.
[0018] Optionally, both front and rear ends of the two phases of the bracket away from one side are vertically threaded with studs, and a rotating handle is fixed to the top of the studs.
[0019] By adopting the above technical solution, the stud is rotated by holding the handle, and the height of the bracket 2 is adjusted when the stud is rotated to ensure that the upper surfaces of the two brackets are in the same plane.
[0020] Optionally, notches are provided on both left and right sides of the bottom of the transverse plate, and the second bracket is located outside a fixed limiting block in the hanging frame.
[0021] By adopting the above technical solution, the cross plate is supported by the mounting frame, and the firmness of the cross plate on the second bracket is maintained to avoid the problem of left and right movement of the cross plate.
[0022] In summary, the present invention includes at least one of the following beneficial effects:
[0023] 1. By setting the tooling frame into modular form, it can be assembled and disassembled, so it can be used according to the actual construction scene;
[0024] 2. When the upper and lower brackets are butt-jointed, the plug-in column is inserted into the connecting tube. During the insertion, the plug-in column will squeeze the mounting frame, and the mounting frame will move outward. After the plug-in column is fully inserted into the connecting tube, the latch is reset by the spring to penetrate the connecting tube and the plug-in column, thus completing the installation between the upper and lower brackets, and improving the convenience during assembly;
[0025] 3. Use the studs to adjust the second bracket according to the flatness of the ground, and try to make the horizontal board assembled on the second bracket stable to avoid displacement of the horizontal board. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 This is a schematic diagram of the main structure of the utility model;
[0027] Figure 2 It is a partial cross-sectional structural schematic diagram of the utility model;
[0028] Figure 3 For the utility model Figure 2 The enlarged structural diagram at A in the middle;
[0029] Figure 4 It is a partial structural schematic diagram of the utility model;
[0030] Figure 5 For the utility model Figure 4 Enlarged structural diagram at B in the middle.
[0031] In the figure: 1. Template 1; 2. Template 2; 3. Bracket 1; 4. Bracket 2; 5. Connecting part; 6. Reinforcing plate; 7. Connecting frame; 8. Plug-in column; 9. Connecting tube; 10. L-frame; 11. T-bar; 12. Spring; 13. Latch; 14. Cross plate; 15. Turn handle; 16. Hook; 17. Chain; 18. Stud; 19. Hanging frame; 20. Limit block; 21. Notch. DETAILED DESCRIPTION
[0032] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0033] The following is combined with Figure 1-5 The utility model is described in further detail.
[0034] The utility model discloses a municipal bridge high pier combined formwork, including a template 1 and a template 2, the template 1 is provided with the template 2 2 on the left side, the template 1 is provided with a connection part 5 at both ends of the template 1 and the template 2 2 close to each other, and the template 1 and the template 2 2 are fixed by the cooperation of the fastener and the connection part 5; the template 1 and the template 2 2 are provided with a plurality of templates, and the plurality of templates 1 and templates 2 2 are assembled up and down, and can be assembled according to the required height; brackets 2 4 are provided on both sides of the bottom, and the brackets 2 4 are used to prevent the L frame 10 at the bottom of the bottom bracket 3 from contacting the ground; the template A connecting frame 7 is fixed to the side away from the template 1 and the template 2, and a bracket 3 is fixed to the front and rear ends of one side of the connecting frame 7, and the bracket 3 and the template 1 or the bracket 3 and the template 2 are fixedly connected by the connecting frame 7; a reinforcing plate 6 is fixed to the outer walls of the front and rear ends of the template 1 and the template 2, and the reinforcing plate 6 is located at the position where the connecting frame 7 is away from the template 1 or away from the template 2, and the connecting frame 7 and the template 1 or the connecting frame 7 and the template 2 are further fixed by the reinforcing plate 6; a connecting tube 9 is fixed to the bottom end of the bracket 3, and a plug-in column 8 is fixed to the top end of the bracket 3. The top view cross section of the plug-in column 8 is equal to the top view cross section of the inner wall of the connecting tube 9, and the plug-in column 8 is inserted into the connecting tube 9 by extrusion.
[0035] Reference Figure 1-3 The outer wall of the connecting tube 9 is fixed with an L frame 10, and a T-shaped rod 11 is horizontally passed through the upper part of the L frame 10. A plug 13 is fixed to the side of the T-shaped rod 11 close to the connecting tube 9. The plug 13 and the T-shaped rod 11 are fixedly integrated, and a reserved hole for the T-shaped rod 11 to be plugged in is opened on the L frame 10; and the plug 13 passes through the connecting tube 9. A horizontal plug hole for the plug 13 to be plugged in is opened on the plug column 8, and the bottom end of one side of the plug 13 is set in an inclined surface. When the plug-in column 8 is inserted into the connecting tube 9, the plug-in column 8 will squeeze the plug pin 13, and the plug pin 13 will move outward after being squeezed, until the plug-in column 8 is completely inserted into the connecting tube 9, and the plug pin 13 will move toward the connecting tube 9, and the bracket 13 will penetrate the plug-in column 8 and the connecting tube 9, and fix the upper and lower brackets 13; wherein, a spring 12 is provided on the outer cover of the T-shaped rod 11 between one side of the plug pin 13 and the L frame 10, and the other end of the spring 12 is fixedly connected to the L frame 10. When there is no object squeezing one side of the plug pin 13, the plug pin 13 automatically resets and is inserted into the connecting tube 9 under the action of the spring 12.
[0036] Reference Figure 4 The front and rear ends of the bracket 2 4 are vertically threaded with studs 18, and the top of the studs 18 is fixed with a rotating handle 15. The height of the bracket 2 4 is adjusted by the studs 18 to control the upper surfaces of the two brackets 2 4 to be in the same plane. When in use, the studs 18 are rotated by holding the rotating handle 15. In addition, the bracket 2 4 is supported by the hand or an external support workpiece, so that the bracket 2 4 can be moved up and down when the studs 18 rotate.
[0037] Reference Figure 1 , Figure 4 and Figure 5 , the front and rear ends of the two brackets 24 are fixed with a hanging frame 19, and the hanging frame 19 is L-shaped when viewed from the side. A horizontal board 14 is placed between the two hanging frames 19 and the bracket 24, and two chains 17 are connected to the bottom of the horizontal board 14, and a hook 16 is connected to the bottom of the chain 17. The horizontal board 14 is placed in the hanging frame 19, and the hanging frame 19 and the bracket 24 support the horizontal board 14, ensuring the stability of the horizontal board 14 between the two brackets 24; notches 21 are opened on the left and right sides of the bottom of the horizontal board 14, and a limited block 20 is fixed outside the bracket 24 in the hanging frame 19. Among them, the hanging frame 19 is used to support the horizontal board 14; the firmness of the horizontal board 14 on the bracket 24 is maintained to prevent the horizontal board 14 from moving left and right.
[0038] The implementation principle of the utility model of a municipal bridge high pier combined formwork is:
[0039] First, the bracket 2 4 is placed on the ground, and the stud 18 is used to adjust the stability of the bracket 2 4. Then, the cross plate 14 is placed on the hanging frame 19, and the cross plate 14 is positioned and assembled with the cooperation of the limit block 20 and the notch 21, and the hook 16 and the chain 17 are used to hang and pull the pipe inserted in the soil.
[0040] Secondly, after the template 1 and the template 2 2 are docked and placed, they are fixed by the connecting part 5, and then the template 1 and the template 2 2 are inserted on the template 1 and the template 2 2 below, and are also fixed by the connecting part 5. The plug-in column 8 on the bracket 1 3 is inserted into the connecting tube 9, and the connecting tube 9 and the plug-in column 8 are penetrated by the pin 13 to fix the plug-in column 8 and the connecting tube 9; finally, the template 1 and the template 2 2 are assembled upward in sequence by the above-mentioned docking method.
[0041] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
Claims
1. A municipal bridge high pier modular formwork, comprising a formwork 1 (1) and a formwork 2 (2), characterized in that: A template 2 (2) is arranged on the left side of the template 1 (1), and connecting parts (5) are fixed at both ends of the side where the template 1 (1) and the template 2 (2) are close to each other. The template 1 (1) and the template 2 (2) are provided in plurality, and the plurality of templates 1 (1) and the template 2 (2) are assembled up and down, and brackets 2 (4) are arranged on both sides at the bottom. A connecting frame (7) is fixed on the side where the template 1 (1) and the template 2 (2) are far away from each other, and brackets 1 (3) are fixed on the front and rear ends of one side of the connecting frame (7). Reinforcing plates (6) are fixed on the outer walls of the front and rear ends of the template 1 (1) and the template 2 (2), and the reinforcing plates (6) are located at a position where the connecting frame (7) is away from the template 1 (1) or away from the template 2 (2). A connecting tube (9) is fixed at the bottom end of the bracket 1 (3), and a plug-in column (8) is fixed at the top end of the bracket 1 (3).
2. The municipal bridge high pier combined formwork according to claim 1, characterized in that: An L-frame (10) is fixed to the outer wall of the connecting tube (9), a T-shaped rod (11) is passed through the upper part of the L-frame (10) in a transverse direction, a latch (13) is fixed to the side of the T-shaped rod (11) close to the connecting tube (9), and the latch (13) passes through the connecting tube (9).
3. The municipal bridge high pier combined formwork according to claim 1, characterized in that: The plug-in column (8) is provided with a transverse plug-in hole for the plug-in of the plug pin (13), and the bottom end of one side of the plug pin (13) is arranged in an inclined surface.
4. The municipal bridge high pier combined formwork according to claim 3, characterized in that: A spring (12) is provided on the outer sleeve of the T-shaped rod (11) between one side of the latch pin (13) and the L frame (10), and the other end of the spring (12) is fixedly connected to the L frame (10).
5. The municipal bridge high pier combined formwork according to claim 1, characterized in that: A hanging frame (19) is fixed to both the front and rear ends of the two brackets (4), and the hanging frame (19) is arranged in an L shape when viewed from the side.
6. The municipal bridge high pier combined formwork according to claim 5, characterized in that: A horizontal plate (14) is placed between the two hanging frames (19) and the second bracket (4), and the bottom end of the horizontal plate (14) is connected to two chains (17), and the bottom end of the chain (17) is connected to a hook (16).
7. The municipal bridge high pier combined formwork according to claim 1, characterized in that: Both front and rear ends of the side away from the second bracket (4) are vertically threaded with studs (18), and a rotating handle (15) is fixed to the top of the studs (18).
8. The municipal bridge high pier combined formwork according to claim 6, characterized in that: The bottom of the horizontal plate (14) is provided with notches (21) on both left and right sides, and the second bracket (4) is externally located inside the hanging frame (19) and fixed with a limiting block (20).