River channel flood bank structure

By combining the design of wave-resistance board, planted soil layer and porous gabion mesh in the flood control embankment structure, the anchoring capacity and drainage system of water-resistant plants are used to solve the problem of degradation of the stability of the flood control embankment structure and improve the safety of the flood control embankment and practicality, reduces water flow impact and foreign body blockage, and enhances riverbed firmness and water volume observation.

CN222008786UActive Publication Date: 2024-11-15FUJIAN QINGYU ENG MANAGEMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420273250.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-04
Publication Date
2024-11-15
Estimated Expiration
2034-02-04

AI Technical Summary

Technical Problem

During the flood season, the water level fluctuations of rivers and lakes and the impact of the water flow caused by the typhoon seasonal wind and waves caused the stability of the flood control embankment structure to decrease, which increased the risk of dam collapse and reduced safety.

Method used

A river flood control embankment structure is adopted, including the main body of the flood control embankment, the concrete foundation and multiple wave blocks of different heights, planted soil layer and porous gabion mesh foundation, combined with the anchoring ability of water-resistant plants, the wave block disperses the impact of the water flow. and reduce soil erosion and foreign body blockage through drains, water conduits and filters. Set up prompts buoyancy bodies and acrylic transparent windows to observe the water level, foreign body intercepting nets and T-shaped cleaning ladders to clean, and guardrails provide pedestrian protection.

Benefits of technology

Improve the stability and safety of the flood control embankment, reduce the impact strength of the water flow, enhance the firmness of the riverbed, reduce soil erosion and foreign body blockage, improve the practicality of water volume observation and cleaning, and enhance the safety and aesthetics of the device. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008786U_ABST
    Figure CN222008786U_ABST
Patent Text Reader

Abstract

The utility model discloses a river channel flood bank structure, and relates to the technical field of flood banks. The flood bank comprises a flood bank body, a fence is fixedly connected to one end of the flood bank body, a planting soil layer is arranged in the fence, a concrete foundation is arranged on one side of the fence, and a plurality of wave blocking plates with different heights are arranged at the top of the concrete foundation in a staggered mode. According to the flood bank, the wave blocking plate and the planting soil layer are used in cooperation, water-resistant plants can be conveniently planted in the planting soil layer, the firmness of a riverbed is improved through the anchoring capacity of root systems of the water-resistant plants, and meanwhile the impact force of water flow rushing to the flood bank body is dispersed and weakened through the wave blocking plate; and therefore, the stability of the flood bank body is effectively improved, the strength of water flow impacting the flood bank body is reduced, and the safety of the device is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of flood levees, and in particular to a river flood levee structure. Background Art

[0002] A levee is a dam built to prevent river flooding. Flood levees have been around for hundreds of years and are usually just a pile of dirt in long strips that sometimes stretch for kilometers along a river, lake or ocean. Flood levees can suppress floods, and flood levees can protect people living on river banks from floods and property losses every year.

[0003] With the development of the times, existing flood embankment projects are usually built with materials such as earth, stone or concrete. Different structures and cross-sectional forms are adopted according to different terrain, geological and hydrological conditions. When the water levels of rivers and lakes rise and fall during the flood season and the wind and waves are strong during the typhoon season, the flood embankments intercept and guide the rising water flow to reduce the risk of floods crossing the flood embankments and causing disasters.

[0004] However, the fluctuations in water levels of rivers and lakes during the flood season and the impact of wind and wave attacks during the typhoon season are very large. The long-term continuous impact of these water flows reduces the structural stability of the flood control dike, increases the risk of flood control dike collapse, and reduces the safety of the flood control dike. Utility Model Content

[0005] The purpose of the present application is to solve the problem that the water level fluctuations of rivers and lakes during the flood season and the water flow impact forces generated by the wind and wave attacks during the typhoon season are very large. The structural stability of the flood levees decreases due to the long-term continuous impact of these water flows, which increases the risk of the flood levees collapsing and reduces the safety of the flood levees. The present application provides a river flood levee structure.

[0006] In order to achieve the above-mentioned purpose, this application specifically adopts the following technical solutions:

[0007] A river flood embankment structure comprises a flood embankment body, one end of the flood embankment body is fixedly connected to a fence, a planting soil layer is arranged inside the fence, a concrete foundation is arranged on one side of the fence, and a plurality of wave-breaking plates of different heights are staggered on the top of the concrete foundation.

[0008] By adopting the above technical scheme, by setting up the wave-breaking board and the coordinated use of the planting soil layer, it is convenient to use the planting soil layer to plant water-resistant plants, and use the anchoring ability of the roots of the water-resistant plants to improve the firmness of the riverbed, and at the same time use the wave-breaking board to disperse and weaken the impact force of the water flow rushing towards the flood levee body, thereby effectively improving the stability of the flood levee body, reducing the intensity of the water flow impacting the flood levee body, and improving the safety of the device.

[0009] Furthermore, a porous gabion base is provided at one end of the flood embankment body, and the planting soil layer is installed on the top of the porous gabion base.

[0010] By adopting the above technical solution and setting up the coordinated use of the porous gabion mesh base and the enclosure, it is convenient to improve the supporting strength of the planting soil layer, provide a more stable growth environment for water-resistant plants planted inside the planting soil layer, and improve the practicability of the device.

[0011] Furthermore, curbstones are symmetrically arranged on the top of the flood embankment body, drainage outlets are symmetrically opened at one end of the curbstones, and a water pipe adapted to the drainage outlet is symmetrically fixedly connected to one end of the flood embankment body.

[0012] By adopting the above technical solution, by setting up the drainage outlet and the coordinated use of the water pipe, it is convenient to guide the rainwater on the top of the flood control dike body directly into the river channel along the water pipe, thereby reducing the situation where the rainwater on the top of the flood control dike body rushes into the planting soil layer along the inclined surface and causes soil erosion, thereby improving the practicability of the device.

[0013] Furthermore, a filter screen is fixedly connected to the inside of the drain outlet and the bottom of the water pipe.

[0014] By adopting the above technical solution, by setting the filter net and the coordinated use of the drain outlet and the water pipe, the situation in which foreign matter driven by the water flow enters the interior of the water pipe and causes blockage inside the water pipe is effectively reduced.

[0015] Furthermore, a warning buoyancy body is arranged inside the water conduit, an acrylic transparent window is arranged on the top of the water conduit, and a water level mark is arranged at one end of the acrylic transparent window.

[0016] By adopting the above technical scheme, by setting the prompt buoyancy body in conjunction with the acrylic transparent window and the water level mark, it is convenient to utilize the buoyancy of the rising water flow inside the river channel to push the prompt buoyancy body to move to the position corresponding to the water level mark, thereby facilitating the observation of the amount of water rising from the water flow inside the river channel through the prompt buoyancy body, thereby improving the practicability of the device.

[0017] Furthermore, a foreign matter interception net is fixedly connected to one side of the flood levee body, and the foreign matter interception net is installed above the planting soil layer.

[0018] By adopting the above technical solution, a foreign object interception net is set up to intercept foreign objects sliding down from the top of the flood control embankment body, thereby effectively reducing the situation where foreign objects sliding down from the top of the flood control embankment body fall into the planting soil layer.

[0019] Furthermore, a guide opening is opened at one end of the curbstone, and a T-shaped cleaning ladder adapted to the guide opening is fixedly connected to one side of the flood embankment body, and the T-shaped cleaning ladder is installed above the foreign matter interception net.

[0020] By adopting the above technical solution, by setting the guide port and using it in conjunction with the T-shaped cleaning ladder, it is convenient to guide the staff to collect the foreign objects intercepted by the foreign object interception net through the T-shaped cleaning ladder, thereby improving the practicality of the device.

[0021] Furthermore, a guardrail is symmetrically fixedly connected to the top of the flood embankment body.

[0022] By adopting the above technical solution, guardrails are set up to provide protection for pedestrians passing on the top of the flood control levee body, thereby improving the safety of the device.

[0023] In summary, the present application includes at least one of the following beneficial effects:

[0024] 1. By setting up the wave-breaking board and the planting soil layer, it is convenient to use the planting soil layer to plant water-resistant plants, and use the anchoring ability of the roots of water-resistant plants to improve the firmness of the riverbed. At the same time, the wave-breaking board is used to disperse and weaken the impact force of the water flow rushing towards the flood levee body, thereby effectively improving the stability of the flood levee body, reducing the intensity of the water flow impacting the flood levee body, and improving the safety of the device.

[0025] 2. By setting the prompt buoyancy body in conjunction with the acrylic transparent window and the water level mark, it is convenient to utilize the buoyancy of the rising water flow inside the river channel to push the prompt buoyancy body to move to the position corresponding to the water level mark, thereby facilitating the observation of the amount of water flow rising inside the river channel through the prompt buoyancy body, thereby improving the practicability of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the three-dimensional structure of the device body in this application.

[0027] Figure 2 It is a side cross-sectional view of the device body in this application.

[0028] Figure 3 It is an exploded view of the internal structure of the water pipe in this application.

[0029] Description of reference numerals:

[0030] 1. Flood control embankment body; 2. Fence; 3. Planting soil layer; 4. Concrete base; 5. Wave-breaking board; 6. Porous gabion base; 7. Curbstone; 8. Drainage outlet; 9. Water guide pipe; 10. Filter net; 11. Buoyancy warning body; 12. Acrylic transparent window; 13. Water level mark; 14. Foreign body interception net; 15. Guide port; 16. T-shaped cleaning ladder; 17. Guardrail. DETAILED DESCRIPTION

[0031] The following is combined with Figure 1-3 This application is described in further detail.

[0032] The embodiment of the present application discloses a river flood embankment structure.

[0033] Reference Figure 1 and Figure 2 A river flood embankment structure comprises a flood embankment body 1, one end of the flood embankment body 1 is fixedly connected with a fence 2, a planting soil layer 3 is arranged inside the fence 2, a concrete base 4 is arranged on one side of the fence 2, and a plurality of wave-breaking plates 5 of different heights are staggered on the top of the concrete base 4;

[0034] Among them, a porous gabion mesh base 6 is arranged at one end of the flood control embankment body 1, and the planting soil layer 3 is installed on the top of the porous gabion mesh base 6.

[0035] When in use, first, a relatively stable foundation is formed by setting a porous gabion mesh base 6 in cooperation with the enclosure 2, and then the planting soil layer 3 is filled into the interior of the enclosure 2, and water-resistant plants are planted inside the planting soil layer 3, so that the water-resistant plants grow inside the planting soil layer 3, and as the water-resistant plants grow, the roots of the water-resistant plants extend through the gaps inside the porous gabion mesh base 6 to the interior of the riverbed, and the anchoring ability of the roots of the water-resistant plants is used to improve the firmness of the riverbed, reduce soil erosion, and make the installation of the concrete foundation 4 more stable. At the same time, when the water flow rushes to one side of the flood levee body 1, the water flow is blocked by a plurality of wave-blocking plates 5, and in the process of the water flow crossing the plurality of wave-blocking plates 5 and rushing to the flood levee body 1, the impact energy of the water flow is continuously dispersed and weakened by the plurality of wave-blocking plates 5, thereby effectively improving the stability of the flood levee body 1, reducing the intensity of the water flow impacting the flood levee body 1, and improving the safety of the device.

[0036] Reference Figure 1 and Figure 3 The top of the flood embankment body 1 is symmetrically provided with a curbstone 7, one end of the curbstone 7 is symmetrically provided with a drainage port 8, and one end of the flood embankment body 1 is symmetrically fixedly connected with a water pipe 9 adapted to the drainage port 8;

[0037] The inside of the drain port 8 and the bottom of the water pipe 9 are both fixedly connected with a filter screen 10;

[0038] Furthermore, a warning buoyancy body 11 is arranged inside the water conduit 9 , an acrylic transparent window 12 is arranged on the top of the water conduit 9 , and a water level mark 13 is arranged at one end of the acrylic transparent window 12 .

[0039] When in use, firstly, by setting the drainage port 8 and the water pipe 9 for coordinated use, it is convenient to guide the rainwater on the top of the flood control levee body 1 into the river channel through the water pipe 9, thereby reducing the rainwater from rushing into the planting soil layer 3 along the inclined surface of the flood control levee body 1 to cause soil and water loss. At the same time, the filter net 10 is used to filter and intercept the water flow passing through the water pipe 9 and the prompt buoyancy body 11, thereby reducing the situation where foreign matter enters the water pipe 9 and causes blockage, and also avoiding the situation where the prompt buoyancy body 11 rushes out of the water pipe 9.

[0040] Then, when the water level rises, the warning buoyancy 11 is pushed by the buoyancy of the water flow inside the river channel and goes upstream along the inside of the aqueduct 9. At the same time, the warning buoyancy 11 moves to the position corresponding to the water level mark 13 as the water level rises. This makes it easy for people to judge the amount of rising water through the relative position of the warning buoyancy 11 and the water level mark 13, thereby improving the practicability of the device.

[0041] Reference Figure 1-Figure 3 A foreign body interception net 14 is fixedly connected to one side of the flood embankment body 1, and the foreign body interception net 14 is installed above the planting soil layer 3;

[0042] Among them, a guide opening 15 is opened at one end of the curb stone 7, and a T-shaped cleaning ladder 16 adapted to the guide opening 15 is fixedly connected to one side of the flood embankment body 1. The T-shaped cleaning ladder 16 is installed above the foreign body interception net 14.

[0043] When in use, firstly, a foreign object interception net 14 is set up to intercept foreign objects sliding down from the top of the flood control embankment body 1, thereby reducing the number of foreign objects falling into the planting soil layer 3 and affecting the growth of water-resistant plants. Then, the staff is guided to pass through the guide port 15 and move along the surface of the T-shaped cleaning ladder 16 to the top of the foreign object interception net 14, and the foreign objects intercepted by the foreign object interception net 14 are collected and cleaned, thereby effectively reducing the number of foreign objects on the top of the flood control embankment body 1 sliding down into the planting soil layer 3, thereby improving the aesthetics of the device and the growth effect of water-resistant plants in the planting soil layer 3.

[0044] Reference Figure 1 and Figure 3 A guardrail 17 is symmetrically fixedly connected to the top of the flood embankment body 1.

[0045] When in use, the guardrail 17 is provided to provide protection for pedestrians passing by the top of the flood levee body 1, thereby reducing the situation where pedestrians fall along the inclined surface of the flood levee body 1 and improving the safety of the device.

[0046] The implementation principle of a river flood embankment structure of the present embodiment is as follows: first, a relatively stable foundation is formed by setting a porous gabion mesh base 6 in cooperation with the enclosure 2, and then a planting soil layer 3 is filled into the interior of the enclosure 2, and water-resistant plants are planted inside the planting soil layer 3, so that the water-resistant plants grow inside the planting soil layer 3, and as the water-resistant plants grow, the roots of the water-resistant plants extend through the gaps inside the porous gabion mesh base 6 to the interior of the riverbed, and the anchoring ability of the roots of the water-resistant plants is used to improve the firmness of the riverbed, reduce soil erosion, and make the installation of the concrete foundation 4 more stable. At the same time, when the water flow rushes to one side of the flood embankment body 1, the water flow is blocked by the multiple wave-blocking plates 5, and in the process of the water flow passing over the multiple wave-blocking plates 5 and rushing to the flood embankment body 1, the impact energy of the water flow is continuously dispersed and weakened by the multiple wave-blocking plates 5;

[0047] Then, by setting the drainage port 8 and the water pipe 9 for use together, it is convenient to guide the rainwater on the top of the flood control levee body 1 into the river channel through the water pipe 9, reducing the rainwater from rushing into the planting soil layer 3 along the inclined surface of the flood control levee body 1 to cause soil and water loss. At the same time, the filter net 10 and the prompt buoyancy body 11 are used to filter and intercept the water flow passing through the water pipe 9, reducing the situation where foreign matter enters the water pipe 9 and causes blockage;

[0048] Then, when the water level rises, the warning buoyancy 11 is pushed by the buoyancy of the water flow inside the river channel and moves upstream along the inside of the aqueduct 9. At the same time, the warning buoyancy 11 moves to the position corresponding to the water level mark 13 as the water level rises, so that people can judge the amount of water rising through the relative position of the warning buoyancy 11 and the water level mark 13.

Claims

1. A river flood embankment structure, comprising a flood embankment body (1), characterized in that: One end of the flood embankment body (1) is fixedly connected to a fence (2), a planting soil layer (3) is provided inside the fence (2), a concrete base (4) is provided on one side of the fence (2), and a plurality of wave-breaking plates (5) of different heights are staggered on the top of the concrete base (4).

2. A river flood embankment structure according to claim 1, characterized in that: A porous gabion base (6) is provided at one end of the flood embankment body (1), and the planting soil layer (3) is installed on the top of the porous gabion base (6).

3. A river flood embankment structure according to claim 1, characterized in that: A curbstone (7) is symmetrically arranged on the top of the flood embankment body (1), a drainage outlet (8) is symmetrically opened at one end of the curbstone (7), and a water pipe (9) adapted to the drainage outlet (8) is symmetrically fixedly connected to one end of the flood embankment body (1).

4. A river flood embankment structure according to claim 3, characterized in that: The interior of the drain outlet (8) and the bottom of the water pipe (9) are both fixedly connected with a filter screen (10).

5. A river flood embankment structure according to claim 3, characterized in that: A warning buoyancy body (11) is arranged inside the water conduit (9), an acrylic transparent window (12) is arranged on the top of the water conduit (9), and a water level mark (13) is arranged at one end of the acrylic transparent window (12).

6. A river flood embankment structure according to claim 1, characterized in that: A foreign matter interception net (14) is fixedly connected to one side of the flood embankment body (1), and the foreign matter interception net (14) is installed above the planting soil layer (3).

7. A river flood embankment structure according to claim 3, characterized in that: A guide opening (15) is provided at one end of the curbstone (7), a T-shaped cleaning ladder (16) adapted to the guide opening (15) is fixedly connected to one side of the flood embankment body (1), and the T-shaped cleaning ladder (16) is installed above the foreign matter interception net (14).

8. A river flood embankment structure according to claim 1, characterized in that: Guardrails (17) are symmetrically fixedly connected to the top of the flood embankment body (1).