Concrete pipe pile for building
By using threaded connection and clamping block structures in concrete pipe piles for construction, the problem of long welding time is solved, and the firmness and working efficiency of pipe piles are improved.
Patent Information
- Application Number
- CN202420051250.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-09
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-01-09
AI Technical Summary
The welding time of existing concrete pipe piles for construction is long, resulting in inefficient work.
It adopts a combined design including a first threaded rod, a nut, an upper connection member, a lower connection member, a fixing rod, a through hole, a through groove, a side groove, a first threaded hole, a first fixing plate, a second fixing plate and other structures. Through the mating of threaded connection and engagement blocks, the butt and fixing process of pipe piles is simplified.
It improves the firmness and overall strength of the pipe piles, shortens the installation and disassembly time, and significantly improves work efficiency.
Smart Images

Figure CN222008886U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of coking production equipment, in particular to a concrete pipe pile for construction. Background Art
[0002] In the late 1960s, the Fengtai Bridge Factory of the Ministry of Railways began to produce pre-tensioned prestressed concrete pipe piles (PC pipe piles for short), which were mainly used for the infrastructure construction of railway bridge projects at that time; in the 1970s, post-tensioned prestressed concrete pipe piles were developed and produced.
[0003] A document of a Chinese patent with a search announcement number of CN218712905U discloses a concrete pipe pile for construction, including a pipe pile body and a grouting mechanism. The pipe pile body is provided with a grouting mechanism, and the grouting mechanism includes a connecting ring, an end ring, a reinforcing rib and a through hole. An end ring is provided at a middle position inside the pipe pile body and the positions of the end rings correspond. Reinforcing ribs are welded between the end rings and there are multiple reinforcing ribs. A through hole is opened at the middle position inside the pipe pile body and the through hole is connected to the reinforcing rib. Although this patented technology improves the grouting discharge rate and reduces blockage, this method takes a long time to weld, increases working time, and reduces work efficiency. Utility Model Content
[0004] The purpose of the utility model is to solve the shortcomings of the prior art and to propose a concrete pipe pile for construction, aiming to improve the connection method in the prior art, which not only requires welding technology but also takes a long time to weld, thus increasing working time and reducing working efficiency.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a concrete pipe pile for construction, comprising a lower pipe pile, the top of the lower pipe pile is fixedly connected with a lower connecting piece, the top of the lower pipe pile is fixedly connected with a first threaded rod, an upper connecting piece is arranged on the outside of the lower connecting piece, the upper connecting piece is fixedly connected to the bottom of the upper pipe pile, a first threaded hole is opened on the bottom of the upper pipe pile, the first threaded rod is threadedly connected to the inside of the first threaded hole, a side groove is opened on the outside of the upper connecting piece, a nut is threadedly connected to the outside of the first threaded rod, a through hole is opened on the inside of the upper connecting piece, a through groove is opened on the outside of the lower connecting piece, and a fixing component is arranged on the outside of the upper connecting piece.
[0006] Further, the fixing assembly includes a first fixing plate, the first fixing plate is arranged on the outside of the upper connecting member, both sides of the bottom of the first fixing plate are fixedly connected with snap blocks, the bottom of the first fixing plate is provided with a second fixing plate, both sides of the top of the second fixing plate are provided with snap grooves, and the snap blocks are arranged inside the snap grooves.
[0007] Furthermore, a second threaded hole is provided inside the engaging block, a second threaded hole is provided on both sides of the second fixing plate, and a second threaded rod is threadedly connected inside the second threaded hole.
[0008] Furthermore, the engaging blocks are provided with limiting grooves inside, the limiting grooves are slidably connected to limiting blocks inside, and the limiting blocks are fixedly connected to the inner side of the movable plate.
[0009] Furthermore, the movable plates are slidably connected to the inside of the movable box, the movable box is fixedly connected to the inside of both sides of the second fixed plate, the outer sides of the movable plates are fixedly connected to pull rods, and the ends of the pull rods away from each other are fixedly connected to pull rings.
[0010] Furthermore, springs are arranged outside the pull rods, the ends of the springs that are close to each other are fixedly connected to the outside of the movable plate, and the ends of the springs that are far away from each other are fixedly connected to the inside of the movable groove.
[0011] Furthermore, the inner sides of the first fixing plates are fixedly connected with fixing rods, and the inner sides of the second fixing plates are fixedly connected with fixing rods.
[0012] Furthermore, the adjacent ends of the fixing rods are both arranged inside the through slots, and the fixing rods are both arranged inside the through holes.
[0013] The utility model has the following beneficial effects:
[0014] 1. In the utility model, firstly, through the coordination among the first threaded rod, the nut, the upper connecting piece, the lower connecting piece, the fixing rod, the through hole, the through groove, the side groove, the first threaded hole, the first fixing plate, the second fixing plate and other structures, the firmness and the overall strength of the pipe pile during docking can be ensured, which is conducive to extending the overall service life.
[0015] 2. In the utility model, the coordination among the second threaded rod, the second threaded hole, the pull ring, the pull rod, the limit block, the limit groove, the movable groove, the spring, the movable plate, the first fixed plate, the second fixed plate and other structures makes installation and disassembly more convenient, saves connection time and improves work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 A three-dimensional diagram of a concrete pipe pile for construction proposed by the utility model;
[0017] Figure 2 This is a partial structural exploded diagram of a concrete pipe pile for construction proposed by the utility model;
[0018] Figure 3 This is a partial structural cross-sectional view of a concrete pipe pile for construction proposed by the utility model;
[0019] Figure 4 for Figure 3 Enlarged view of point A in the middle.
[0020] Legend:
[0021] 1. Upper pipe pile; 2. Lower pipe pile; 3. Upper connecting piece; 4. Lower connecting piece; 5. First threaded rod; 6. Nut; 7. First fixing plate; 8. Second fixing plate; 9. Engaging block; 10. Engaging groove; 11. Second threaded rod; 12. First threaded hole; 13. Pull ring; 14. Pull rod; 15. Limit block; 16. Limit groove; 17. Movable box; 18. Spring; 19. Movable plate; 20. Second threaded hole; 21. Side groove; 22. Through hole; 23. Through groove; 24. Fixing rod. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] Reference Figure 1 , Figure 2 and Figure 4 The utility model provides an embodiment: a concrete pipe pile for construction, comprising a lower pipe pile 2, a lower connecting piece 4 is fixedly connected to the top of the lower pipe pile 2, a first threaded rod 5 is fixedly connected to the top of the lower pipe pile 2, an upper connecting piece 3 is arranged outside the lower connecting piece 4, the upper connecting piece 3 is fixedly connected to the bottom of the upper pipe pile 1, a first threaded hole 12 is opened at the bottom of the upper pipe pile 1, the first threaded rod 5 is threadedly connected to the inside of the first threaded hole 12, a side groove 21 is opened outside the upper connecting piece 3, and the first threaded rod 5 is threadedly connected to the inside of the first threaded hole 12. The outside is threadedly connected with a nut 6, the inside of the upper connecting member 3 is provided with a through hole 22, the outside of the lower connecting member 4 is provided with a through groove 23, and the outside of the upper connecting member 3 is provided with a fixing component, the fixing component includes a first fixing plate 7, the first fixing plate 7 is arranged on the outside of the upper connecting member 3, both sides of the bottom of the first fixing plate 7 are fixedly connected with a clamping block 9, the bottom of the first fixing plate 7 is provided with a second fixing plate 8, both sides of the top of the second fixing plate 8 are provided with a clamping groove 10, and the clamping blocks 9 are arranged inside the clamping groove 10.
[0024] Align and insert the upper connecting piece 3 on the upper pipe pile 1 with the lower connecting piece 4 on the lower pipe pile 2, and then align the first threaded rod 5 on the lower pipe pile 2 with the first threaded hole 12 set inside the lower pipe pile 2. When the first threaded rod 5 reaches the inside of the side groove 21, tighten the nut 6 on the first threaded rod 5 to fix the two pipe piles. The through hole 22 and the through groove 23 are used to fix the fixing rod 24. The first fixing plate 7 and the second fixing plate 8 are locked and fixed by the snap block 9 and the snap groove 10. The two fixing plates are used to reinforce the connection between the pipe piles to make them more secure when docking.
[0025] Reference Figure 2-4 A second threaded hole 20 is provided inside the locking block 9, a second threaded hole 20 is provided on both sides of the second fixed plate 8, the second threaded hole 20 is threadedly connected to the second threaded rod 11, a limiting groove 16 is provided inside the locking block 9, and the limiting block 15 is slidably connected inside the limiting groove 16. The limiting blocks 15 are fixedly connected to the inner side of the movable plate 19, and the movable plate 19 is slidably connected to the inside of the movable box 17. The movable box 17 is fixedly connected to the inside of both sides of the second fixed plate 8, and the outer side of the movable plate 19 is fixedly connected to the pull rod 14, and the end of the pull rod 14 away from the pull rod is fixedly connected to the pull ring 13.
[0026] The second threaded rod 11 is threadedly connected to the inside of the second threaded hole 20, so that the two fixed blocks are locked. By pulling the pull ring 13, the pull rod 14 drives the movable plate 19 to move, and the movable plate 19 compresses the spring 18. The movable plate 19 drives the limit block 15 to move, so that the locking block 9 can completely enter the inside of the locking groove 10. The pull ring 13 is released, and the movable plate 19 is reset by the pressure of the spring 18, so that the limit block 15 enters the limit groove 16, thereby achieving locking and fixation.
[0027] Reference Figure 2-4 A spring 18 is provided on the outside of the pull rod 14, and the ends of the springs 18 that are close to each other are fixedly connected to the outside of the movable plate 19, and the ends of the springs 18 that are far away are fixedly connected to the inside of the movable box 17. A fixing rod 24 is fixedly connected to the inside of the first fixed plate 7, and a fixing rod 24 is fixedly connected to the inside of the second fixed plate 8. The ends of the fixing rods 24 that are close to each other are arranged inside the through groove 23, and a fixing rod 24 is arranged inside the through hole 22.
[0028] The pull rod 14 is driven, and the pull rod 14 drives the movable plate 19 to compress the spring 18. The fixing rod 24 passes through the through hole 22 on the upper connecting member 3 and reaches the inside of the through groove 23 on the lower connecting member 4, thereby realizing the first step of engaging the two fixing blocks.
[0029] Working principle: When using the device, the upper connecting piece 3 on the upper pipe pile 1 is plugged into the lower connecting piece 4 on the lower pipe pile 2, and the first threaded rod 5 on the lower pipe pile 2 is aligned with the first threaded hole 12 opened on the upper pipe pile 1. When the first threaded rod 5 reaches the inside of the side groove 21, it is locked with the nut 6, so as to achieve a simple docking of the two pipe piles, and then the first fixing plate 7 is engaged with the second fixing plate 8, which is engaged at the connection between the upper pipe pile 1 and the lower pipe pile 2, and the fixing rods 24 on the inner sides of the two fixing plates are aligned with the upper connecting piece 3. The through hole 22 is opened so that it reaches the inside of the through groove 23 opened on the lower connecting member 4, that is, the fixation is completed, and then the two fixing blocks are fixed by the limit block 15, the locking block 9 at the bottom of the first fixing plate 7 is locked into the locking groove 10 inside the second fixing plate 8, the pull ring 13 is released, and the limit block 15 is locked into the inside of the limit groove 16 through the pressure of the spring 18, and then the two fixing plates are locked and fixed by the second threaded rod 11, so as to ensure the firmness and overall strength of the pipe pile when docking, which is beneficial to prolonging the overall service life.
[0030] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A concrete pipe pile for construction, comprising a lower pipe pile (2), characterized in that: The top of the lower pipe pile (2) is fixedly connected to a lower connecting piece (4), and the top of each of the lower pipe piles (2) is fixedly connected to a first threaded rod (5). An upper connecting piece (3) is arranged outside the lower connecting piece (4), and the upper connecting piece (3) is fixedly connected to the bottom of the upper pipe pile (1). The bottom of each of the upper pipe piles (1) is provided with a first threaded hole (12), and the first threaded rod (5) is threadedly connected to the inside of the first threaded hole (12). A side groove (21) is arranged outside the upper connecting piece (3), and a nut (6) is threadedly connected to the outside of the first threaded rod (5). A through hole (22) is arranged inside the upper connecting piece (3), and a through groove (23) is arranged outside the lower connecting piece (4). A fixing component is arranged outside the upper connecting piece (3).
2. A construction concrete pipe pile according to claim 1, characterized in that: The fixing assembly comprises a first fixing plate (7), the first fixing plate (7) being arranged outside the upper connecting member (3), the bottom two sides of the first fixing plate (7) being fixedly connected with snap-fit blocks (9), the bottom of the first fixing plate (7) being arranged with a second fixing plate (8), the top two sides of the second fixing plate (8) being provided with snap-fit grooves (10), and the snap-fit blocks (9) being arranged inside the snap-fit grooves (10).
3. A construction concrete pipe pile according to claim 2, characterized in that: The locking block (9) is provided with a second threaded hole (20) inside, the second fixing plate (8) is provided with a second threaded hole (20) on both sides, and the inside of the second threaded hole (20) is threadedly connected with a second threaded rod (11).
4. A construction concrete pipe pile according to claim 2, characterized in that: The locking blocks (9) are provided with limiting grooves (16) inside, the limiting grooves (16) are slidably connected to limiting blocks (15) inside, and the limiting blocks (15) are fixedly connected to the inner side of the movable plate (19).
5. A concrete pipe pile for construction according to claim 4, characterized in that: The movable plates (19) are slidably connected to the inside of the movable box (17), the movable box (17) is fixedly connected to the inside of both sides of the second fixed plate (8), the outer sides of the movable plates (19) are fixedly connected to the pull rods (14), and the ends of the pull rods (14) that are away from each other are fixedly connected to the pull rings (13).
6. A concrete pipe pile for construction according to claim 5, characterized in that: A spring (18) is arranged outside the pull rod (14), and the ends of the springs (18) that are close to each other are fixedly connected to the outside of the movable plate (19), and the ends of the springs (18) that are far away from each other are fixedly connected to the inside of the movable box (17).
7. A construction concrete pipe pile according to claim 2, characterized in that: The inner side of each of the first fixing plates (7) is fixedly connected to a fixing rod (24), and the inner side of each of the second fixing plates (8) is fixedly connected to a fixing rod (24).
8. A concrete pipe pile for construction according to claim 7, characterized in that: The adjacent ends of the fixing rods (24) are both arranged inside the through grooves (23), and the fixing rods (24) are both arranged inside the through holes (22).