Flexible waterproof pre-sealing device for post-cast strip
Through the use of flexible waterproof pre-enclosing device of the rear pouring belt, the impact of early construction of the landscape demonstration area on the basement roof panel is solved, and one-time soil covering and construction is realized, structural safety and waterproof performance are ensured, and construction costs and construction periods are reduced.
Patent Information
- Application Number
- CN202322857728.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-24
- Publication Date
- 2024-11-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the construction of high-rise residential buildings, when the landscape demonstration area is constructed in advance, the basement roof panel is not closed, how to ensure the safety and waterproofing quality of the rear casting strip structure, and avoid the waste of project construction costs caused by secondary excavation and repeated cleaning.
Flexible waterproof pre-enclosing device of the rear casting belt, including cover plate, base, external waterproof system and support system, and the disposable soil covering and municipal pipeline landscape greening construction is achieved by reserved for the reserved material conduit. After the structure is deformed and stabilized, it can be expanded by micro-expanding. Dense concrete pouring ensures the overall stress and waterproof performance of the structure.
The single-time soil covering of the underground structure roof panel and the municipal pipeline landscape greening have been achieved without secondary damage, reducing the project construction cost, ensuring structural safety and waterproof performance, and saving construction period.
Smart Images

Figure CN222009007U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of underground structure safety and waterproofing, and is a flexible waterproof pre-sealing device for a post-cast strip, and in particular to a flexible waterproof pre-sealing device for a post-cast strip connected to an underground structure, in which soil is first covered and backfilled above the post-cast strip without secondary excavation. Background Art
[0002] With the rapid development of urban construction, there are more and more high-rise residential communities. The underground of the entire community is often designed as an integrated basement with a settlement post-cast strip around the high-rise residential buildings. In order to promote the sales of real estate projects, real estate developers often cover the top slabs of the basements between buildings with soil in advance, install municipal pipelines, and carry out the construction of landscape demonstration areas before the surrounding settlement post-cast strips are closed and cast during the construction of the main structure of the high-rise residential buildings. This requires a proper solution to the problem of the impact of the early landscape construction (such as covering, pipeline laying, greening planting, etc.) on the safety and quality of the post-cast strip structure of the basement top slab that has not been closed and cast.
[0003] In order to meet the needs of permanent display of the project's landscape demonstration area in advance, the construction and opening time of the landscape demonstration area is far ahead of the pouring time of the settlement post-casting strip. How to ensure the safety of the underground structure and the pouring and waterproofing quality of the post-casting strip when the landscape is constructed first is an industry technical problem. Utility Model Content
[0004] The technical problem to be solved by the utility model is to overcome the two significant shortcomings of the traditional post-cast strip top plate: first, it is impossible to backfill the top soil in advance, and construction can only be carried out after the structural settlement is stable and the deformation difference on both sides of the post-cast strip is stable, which causes difficulties in site operations and loss of project construction period; second, the post-cast strip needs to be closed with a formwork in advance, and secondary excavation or repeated cleaning is required when pouring concrete, which consumes labor and materials and causes waste of project construction costs.
[0005] The two outstanding advantages of the utility model are: first, the flexible waterproof pre-closure of the post-cast strip (reserved feed conduit) can realize the one-time covering of the top plate, and the one-time construction of municipal pipelines and landscaping without secondary damage, which significantly improves the display effect of the project demonstration area and reduces the construction cost; second, after the structural deformation difference on both sides of the post-cast strip is stable, the micro-expansive self-compacting concrete is poured through the reserved feed conduit, which can ensure the overall stress of the post-cast strip structure, and the structural safety and waterproofing are guaranteed.
[0006] In order to achieve the above-mentioned purpose, the technical solution adopted by the utility model is: a flexible waterproof pre-sealing device for post-cast strips, which is composed of a cover plate, a base, an external waterproof system, a support system and post-cast concrete. The cover plate is a reinforced concrete component with a steel mesh inside, and part of the cover plate is reserved for concrete feed conduits. The cover plate is embedded in the reserved grooves of the base on both sides of the post-cast strip, and the base is fixed to the structural top plates on both sides, which can fix the cover plate to prevent slippage and have the function of structural self-waterproofing. The waterproof system is wrapped around the cover plate (including the conduit), the base and the outer side of the structural top plate to ensure the overall waterproof function of the structural system. The support system is erected under the post-cast strip to ensure the overall structural force stability during backfilling and pouring of concrete. After the structural deformation on both sides of the post-cast strip is relatively stable, the micro-expansion self-compacting concrete is poured through the feed conduits reserved in the cover plate, and the support system is removed after the concrete strength is formed.
[0007] Furthermore, the cover plate is a reinforced concrete component prefabricated on site or in a factory, and wooden blocks can be used as a mold on site, and the mold can be reused.
[0008] Furthermore, the cover plate reinforcement is cut according to the size of the mould, and the reinforcement is preferably arranged in double layers and in two directions and tied and fixed.
[0009] Furthermore, steel hooks should be embedded after the reinforcement of the cover plate is tied to facilitate the subsequent lifting and installation of the cover plate after production is completed.
[0010] Furthermore, according to the requirements of the on-site plan layout, it is preferred to leave a feed conduit for later pouring of concrete every 1-2 cover plates. The conduit is preferably a finished steel pipe and welded to the bottom steel mesh of the cover plate. The upper steel mesh can be disconnected at the conduit position and welded around the pipe.
[0011] Furthermore, the cover slab concrete produced on site preferably uses the leftover material from the pouring of the main structure to save materials. After the concrete is poured, it is preferably subjected to moisture-maintaining curing and the concrete curing time is guaranteed.
[0012] Furthermore, in order to prevent the cover plate from shifting and failing due to extrusion and collision during backfilling of soil above the structure top plate, the cover plate is embedded in the reserved grooves of the base on both sides of the post-cast strip during installation, and the gap between the cover plate and the base is filled with flexible water-swellable waterproof material. At the same time, the soil around the discharge conduit should be manually backfilled and the pipe mouth should be protected and closed.
[0013] Furthermore, the base is a cast-in-place reinforced concrete pedestal above the structural top plates on both sides of the post-cast strip. The surface of the base in contact with the original structural top plate is roughened to enhance the bite force and prevent leakage from the joint surface of the main structure. At the same time, the post-cast strip is cleaned and the two sides are roughened. Steel bars are pre-implanted on the bottom surface of the base at a certain distance along the longitudinal direction of the post-cast strip (consistent with the position of the feeding conduit) to strengthen the connection between the base and the structural top plate to prevent lateral displacement of the base.
[0014] Furthermore, 45-degree slope chamfers are made on both sides of the base to ensure the construction quality of the waterproof system.
[0015] Furthermore, the external waterproofing system adopts double-layer waterproof membrane: the upper layer of root-penetration-resistant waterproof membrane and the lower layer of self-adhesive waterproof membrane. The wrapping range should cover the feeding duct, cover plate, base and structural top plate, and ensure the overall waterproofing quality and effect.
[0016] Furthermore, the external waterproof system should cover the feed conduit to a certain height, preferably using metal wire tying and waterproof coating to seal the edges to prevent groundwater from seeping in from the outer wall of the conduit.
[0017] Furthermore, an independent support system is set up under the post-cast zone, which is separated from the original structural support system. The independent support should ensure the overall structural stress stability during backfilling and concrete pouring.
[0018] Furthermore, after the settlement and deformation of the structures on both sides of the post-casting strip are stable, the micro-expanding self-compacting concrete is poured through the reserved feed conduit to seal the post-casting strip structure. The filling density of the concrete should be ensured. It is preferred to vibrate the concrete through the feed conduit and observe the filling state of the concrete through the uncast feed conduit.
[0019] Furthermore, according to the I-shaped, L-shaped or Z-shaped layout of the post-cast strip plane, a cover plate with a duct should be arranged at the starting point, end point and corner of the post-cast strip. At the same time, the pouring of concrete in the post-cast strip should be carried out in one direction from one side to the other to ensure that the concrete is dense and has no cavity in the post-cast strip.
[0020] Furthermore, the support system can be removed only after the concrete of the post-cast zone has been poured and cured to a strength of 100% to ensure the integrity and waterproof performance of the post-cast zone structure.
[0021] Compared with the prior art, the utility model can realize one-time backfilling of soil above the top plate of the underground structure, one-time construction of municipal pipelines and landscaping without secondary damage in the later stage through the reserved feed conduit and the pre-sealing of the flexible waterproof system in the post-cast strip, and the overall wrapping of the waterproof system ensures the waterproofness of the structure, greatly reduces the construction cost of the project, and saves the construction period of the project; at the same time, after the structural deformation difference on both sides of the post-cast strip is stabilized, self-compacting micro-expansive concrete is poured through the feed conduit reserved in the cover plate, which does not damage the constructed municipal pipelines and landscaping gardens, and can ensure the integrity and density of the concrete structure, and the structural safety is guaranteed. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The present invention will be further described below in conjunction with the accompanying drawings and specific implementation methods. Figure 1 A side cross-sectional view of a flexible waterproof pre-sealing device for connecting a post-casting belt of an underground structure provided by the utility model when a concrete feeding conduit is left on the cover plate; Figure 2It is a side cross-sectional view of the cover plate when no concrete discharge conduit is reserved; Figure 3 The plane direction and Figure 1 , Figure 2 Schematic diagram of the planar layout of two types of covers and bases; Figure 4 The figure is a process flow chart for implementing the utility model. In the figure: the device mainly comprises a cover plate 1, a base 2, an external waterproof system 3, an independent support system 4, and post-cast concrete 5, a total of five parts.
[0023] The cover plate 1 includes two types: a cover plate 11 with a material discharge duct and a cover plate 12 without a material discharge duct. Both the cover plates 11 and 12 are provided with double-layer bidirectional steel meshes 101. A concrete material discharge duct 102 is reserved in the cover plate 11, while no concrete material discharge duct 102 is reserved in the cover plate 12.
[0024] The base 2 is arranged on the top surface of the structural top plate 6 on both sides of the post-cast strip, and a reserved groove 201 is provided at the covering position of the cover plate 1 to embed the cover plate 1. The gap between the base 2 and the cover plate 1 is filled with a flexible water-swellable waterproof material 202. The connecting surface between the bottom surface of the base 2 and the top surface of the original structural plate 6 is pre-chiselled into a rough surface 203. Anchor steel bars 204 are pre-implanted on the top surface of the original structural top plate 6 before pouring the base 2. Rigid water stop plates 7 are reserved for the original structural top plate 6 before pouring concrete on both sides of the post-cast strip.
[0025] The external waterproof system 3 includes two layers of flexible waterproof membranes and a protective layer: a lower layer of self-adhesive waterproof membrane 302, an upper layer of root-penetration-resistant waterproof membrane 301 and a fine stone concrete protective layer 304. The coverage range of the root-penetration-resistant waterproof membrane 301 includes the upper surface of the conduit cover 1 not provided and the root of the conduit 102 with the conduit cover 11 at a certain height, the upper surface of the base 2, and the entire upper surface of the original structural top plate 6 on both sides of the base 2. The coverage range of the self-adhesive waterproof membrane 302 includes the upper surface of the conduit cover 1 not provided and the root of the conduit 102 with the conduit cover 11 at a certain height, the upper surface of the base 2, and the upper surface of the original structural top plate 6 on both sides of the base 2 at a certain width. First, the self-adhesive waterproof membrane 302 is bonded to the outer surface of the structure, and then the root-penetration-resistant waterproof membrane 301 is wrapped around the outside of the self-adhesive waterproof membrane 302. After the waterproof membranes 301 and 302 at the conduit 102 are turned up, the metal hoop 303 is used to tighten around the conduit 102. After the construction of the two layers of flexible waterproof membrane is completed, the fine stone concrete protective layer 304 is laid.
[0026] The independent support system 4 is erected below the post-casting zone, and includes load-bearing components such as a cross bar 401 , a vertical bar 402 , and a formwork 403 .
[0027] The post-cast zone micro-expansion self-compacting concrete 5 is cast through the reserved conduit 102 of the cover plate 1, and the concrete filling state is observed through the uncast conduit port 102. After the concrete casting is completed, the excess conduit is cut off to below the fill surface, and the upper port of the uncut conduit 102 is welded with the cover plate 103. After the strength of the post-cast zone micro-expansion self-compacting concrete 5 reaches the design requirements, the support system 4 is removed. DETAILED DESCRIPTION
[0028] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below with reference to specific illustrations.
[0029] It should be noted that the structures, proportions, sizes, etc. illustrated in the drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions for the implementation of the utility model, so they have no substantial technical significance. Any modification of the structure, change of the proportion relationship or adjustment of the size, without affecting the effects and purposes that can be achieved by the utility model, should still fall within the scope of the technical content disclosed by the utility model. At the same time, the terms such as "upper", "lower", "left", "right", "middle" and "one" quoted in this specification are only for the convenience of description, and are not used to limit the scope of the implementation of the utility model. The change or adjustment of their relative relationship should also be regarded as the scope of the implementation of the utility model without substantial change of the technical content.
[0030] The utility model is described in detail below with reference to the accompanying drawings: Example
[0031] See also Figure 1 and Figure 2 The utility model provides a post-cast strip flexible waterproof pre-sealing device, which is composed of a cover plate 1, a base 1, an external waterproof system 3, a support system 4 and post-cast concrete 5.
[0032] There are two types of cover plates 1: a cover plate 11 with a concrete discharge conduit and a cover plate 12 without a concrete discharge conduit. The cover plates 11 and 12 are preferably arranged at intervals along the longitudinal direction of the post-cast strip.
[0033] Please also read Figure 3 A material discharge duct cover plate 11 is preferably arranged at the starting point, end point and corner of the post-casting zone to facilitate observation of the concrete flow and filling state during concrete pouring.
[0034] The base 2 is arranged on the top surface of the structural top plate 6 on both sides of the post-cast strip, and the base 2 is provided with a reserved groove 201 for embedding the cover plate 1. The gap between the base 2 and the cover plate 1 is filled with a flexible water-swellable waterproof material 202. The connecting surface between the bottom surface of the base 2 and the top surface of the original structural plate 6 is pre-chiselled into a rough surface 203. The top surface of the original structural top plate 6 is pre-implanted with anchor steel bars 204 before pouring the base 2. Rigid water stop plates 7 are reserved for the original structural top plate 6 before pouring concrete on both sides of the post-cast strip.
[0035] Please also read Figure 1 and Figure 2 , the external waterproof system is respectively from bottom to top: the lower self-adhesive waterproof membrane 302, the upper root-piercing resistant waterproof membrane 301, and the fine stone concrete protective layer 304. The lower self-adhesive waterproof membrane 302 is laid first, and then the lower self-adhesive waterproof membrane 302 is laid. The material discharge conduit cover 11 is set. After the two layers of waterproof membrane are turned up, it is preferred to use a metal hoop 303 to tighten around the conduit 102. The material discharge conduit cover 12 is not set. The two layers of waterproof materials are superimposed and laid. After the upper and lower layers of waterproof membranes are laid, the fine stone concrete protective layer 304 is laid thereon. After the strength of the fine stone concrete protective layer 304 is formed, the soil backfilling, municipal pipeline laying, landscape and garden construction can be implemented. At the same time, it should be noted that the soil around the material discharge conduit should be manually backfilled and the pipe mouth should be protected and closed.
[0036] Please also read Figure 1 and Figure 2 The independent support system 4 is set up below the post-casting strip and is separated from the original structural support system. The independent support system 4 is set up before the cover plate is installed to ensure the overall structural force stability during backfilling and pouring of concrete 5. After the structural settlement and deformation on both sides of the post-casting strip are stable, the micro-expansion self-compacting concrete 5 is poured through the reserved feed pipe 102 to close the post-casting strip structure. The support system 4 can be removed after the post-casting strip concrete 5 is poured and cured to a strength of 100%. Example
[0037] See also Figure 4 , the construction process flow of the settlement post-casting belt of the utility model is further explained.
[0038] Before installing the flexible waterproof pre-sealing device for the post-cast belt, prepare the relevant materials, site, and transportation channel. Figure 1 and Figure 2 The cover plate 1 of this embodiment is prefabricated on site. The cover plate includes two types: a cover plate 11 with a concrete feeding conduit and a cover plate 12 without a concrete feeding conduit. The cover plate mold adopts a wooden mold.
[0039] Next, a reusable wooden formwork is pre-made according to the size of the cover plate, and then the cover plate reinforcement 101 is tied and the hook is pre-buried. After the reinforcement skeleton 101 of the cover plate 12 is made, the steel concrete feeding conduit 102 is installed. After the cover plate reinforcement skeleton 101 and the conduit 102 are all installed, the cover plate concrete is poured and cured. After the cover plate concrete is cured for 14 days, the cover plate 1 can be installed.
[0040] At the same time, the independent support system 4 on the lower side of the post-casting strip is erected, including the installation and locking of the load-bearing components such as the crossbar 401, the vertical pole 402, and the formwork 403. The two sides of the post-casting strip and the joint surface between the top surface of the original structure top plate 6 and the base 2 are pre-roughened, and at the same time, the top surface of the original structure top plate 6 is pre-implanted with anchor steel bars 204 under the base on both sides of the concrete feed pipe cover plate 11. After the base steel frame is installed and the formwork is installed, the base 2 concrete can be poured.
[0041] Next, after the concrete strength of the cover plate 1 and the base 2 reaches the design strength, the cover plate 1 can be hoisted and installed, and the gap between the cover plate 1 and the base 2 is filled with a flexible water-swellable waterproof material 202.
[0042] Next, the waterproof system is constructed by first laying the lower self-adhesive waterproof membrane 302, and then laying the upper root-resistant and puncture-resistant waterproof membrane 301. After the two layers of flexible waterproof membrane are turned up at the root of the concrete feed conduit 102, it is preferred to use a metal hoop 303 to tighten around the conduit 102. After the construction of the two layers of flexible waterproof membrane is completed, a fine stone concrete protective layer 304 is laid.
[0043] Next, after the external waterproof system is completed, the soil above the structure top plate 6 will be backfilled, municipal pipelines will be laid, and landscape gardening will be constructed. Note that backfilling around the downpipe 102 should be done manually to avoid large-scale equipment from colliding with the downpipe. At the same time, the downpipe 102 should be sealed to prevent garbage and debris from falling into the cavity of the post-casting zone at the pipe mouth.
[0044] Next, the micro-expanding self-compacting concrete 5 is poured into the post-casting zone through the reserved conduit 102 of the cover plate 1, and the concrete filling state is observed through the non-casting conduit port 102. After the concrete pouring is completed, the excess conduit is cut off to below the fill surface, and the upper port of the uncut conduit 102 is welded with the cover plate 103.
[0045] Next, the support system 4 is removed after the strength of the post-cast zone micro-expansion self-compacting concrete 5 reaches the design requirements.
[0046] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. The utility model may have various changes and improvements without departing from the spirit and scope of the utility model. These changes and improvements fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.
Claims
1. Post-cast belt flexible waterproof pre-sealing device, which consists of a cover plate, a base, an external waterproof system, a support system and post-cast concrete, and is characterized by: The cover plate is installed in the embedded groove reserved in the base, and the gap between the two is filled with flexible water-swelling waterproof material. Some cover plates are equipped with concrete pouring feed ducts; the base is symmetrically arranged on both sides of the post-cast strip and is rigidly connected to the top surface of the original structure top plate; the waterproof system has a certain deformation adaptability and overall bonding waterproof function; the support system is independently erected under the post-cast strip to ensure the overall stability of the device; the post-cast concrete is self-compacting micro-expanding concrete, and the support system will be removed after the concrete strength meets the standard.
2. The flexible waterproof pre-sealing device for post-cast strip according to claim 1 is characterized in that: The cover plate is a reinforced concrete component, which is prefabricated on site or in a factory. A steel mesh is installed inside the cover plate, and the amount of reinforcement is determined by calculating the bending bearing capacity of the cover plate.
3. The flexible waterproof pre-sealing device for post-cast strip according to claim 1 is characterized in that: After the cover plate reinforcement is tied, steel hooks are embedded to facilitate the subsequent lifting and installation of the cover plate.
4. The flexible waterproof pre-sealing device for post-cast strip according to claim 1 is characterized in that: According to the plane direction of the post-cast strip and the requirements of the cover plate layout, a feed conduit for later pouring of concrete is retained inside the cover plate every 1-2 cover plates. The conduit is preferably made of finished steel pipe and welded to the bottom steel mesh of the cover plate. The upper steel mesh can be disconnected at the conduit position and welded around the pipe.
5. The flexible waterproof pre-sealing device for post-cast strip according to claim 1 is characterized in that: The cover panels prefabricated on site are made using wooden blocks as moulds, and the moulds can be reused.
6. The flexible waterproof pre-sealing device for post-cast strip according to claim 1 is characterized in that: The cover slab concrete produced on site is made of the leftover materials from the pouring of the main structure. After the concrete is poured, it is subjected to moisture-maintaining maintenance to ensure that the concrete can be hoisted and installed after the curing time is up.
7. The flexible waterproof pre-sealing device for post-cast strip according to claim 1 is characterized in that: Before installing the cover, clean up the garbage in the post-cast strip in advance and set up the support system under the post-cast strip. When installing the cover, keep the cavity of the post-cast strip clean and free of debris.
8. The flexible waterproof pre-sealing device for post-cast strip according to claim 1 is characterized in that: The cover plate is installed and embedded in the reserved grooves of the base on both sides of the post-cast strip, and the gap between the cover plate and the base is filled with flexible water-swellable waterproof material.
9. The flexible waterproof pre-sealing device for post-cast strip according to claim 1 is characterized in that: The contact area between the base and the original structure top plate is roughened, and at the same time, steel bars are pre-implanted at a certain distance along the longitudinal direction of the post-cast strip on the bottom surface of the base to strengthen the base embedding, corresponding to the position of the feed conduit.
10. The flexible waterproof pre-sealing device for post-cast strip according to claim 1 is characterized in that: The external waterproof system includes a lower layer of self-adhesive waterproof membrane, an upper layer of root-penetration-resistant waterproof membrane and a top layer of fine stone concrete protective layer, which are laid and sealed layer by layer from bottom to top.
11. The flexible waterproof pre-sealing device for post-cast strip according to claim 1 is characterized in that: After the external waterproofing system is closed, the soil is backfilled, the municipal pipelines are buried, and the garden landscape is constructed. The soil around the material discharge conduit is backfilled manually and the pipe openings are protected and closed.
12. The flexible waterproof pre-sealing device for post-cast strip according to claim 1 is characterized in that: The support system is independently set up and erected below the post-casting strip. It is erected before the cover plate is installed and is separated from the original structure support system.
13. The flexible waterproof pre-sealing device for post-cast strip according to claim 1 is characterized in that: After the settlement and deformation of the structures on both sides of the post-casting strip are stable, slightly expanding self-compacting concrete is poured through the discharge duct reserved in the cover plate to seal the cavity of the post-casting strip.
14. The flexible waterproof pre-sealing device for post-cast strip according to claim 1 is characterized in that: After the concrete of the post-cast zone has reached the designed strength, the support system is removed and the post-cast zone closing device can function independently after settlement.