Tower crane assembly type aerial corridor structure

By designing the assembled aerial corridor structure of the tower crane, the frame passage and spring connector are used to fix it between the tower crane and the building floor, the problems of low safety and high hidden dangers of the tower crane air corridor are solved, and higher safety is achieved and flexible use simplifies the construction process.

CN222009536UActive Publication Date: 2024-11-15SHANXI CONSTR ENG GROUP CORP
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323454710.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-19
Publication Date
2024-11-15
Estimated Expiration
2033-12-19

AI Technical Summary

Technical Problem

The tower crane aerial corridor has problems such as low safety factor, high hidden dangers, and inability to be used in high-rise buildings. Especially when the tower body is affected by wind load, it leads to unstable ends of the air corridor.

Method used

Design a tower crane assembled air corridor structure, including frame passage, tower crane connection plate, embedded ring, U-shaped connection ring and spring connector. Combined with password protection door, the tower cranes inserted at both ends of the frame passage and the building floor depth is not Less than 500mm, fixed by spring-type connectors, forming a stable rectangular channel structure to enhance safety.

Benefits of technology

Improve the safety of the tower crane aerial corridor, reduce safety hazards, simplify the construction and dismantling process, reduce the preparation time for get off work of the tower, improve work efficiency, and support assembly and adjustment according to the distance between the tower body and the building. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222009536U_ABST
    Figure CN222009536U_ABST
Patent Text Reader

Abstract

The utility model relates to a tower crane assembly type air corridor structure, which belongs to the technical field of building construction, and particularly comprises a frame channel for connecting a tower crane and building floors, a corridor connecting plate is mounted at the bottom in the frame channel, and a tower crane connecting plate is arranged at the bottom of the front end of the frame channel. The tower crane connecting plate is fixed to a tower crane through bolts, the tail end of the frame channel extends into a building floor, a pre-embedded ring is arranged in the building floor in a pre-embedded mode, a U-shaped connecting ring is further fixed to the tail end of the frame channel, and the pre-embedded ring and the U-shaped connecting ring are connected through a spring type connector. By means of the tower crane aerial corridor, the problems that in the prior art, an aerial corridor of a tower crane is low in safety coefficient, large in hidden danger and incapable of being used in a turnover mode can be well solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a tower crane assembled aerial corridor structure, belonging to the technical field of building construction. Background Art

[0002] At present, with the rapid development of urbanization, land resources are becoming increasingly scarce. In order to improve the utilization rate of land, high-rise buildings have become a trend. During the construction process, tower cranes have become the main means of transportation for vertical transportation machinery for the proposed building. In order to ensure the safe use of tower cranes, tower cranes are generally installed at a position relatively close to the main body of the building. At the same time, due to the different designs of the main structure, the distance between the tower body and the proposed building is not exactly the same. After the tower crane is installed, the tower operator generally climbs from the escalator inside the tower crane to the operating room. As the height of the building gradually increases, the height of the tower crane also increases. When the height of the tower crane is too high, the operator will build an aerial passage between the high-rise building and the tower crane to facilitate the operator to climb to the tower crane operating room safely and quickly.

[0003] In the actual construction process, temporary sky corridors are often built with steel frames for the crane operator to climb up and down to the crane operation room. Guardrails are installed on both sides of the steel frame. One end of the steel frame extends into the tower body and is fixed to the tower body, and the other end extends to the floor. As the height of the tower crane increases, the tower body will sway irregularly and slightly due to the influence of wind load, which will cause the end of the sky corridor to be unstable and cause major safety hazards. In view of the above situation, a tower crane assembled sky corridor structure is urgently needed to solve this problem. Utility Model Content

[0004] In order to solve the technical problems existing in the prior art, the utility model provides a tower crane assembled aerial corridor structure, which can well solve the problems of low safety factor, great hidden dangers and inability to be circulated in the prior art of the tower crane aerial corridor.

[0005] To achieve the above-mentioned purpose, the technical solution adopted by the utility model is a tower crane assembled aerial corridor structure, including a frame channel for connecting the tower crane and the building floors, an aisle connecting plate is installed at the bottom of the frame channel, a tower crane connecting plate is arranged at the bottom of the front end of the frame channel, the tower crane connecting plate is fixed to the tower crane by bolts, the tail end of the frame channel extends into the building floor, and an embedded ring is pre-embedded in the building floor, a U-shaped connecting ring is also fixed to the tail end of the frame channel, the embedded ring and the U-shaped connecting ring are connected by a spring connector, and a password protection door is also installed at the tail end of the frame channel.

[0006] Preferably, both ends of the frame channel are inserted into the tower crane and the building floor to a depth of not less than 500 mm.

[0007] Preferably, the frame channel includes a first frame and a second frame, the two first frames are arranged up and down, the second frames are installed on both sides of the two first frames respectively, the first frame and the second frame form a rectangular channel, the aisle connecting plate is installed on the bottom first frame, and the inner side of the second frame and the inner side of the top first frame are both installed with mesh protective plates.

[0008] Preferably, the first frame includes two first cross beams and a plurality of first cross rods and a first diagonal rod arranged between the first cross beams, and the two ends of the first cross rods and the first diagonal rods are respectively fixedly connected to the two first cross beams; the second frame includes two second cross beams and a connecting vertical rod arranged between the second cross beams, and the two ends of the connecting vertical rod are respectively fixed to the second cross beams.

[0009] Preferably, the first crossbeam and the second crossbeam are both formed by splicing a plurality of crossbeam sections.

[0010] Compared with the prior art, the utility model has the following technical effects: the material of the utility model is easy to obtain, the processing and manufacturing is simple, the construction is standardized, and the installation and disassembly are simple. At the same time, it can be assembled and adjusted according to the different distances between the tower body and the building for turnover and recycling. This device increases the safety of the tower crane aerial corridor, effectively reduces safety hazards, reduces the preparation time for the tower operator's commuting operations, and improves work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a structural schematic diagram of the utility model.

[0012] Figure 2 It is a top view of the utility model. DETAILED DESCRIPTION

[0013] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0014] like Figure 1 , Figure 2 As shown, a tower crane assembled aerial corridor structure includes a frame channel 1 for connecting the tower crane and the building floor, an aisle connecting plate 2 is installed at the bottom of the frame channel 1, a tower crane connecting plate 3 is arranged at the bottom of the front end of the frame channel 1, the tower crane connecting plate 3 is fixed to the tower crane by bolts, the tail end of the frame channel 1 extends into the building floor, and an embedded ring 4 is pre-embedded in the building floor, a U-shaped connecting ring 5 is also fixed to the tail end of the frame channel 1, the embedded ring 4 and the U-shaped connecting ring 5 are connected by a spring connector 6, and a password protection door is also installed at the tail end of the frame channel 1.

[0015] The two ends of the frame channel 1 in the utility model are inserted into the tower crane and the building floor to a depth of not less than 500mm. The frame channel 1 includes a first frame 8 and a second frame 9, the two first frames 8 are arranged up and down, and the second frames 9 are respectively installed on both sides of the two first frames 8. The first frame 8 and the second frame 9 form a rectangular channel, and the aisle connecting plate 2 is installed on the first frame 8 at the bottom. The inner side of the second frame 9 and the inner side of the first frame 8 at the top are both installed with a mesh type protective plate 10. The first frame 8 includes two first beams 11 and a plurality of first crossbars 12 and first diagonal rods 13 arranged between the first beams 11. The two ends of the first crossbar 12 and the first diagonal rod 13 are respectively fixedly connected to the two first beams 11; the second frame 9 includes two second beams 7 and a connecting rod 14 arranged between the second beams 7. The two ends of the connecting rod 14 are respectively fixed on the second beam 7. The first beam 11 and the second beam 7 are both spliced ​​by multiple sections of beams.

[0016] In the utility model, the frame channel 1 is arranged between the tower crane and the floor of the building. One end of the frame channel 1 is connected and fixed to the tower crane, and the other end is connected to the floor of the building through a spring-type connector 6 to prevent the aerial corridor from shifting too much when the tower body shakes. A password protection door is installed at one end of the frame channel 1 connected to the floor of the building, and the password protection door can prevent unauthorized personnel from entering the aerial corridor. The frame channel 1 adopts a rectangular channel structure formed by welding two first frames 8 and two second frames 9. The first frame 8 and the second frame 9 are both welded by beams. An aisle connection plate is installed on the first frame 8 at the bottom, and a mesh protection plate is installed on the inner side of the second frame 9 to close and protect the channel.

[0017] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principle of the present invention shall be included in the scope of the present invention.

Claims

1. A tower crane assembled sky corridor structure, characterized by: It comprises a frame channel for connecting a tower crane and a building floor, wherein an aisle connecting plate is installed at the bottom of the frame channel, a tower crane connecting plate is arranged at the bottom of the front end of the frame channel, the tower crane connecting plate is fixed to the tower crane by bolts, the tail end of the frame channel extends into the building floor, and an embedded ring is pre-embedded in the building floor, a U-shaped connecting ring is also fixed at the tail end of the frame channel, the embedded ring and the U-shaped connecting ring are connected by a spring-type connector, and a password protection door is also installed at the tail end of the frame channel.

2. The tower crane assembled sky corridor structure according to claim 1 is characterized by: The depth of both ends of the frame channel inserted into the tower crane and the building floor is not less than 500mm.

3. The tower crane assembled sky corridor structure according to claim 1 is characterized by: The frame channel includes a first frame and a second frame, the two first frames are arranged up and down, and the second frames are respectively installed on both sides of the two first frames. The first frame and the second frame form a rectangular channel, and the aisle connecting plate is installed on the bottom first frame, and the inner side of the second frame and the inner side of the top first frame are both installed with mesh protective plates.

4. The tower crane assembled sky corridor structure according to claim 3 is characterized by: The first frame includes two first cross beams and a plurality of first cross rods and a first diagonal rod arranged between the first cross beams, and the two ends of the first cross rods and the first diagonal rods are respectively fixedly connected to the two first cross beams; the second frame includes two second cross beams and a connecting vertical rod arranged between the second cross beams, and the two ends of the connecting vertical rod are respectively fixed to the second cross beams.

5. The tower crane assembled sky corridor structure according to claim 4 is characterized in that: The first crossbeam and the second crossbeam are both formed by splicing a plurality of crossbeam sections.

Citation Information

Cited By

  • Tower crane corridor

    CN223575998U