Automatic ash removal device for boiler and boiler
By designing an automatic ash cleaning device in the boiler and using the timed start of compressed air supply and purge, the problem of blockage of the boiler negative pressure sampling device is solved, automatic ash cleaning and real-time monitoring are achieved, and the safety and production of the boiler are improved. efficiency.
Patent Information
- Application Number
- CN202420293116.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-18
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-02-18
AI Technical Summary
The negative pressure sampling devices on both sides of the original furnace of the existing boiler are easily blocked, affecting the reliability of the pressure monitoring and protection device, and require frequent manual cleaning, endangering the safety of the boiler.
Design an automatic ash cleaning device for boilers, including a compressed air supply mechanism and a purifier, which is connected through the main pipeline. The purifier is equipped with a sampling tube and multiple alarm signal sampling holes in the furnace, and is started and closed regularly for automatic cleaning. Ash, avoid blockage, and communicate with the furnace safety monitoring system to ensure that signal transmission is not disturbed.
It realizes automatic dust cleaning of the boiler negative pressure measurement points, reduces manual workload, maintains the stability of the furnace safety monitoring signal, and promptly issues alarm signals, improving the safe operation and production efficiency of the boiler.
Smart Images

Figure CN222011948U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of boilers, in particular to an automatic ash cleaning device for a boiler and a boiler. Background Art
[0002] The existing negative pressure sampling devices on both sides of the original furnace of the boiler have design defects and are often blocked, which affects the reliability of monitoring and the correct action of the high and low furnace pressure protection and the automatic input rate of the furnace pressure, posing a serious threat to the safety of the boiler. At the same time, manual cleaning is required frequently, and the furnace negative pressure automatic and protection are exited at the same time, which has an adverse impact on the safe operation of the boiler.
[0003] The above problems need to be solved urgently. Utility Model Content
[0004] The utility model aims to provide an automatic ash cleaning device for a boiler and a boiler.
[0005] In order to solve the above technical problems, the utility model provides an automatic ash cleaning device for a boiler, comprising:
[0006] Compressed air supply mechanism and purge device;
[0007] The compressed air supply mechanism is connected to the purge device through a main pipe;
[0008] The sampling tube of the purge device is arranged in the furnace of the boiler;
[0009] The sample outlet of the purge device is provided with at least one alarm signal sampling hole;
[0010] The alarm signal sampling hole is connected to an external furnace safety monitoring system.
[0011] Furthermore, there are three alarm signal sampling holes.
[0012] Furthermore, two of the three alarm signal sampling holes are high-pressure alarm sampling holes, and the remaining one is a low-pressure early warning sampling hole.
[0013] Furthermore, the purge device is also provided with a pressure signal sampling hole;
[0014] The pressure signal sampling hole is communicated with an external furnace safety monitoring system.
[0015] Furthermore, the number of the blowers is N, where N is greater than or equal to 1.
[0016] Further, when N is greater than or equal to 2, one of the purge devices is provided with a blowing signal sampling hole;
[0017] The blowing signal is connected to an external analog quantity control system through a hole.
[0018] Furthermore, when N is greater than or equal to 2, the plurality of purge devices are configured to work alternately.
[0019] Furthermore, the sample outlet of the purge device is also provided with a pressure delivery pipe;
[0020] The pressure delivery pipe is communicated with the negative pressure side of the external cooling air blower pressure switch.
[0021] Furthermore, the compressed air supply mechanism includes: an air source, a switch valve and a compressed air filter;
[0022] The air source is sequentially connected to the purge device through a switch valve and a compressed air filter.
[0023] The utility model also provides a boiler, comprising: a boiler body, a furnace safety monitoring system, an analog quantity control system, a cooling fan and the automatic ash cleaning device for the boiler as described above;
[0024] The automatic ash cleaning device for the boiler is arranged on the boiler body.
[0025] The beneficial effect of the utility model is that the utility model provides an automatic ash cleaning device for a boiler and a boiler, wherein the automatic ash cleaning device for a boiler comprises: a compressed air supply mechanism and a purge; the compressed air supply mechanism is connected to the purge through a main pipeline; the sampling tube of the purge is arranged in the furnace of the boiler; the sample outlet of the purge is provided with at least one alarm signal sampling hole; the alarm signal sampling hole is connected to an external furnace safety monitoring system. By starting and shutting down the purge at a scheduled time, the negative pressure measuring point of the furnace is automatically cleaned to avoid blockage, which greatly reduces the manual workload. At the same time, during the pipeline purge, the signal monitored by the furnace safety monitoring system remains unchanged and does not interfere with the system. The gas in the furnace is sampled through the sampling tube and transmitted to the alarm signal sampling hole. When the furnace safety monitoring system detects overpressure or leakage through the pressure of the alarm signal sampling hole, an alarm signal can be issued in time to prompt maintenance. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] The utility model is further described below in conjunction with the accompanying drawings and embodiments.
[0027] Figure 1 It is a structural schematic diagram of an automatic ash cleaning device for a boiler provided in an embodiment of the utility model.
[0028] In the figure: 110, switch valve; 120, compressed air filter; 131, high pressure alarm sampling hole; 132, low pressure warning sampling hole; 133, pressure signal sampling hole; 134, blowing signal sampling hole; 140, sampling tube; 150, sample body outlet; 160, main line. DETAILED DESCRIPTION
[0029] Now the utility model is further described in detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the utility model in a schematic manner, and therefore only show the components related to the utility model.
[0030] Example 1, please refer to Figure 1 This embodiment provides an automatic ash cleaning device for a boiler, including: a compressed air supply mechanism and a purge; the compressed air supply mechanism is connected to the purge through a main pipeline 160; the sampling tube 140 of the purge is arranged in the furnace of the boiler; the sample outlet 150 of the purge is provided with at least one alarm signal sampling hole; the alarm signal sampling hole is connected to an external furnace safety monitoring system. By timing the start and stop of the purge, the negative pressure measuring point of the furnace is automatically cleaned to avoid blockage, which greatly reduces the manual workload. At the same time, during the pipeline purge, the signal monitored by the furnace safety monitoring system remains unchanged and will not interfere with the system. The gas in the furnace is sampled through the sampling tube 140 and transmitted to the alarm signal sampling hole. When the furnace safety monitoring system detects overpressure or leakage through the pressure of the alarm signal sampling hole, it can send out an alarm signal in time to prompt maintenance. Figure 1 The FSSS in the figure indicates the furnace safety monitoring system, the MCS indicates the analog control system, and the arrow A indicates the compressed air intake direction.
[0031] Among them, there are 3 alarm signal sampling holes. Two of the 3 alarm signal sampling holes are high-pressure alarm sampling holes 131, and the remaining one is a low-pressure warning sampling hole 132. Since the number of purges can be configured as multiple, when high pressure appears locally, in order to avoid false triggering, in this application, the alarm is triggered only when the pressure collected by two or more high-pressure alarm sampling holes 131 reaches HH (indicating 2 times the warning positive pressure). When the pressure of the low-pressure warning sampling hole 132 reaches H, the warning is triggered, where H is the warning positive pressure, indicating the dangerous state at this time, and always pay attention to observation.
[0032] It should be noted that due to the large size of the boiler, it is necessary to monitor and clean both sides of the furnace at the same time. The structure of the automatic ash cleaning device for the boiler on the other side is the same as the structure in the present application. The difference is that the trigger condition of the high-pressure alarm sampling hole 131 is configured as LL (indicating twice the warning negative pressure). When the pressure of the low-pressure warning sampling hole 132 reaches L, an early warning is triggered, where L is the warning negative pressure.
[0033] In this embodiment, the pressure of one of the high-pressure warning sampling holes of the automatic ash cleaning device structure for a boiler is configured as LL for negative pressure alarm.
[0034] In this embodiment, the purge device is also provided with a pressure signal sampling hole 133; the pressure signal sampling hole 133 is connected to the external furnace safety monitoring system. The pressure of the furnace is monitored in real time through the pressure signal sampling hole 133, and the entire monitoring process is monitored and analyzed. The self-diagnosis function is integrated into the purge process, and the sealing status of the sensor and pipeline is monitored in real time to ensure the accuracy of the monitoring. From the monitoring perspective, it provides a reliable guarantee for the production efficiency and environmental protection of the boiler.
[0035] In this embodiment, the number of the purge devices is N, where N is greater than or equal to 1. The specific number is set according to the size of the boiler.
[0036] Specifically, when N is greater than or equal to 2, one of the blowers is provided with a blowing signal sampling hole 134; the blowing signal sampling hole is connected to the external analog quantity control system. That is, no matter the number of blowers is one or more, only one of the blowers is provided with a blowing signal sampling hole 134, and the air volume of the air cooler is controlled by connecting the blowing signal sampling hole to the external analog quantity control system and the pressure collected by the blowing signal sampling hole 134.
[0037] It should be noted that when N is greater than or equal to 2, multiple purges are configured to work alternately. Time-sharing cross-start does not affect the normal operation of automatic and protective devices, and improves the safety of boiler operation.
[0038] In this embodiment, the sample outlet 150 of the blower is further provided with a pressure delivery pipe; the pressure delivery pipe is connected to the negative pressure side of the external cooling air blower pressure switch.
[0039] In this embodiment, the compressed air supply mechanism includes: an air source, a switch valve 110 and a compressed air filter 120; the air source is connected to the purge device through the switch valve 110 and the compressed air filter 120 in sequence.
[0040] This embodiment also provides a boiler, comprising: a boiler body, a furnace safety monitoring system, an analog quantity control system, a cooling fan, and the automatic ash cleaning device for the boiler as described above; the automatic ash cleaning device for the boiler is arranged on the boiler body
[0041] The beneficial effect of the utility model is that the utility model provides an automatic ash cleaning device for a boiler and a boiler, wherein the automatic ash cleaning device for a boiler includes: a compressed air supply mechanism and a purge; the compressed air supply mechanism is connected to the purge through a main pipeline 160; the sampling tube 140 of the purge is arranged in the furnace of the boiler; the sample outlet 150 of the purge is provided with at least one alarm signal sampling hole; the alarm signal sampling hole is connected to an external furnace safety monitoring system. By timing the start and stop of the purge, the negative pressure measuring point of the furnace is automatically cleaned to avoid blockage, greatly reducing the manual workload. At the same time, during the pipeline purge, the signal monitored by the furnace safety monitoring system remains unchanged and will not interfere with the system. The gas in the furnace is sampled through the sampling tube 140 and transmitted to the alarm signal sampling hole. When the furnace safety monitoring system detects overpressure or leakage through the pressure of the alarm signal sampling hole, it can send out an alarm signal in time to prompt maintenance.
[0042] All devices (parts without specific structure) selected in this application are universal standard parts or parts known to those skilled in the art, and their structures and principles can be known by those skilled in the art through technical manuals or conventional experimental methods. In addition, the software programs involved in this application are all prior art, and this application does not involve any improvement to the software programs.
[0043] In the description of the embodiments of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0044] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0045] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. The device embodiments described above are merely schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some communication interfaces, and the indirect coupling or communication connection of devices or units can be electrical, mechanical or other forms.
[0046] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0047] In addition, each functional unit in each embodiment of the present utility model may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.
[0048] Based on the above ideal embodiments of the utility model, the relevant staff can make various changes and modifications without deviating from the technical concept of the utility model through the above description. The technical scope of the utility model is not limited to the content of the specification, and its technical scope must be determined according to the scope of the claims.
Claims
1. An automatic ash cleaning device for a boiler, It is characterized in that include: Compressed air supply mechanism and purge device; The compressed air supply mechanism is connected to the purge device through a main pipe; The sampling tube of the purge device is arranged in the furnace of the boiler; The sample outlet of the purge device is provided with at least one alarm signal sampling hole; The alarm signal sampling hole is connected to the external furnace safety monitoring system; The purge device is configured to start and shut down at a fixed time.
2. The automatic boiler ash cleaning device according to claim 1, It is characterized in that There are three alarm signal sampling holes.
3. The automatic ash cleaning device for a boiler according to claim 2, It is characterized in that Two of the three alarm signal sampling holes are high-pressure alarm sampling holes, and the remaining one is a low-pressure early warning sampling hole.
4. The automatic boiler ash cleaning device according to claim 1, It is characterized in that The purge device is also provided with a pressure signal sampling hole; The pressure signal sampling hole is communicated with an external furnace safety monitoring system.
5. The automatic boiler ash cleaning device according to claim 1, It is characterized in that The number of the purge devices is N, where N is greater than or equal to 1.
6. The automatic boiler ash cleaning device according to claim 5, It is characterized in that When N is greater than or equal to 2, one of the purge devices is provided with a blowing signal sampling hole; The blowing signal is connected to an external analog quantity control system through a hole.
7. The automatic boiler ash cleaning device according to claim 5, It is characterized in that When N is greater than or equal to 2, the plurality of purge devices are configured to work alternately.
8. The automatic boiler ash cleaning device according to claim 1, It is characterized in that The sample outlet of the purge device is also provided with a pressure delivery pipe; The pressure delivery pipe is communicated with the negative pressure side of the external cooling air blower pressure switch.
9. The automatic boiler ash cleaning device according to claim 1, It is characterized in that The compressed air supply mechanism comprises: an air source, a switch valve and a compressed air filter; The air source is sequentially connected to the purge device through a switch valve and a compressed air filter.
10. A boiler, It is characterized in that include: A boiler body, a furnace safety monitoring system, an analog control system, an air cooler, and an automatic ash cleaning device for a boiler as claimed in any one of claims 1 to 9; The automatic ash cleaning device for the boiler is arranged on the boiler body.