Intelligent temporary power equipment for construction site

By integrating controllers, leakage protectors and wireless communication modules in the construction site power equipment, intelligent monitoring and automated operation and maintenance are achieved, and the safety hazards and low management efficiency of existing power equipment are solved, which improves the construction site Security and management efficiency.

CN222015953UActive Publication Date: 2024-11-15CHINA CONSTR SEVENTH ENG DIVISION CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420595966.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-26
Publication Date
2024-11-15
Estimated Expiration
2034-03-26

AI Technical Summary

Technical Problem

The existing temporary power equipment at the construction site has safety hazards when used, and it is difficult to achieve intelligent monitoring and automated operation and maintenance, resulting in low construction safety and energy consumption management efficiency.

Method used

A smart power equipment including a power supply equipment box, controller, leakage protector, wireless communication module and cooling system was designed. By monitoring power consumption in real time and automatically counting data, it realizes remote operation and maintenance and rapid fault positioning. Reduce manual inspections to ensure the safety of workers.

Benefits of technology

Effectively ensure the power safety at the construction site, reduce energy consumption, improve management efficiency, realize rapid handling and early warning of abnormal problems, reduce manual inspections, and improve the safety and operation and maintenance efficiency of the construction site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222015953U_ABST
    Figure CN222015953U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of temporary power equipment on a construction site, and discloses intelligent temporary power equipment on the construction site, which comprises a temporary power equipment box body, movable wheels are arranged at the bottom of the temporary power equipment box body, and a box door is movably arranged on one side of the temporary power equipment box body. According to the utility model, power utilization of a construction site can be monitored in real time, the problems of electric leakage, overload and the like are clear at a glance, the construction safety is ensured, the controller carries an electric power intelligent operation and maintenance system, intelligent monitoring of power utilization is realized, and the construction efficiency is improved. The power utilization data is counted in real time, power utilization information is automatically calculated, waste is avoided, energy consumption is reduced, remote automatic operation and maintenance operation is achieved, maintenance information can be recorded, operation and maintenance time can be traced, the equipment state is easily mastered, management efficiency is improved, hidden danger can be checked, faults can be rapidly positioned, closed-loop processing of abnormal problems is achieved, and accidents are prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of temporary power equipment at a construction site, in particular to intelligent temporary power equipment at a construction site. Background Art

[0002] The construction site refers to the construction site where industrial and civil projects such as housing construction, civil engineering, equipment installation, pipeline laying and other construction activities are carried out, the construction site occupied with approval and the place where people carry out safe production, civilized work and construction, including all areas on land, sea and air where construction work can be carried out. The project manager is fully responsible for the on-site management of the construction process, and should establish the construction site management responsibilities and organize their implementation according to the scale of the project, the technical complexity and the specific conditions of the construction site.

[0003] Temporary water and electricity play a decisive role in the construction process. The completion of most processes is closely related to temporary electricity. The existing temporary power equipment on construction sites poses a safety hazard when in use. Utility Model Content

[0004] The utility model aims to solve the shortcomings in the prior art and proposes an intelligent temporary power supply device for a construction site.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] A kind of intelligent temporary power equipment at a construction site, comprising a temporary power equipment box, movable wheels are installed at the bottom of the temporary power equipment box, a box door is movably installed on one side of the temporary power equipment box, a controller, a leakage protector and a wireless communication module are installed on the inner wall of the temporary power equipment box, a control panel is installed on the side of the box door, and a mounting mesh is installed on the inner wall of the temporary power equipment box for installing electrical components; heat dissipation holes are opened on the side walls of the temporary power equipment box, and the opening positions of the heat dissipation holes correspond to the side positions of the mounting mesh for dissipating heat inside the temporary power equipment box.

[0007] As a further solution of the utility model: a transition shell is installed on the outer side of the temporary power equipment box, the opening position of the heat dissipation hole is located inside the transition shell, and a heat dissipation fan is installed on the side wall of the transition shell.

[0008] As a further solution of the utility model: a through hole is opened on the side wall of the temporary power equipment box, and a fixing sleeve with an annular structure is installed on the side wall of the transition shell, and the opening position of the fixing sleeve corresponds to the opening position of the through hole.

[0009] As a further solution of the utility model: a connecting sleeve is installed on the internal thread of the fixing sleeve, and an extension sleeve is arranged at one end of the connecting sleeve away from the temporary power equipment box.

[0010] As a further solution of the utility model: the extension sleeve is made of a flexible material, and the inner diameter of the opening of one end of the extension sleeve close to the connecting sleeve is larger than the inner diameter of the opening of the other end of the extension sleeve away from the connecting sleeve.

[0011] The beneficial effects of the utility model are as follows: a leakage protector is provided to monitor the electricity consumption at the construction site in real time, and problems such as leakage and overload are clearly visible to ensure construction safety; the controller is equipped with an intelligent power operation and maintenance system to realize intelligent monitoring of electricity consumption, real-time statistics of electricity consumption data, and automatic calculation of electricity consumption information to avoid waste, reduce energy consumption, and realize remote automated operation and maintenance operations; maintenance information can be recorded and operation and maintenance time can be traced, so that the equipment status can be easily grasped and management efficiency can be improved; hidden dangers can also be checked and faults can be quickly located to realize closed-loop processing of abnormal problems, prevent accidents, reduce manual inspections, and ensure the safety of workers; the operation and maintenance status can be viewed through the control panel, and the wireless communication module can send safety warning information of abnormal electricity consumption to the computer in time to warn workers in time. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 This is a cross-sectional view of the overall structure of an intelligent temporary power supply device for a construction site proposed by the utility model;

[0013] Figure 2 A schematic diagram of a temporary power device box and a transition shell structure of an intelligent temporary power device for a construction site proposed by the utility model;

[0014] Figure 3 The utility model is a schematic diagram of the structure of a connection sleeve of intelligent temporary power equipment on a construction site.

[0015] In the figure: 1-temporary power equipment box, 2-wireless communication module, 3-controller, 4-transition shell, 5-cooling fan, 6-connection sleeve, 7-extension sleeve, 8-through hole, 9-fixing sleeve, 10-heat dissipation hole, 11-installation mesh plate, 12-movable wheel, 13-box door, 14-leakage protector, 15-control panel. DETAILED DESCRIPTION

[0016] The technical solution of this patent is further described in detail below in conjunction with specific implementation methods.

[0017] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0018] Reference Figure 1-3A construction site intelligent temporary power equipment comprises a temporary power equipment box 1, a movable wheel 12 is installed at the bottom of the temporary power equipment box 1, a box door 13 is movably installed on one side of the temporary power equipment box 1, a controller 3, a leakage protector 14 and a wireless communication module 2 are installed on the inner wall of the temporary power equipment box 1, a control panel 15 is installed on the side of the box door 13, and a mounting mesh plate 11 is installed on the inner wall of the temporary power equipment box 1 for installing electrical components; a heat dissipation hole 10 is opened on the side wall of the temporary power equipment box 1, and the opening position of the heat dissipation hole 10 corresponds to the side position of the mounting mesh plate 11, which is used to dissipate heat inside the temporary power equipment box 1.

[0019] When in use, the electrical components are installed on the mounting mesh plate 11, and the heat generated by the electrical components is dissipated through the heat dissipation holes 10. The leakage protector 14 monitors the electricity consumption on the construction site in real time, and problems such as leakage and overload are clearly visible to ensure construction safety. The controller 3 is equipped with an intelligent power operation and maintenance system to realize intelligent monitoring of electricity consumption, real-time statistics of electricity consumption data, and automatic accounting of electricity consumption information to avoid waste, reduce energy consumption, and realize remote automated operation and maintenance operations. Maintenance information can be recorded and operation and maintenance time can be traced, so that the equipment status can be easily grasped and management efficiency can be improved. Hidden dangers can also be checked, faults can be quickly located, closed-loop processing of abnormal problems can be realized, accidents can be prevented, manual inspections can be reduced, and the safety of workers can be ensured. The operation and maintenance status can be viewed through the control panel 15, and the wireless communication module 2 can send safety warning information of abnormal electricity consumption to the computer in time to warn workers in time.

[0020] As a preferred embodiment of the utility model, a transition shell 4 is installed on the outer side of the temporary power equipment box 1, the opening position of the heat dissipation hole 10 is located inside the transition shell 4, and a heat dissipation fan 5 is installed on the side wall of the transition shell 4. The heat dissipation fan 5 can be used to evacuate the interior of the transition shell 4, thereby accelerating the heat dissipation in the temporary power equipment box 1.

[0021] As a preferred embodiment of the utility model, a through hole 8 is opened on the side wall of the temporary power equipment box 1, and a fixing sleeve 9 of an annular structure is installed on the side wall of the transition shell 4, and the opening position of the fixing sleeve 9 corresponds to the opening position of the through hole 8.

[0022] As a preferred embodiment of the utility model, a connecting sleeve 6 is installed on the internal thread of the fixing sleeve 9, and an extension sleeve 7 is provided at one end of the connecting sleeve 6 away from the temporary power equipment box 1.

[0023] As a preferred embodiment of the utility model, the extension sleeve 7 is made of flexible material, and the inner diameter of the opening of the extension sleeve 7 at one end close to the connecting sleeve 6 is larger than the inner diameter of the opening of the extension sleeve 7 at one end away from the connecting sleeve 6. When the electrical components are installed, the power cables pass through the extension sleeve 7 and the connecting sleeve 6 in sequence, and extend to the interior of the temporary power equipment box 1 through the opening of the through hole 8. After the power cables are connected, the connecting sleeve 6 and the fixing sleeve 9 are threadedly installed. At this time, the connecting sleeve 6 and the extension sleeve 7 shield the opening of the through hole 8 from rain, thereby preventing rainwater from entering the temporary power equipment box 1 through the through hole 8 when used outdoors.

[0024] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. An intelligent temporary power supply device for a construction site, comprising a temporary power supply device box (1), a movable wheel (12) is installed at the bottom of the temporary power supply device box (1), and a box door (13) is movably installed on one side of the temporary power supply device box (1), characterized in that: The inner wall of the temporary power equipment box (1) is installed with a controller (3), a leakage protector (14) and a wireless communication module (2); the side of the box door (13) is installed with a control panel (15); the inner wall of the temporary power equipment box (1) is installed with a mounting mesh plate (11) for mounting electrical components; the side wall of the temporary power equipment box (1) is provided with a heat dissipation hole (10); the opening position of the heat dissipation hole (10) corresponds to the side position of the mounting mesh plate (11), and is used to dissipate heat inside the temporary power equipment box (1).

2. The intelligent temporary power supply equipment for construction site according to claim 1, characterized in that: A transition shell (4) is installed on the outer side of the temporary power equipment box (1), the opening position of the heat dissipation hole (10) is located inside the transition shell (4), and a heat dissipation fan (5) is installed on the side wall of the transition shell (4).

3. The intelligent temporary power supply equipment for construction site according to claim 2, characterized in that: The side wall of the temporary power equipment box (1) is provided with a through hole (8), and the side wall of the transition shell (4) is provided with a fixing sleeve (9) of an annular structure, and the opening position of the fixing sleeve (9) corresponds to the opening position of the through hole (8).

4. The intelligent temporary power supply equipment for construction site according to claim 3, characterized in that: The internal thread of the fixing sleeve (9) is provided with a connecting sleeve (6), and an extension sleeve (7) is provided at one end of the connecting sleeve (6) away from the temporary power equipment box (1).

5. The intelligent temporary power supply equipment for construction site according to claim 4, characterized in that: The extension sleeve (7) is made of a flexible material, and the inner diameter of the opening of the end of the extension sleeve (7) close to the connection sleeve (6) is larger than the inner diameter of the opening of the end of the extension sleeve (7) away from the connection sleeve (6).