Recording device for constructional engineering management inspection

By designing the winding and tightening mechanism in the recording device for construction project management inspection, the problem that the handwriting board is not easy to winding is solved, and the efficiency of construction workers recording information at different locations is improved.

CN222022442UActive Publication Date: 2024-11-19石婷婷
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323422118.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-15
Publication Date
2024-11-19
Estimated Expiration
2033-12-15

AI Technical Summary

Technical Problem

During construction of construction projects, it is difficult to wrap the engineering drawings with handwritten boards, which leads to extremely inconvenience for construction workers when modifying them and affects the recording rate.

Method used

A recording device for construction engineering management inspection is designed, including a handwriting board, a winding mechanism and a tightening mechanism. The winding and position adjustment of engineering drawings is achieved through support seats, fixing frames, bolts and winding drums, which facilitates construction personnel. Record information in different locations.

Benefits of technology

It has achieved convenient collection and position adjustment of engineering drawings, improved the work efficiency of construction workers, and solved the problem that handwriting boards are not easy to collect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222022442U_ABST
    Figure CN222022442U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of constructional engineering management equipment, and discloses a recording device for constructional engineering management inspection, which comprises a handwriting board, the top of the handwriting board is provided with a winding mechanism and a pressing mechanism, the winding mechanism comprises two groups of supporting seats, a fixing frame, a bolt I and a winding drum, the two groups of supporting seats are welded to the top of the handwriting board, and the two groups of supporting seats are welded to the top of the handwriting board. A protruding block at the top of the fixing frame is rotationally connected to the inner side of the supporting base through a rod piece, the first bolt is inserted into the inner side of the fixing frame, the two winding drums are welded to the bottom of the handwriting board, and the first bolt is in threaded connection with the handwriting board. According to the recording device for constructional engineering management inspection, the two ends of an engineering drawing can be rolled into the two sets of rolling cylinders, the engineering drawing is pulled to different positions, constructors can conveniently record inspection management information on the engineering drawing, and the working efficiency of the constructors is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of construction engineering management equipment, and specifically to a recording device for construction engineering management inspections. Background Art

[0002] During the construction process of a building project, designers and supervisors need to carry the corresponding engineering drawings when inspecting the construction site so that they can accurately identify problems and make modifications in a timely manner. Construction workers will carry a handwriting board when entering the construction site, and they will put the engineering drawings on the handwriting board to record and modify the drawings. The engineering drawings are generally long, while the handwriting board is short, and the handwriting board is not convenient to roll up, which makes it extremely inconvenient for construction workers to put the drawings on the handwriting board for modification, affecting the construction workers' recording speed.

[0003] Therefore, there is an urgent need for a recording device for construction engineering management inspection to solve the problem that the handwriting board is not easy to roll up the engineering drawings. Utility Model Content

[0004] In view of the shortcomings of the prior art, the present application provides a recording device for construction project management inspection, which has the advantage of being easy to modify different positions of engineering drawings and solves the problem that it is difficult to roll up engineering drawings using a handwriting tablet.

[0005] To achieve the above-mentioned purpose, the present application provides the following technical solutions: A recording device for construction engineering management inspection, comprising a handwriting board, a winding mechanism and a pressing mechanism are provided on the top of the handwriting board;

[0006] The winding mechanism includes a support seat, a fixing frame, a bolt 1 and a winding drum, two groups of the support seats are fused to the top of the handwriting board, the protrusion on the top of the fixing frame is rotatably connected to the inner side of the support seat through a rod, the bolt 1 is inserted into the inner side of the fixing frame, the two groups of the winding drums are fused to the bottom of the handwriting board, and the bolt 1 is threadedly connected to the handwriting board.

[0007] Both ends of the engineering drawings can be rolled up into two sets of winding drums, pulling the engineering drawings to different positions, allowing construction workers to conveniently record inspection and management information on the engineering drawings, thereby improving the work efficiency of construction workers.

[0008] Preferably, square grooves are formed on the outer sides of the two groups of winding drums.

[0009] Preferably, the two groups of winding rollers are symmetrically distributed at the bottom of the handwriting board.

[0010] Preferably, the clamping mechanism includes a threaded seat, a threaded rod, a fixed seat and a connecting ball, four groups of the threaded seat are welded to the top of the fixing frame, the threaded rod is threadedly connected to the threaded seat, the fixed seat is welded to the top of the threaded rod, and the connecting ball is welded to the inner side of the fixed seat.

[0011] Preferably, the four groups of threaded seats are located on the top of the fixing frame and distributed in a rectangular shape.

[0012] Preferably, a notch adapted to the connecting ball is provided on the inner side of the fixing seat.

[0013] In summary, the present application includes at least one of the following beneficial effects:

[0014] 1. The recording device for construction engineering management inspection can roll up the two ends of the engineering drawings into two sets of winding drums. At the same time, the engineering drawings pass through the fixed frame and the inside of the handwriting board, and pull the engineering drawings to different positions, so that construction personnel can conveniently record the inspection management information on the engineering drawings, thereby improving the work efficiency of construction personnel.

[0015] 2. The recording device for construction project management and inspection adjusts the height of the four sets of fixed seats. When the fixed seats drive the connecting balls to move downward, the connecting balls are pressed against the top of the engineering drawings, thereby pressing the position of the engineering drawings. At the same time, when the connecting balls move upward, the construction personnel can easily pull the engineering drawings to different positions, making it convenient for the construction personnel to record at different positions of the drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 The overall structure diagram of the recording device for this application;

[0017] Figure 2 A bottom-up structural diagram of the recording device for this application;

[0018] Figure 3 This is a front view of the recording device for this application;

[0019] Figure 4 This is the overall structural diagram of the clamping mechanism of this application.

[0020] Among them: 1. handwriting board; 111. support seat; 112. fixing frame; 113. bolt 1; 114. winding drum; 115. square groove; 211. threaded seat; 212. threaded rod; 213. fixing seat; 214. connecting ball. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0022] See also Figure 1-4A recording device for construction engineering management inspection includes a handwriting board 1, and a winding mechanism and a pressing mechanism are arranged on the top of the handwriting board 1.

[0023] Through the above technical solution, the drawings used for the construction project can be placed on the handwriting board 1, and the construction personnel can modify and record the information that needs to be recorded on the drawings during management inspections.

[0024] Specifically, the winding mechanism includes a support seat 111, a fixing frame 112, a bolt 113 and a winding drum 114. The two groups of support seats 111 are fused to the top of the handwriting board 1. The protrusion on the top of the fixing frame 112 is rotatably connected to the inner side of the support seat 111 through a rod. The bolt 113 is inserted into the inner side of the fixing frame 112. The two groups of winding drums 114 are fused to the bottom of the handwriting board 1. The two groups of winding drums 114 are symmetrically distributed at the bottom of the handwriting board 1. The bolt 113 is threadedly connected to the handwriting board 1. The outer sides of the two groups of winding drums 114 are provided with square grooves 115.

[0025] Through the above technical solution, the two ends of the engineering drawings can be rolled up into the two sets of winding drums 114. At the same time, the engineering drawings pass through the fixing frame 112 and the inner side of the handwriting board 1. When the fixing frame 112 is rotated to the top of the handwriting board 1 and remains parallel to the handwriting board 1, the construction personnel can rotate bolt 113 to fix the position of bolt 113. The construction personnel can record information on the engineering drawings inside the fixing frame 112. When modifying the information recorded on the engineering drawings, the construction personnel hold one side of the handwriting board 1 and place the engineering drawings to move; the two ends of the engineering drawings are inserted into the inside of the winding drum 114 from the square slot 115 for winding.

[0026] Specifically, the clamping mechanism includes a threaded seat 211, a threaded rod 212, a fixed seat 213 and a connecting ball 214. Four groups of threaded seats 211 are welded to the top of the fixing frame 112. The four groups of threaded seats 211 are located at the top of the fixing frame 112 and are distributed in a rectangular shape. The threaded rod 212 is threadedly connected to the threaded seat 211. The fixed seat 213 is welded to the top of the threaded rod 212. The connecting ball 214 is welded to the inner side of the fixed seat 213. A groove adapted to the connecting ball 214 is opened on the inner side of the fixed seat 213.

[0027] Through the above technical solution, construction workers can rotate the threaded rod 212, and when the threaded rod 212 rotates, it drives the fixed seat 213 to move up and down. When the fixed seat 213 moves up and down, it drives the connecting ball 214 to move. The connecting ball 214 moves down and presses to the top of the engineering drawing, thereby pressing the position of the engineering drawing. At the same time, when the connecting ball 214 moves up, the construction workers can easily pull the engineering drawings to different positions, which is convenient for the construction workers to work at different positions of the drawings.

[0028] When in use, both ends of the engineering drawings can be rolled up into the two sets of winding drums 114, and the engineering drawings can be pulled to different positions, so that construction workers can conveniently record inspection and management information on the engineering drawings, thereby improving the work efficiency of construction workers.

[0029] Although the embodiments of the present application have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the appended claims and their equivalents.

Claims

1. A recording device for construction engineering management inspection, comprising a handwriting tablet (1), characterized in that: The top of the handwriting board (1) is provided with a rolling mechanism and a pressing mechanism; The winding mechanism comprises a support seat (111), a fixing frame (112), a bolt one (113) and a winding drum (114); two groups of the support seats (111) are fused to the top of the handwriting board (1); a protrusion at the top of the fixing frame (112) is rotatably connected to the inner side of the support seat (111) through a rod; the bolt one (113) is plugged into the inner side of the fixing frame (112); the two groups of the winding drum (114) are fused to the bottom of the handwriting board (1); and the bolt one (113) is threadedly connected to the handwriting board (1).

2. A recording device for construction engineering management inspection according to claim 1, characterized in that: Square grooves (115) are formed on the outer sides of the two groups of winding drums (114).

3. A recording device for construction engineering management inspection according to claim 1, characterized in that: The two groups of winding rollers (114) are symmetrically distributed at the bottom of the handwriting board (1).

4. A recording device for construction engineering management inspection according to claim 1, characterized in that: The clamping mechanism comprises a threaded seat (211), a threaded rod (212), a fixed seat (213) and a connecting ball (214); four groups of the threaded seats (211) are welded to the top of the fixing frame (112); the threaded rod (212) is threadedly connected to the threaded seat (211); the fixed seat (213) is welded to the top of the threaded rod (212); and the connecting ball (214) is welded to the inner side of the fixed seat (213).

5. A recording device for construction engineering management inspection according to claim 4, characterized in that: The four groups of threaded seats (211) are located on the top of the fixing frame (112) and are distributed in a rectangular shape.

6. A recording device for construction engineering management inspection according to claim 4, characterized in that: A notch adapted to the connecting ball (214) is provided on the inner side of the fixing seat (213).