Auxiliary datum plate for quick installation of prefabricated wall panel
By using prefabricated wall panels to quickly install auxiliary reference plates in prefabricated buildings, using grouting sleeves and support rods to achieve rapid hole-free installation, solving the problems of slow lifting speed and structural damage of prefabricated wall panels, and improving construction efficiency and installation speed.
Patent Information
- Application Number
- CN202420065039.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-10
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-01-10
AI Technical Summary
In prefabricated building construction, there are difficulties in rapid installation of prefabricated wall panels, especially during the lifting process, which requires multiple components to be lifted, resulting in slow construction speed and damage to the structure.
A prefabricated wall panel is used to quickly install auxiliary reference plates, including cast-in-place floors, prefabricated walls, steel reference plates and support rods. Through grouting sleeves, adjustment gaskets, anchor rings and pull rings, no need to punch The prefabricated wall panels can be quickly installed and lifted and fixed using support rods.
The installation speed of prefabricated wall panels has been greatly accelerated, the damage to the structure has been reduced, and the recycling of reference boards has been realized, which has improved construction efficiency.
Smart Images

Figure CN222025480U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a prefabricated wall panel quick installation auxiliary reference plate. Background Art
[0002] In recent years, with the development of prefabricated buildings, many prefabricated buildings have emerged in various places. Most of the high-rise residential buildings were originally designed as shear wall structures, but now they are designed as assembled integral shear wall structures. Since the prefabricated wall panels need to be hoisted and installed after being transported to the construction site, facing a large number of component hoisting work, how to achieve rapid installation of prefabricated wall panels is a major problem faced by construction units, so the study of this construction method and its auxiliary parts is just to solve the above problems.
[0003] In view of the above problems, the inventor proposes a prefabricated wall panel quick installation auxiliary reference plate to solve the above problems. Utility Model Content
[0004] In order to overcome the shortcomings of the prior art, the utility model provides a steel reference plate for the rapid installation construction of prefabricated wall panels for assembled buildings. When using this reference plate, there is no need to drill holes in the floor surface or install expansion bolts. The existing supporting rods can be used, which can reduce damage to the structure and greatly speed up the installation speed.
[0005] In order to solve the above technical problems, the utility model adopts the following technical solutions: a prefabricated wall panel quick installation auxiliary reference plate, including a cast-in-place floor, a prefabricated wall is arranged on one side of the upper end of the cast-in-place floor, a plurality of grouting sleeves are arranged inside the prefabricated wall, an adjusting gasket is arranged at the lower end of the prefabricated wall, and the lower end of the adjusting gasket is in active contact with the cast-in-place floor, and the specific method of installing the gasket is as follows: a gap of about 20 mm is reserved between the bottom of the prefabricated wall and the structural surface as a slurry flow channel for prefabricated wall leveling and subsequent grouting, and the gasket is used to control the elevation to facilitate the compaction of the prefabricated wall slurry; the slurry is arranged on the inner side around the prefabricated wall installation position, and two anchor rings are arranged at the upper end of the cast-in-place floor. Two steel reference plates are provided at the upper end of the cast-in-place floor, and a dowel reference line is provided on one side of the steel reference plate. The dowel reference line is specifically to measure the center line of the dowel extending from the sleeve of the adjusted floor, and project it onto the steel reference plate, mark it, and install the steel reference plate (height 520mm, used in pairs) along the control edge of the prefabricated wall panel, adjust the verticality and horizontality of the reference plate, the cross-sectional shape of the steel reference plate is "L" shaped, and one side of the steel reference plate is in contact with one side of the prefabricated wall, one end of the steel reference plate is provided with two pull rings, and a support rod is fixedly connected between the two pull rings and the anchor ring at the corresponding positions, and the inner side of the prefabricated wall is provided with 50 line and sleeve projection line. The specific marking standards of the 50 line and sleeve projection line are as follows: the sleeve projection line is to measure the center line of the sleeve dowel that has been adjusted on the floor to the steel reference plate, and mark it. A 50 horizontal line is popped up on the inside of the wall panel. At the same time, the center line of the outermost (left or right) wall panel grouting sleeve is measured and marked to the inside of the wall panel (from the bottom of the component to beyond the 50 horizontal line). A control line is provided on one side of the upper end of the cast-in-place floor. The control line is aligned with one side of the lower end of the steel reference plate, and the 50 line is aligned with the upper end of the steel reference plate. Lifting and positioning of components: lift the prefabricated wall panels strictly according to the number and position of the reserved lifting points. The prefabricated wall panels are lifted to the foundation. Keep it stable when aligning the panel position. The installer guides the prefabricated wall panel close to the reference plate and adjusts the position of the wall panel so that the center measuring line of the sleeve on the wall panel corresponds to the projection line of the steel bar on the reference plate. The steel bar can be smoothly inserted into the sleeve, and the wall panel is steadily lowered. The long support rod is connected and the wall panel is fixed. Check the verticality and horizontality of the wall panel, tighten the support rod bolts, calibrate and verify the wall panel: check whether the 50 line is flush with the upper edge of the reference plate to verify the level of the wall panel; verify the verticality of the wall panel by the fit between the component and the reference plate (check with a measuring ruler when necessary), tighten the long support rod, remove the reference plate, connect and tighten the short support rod, complete the hoisting, unhook, and move on to the next prefabricated wall panel hoisting construction.
[0006] Compared with the prior art, the beneficial effects of the present invention are:
[0007] 1. The utility model uses a prefabricated wall panel to quickly install a steel reference plate, which is used for the installation of prefabricated wall panels in assembled buildings, thereby improving the installation speed of prefabricated wall panels. The prefabricated wall panel reference plate is installed in place before the wall panel is hoisted, and after the wall panel is installed, it is removed and transferred to the next prefabricated wall panel position for continued installation and use, thus achieving recycling; BRIEF DESCRIPTION OF THE DRAWINGS
[0008] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0009] Figure 1 It is a schematic diagram of the structure of the utility model.
[0010] Figure 2 It is a top view of the structure of the utility model.
[0011] Figure 3 For this utility model Figure 1 A schematic diagram of the enlarged structure in the middle.
[0012] In the figure: 1. Cast-in-place floor; 11. Control line; 2. Prefabricated wall; 21. Grouting sleeve; 22. Sleeve projection line; 23. 50 line; 24. Insert reinforcement reference line; 3. Steel reference plate; 31. Pull ring; 4. Anchor ring; 5. Support rod; 6. Adjustment gasket. DETAILED DESCRIPTION
[0013] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0014] Embodiment 1: Figure 1-3As shown, the utility model provides a prefabricated wall panel quick installation auxiliary reference plate, including a cast-in-place floor 1, a prefabricated wall 2 is provided on one side of the upper end of the cast-in-place floor 1, a plurality of grouting sleeves 21 are provided inside the prefabricated wall 2, an adjusting gasket 6 is provided on the lower end of the prefabricated wall 2, and the lower end of the adjusting gasket 6 is in active contact with the cast-in-place floor 1, two anchor rings 4 are provided on the upper end of the cast-in-place floor 1, and two steel reference plates 3 are provided on the upper end of the cast-in-place floor 1, two pull rings 31 are provided on one side of the steel reference plate 3, and a support rod 5 is fixedly connected between the two pull rings 31 and the anchor ring 4 at corresponding positions, a 50 line 23 and a sleeve projection line 22 are provided on the inner side of the prefabricated wall 2, a control line 11 is provided on one side of the upper end of the cast-in-place floor 1, and a control line 11 is provided on the upper end of the cast-in-place floor 1. The control lines 11, sleeve projection lines 22 and 50 lines 23 on the surface 1 and the prefabricated wall 2 are calibrated, and the steel reference plate 3 is installed along the line. The installation of the steel reference plate 3 uses the pre-buried steel ring on the floor, and uses the support rod 5 to connect the anchor ring 4 and the welded steel ring on the steel reference plate 3. Each steel reference plate 3 is connected to the plate surface anchor ring 4 at one end through two support rods 5, and the other end is connected to the upper and lower pull rings 31 of the steel reference plate 3. The bolts are adjusted to adjust the verticality and horizontality of the steel reference plate 3. Finally, the support rods 5 are bolted to tighten in place, so that the surface of each steel reference plate 3 is perpendicular to the horizontal plane of the floor slab, and the upper plate edges of the two steel reference plates 3 are kept in line and horizontal. The outermost side (left or right side is selected) is marked on the inner side of the steel reference plate 3. Take any side, in this case choose the right side) sleeve projection line 22, place an adjusting gasket 6 on the left and right sides of the installation line of the prefabricated wall 2 respectively. There is a grouting cavity of about 20mm between the prefabricated wall 2 and the cast-in-place floor 1. Place two adjusting gaskets 6 so that after the prefabricated wall 2 is in place, the cavity height is guaranteed to be about 20mm, and the thickness of the gasket 6 is adjusted according to the horizontal control line 11, so that the wall installation is finally level. First pop up the 50 line 23 and the right sleeve projection line 22 on the prefabricated wall 2 to hoist the prefabricated wall 2; when the wall panel falls to 400mm away from the panel surface, slowly and steadily move the wall panel so that its inner side is close to the steel reference plate 3; at the same time, slowly and steadily move the prefabricated wall 2 so that the center line of the sleeve on the wall panel is aligned with the center line on the steel reference plate 3. The inserted reinforcement marking line coincides; the prefabricated wall 2 is slowly lowered to allow the steel bar to be smoothly inserted into the steel sleeve. The prefabricated wall 2 falls on the adjusting gasket 6, and one end is connected to the plate surface anchor ring 4 through the long support rod 5, and the other end is connected to the upper fixing ring of the prefabricated wall 2. The fit between the prefabricated wall 2 and the steel reference plate 3 is checked and the bolts are adjusted to make the prefabricated wall 2 perpendicular to the horizontal plane; check whether the 50 line on the prefabricated wall 2 coincides with the upper mouth of the steel reference plate 3, check the installation level of the prefabricated wall 2, check and adjust, and tighten the bolts of the long support rod 5; remove the steel reference plate 3, and then install the short support rod 5, which is connected and fixed to the lower fixing ring of the prefabricated wall 2, complete the component hoisting, unhook, and move the steel reference plate 3 to the next component for recycling.
[0015] The cross-sectional shape of the steel reference plate 3 is “L”-shaped, and one side of the steel reference plate 3 is in contact with one side of the prefabricated wall 2 .
[0016] By adopting the above technical solution, the "L"-shaped structure has higher strength.
[0017] The height of the steel reference plate 3 is 520 mm, and the steel reference plates 3 are used in pairs.
[0018] By adopting the above technical solution, the steel reference plates 3 used in pairs are more convenient for realizing the rapid installation of prefabricated wall panels.
[0019] The sleeve projection line 22 is specifically the center line of the adjusted floor extending out of the sleeve insert, and is projected onto the steel reference plate 3 and marked.
[0020] By adopting the above technical solution, the center position of the grouting sleeve 21 can be effectively calibrated in conjunction with the use of a reference plate.
[0021] The control line 11 is in contact with one side of the lower end of the steel reference plate 3 , and the 50 line 23 is in contact with the upper end of the steel reference plate 3 .
[0022] By adopting the above technical solution, auxiliary installation is facilitated.
[0023] A rebar reference line 24 is provided on one side of the steel reference plate 3. The rebar reference line 24 is specifically used to measure the center line of the adjusted floor sleeve rebar, project it onto the steel reference plate 3, and mark it.
[0024] By adopting the above technical solution, the marking of the reinforcing bar reference line 24 is completed.
[0025] Working principle: through the control line 11, sleeve projection line 22 and 50 line 23 calibration on the cast-in-place floor 1 and the prefabricated wall 2, the steel reference plate 3 is installed along the line. The installation of the steel reference plate 3 borrows the pre-buried steel ring of the floor, and uses the support rod 5 to connect the anchor ring 4 and the welded steel ring on the steel reference plate 3. Each steel reference plate 3 is connected to the plate surface anchor ring 4 at one end and the other end is connected to the upper and lower pull rings 31 of the steel reference plate 3 through two support rods 5, and the bolts are adjusted to adjust the verticality and horizontality of the steel reference plate 3. Finally, the support rod 5 bolts Fasten in place, make each steel reference plate 3 perpendicular to the horizontal plane of the floor, keep the upper edges of the two steel reference plates 3 in line and horizontal, mark the outermost (either the left or right side, in this case the right side) sleeve projection line 22 on the inner side of the steel reference plate 3, place an adjustment gasket 6 on the left and right sides of the installation line of the prefabricated wall 2, there is a grouting cavity of about 20mm between the prefabricated wall 2 and the cast-in-place floor 1, place two adjustment gaskets 6, after the prefabricated wall 2 is in place, ensure that the cavity height is about 20mm, and adjust according to the horizontal control line 11 Adjust the thickness of the gasket 6 to make the wall installation level. Pop out the 50 line 23 and the right sleeve projection line 22 on the prefabricated wall 2 first, and then hoist the prefabricated wall 2. When the wall panel falls to 400mm from the panel surface, slowly and steadily move the wall panel so that its inner side is close to the steel reference plate 3. At the same time, slowly and steadily move the prefabricated wall 2 so that the center line of the sleeve on the wall panel coincides with the rebar insertion mark line on the steel reference plate 3. Slowly drop the prefabricated wall 2 so that the steel bar is smoothly inserted into the steel sleeve. The prefabricated wall 2 falls on the adjusting gasket 6 and is connected to the steel sleeve at one end through the long support rod 5. The plate surface anchor ring 4 has its other end connected to the upper fixing ring of the prefabricated wall 2. The fit between the prefabricated wall 2 and the steel reference plate 3 is checked and the bolts are adjusted to make the prefabricated wall 2 perpendicular to the horizontal plane. Check whether the 50 line 23 on the prefabricated wall 2 coincides with the upper end of the steel reference plate 3. Check the installation level of the prefabricated wall 2. After the adjustment is completed, tighten the bolts of the long support rod 5. Remove the steel reference plate 3, and then install the short support rod 5, which is connected and fixed to the lower fixing ring of the prefabricated wall 2. Complete the component hoisting, unhook, and move the steel reference plate 3 to the next component for a cycle.
[0026] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A prefabricated wall panel quick installation auxiliary reference plate, comprising a cast-in-place floor (1), Features: A prefabricated wall (2) is provided on one side of the upper end of the cast-in-place floor (1), a plurality of grouting sleeves (21) are provided inside the prefabricated wall (2), an adjusting gasket (6) is provided on the lower end of the prefabricated wall (2), and the lower end of the adjusting gasket (6) is in active contact with the cast-in-place floor (1), two anchor rings (4) are provided on the upper end of the cast-in-place floor (1), and two steel reference plates (3) are provided on the upper end of the cast-in-place floor (1), two pull rings (31) are provided on one side of the steel reference plate (3), and a support rod (5) is fixedly connected between the two pull rings (31) and the anchor ring (4) at corresponding positions, a 50 line (23) and a sleeve projection line (22) are provided on the inner side of the prefabricated wall (2), and a control line (11) is provided on one side of the upper end of the cast-in-place floor (1).
2. A prefabricated wall panel quick installation auxiliary reference plate as claimed in claim 1, Features: The cross-sectional shape of the steel reference plate (3) is an "L" shape, and one side of the steel reference plate (3) is in contact with one side of the prefabricated wall (2).
3. A prefabricated wall panel quick installation auxiliary reference plate as claimed in claim 1, Features: The control line (11) is in contact with one side of the lower end of the steel reference plate (3), and the 50 line (23) is in contact with the upper end of the steel reference plate (3).
4. A prefabricated wall panel quick installation auxiliary reference plate as claimed in claim 1, Features: The height of the steel reference plate (3) is 520 mm, and the steel reference plates (3) are used in pairs.
5. A prefabricated wall panel quick installation auxiliary reference plate as claimed in claim 1, Features: The sleeve projection line (22) is specifically used to measure the center line of the sleeve at the end of the prefabricated wall panel and to pop up a black line on the prefabricated wall panel.
6. A prefabricated wall panel quick installation auxiliary reference plate as claimed in claim 1, Features: A dowel reference line (24) is provided on one side of the steel reference plate (3). The dowel reference line (24) is specifically a center line of the calibrated floor dowel extending out of the sleeve, which is projected onto the steel reference plate (3) and marked.