Circulating cooling system

By using the terrain height misalignment to arrange the cooling tower and the pump room, the problems of the pump room being flooded and the cooling tower structure being raised in the prior art are solved, and the safe operation and construction cost of the pump room are achieved.

CN222025535UActive Publication Date: 2024-11-19CHINA ENERGY ENG GRP GUANGDONG ELECTRIC POWER DESIGN INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420351182.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-26
Publication Date
2024-11-19
Estimated Expiration
2034-02-26

AI Technical Summary

Technical Problem

The existing mechanical ventilation cooling tower and circulating water pump room are arranged on the floor of the same elevation plant area, resulting in the semi-underground pump room being easily flooded, the equipment maintenance is difficult, and the cooling tower needs to be raised to increase the cost of civil engineering.

Method used

The cooling tower and circulating water pump room are arranged by terrain height deviation. The cooling tower is under the high terrain plane, the pump room is on the low terrain plane, the water collection pool is below the ground plane, and the room body is above the ground plane, and the circulation pipe group is The highest point is lower than the top surface of the collecting pool, and the underground collecting pool and above-ground pump room are arranged, so that the pump room can be maintained conveniently through crane components and suction wells.

Benefits of technology

It avoids the risk of water flooding of the pump room, simplifies the cooling tower structure, reduces civil engineering costs, and improves the convenience of the pump room maintenance, ensuring the safe operation of the circulating cooling system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222025535U_ABST
    Figure CN222025535U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of cooling towers, and discloses a circulating cooling system which comprises a first tower row and a circulating water pump room, the circulating water pump house comprises a house body and a circulating pipe set arranged in the house body, the first tower row comprises a cooling tower, the cooling tower and the house body are arranged in parallel, the cooling tower comprises a water collecting pool, the circulating pipe set is communicated with the water collecting pool, the water collecting pool is arranged below a first ground plane, the top face of the water collecting pool is 300 mm higher than the first ground plane, and the house body is arranged on a second ground plane. The second ground plane is lower than the first ground plane, and the highest point of the circulating pipe group is lower than the top surface of the water collecting tank. According to the circulating cooling system provided by the utility model, the circulating water pump house can be arranged into the overground pump house by utilizing the terrain height difference, so that the risk that the circulating water pump house is flooded is avoided, the safe operation is ensured, and the construction cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of cooling towers, in particular to a circulating cooling system. Background Art

[0002] At present, most of the existing mechanical ventilation cooling towers and circulating water pump rooms are arranged on the same elevation of the factory floor. The commonly used layout schemes are: Scheme 1, when using an underground water collection tank mechanical ventilation cooling tower, in order to meet the water suction requirements of the circulating water pump, a semi-underground circulating water pump room is required; Scheme 2, when using an above-ground water collection tank mechanical ventilation cooling tower, an above-ground circulating water pump is required.

[0003] When arranged according to the above-mentioned plan 1, the semi-underground pump room equipment is easily flooded; the pump room is high, and it is difficult to lift the equipment during maintenance; when arranged according to the above-mentioned plan 2, because the circulating water pump room is an above-ground pump room, in order to meet the water absorption requirements of the circulating water pump, the cooling tower collection tank needs to be arranged as an above-ground water tank. At this time, in order to meet the height requirements of the cooling tower air inlet, the overall height of the cooling tower needs to be raised with a corresponding structure, and the civil engineering cost of the mechanical ventilation cooling tower is increased. Utility Model Content

[0004] The purpose of the utility model is to provide a circulating cooling system that can utilize the height difference of the terrain to displace the cooling tower and the circulating water pump room, arrange the mechanical ventilation cooling tower on the plane with high terrain, use the underground water collection tank, and arrange the above-ground circulating water pump room on the plane with low terrain, which can not only meet the water absorption requirements of the horizontal circulating water pump, but also avoid the risk of the circulating water pump room being flooded, ensure safe operation, and reduce construction costs. The plane where the circulating water pump room is located is connected to the main road, which is conducive to the maintenance of the circulating water pump.

[0005] In order to achieve the above-mentioned object, the utility model provides a circulating cooling system, including a first tower row and a circulating water pump room;

[0006] The circulating water pump room includes a room body and a circulating pipe group arranged inside the room body, the first tower row includes a cooling tower, the cooling tower and the room body are arranged in parallel, the cooling tower includes a water collecting tank, the circulating pipe group and the water collecting tank are connected to each other, the water collecting tank is arranged below a first ground plane, and the top surface of the water collecting tank is 300 mm higher than the first ground plane, the room body is arranged on a second ground plane, the second ground plane is lower than the first ground plane, and the highest point of the circulating pipe group is lower than the top surface of the water collecting tank.

[0007] Furthermore, the first tower row includes a plurality of cooling towers, and the plurality of cooling towers are arranged in parallel along the front-to-back direction to form a first tower group and a second tower group, the first tower group and the second tower group are spaced apart along the front-to-back direction, the building body is disposed between the first tower group and the second tower group, and the water collecting tanks of the two cooling towers adjacent to the building body are both connected to the circulation pipe group.

[0008] Furthermore, the circulating cooling system also includes a second tower row, which is arranged on one side of the length direction of the first tower row, and the second tower row includes a plurality of cooling towers, which are arranged in parallel along the front-to-back direction, a first return water ditch is connected between the first tower group and the second tower row, and a second return water ditch is connected between the second tower group and the second tower row.

[0009] Furthermore, the first return ditch connects the cooling tower located at the front side of the first tower group and the cooling tower located at the front side of the second tower row, and the second return ditch connects the cooling tower located at the rear side of the second tower group and the cooling tower located at the rear side of the second tower row.

[0010] Furthermore, a crane assembly is arranged in the room body, and the crane assembly includes a crane track and a crane slidably arranged on the crane track, and two ends of the crane track are respectively connected to the inner wall of the room body.

[0011] Furthermore, reinforcing ribs are provided at the connection between the crane track and the room body.

[0012] Furthermore, a water suction well is provided below the water collecting tank of the two cooling towers adjacent to the building body, the water suction well is connected with the water collecting tank, and a water suction pipe is connected between the circulation pipe group and the water suction well.

[0013] Furthermore, a filter screen is provided between the water absorption well and the water collection tank.

[0014] Compared with the prior art, a circulating cooling system according to an embodiment of the utility model has the following beneficial effects: a water collecting tank is arranged below a first ground plane, an upper end surface of the water collecting tank is flush with the first ground plane, a room body is arranged on a second ground plane, the first ground plane is higher than the second ground plane, the highest point of the circulating pipe group is lower than the top surface of the water collecting tank, and the arrangement of the water collecting tank and the circulating water pump room is staggered by utilizing the height difference of the terrain, and the circulating water pump room is arranged as an above-ground type, which can not only meet the water absorption requirement of the circulating pipe group, but also avoid the risk of flooding of the semi-underground pump room, thereby ensuring the safe operation of the circulating cooling system, and there is no need to lift the cooling tower structure, thereby reducing the construction cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1It is a cross-sectional view of the first tower row and the circulating water pump room of the circulating cooling system of the embodiment of the utility model;

[0016] Figure 2 It is a top view of the circulating cooling system of the embodiment of the utility model.

[0017] In the figure, 1, first tower row; 101, first tower group; 102, second tower group;

[0018] 2. Circulating water pump room; 201. Room body; 202. Circulating pipe group; 2021. Circulating pipeline; 2022. Circulating water pump; 203. Suction pipe;

[0019] 3. Second tower row;

[0020] 4. Cooling tower; 401. Water collecting tank; 402. Water absorption well; 403. Filter;

[0021] 5. The first ditch;

[0022] 6. Second water ditch;

[0023] 7. Crane assembly; 701. Crane track; 702. Crane; 703. Reinforcement ribs;

[0024] 8. First ground plane;

[0025] 9. The second ground plane. DETAILED DESCRIPTION

[0026] The following is a further detailed description of the specific implementation of the present invention in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0027] In the description of the present invention, the terms "upper", "lower", "left", "right", "front", "back", "inner", "outer", "lateral", "longitudinal" and the like used to indicate the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only used to facilitate the description of the present invention and simplify the description, and are not used to limit the indicated devices, elements or components to have a specific orientation, or to be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. For ordinary technicians in this field, the specific meanings of these terms in the present invention can be understood according to specific circumstances.

[0028] In the description of the present utility model, the terms "provided with", "set", "connected", and "placed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be an internal connection between two devices, elements, or components. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.

[0029] In addition, the terms "first", "second", etc. are mainly used to distinguish different devices, elements or components (the specific types and structures may be the same or different), and are not used to indicate or imply the relative importance and quantity of the indicated devices, elements or components. Unless otherwise specified, "plurality" means two or more.

[0030] The technical solution of the utility model is further described below in conjunction with the embodiments and drawings.

[0031] like Figure 1 As shown, a circulating cooling system according to an embodiment of the utility model comprises a first tower row 1 and a circulating water pump room 2;

[0032] The circulating water pump room 2 includes a room body 201 and a circulating pipe group 202 arranged inside the room body 201. The first tower row 1 includes a cooling tower 4. The cooling tower 4 is arranged in parallel with the room body 201. The cooling tower 4 includes a collecting tank 401. The circulating pipe group 202 and the collecting tank 401 are interconnected. The collecting tank 401 is arranged below the first ground plane 8, and the top surface of the collecting tank 401 is 300 mm higher than the first ground plane 8. The room body 201 is arranged on the second ground plane 9, which is lower than the first ground plane 8. The highest point of the circulating pipe group 202 is lower than the top surface of the collecting tank 401.

[0033] Based on the above technical solution, the water collecting tank 401 is lower than the first ground plane 8, and the upper end surface of the water collecting tank 401 is flush with the first ground plane 8. The building body 201 is set on the second ground plane 9, the first ground plane 8 is higher than the second ground plane 9, and the highest point of the circulating pipe group 202 is lower than the top surface of the water collecting tank 401. The layout of the water collecting tank 401 and the circulating water pump room 2 are staggered by utilizing the height difference of the terrain, which can avoid the building body 201 from being flooded, ensure the safe operation of the circulating cooling system, and there is no need to lift the cooling tower 4, thereby reducing the construction cost.

[0034] Preferably, if Figure 2The first tower row 1 shown includes a plurality of cooling towers 4, which are arranged in parallel along the front-to-back direction to form a first tower group 101 and a second tower group 102. The first tower group 101 and the second tower group 102 are arranged at intervals along the front-to-back direction, and the room body 201 is arranged between the first tower group 101 and the second tower group 102. The water collection tanks 401 of the two cooling towers 4 adjacent to the room body 201 are both connected to the circulation pipe group 202. The first tower group 101 and the second tower group 102 are respectively arranged at the front and rear ends of the circulating water pump room 2. The cooling water in the water collection tanks 401 of the first tower group 101 and the second tower group 102 flows into the circulation pipe group 202. The circulation pipe group 202 has two water inlet ends to ensure the stability of the cooling water output from the circulation pipe group 202 and the safety of the overall system operation. If the circulation pipe group 202 is provided with a single water inlet end, when the water inlet end is blocked, the cooling water output to the outside is sharply reduced, which is very likely to cause a loss of cooling accident.

[0035] Specifically, the water collection tanks 401 of the cooling towers 4 arranged in parallel are connected to each other.

[0036] More preferably, the circulating cooling system also includes a second tower row 3, which is arranged on one side of the length direction of the first tower row 1, and the second tower row 3 includes a plurality of cooling towers 4, which are arranged in parallel along the front-to-back direction, and a first return water ditch 5 is connected between the first tower group 101 and the second tower row 3, and a second return water ditch 6 is connected between the second tower group 102 and the second tower row 3.

[0037] More preferably, the first return water ditch 5 is connected to the cooling tower 4 at the front side of the first tower group 101 and the cooling tower 4 at the front side of the second tower row 3, and the second return water ditch 6 is connected to the cooling tower 4 at the rear side of the second tower group 102 and the cooling tower 4 at the rear side of the second tower row 3. The first return water ditch 5 is connected to the water collection tank 401 of the cooling tower 4 at the front side of the first tower group 101 and the water collection tank 401 of the cooling tower 4 at the front side of the second tower row 3, and the second return water ditch 6 is connected to the water collection tank 401 of the cooling tower 4 at the rear side of the second tower group 102 and the water collection tank 401 of the cooling tower 4 at the rear side of the second tower row 3, so as to reduce the number of turns of the cooling water flowing from the second tower row 3 to the first tower group 101, the second tower group 102 and then to the circulation pipe group 202, reduce the impulse reduction amount when the cooling water flows, and the cooling water can flow to the circulation pipe group 202 faster for output and use, and cool in time to ensure the safety of the overall system operation.

[0038] More preferably, a crane assembly 7 is provided in the house body 201 , and the crane assembly 7 includes a crane rail 701 and a crane 702 slidably disposed on the crane rail 701 , and both ends of the crane rail 701 are respectively connected to the inner side walls of the house body 201 .

[0039] In a specific embodiment, the circulation pipe set 202 includes a circulation pipeline 2021 and a circulation water pump 2022 detachably disposed on the circulation pipeline 2021 .

[0040] A crane assembly 7 is provided. When the circulating water pump fails, the crane 702 can slide along the crane track 701 to the top of the circulating water pump 2022, lift the circulating water pump 2022, and replace or repair the circulating water pump 2022 in time.

[0041] More preferably, a reinforcing rib 703 is provided at the connection between the crane track 701 and the house body 201. Since the span of the crane track 701 arranged in the house body 201 is relatively large, the sliding stability of the crane 702 on the crane track 701 is poor, and the reinforcing rib 703 is provided to increase the structural strength of the crane track 701, increase the stability of the crane 702 sliding and the crane 702 lifting the circulating water pump.

[0042] More preferably, a water suction well 402 is provided below the water collection tank 401 of the two cooling towers 4 adjacent to the building body 201, the water suction well 402 is connected to the water collection tank 401, and a water suction pipe 203 is connected between the circulation pipe group 202 and the water suction well 402. The water suction well 402 is provided below the water collection tank 401 and is directly connected to the water collection tank 401, which reduces the need to set up a forebay and saves the civil engineering cost of the forebay.

[0043] More preferably, a filter screen 403 is provided between the water absorption well 402 and the water collection tank 401. The cooling water in the water collection tank 401 is further filtered and then flows into the circulation pipe group 202 to reduce impurities in the cooling water and ensure the cooling effect of the cooling water.

[0044] Furthermore, the second ground plane 9 is connected to the outdoor road of the house body 201. The second ground plane 9 is connected to the main road outside the house body 201, which is conducive to the maintenance and repair of the circulation pipe group.

[0045] In summary, an embodiment of the utility model provides a circulating cooling system, wherein a water collecting tank 401 is lower than a first ground plane 8, an upper end surface of the water collecting tank 401 is flush with the first ground plane 8, a room body 201 is arranged on a second ground plane 9, the first ground plane 8 is higher than the second ground plane 9, the highest point of the circulating pipe group 202 is lower than the top surface of the water collecting tank 401, and the arrangement of the water collecting tank 401 and the circulating water pump room 2 is staggered by utilizing the height difference of the terrain, so that the circulating water pump room 2 is arranged as an above-ground type, which can avoid the situation where the room body 201 is flooded, thereby ensuring the safe operation of the circulating cooling system, and there is no need to lift the cooling tower 4, thereby reducing the construction cost.

[0046] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principle of the present invention. These improvements and substitutions should also be regarded as the protection scope of the present invention.

Claims

1. A circulating cooling system, It is characterized in that It includes a first tower row (1) and a circulating water pump room (2); The circulating water pump room (2) comprises a room body (201) and a circulating pipe group (202) arranged inside the room body (201); the first tower row (1) comprises a cooling tower (4); the cooling tower (4) and the room body (201) are arranged in parallel; the cooling tower (4) comprises a water collecting tank (401); the circulating pipe group (202) and the water collecting tank (401) are interconnected; the water collecting tank (401) is arranged below a first ground plane, and the top surface of the water collecting tank (401) is 300 mm higher than the first ground plane (8); the room body (201) is arranged on a second ground plane (9), the second ground plane (9) is lower than the first ground plane (8); the highest point of the circulating pipe group (202) is lower than the top surface of the water collecting tank (401).

2. The circulating cooling system according to claim 1, It is characterized in that The first tower row (1) comprises a plurality of cooling towers (4), and the plurality of cooling towers (4) are arranged in parallel along the front-to-back direction to form a first tower group (101) and a second tower group (102), and the first tower group (101) and the second tower group (102) are arranged at intervals along the front-to-back direction, and the building body (201) is arranged between the first tower group (101) and the second tower group (102), and the water collecting tanks (401) of the two cooling towers (4) adjacent to the building body (201) are both connected to the circulation pipe group (202).

3. The circulating cooling system according to claim 2, It is characterized in that The invention also comprises a second tower row (3), wherein the second tower row (3) is arranged on one side of the length direction of the first tower row (1), the second tower row (3) comprises a plurality of cooling towers (4), the plurality of cooling towers (4) are arranged in parallel along the front-to-back direction, a first return water ditch (5) is connected between the first tower group (101) and the second tower row (3), and a second return water ditch (6) is connected between the second tower group (102) and the second tower row (3).

4. The circulating cooling system according to claim 3, It is characterized in that The first return water ditch (5) connects the cooling tower (4) located at the front side of the first tower group (101) and the cooling tower (4) located at the front side of the second tower row (3), and the second return water ditch (6) connects the cooling tower (4) located at the rear side of the second tower group (102) and the cooling tower (4) located at the rear side of the second tower row (3).

5. The circulating cooling system according to claim 2, It is characterized in that A crane assembly (7) is arranged in the house body (201), and the crane assembly (7) comprises a crane track (701) and a crane (702) slidably arranged on the crane track (701), and two ends of the crane track (701) are respectively connected to the inner side wall of the house body (201).

6. The circulating cooling system according to claim 5, It is characterized in that A reinforcing rib (703) is provided at the connection between the crane track (701) and the house body (201).

7. The circulating cooling system according to claim 2, It is characterized in that A water suction well (402) is provided below the water collecting tank (401) of the two cooling towers (4) adjacent to the building body (201); the water suction well (402) is connected to the water collecting tank (401); and a water suction pipe (203) is connected between the circulation pipe group (202) and the water suction well (402).

8. The circulating cooling system according to claim 7, It is characterized in that A filter screen (403) is provided between the water absorption well (402) and the water collection tank (401).