Drilling device with tool capable of being rapidly replaced for building engineering construction
By designing a rotating structure and a hydraulic fixing system, the problem of low tool replacement efficiency in drilling devices was solved, enabling rapid tool replacement and precise drilling, and extending the service life of the drilling tools.
Patent Information
- Application Number
- CN202420662295.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-02
- Publication Date
- 2024-11-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing drilling equipment requires the use of special tools when changing drilling tools, resulting in low work efficiency.
A rotating structure including a head, a first bolt, a first shaft, a handle, a washer, and a nut is designed to allow for quick manual replacement of the drilling tool; at the same time, the workpiece is fixed by a hydraulic cylinder, a hydraulic rod, and a clamp to reduce vibration; and the temperature of the drilling tool is reduced by water pipes, a water pump, and a water tank.
It enables quick replacement of drilling tools without tools, reduces workpiece vibration, ensures accurate drilling position, extends the service life of drilling tools, and improves drilling accuracy.
Smart Images

Figure CN222039138U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field related to construction engineering, in particular to a drilling device with a tool capable of being quickly replaced for construction engineering. Background Art
[0002] Construction engineering refers to the planning, investigation, design, construction, completion and other technical work and completed engineering entities for the construction, reconstruction or expansion of buildings and ancillary structures and facilities, as well as the installation of supporting lines, pipelines and equipment. During the construction process, drilling devices play an important role in drilling, taking soil and coring, laying steel bars, assisting construction and saving work costs, and are widely used in various construction projects.
[0003] When the drilling tool of the existing drilling device needs to be replaced, a special tool is required to replace the drilling tool. It takes a lot of time to replace the tool during use, which will reduce work efficiency and affect production progress. Therefore, it is necessary to propose a drilling device with quickly replaceable tools for construction engineering construction. Utility Model Content
[0004] The purpose of the utility model is to provide a drilling device with a tool that can be quickly replaced for construction engineering, so as to solve the problems raised in the above-mentioned background technology.
[0005] To achieve the above-mentioned objectives, the utility model provides the following technical solutions: a drilling device with quickly replaceable tools for construction engineering, comprising a base, mounting frames are fixed on both sides of the base, a sliding frame is fixed on the top of the base, a first sliding block is sleeved on one side of the sliding frame, a fixing frame is fixed on one side of the first sliding frame, a fixing block is fixed on one side of the fixing frame, a screw rod passes through the surface of the fixing frame, a first motor is installed below the screw rod, a second motor is installed below the fixing frame, a machine head is installed at the output end below the second motor, a drilling tool is installed below the machine head, a first bolt passes through one end of the drilling tool, a first rotating shaft is movably connected to one end of the first bolt, a handle is movably connected to one end of the first rotating shaft, a gasket is fixed to one side of the handle, and a nut is installed at the other end of the first bolt.
[0006] Preferably, the drilling tool forms a rotating structure with a fixed frame through a machine head, and the drilling tool is threadedly connected to the machine head through a first bolt.
[0007] Preferably, the handle forms a rotating structure through a first rotating shaft and a first bolt, and the handle and the gasket are integrally formed.
[0008] Preferably, hydraulic cylinders are fixed on both sides of the mounting frame, a hydraulic rod is installed at one end of the hydraulic cylinder, a second slider is fixed at one end of the hydraulic rod, a fixing clamp is installed above the second slider, and a second bolt penetrates the surface of the fixing clamp.
[0009] Preferably, the fixing clamp forms a sliding structure with the mounting frame via a second sliding block, and the second sliding block is symmetrically arranged with respect to the central axis of the mounting frame.
[0010] Preferably, one side of the fixed block is movably connected to a second rotating shaft, one side of the second rotating shaft is movably connected to a fixed sleeve, one side of the fixed sleeve is penetrated by a third bolt, the inner side of the fixed sleeve is provided with a water pipe, one end of the water pipe is equipped with a nozzle, the other side of the water pipe is equipped with a water pump, and one side of the water pump is equipped with a water tank.
[0011] Preferably, the fixing sleeve forms a rotating structure with the fixing block via the second rotating shaft, and the fixing sleeve is threadedly connected with the fixing block via a third bolt.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] 1. A drilling device with a tool that can be quickly replaced for construction engineering, through the arrangement of a machine head, a first bolt, a first rotating shaft, a handle, a gasket and a nut, during the use of the device, by rotating the handle to separate the gasket from the machine head, the nut can be manually removed from the first bolt, and the drilling tool can be replaced. The drilling tool can be quickly replaced without tools, which reduces the work intensity of the operator and improves work efficiency;
[0014] 2. A drilling device with a tool that can be quickly replaced for construction engineering, through the arrangement of a hydraulic cylinder, a hydraulic rod, a second slide block and a fixing clamp, during the use of the device, by turning on the switch of the hydraulic cylinder, the hydraulic rod is extended and retracted, driving the fixing clamp to fix the workpiece, reducing the vibration of the workpiece caused by the rotation and impact of the drill bit, preventing the workpiece from moving during the drilling process, and ensuring the accuracy of the drilling position;
[0015] 3. A drilling device with quickly replaceable cutting tools for construction engineering projects, through the arrangement of a drilling tool, a fixing sleeve, a water pipe, a water pump and a water tank. During the use of the device, the water pipe is fixed at a desired position by the fixing sleeve, and by turning on the water pump, water in the water tank is sprayed onto the drilling tool, taking away the heat generated by the friction between the drilling tool and the workpiece, reducing the temperature of the drilling tool, preventing the drill bit from being aggravated by the continuous increase in the temperature of the drilling tool, increasing the service life of the drilling tool, preventing the cutting edge of the drilling tool from becoming blunt due to excessive temperature, and ensuring the accuracy and quality of drilling. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1It is a schematic diagram of the overall structure of the utility model;
[0017] Figure 2 This is a schematic diagram of the handle structure of the utility model;
[0018] Figure 3 This is a schematic diagram of the cross-sectional structure of the mounting frame of the utility model;
[0019] Figure 4 This is a schematic diagram of the structure of the fixed block of the utility model.
[0020] In the figure: 1. base; 2. mounting frame; 3. sliding frame; 4. first slider; 5. fixing frame; 6. fixing block; 7. screw rod; 8. first motor; 9. second motor; 10. machine head; 11. drilling tool; 12. first bolt; 13. first rotating shaft; 14. handle; 15. gasket; 16. nut; 17. hydraulic cylinder; 18. hydraulic rod; 19. second slider; 20. fixing clamp; 21. second bolt; 22. second rotating shaft; 23. fixing sleeve; 24. third bolt; 25. water pipe; 26. nozzle; 27. water pump; 28. water tank. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0022] See also Figure 1-2The utility model provides a technical solution: a drilling device with a tool that can be quickly replaced for construction engineering, comprising a base 1, mounting frames 2 are fixed on both sides of the base 1, a sliding frame 3 is fixed on the top of the base 1, a first sliding block 4 is sleeved on one side of the sliding frame 3, a fixing frame 5 is fixed on one side of the first sliding block 4, a fixing block 6 is fixed on one side of the fixing frame 5, a screw rod 7 penetrates the surface of the fixing frame 5, a first motor 8 is installed below the screw rod 7, a second motor 9 is installed below the fixing frame 5, a machine head 10 is installed at the output end below the second motor 9, a drilling tool 11 is installed below the machine head 10, a first bolt 12 is penetrated at one end of the drilling tool 11, the drilling tool 11 forms a rotating structure with the fixing frame 5 through the machine head 10, and the drilling tool 11 passes through the first bolt 12. A bolt 12 is threadedly connected to the machine head 10, and the drilling tool 11 is rotated through the machine head 10 to perform drilling operations on the workpiece. One end of the first bolt 12 is movably connected to the first rotating shaft 13, and one end of the first rotating shaft 13 is movably connected to the handle 14. A gasket 15 is fixed to one side of the handle 14, and a nut 16 is installed on the other end of the first bolt 12. The handle 14 forms a rotating structure with the first bolt 12 through the first rotating shaft 13. The handle 14 and the gasket 15 are integrally formed. By rotating the handle 14, the gasket 15 and the machine head 10 are separated, and the nut 16 can be manually removed from the first bolt 12 to replace the drilling tool 11. The drilling tool 11 can be quickly replaced without tools, which reduces the work intensity of the operator and improves work efficiency.
[0023] See also Figure 3-4, hydraulic cylinders 17 are fixed on both sides of the mounting frame 2, a hydraulic rod 18 is installed at one end of the hydraulic cylinder 17, a second slider 19 is fixed at one end of the hydraulic rod 18, a fixing clamp 20 is installed above the second slider 19, a second bolt 21 penetrates the surface of the fixing clamp 20, the fixing clamp 20 forms a sliding structure with the mounting frame 2 through the second slider 19, and the second slider 19 is symmetrically arranged with the central axis of the mounting frame 2. By turning on the switch of the hydraulic cylinder 17, the hydraulic rod 18 is extended and retracted, driving the fixing clamp 20 to fix the workpiece, reducing the vibration of the workpiece caused by the rotation and impact of the drill bit, preventing the workpiece from moving during the drilling process, and ensuring the accuracy of the drilling position, one side of the fixed block 6 is movably connected with a second rotating shaft 22, one side of the second rotating shaft 22 is movably connected with a fixing sleeve 23, and one side of the fixing sleeve 23 penetrates There is a third bolt 24, and a water pipe 25 is provided on the inner side of the fixing sleeve 23. A nozzle 26 is installed at one end of the water pipe 25, and a water pump 27 is installed on the other side of the water pipe 25. A water tank 28 is installed on one side of the water pump 27. The fixing sleeve 23 forms a rotating structure with the fixing block 6 through the second rotating shaft 22. The fixing sleeve 23 is threadedly connected with the fixing block 6 through the third bolt 24. The water pipe 25 is fixed at a desired position through the fixing sleeve 23. By turning on the switch of the water pump 27, the water in the water tank 28 is sprayed onto the drilling tool 11, taking away the heat generated by the friction between the drilling tool 11 and the workpiece, reducing the temperature of the drilling tool 11, preventing the drill bit from being aggravated due to the continuous increase in the temperature of the drilling tool 11, and improving the service life of the drilling tool 11. It is prevented that the cutting edge of the drilling tool 11 becomes blunt due to excessive temperature, and the accuracy and quality of drilling are guaranteed.
[0024] Working principle: When using the drilling device with a tool that can be quickly replaced for construction engineering, first connect the external power supply, place the workpiece on the base 1, then turn on the switch of the hydraulic cylinder 17, so that the hydraulic rod 18 is extended and retracted, driving the fixing clamp 20 to fix the workpiece to prevent the workpiece from moving during the drilling process, turn on the switch of the second motor 9, so that the drilling tool 11 rotates, turn on the switch of the first motor 8, so that the screw rod 7 rotates, drives the second motor 9 to rise and fall, moves the second motor 9 to the desired position, drills the workpiece, and turns on the switch of the water pump 27 so that the water in the water tank 28 is sprayed onto the drilling tool 11 to take away the friction product of the drilling tool 11 and the workpiece. The heat generated can reduce the temperature of the drilling tool 11. When the drilling tool 11 needs to be replaced, the handle 14 is rotated to separate the gasket 15 from the machine head 10, and the nut 16 can be manually removed from the first bolt 12 to replace the drilling tool 11. The drilling tool 11 can be quickly replaced without tools. When the device is not in use, the external power supply of the device is cut off. The model of the first motor 8 is CV400-28, the model of the second motor 9 is XD-3420-2, the model of the hydraulic cylinder 17 is HSG50, and the model of the water pump 27 is WZB-370. In this way, the use process of the drilling device with quickly replaceable tools for construction engineering is completed.
[0025] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A drilling device with a quickly replaceable tool for construction engineering, comprising a base (1), characterized in that: A mounting frame (2) is fixed on both sides of the base (1), a sliding frame (3) is fixed on the top of the base (1), a first sliding block (4) is sleeved on one side of the sliding frame (3), a fixing frame (5) is fixed on one side of the first sliding block (4), a fixing block (6) is fixed on one side of the fixing frame (5), a screw rod (7) passes through the surface of the fixing frame (5), a first motor (8) is installed below the screw rod (7), and a second motor (9) is installed below the fixing frame (5). A head (10) is installed at the output end below the second motor (9), a drilling tool (11) is installed below the head (10), a first bolt (12) passes through one end of the drilling tool (11), one end of the first bolt (12) is movably connected to a first rotating shaft (13), one end of the first rotating shaft (13) is movably connected to a handle (14), a gasket (15) is fixed to one side of the handle (14), and a nut (16) is installed at the other end of the first bolt (12).
2. A drilling device with a quickly replaceable tool for construction engineering according to claim 1, characterized in that: The drilling tool (11) forms a rotating structure through a machine head (10) and a fixing frame (5), and the drilling tool (11) is threadedly connected to the machine head (10) through a first bolt (12).
3. A drilling device with a quickly replaceable tool for construction engineering according to claim 1, characterized in that: The handle (14) forms a rotating structure through the first rotating shaft (13) and the first bolt (12), and the handle (14) and the gasket (15) are integrally formed.
4. A drilling device with a quickly replaceable tool for construction engineering according to claim 1, characterized in that: A hydraulic cylinder (17) is fixed on both sides of the mounting frame (2), a hydraulic rod (18) is installed at one end of the hydraulic cylinder (17), a second slider (19) is fixed at one end of the hydraulic rod (18), a fixing clamp (20) is installed above the second slider (19), and a second bolt (21) penetrates the surface of the fixing clamp (20).
5. A drilling device with a quickly replaceable tool for construction engineering according to claim 4, characterized in that: The fixing clamp (20) forms a sliding structure with the mounting frame (2) via a second sliding block (19), and the second sliding block (19) is symmetrically arranged with respect to the central axis of the mounting frame (2).
6. A drilling device with a quickly replaceable tool for construction engineering according to claim 1, characterized in that: One side of the fixed block (6) is movably connected to a second rotating shaft (22), one side of the second rotating shaft (22) is movably connected to a fixed sleeve (23), one side of the fixed sleeve (23) is penetrated by a third bolt (24), the inner side of the fixed sleeve (23) is provided with a water pipe (25), one end of the water pipe (25) is installed with a spray head (26), the other side of the water pipe (25) is installed with a water pump (27), and one side of the water pump (27) is installed with a water tank (28).
7. A drilling device with a quickly replaceable tool for construction engineering according to claim 6, characterized in that: The fixing sleeve (23) forms a rotating structure with the fixing block (6) via the second rotating shaft (22), and the fixing sleeve (23) is threadedly connected with the fixing block (6) via a third bolt (24).