Lifting device with locking structure for building bridge construction

By using locking structures such as gear discs and rotating rods in the lifting device for bridge construction, the problem that traditional devices are inconvenient to lock the rolling roller is solved, and the safety and stability of the lifting device are improved, avoiding winding due to winding Risk of lift rack drop caused by roller damage.

CN222042498UActive Publication Date: 2024-11-22QINGHAI ZHENSHUO CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420779338.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-15
Publication Date
2024-11-22
Estimated Expiration
2034-04-15

AI Technical Summary

Technical Problem

The traditional bridge construction lifting device is not convenient to lock the rolling roller when used, and it is easy to fall off the lifting frame due to damage, which poses safety hazards.

Method used

A lifting device with a locking structure is designed, using a combined structure of a toothed disk, mounting frame, rotary rod, guide rod and retarder. The retarder is pushed downward through the rotary rod, locking the toothed disk to ensure winding The rollers do not rotate unexpectedly; and in an emergency, the lift box drop speed is slowed down through the cylinder and the articulated rod.

Benefits of technology

Effectively locking the roll roll improves construction safety, prevents unexpected falls of the lift frame, and enhances safety and stability during use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222042498U_ABST
    Figure CN222042498U_ABST
Patent Text Reader

Abstract

The utility model discloses a building bridge construction lifting device with a locking structure. The building bridge construction lifting device comprises a base and a lifting frame. A lifting frame is arranged at the top end of the base, a lifting box is arranged in the base, an emergency switch is arranged on one side in the lifting box, guide blocks are arranged on the two sides in the lifting frame, and auxiliary structures are arranged on the two sides of the top end of the lifting box; a winding roller is arranged at the rear end of the lifting frame, a steel wire rope is arranged on the outer side of the winding roller, one end of the steel wire rope and the top end of the lifting box are installed, and a locking structure is arranged on one side of the winding roller. The locking structure comprises a fluted disc, a mounting frame, a rotating rod, a guide rod and an abutting plate, and the fluted disc is arranged on the outer side of one end of the winding roller. According to the winding device, the rotating rod and the mounting frame are used in cooperation, after the lifting box is lifted to a proper position, the abutting plate is pushed to move downwards, so that the abutting plate is clamped to the upper end of the fluted disc, the fluted disc is locked, the situation that the winding roller rotates accidentally is avoided, and the safety effect is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge construction, in particular to a lifting device with a locking structure for building bridge construction. Background Art

[0002] A bridge is generally composed of an upper structure, a lower structure, a support and ancillary structures. The upper structure is also called a span structure, which is the main structure for crossing obstacles. The lower structure includes abutments, piers and foundations. The support is a force transmission device set up at the supporting place between the span structure and the piers or abutments. When constructing the bottom end of the bridge, a lifting device is needed to lift the workers to the bottom end of the bridge for construction. There are still some problems when using traditional lifting devices.

[0003] Traditional lifting devices generally use a winding roller and a wire rope to perform lifting. This type of lifting device is inconvenient to fix the position of the winding roller when fixing the position. It is easy for the winding roller to be damaged and automatically rotate, causing the risk of the lifting frame falling. Therefore, a lifting device with a locking structure for building bridge construction is needed to solve the above problem. Utility Model Content

[0004] The utility model aims to provide a lifting device for building bridge construction with a locking structure, so as to solve the defect that the lifting device for building bridge construction is inconvenient to lock the winding roller when in use.

[0005] In order to solve the above technical problems, the utility model provides the following technical solutions: a lifting device with a locking structure for building bridge construction, comprising a base and a lifting frame; a lifting frame is arranged at the top of the base, a lifting box is arranged inside the base, an emergency switch is arranged on one side of the lifting box, guide blocks are arranged on both sides of the lifting frame, and auxiliary structures are arranged on both sides of the top of the lifting box; a winding roller is arranged at the rear end of the lifting frame, a steel wire rope is arranged on the outside of the winding roller, one end of the steel wire rope is installed with the top of the lifting box, and a locking structure is arranged on one side of the winding roller; the locking structure comprises a toothed disc, a mounting frame, a rotating rod, a guide rod and a stop plate, and the toothed disc is arranged on the outside of one end of the winding roller.

[0006] Preferably, the mounting frame is arranged at the top end of one side of the winding roller, a rotating rod is arranged inside the mounting frame, a stop plate is arranged at the bottom end of the rotating rod, and guide rods are arranged on both sides of the top end of the stop plate.

[0007] Preferably, the rotating rod is inserted into the interior of the mounting frame, and a threaded connection is formed between the mounting frame and the rotating rod.

[0008] Preferably, two groups of guide rods are provided, and the two groups of guide rods are symmetrically distributed on both sides of the top end of the abutment plate.

[0009] Preferably, the auxiliary structure includes a connecting block, a slider, a movable groove, a movable column, a cylinder, a hinged rod, a hinged seat and a mounting plate. The mounting plate is arranged at the top of the lifting box, a cylinder is arranged at the top of the mounting plate, a connecting plate is arranged at the front end of the cylinder, and the slider is arranged on both sides of the top of the lifting box.

[0010] Preferably, a movable groove is provided on one side of the slider, a movable column is provided inside the movable groove, a connecting block is provided on the outside of the movable column, a hinge seat is provided on one side of the connecting block, hinge rods are provided on both sides of the connecting plate, and the hinge rods are inserted into the interior of the hinge seat.

[0011] Preferably, two groups of the connecting blocks are provided, and the two groups of the connecting blocks are symmetrically distributed on both sides of the connecting plate.

[0012] The utility model provides a lifting device with a locking structure for building bridge construction, which has the advantages of:

[0013] By using the rotating rod and the mounting frame in coordination, after the lifting box is lifted to a suitable position, the stop plate can be pushed downward so that the stop plate is stuck on the upper end of the toothed disc, locking the toothed disc so that the winding roller will not rotate accidentally, thereby improving safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 This is a front view structural schematic diagram of the utility model;

[0015] Figure 2 It is a rear view structural schematic diagram of the utility model;

[0016] Figure 3 It is a side view structural schematic diagram of the utility model;

[0017] Figure 4 It is a schematic diagram of a partial cross-sectional structure of the utility model from a rear view;

[0018] Figure 5 It is a schematic diagram of the auxiliary structure of the utility model from a top view.

[0019] In the figure: 1. base; 2. lifting frame; 3. lifting box; 4. wire rope; 5. winding roller; 6. locking structure; 601. toothed disc; 602. mounting frame; 603. rotating rod; 604. guide rod; 605. abutment plate; 7. guide block; 8. auxiliary structure; 801. connecting block; 802. sliding block; 803. movable groove; 804. movable column; 805. cylinder; 806. articulated rod; 807. articulated seat; 808. mounting plate; 809. connecting plate; 9. emergency switch. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] The utility model provides a lifting device for building bridge construction with a locking structure, such as Figure 1-Figure 5 As shown, a lifting device with a locking structure for building bridge construction includes a base 1 and a lifting frame 2;: the lifting frame 2 is arranged at the top of the base 1, a lifting box 3 is arranged inside the base 1, an emergency switch is arranged on one side of the lifting box 3, guide blocks 7 are arranged on both sides of the lifting frame 2, and auxiliary structures 8 are arranged on both sides of the top of the lifting box 3; a winding roller 5 is arranged at the rear end of the lifting frame 2, a steel wire rope 4 is arranged on the outer side of the winding roller 5, one end of the steel wire rope 4 is installed with the top of the lifting box 3, and a locking structure 6 is arranged on one side of the winding roller 5.

[0022] In a further preferred embodiment of the present invention, Figure 1-Figure 5 As shown: the locking structure 6 includes a toothed disc 601, a mounting frame 602, a rotating rod 603, a guide rod 604 and a stop plate 605. The toothed disc 601 is arranged on the outer side of one end of the winding roller 5, the mounting frame 602 is arranged at the top of one side of the winding roller 5, the interior of the mounting frame 602 is provided with a rotating rod 603, the bottom end of the rotating rod 603 is provided with a stop plate 605, guide rods 604 are provided on both sides of the top of the stop plate 605, the rotating rod 603 is inserted into the interior of the mounting frame 602, and a threaded connection is formed between the mounting frame 602 and the rotating rod 603. Two groups of guide rods 604 are provided, and the two groups of guide rods 604 are symmetrically distributed on both sides of the top of the stop plate 605.

[0023] Specifically, in this embodiment: when repairing the bridge, the base 1 is moved to the bottom of the maintenance position. After the movement is completed, the winding roller 5 is driven to rotate by the motor, so as to raise the height of the lifting box 3. When it is lifted to the specified height, the rotation is stopped, and then the rotating rod 603 is held and rotated. When the rotating rod 603 rotates, it pushes the abutment plate 605 to move downward, so that the teeth at the bottom of the abutment plate 605 are stuck in the gap between the teeth of the toothed disc 601, and the toothed disc 601 is locked, so that the winding roller 5 will not rotate accidentally, thereby completing the locking work.

[0024] In a further preferred embodiment of the present invention, Figure 1-Figure 5As shown: the auxiliary structure 8 includes a connecting block 801, a slider 802, a movable groove 803, a movable column 804, a cylinder 805, a hinged rod 806, a hinged seat 807 and a mounting plate 808, wherein the mounting plate 808 is arranged at the top end of the lifting box 3, the cylinder 805 is arranged at the top end of the mounting plate 808, and a connecting plate 809 is arranged at the front end of the cylinder 805, the slider 802 is arranged on both sides of the top end of the lifting box 3, a movable groove 803 is arranged on one side of the slider 802, a movable column 804 is arranged inside the movable groove 803, a connecting block 801 is arranged on the outer side of the movable column 804, a hinged seat 807 is arranged on one side of the connecting block 801, hinged rods 806 are arranged on both sides of the connecting plate 809, and the hinged rods 806 are inserted into the interior of the hinged seat 807, and two groups of connecting blocks 801 are arranged, and the two groups of connecting blocks 801 are symmetrically distributed on both sides of the connecting plate 809.

[0025] Specifically, in this embodiment, when the staff is inside the lifting box 3 and the lifting box 3 suddenly falls, the emergency switch 9 is pressed, and the cylinder 805 is started after pressing. After starting, the cylinder 805 will push the connecting plate 809 to move to one side. When the connecting plate 809 moves, since the connecting plate 809 and the connecting block 801 are hinged, one end of the connecting block 801 will be driven to move to one side. Since the connecting block 801 is movably connected to the movable column 804, the other end of the connecting block 801 will move to the other side, so that it will abut against one side of the guide block 7, increasing the friction between the connecting block 801 and one side of the guide block 7, thereby slowing down the descending speed of the lifting box 3 and completing the deceleration work.

[0026] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. A lifting device for building bridge construction with a locking structure, comprising a base (1) and a lifting frame (2); Features: A lifting frame (2) is arranged at the top of the base (1), a lifting box (3) is arranged inside the base (1), an emergency switch is arranged on one side inside the lifting box (3), (9) guide blocks (7) are arranged on both sides inside the lifting frame (2), and auxiliary structures (8) are arranged on both sides of the top of the lifting box (3); A winding roller (5) is provided at the rear end of the lifting frame (2), a steel wire rope (4) is provided on the outer side of the winding roller (5), one end of the steel wire rope (4) is mounted on the top end of the lifting box (3), and a locking structure (6) is provided on one side of the winding roller (5); The locking structure (6) comprises a toothed disc (601), a mounting frame (602), a rotating rod (603), a guide rod (604) and a stop plate (605), and the toothed disc (601) is arranged on the outer side of one end of the winding roller (5).

2. A lifting device for building bridge construction with a locking structure according to claim 1, characterized in that: The mounting frame (602) is arranged at the top end of one side of the winding roller (5), a rotating rod (603) is arranged inside the mounting frame (602), a support plate (605) is arranged at the bottom end of the rotating rod (603), and guide rods (604) are arranged on both sides of the top end of the support plate (605).

3. A lifting device for building bridge construction with a locking structure according to claim 2, characterized in that: The rotating rod (603) is inserted into the interior of the mounting frame (602), and a threaded connection is formed between the mounting frame (602) and the rotating rod (603).

4. The lifting device with a locking structure for building bridge construction according to claim 1 is characterized in that: The guide rods (604) are provided in two groups, and the two groups of guide rods (604) are symmetrically distributed on both sides of the top of the abutment plate (605).

5. The lifting device with a locking structure for building bridge construction according to claim 1 is characterized in that: The auxiliary structure (8) comprises a connecting block (801), a slider (802), a movable groove (803), a movable column (804), a cylinder (805), a hinge rod (806), a hinge seat (807) and a mounting plate (808); the mounting plate (808) is arranged at the top end of the lifting box (3); the top end of the mounting plate (808) is provided with a cylinder (805); the front end of the cylinder (805) is provided with a connecting plate (809); and the slider (802) is arranged on both sides of the top end of the lifting box (3).

6. A lifting device for building bridge construction with a locking structure according to claim 5, characterized in that: A movable groove (803) is provided on one side inside the slider (802), a movable column (804) is provided inside the movable groove (803), a connecting block (801) is provided on the outside of the movable column (804), a hinge seat (807) is provided on one side of the connecting block (801), hinge rods (806) are provided on both sides of the connecting plate (809), and the hinge rods (806) are inserted into the interior of the hinge seat (807).

7. The lifting device with a locking structure for building bridge construction according to claim 5 is characterized in that: The connection blocks (801) are provided in two groups, and the two groups of connection blocks (801) are symmetrically distributed on both sides of the connection plate (809).