Water conservancy anti-flood wall

By introducing buffer layers and embedded slot screw hole structures into the flood control wall, the problems of cumbersome splicing and intimate connection are solved, and the effect of convenient assembly and reduced flood impact is achieved, and the service life of the flood control wall is extended.

CN222044078UActive Publication Date: 2024-11-22SHANDONG SURVEY & DESIGN INST OF WATER CONSERVANCY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323467107.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-19
Publication Date
2024-11-22
Estimated Expiration
2033-12-19

AI Technical Summary

Technical Problem

The existing flood control walls are complicated in the splicing process and are not tight enough, so they are easily dispersed by floods, and the impact of water flow causes the wall panel to shorten their life.

Method used

A water conservancy flood control wall was designed, using a buffer layer between the base and the main body of the flood control wall. It is fixedly connected by hooks and fixing rings, and the embedded grooves and screw hole structures between the wall panels and the base panels are added, which simplifies the splicing process and is carried out through The buffer plate reduces flood impact.

Benefits of technology

It realizes convenient assembly of flood control walls and enhances connection tightness, effectively reduces the impact of flood impact on wall panels, and extends service life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222044078U_ABST
    Figure CN222044078U_ABST
Patent Text Reader

Abstract

The water conservancy anti-flood wall comprises a base, the base comprises a bottom plate, second fixing holes, second fixing plates, second fixing rings, second nuts, second bolts, second embedding grooves and second screw holes, the second fixing rings are fixedly installed at the positions, close to the front portion, of the upper surface of the bottom plate, and the second fixing rings are divided into two sets; a second embedding groove is formed in the surface of one side of the bottom plate, second screw holes are formed in the positions, close to one side, of the front surface and the rear surface of the bottom plate, a second fixing plate is fixedly installed on the surface of the other side of the bottom plate, and second fixing holes are formed in the front surface of the second fixing plate; the second bolts are installed between the second fixing holes and the second screw holes in an embedded mode and fixed through second nuts, and a flood prevention wall body is fixedly installed on the upper surface of the base. According to the water conservancy anti-flood wall, the anti-flood wall can be spliced more conveniently, and the impact force of flood on the anti-flood wall can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of flood control walls, in particular to a water conservancy flood control wall. Background Art

[0002] Flood wall is a retaining wall, which refers to a concrete or masonry water-retaining structure used to ensure flood control safety or other special requirements in towns and important industrial and mining enterprises, along rivers, coastal areas (part of seawalls). The advantages of flood wall are mainly saving building space, which is beneficial to the overall urban planning, forming a new landscape line with modern roads, overpasses, high and low floors and other buildings, and is conducive to modern management. According to the needs of urban and transportation development, urban flood walls will have more development.

[0003] Due to the different environments in which flood walls are used, the required width of flood walls is different, and multiple groups of flood walls need to be spliced ​​together. The splicing process of flood walls is cumbersome, and if the connection is not tight enough, it is easy to be washed away by floods. When the flood wall is in use, water directly rushes to the wall panels, which has a great impact on the wall panels and easily shortens the service life of the flood wall. For this reason, we propose a hydraulic flood wall. Utility Model Content

[0004] The main purpose of the utility model is to provide a water conservancy flood prevention wall, which can effectively solve the problems in the background technology.

[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0006] A water conservancy flood wall comprises a base, the base comprises a base plate, a second fixing hole, a second fixing plate, a second fixing ring, a second nut, a second bolt, a second embedding groove, and a second screw hole, the upper surface of the base plate is located near the front position and is fixedly installed with a second fixing ring, the second fixing ring is in two groups, one side surface of the base plate is provided with a second embedding groove, the front surface and the rear surface of the base plate are located near one side and are provided with a second screw hole, the other side surface of the base plate is fixedly installed with a second fixing plate, the front surface of the second fixing plate is provided with a second fixing hole, the second bolt is embedded and installed between the second fixing hole and the second screw hole, and is fixed by the second nut, and the upper surface of the base is fixedly installed with a flood wall body, the flood wall body comprises a first fixing hole, a first fixing plate, a first fixing ring, a first nut, a first bolt, a wall panel, a first embedding groove, a first A screw hole, a first embedding groove is opened on one side surface of the wall panel, the front surface and the rear surface of the wall panel are both provided with first screw holes near the top and bottom, and there are four groups of the first screw holes, and a first fixing plate is fixedly installed on the other side surface of the wall panel, the front surface of the first fixing plate is both provided with first fixing holes near the top and bottom, and there are two groups of the first fixing holes, and there are two groups of the first bolts, and the first bolts are embedded and installed inside the first screw hole and the first fixing hole, and are fixed by the first nut, and the front surface of the wall panel is located near the top and fixedly installed with a first fixing ring, and there are two groups of the first fixing ring, and a buffer layer is fixedly connected between the flood wall body and the base, and the buffer layer includes a hook and a buffer plate, and the upper surface and the lower surface of the buffer plate are located near the front and the rear and fixedly installed with hooks, and there are four groups of hooks.

[0007] Furthermore, the flood wall body and the base are fixedly mounted on the upper surface of the base plate through wall panels and are located in the middle position.

[0008] Furthermore, the buffer layer is fixedly connected between the first fixing ring and the second fixing ring through a hook.

[0009] Compared with the prior art, the utility model has the following beneficial effects:

[0010] In the utility model, by providing the first fixing plate, the second fixing plate and the first embedding groove, the second embedding groove, the wall panel can be easily assembled and conveniently operated; by providing the first fixing ring and the second fixing ring, the buffer layer can be fixed between the wall panel and the bottom plate by hooks, and the buffer layer provides buffering, which is helpful to reduce the impact of floods on the wall panel. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 This is a schematic diagram of the overall structure of a water conservancy flood control wall of the utility model;

[0012] Figure 2This is a front view of a buffer plate of a water conservancy flood wall of the utility model;

[0013] Figure 3 This is a side view of the main body of a flood control wall of a hydraulic flood control wall of the utility model;

[0014] Figure 4 This is a cross-sectional view of a wall panel of a water conservancy flood control wall of the utility model;

[0015] Figure 5 The utility model is a water conservancy flood wall Figure 4 A detailed enlarged picture of point A;

[0016] Figure 6 The utility model is a water conservancy flood wall Figure 4 Enlarged detail of point B.

[0017] In the figure: 1. flood wall body; 101. first fixing hole; 102. first fixing plate; 103. first fixing ring; 104. first nut; 105. first bolt; 106. wall panel; 107. first embedding groove; 108. first screw hole; 2. buffer layer; 201. hook; 202. buffer plate; 3. base; 301. bottom plate; 302. second fixing hole; 303. second fixing plate; 304. second fixing ring; 305. second nut; 306. second bolt; 307. second embedding groove; 308. second screw hole. DETAILED DESCRIPTION

[0018] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.

[0019] like Figure 1-6As shown, a water conservancy flood wall includes a base 3, the base 3 includes a bottom plate 301, a second fixing hole 302, a second fixing plate 303, a second fixing ring 304, a second nut 305, a second bolt 306, a second embedding groove 307, and a second screw hole 308. The upper surface of the bottom plate 301 is fixedly installed with a second fixing ring 304 near the front position, and the second fixing ring 304 is in two groups. A second embedding groove 307 is opened on one side surface of the bottom plate 301, and a second screw hole 308 is opened on the front and rear surfaces of the bottom plate 301 near one side. The second fixing plate 303 is fixedly installed on the other side surface of the bottom plate 301, and the front surface of the second fixing plate 303 is provided with a second fixing hole 302. The second bolt 306 is embedded and installed between the second fixing hole 302 and the second screw hole 308, and is fixed by the second nut 305. The upper surface of the base 3 is fixedly installed with the flood wall body 1, and the flood wall body 1 includes a first fixing hole 101, a first fixing plate 102, a first fixing ring 103, a first nut 104, a first bolt 105, a wall plate 106, a first embedding groove 107, and a first screw hole 108. 8. A first embedding groove 107 is provided on one side surface of the wall panel 106. First screw holes 108 are provided on the front surface and the rear surface of the wall panel 106 near the upper and lower positions. The first screw holes 108 are four groups. A first fixing plate 102 is fixedly installed on the other side surface of the wall panel 106. First fixing holes 101 are provided on the front surface of the first fixing plate 102 near the upper and lower positions. The first fixing holes 101 are two groups. The first bolts 105 are two groups. The first bolts 105 are embedded and installed in the first screw holes 108 and the first fixing holes 101. Inside, and fixed by the first nut 104, the front surface of the wall panel 106 is located near the upper position and fixedly installed with the first fixing ring 103, the first fixing ring 103 is in two groups, a buffer layer 2 is fixedly connected between the flood wall body 1 and the base 3, the buffer layer 2 includes a hook 201 and a buffer plate 202, the buffer plate 202 is in an inclined state, when water impacts the buffer plate 202, it can be buffered on the surface of the buffer layer 202, the upper surface and the lower surface of the buffer plate 202 are located near the front and rear positions and are fixedly installed with hooks 201, the hooks 201 are in four groups;

[0020] The flood wall body 1 and the base 3 are fixedly installed on the upper surface of the bottom plate 301 in the middle position through the wall panel 106. When splicing, the first fixing plate 102 is embedded in the first embedding groove 107, and the second fixing plate 303 is embedded in the second embedding groove 307, which can strengthen the connection between the wall panel 106 and the bottom plate 301; the buffer layer 2 is fixedly connected between the first fixing ring 103 and the second fixing ring 304 through the hook 201.

[0021] It should be noted that the utility model is a water conservancy flood wall. When in use, the flood wall body 1 and the base 3 are spliced ​​according to the needs of use, and the buffer layer 2 is used to buffer the flood; the first fixing plate 102 is embedded in the first embedding groove 107, the second fixing plate 303 is embedded in the second embedding groove 307, the first bolt 105 is embedded in the first screw hole 108 and the first fixing hole 101, and is fixed by the first nut 104, the second bolt 306 is embedded in the second screw hole 308 and the second fixing hole 302, and is fixed by the second nut 305, so that the two sets of wall panels 106 and the bottom plate 301 can be spliced, and the buffer plate 202 is connected through the hook 201, so that the hook 201 is connected to the first fixing ring 103 and the second fixing ring 304, and the buffer plate 202 buffers the water.

[0022] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.

Claims

1. A hydraulic flood control wall, characterized by: The invention comprises a base (3), wherein the base (3) comprises a bottom plate (301), a second fixing hole (302), a second fixing plate (303), a second fixing ring (304), a second nut (305), a second bolt (306), a second embedding groove (307), and a second screw hole (308). The second fixing ring (304) is fixedly installed on the upper surface of the bottom plate (301) at a position close to the front, and the second fixing ring (304) is in two groups. A second embedding groove (307) is provided on one side surface of the bottom plate (301), and a second screw hole (308) is provided on the front and rear surfaces of the bottom plate (301) at a position close to one side. 8), a second fixing plate (303) is fixedly installed on the other side surface of the bottom plate (301), a second fixing hole (302) is opened on the front surface of the second fixing plate (303), the second bolt (306) is embedded and installed between the second fixing hole (302) and the second screw hole (308), and is fixed by a second nut (305), and a flood wall body (1) is fixedly installed on the upper surface of the base (3), and the flood wall body (1) includes a first fixing hole (101), a first fixing plate (102), a first fixing ring (103), a first nut (104), a first bolt (105), a wall plate (106), A first embedding groove (107) and a first screw hole (108), one side surface of the wall panel (106) is provided with a first embedding groove (107), the front surface and the rear surface of the wall panel (106) are both provided with first screw holes (108) near the top and the bottom, and there are four groups of the first screw holes (108); the other side surface of the wall panel (106) is fixedly installed with a first fixing plate (102), the front surface of the first fixing plate (102) is both provided with first fixing holes (101) near the top and the bottom, and there are two groups of the first fixing holes (101), the first bolts (105) are two groups, and the first screw holes (105) are four groups. The bolt (105) is embedded in the first screw hole (108) and the first fixing hole (101), and is fixed by a first nut (104). The front surface of the wall panel (106) is fixedly installed with a first fixing ring (103) near the upper position, and the first fixing ring (103) is in two groups. A buffer layer (2) is fixedly connected between the flood wall body (1) and the base (3). The buffer layer (2) includes a hook (201) and a buffer plate (202). The upper surface and the lower surface of the buffer plate (202) are fixedly installed with hooks (201) near the front and rear positions, and the hooks (201) are in four groups.

2. A hydraulic flood control wall according to claim 1, characterized in that: The flood wall body (1) and the base (3) are fixedly mounted on the upper surface of the bottom plate (301) via a wall plate (106) and are located in the middle.

3. A hydraulic flood control wall according to claim 2, characterized in that: The buffer layer (2) is fixedly connected between the first fixing ring (103) and the second fixing ring (304) via a hook (201).