Bituminous concrete core wall dam foundation gallery structure
By using technologies such as silo segments, water stop components, asphalt concrete anti-seepage layer and polyester grid in the foundation corridor of asphalt concrete heart wall dam, the leakage problem caused by the deformation of the corridor is solved, and the asphalt concrete is realized Safe operation guarantee of the heart wall dam.
Patent Information
- Application Number
- CN202420407423.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-04
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-03-04
AI Technical Summary
Due to its thin body size, the corridor structure of the asphalt concrete heart wall dam is easily exposed under the upper stone pile structure, resulting in deformation and cracking, forming seepage channels and structural joints, resulting in reservoir water leakage problems, affecting the safe operation of the dam.
The trough-type foundation excavated by the dam body is set up to control structural deformation and leakage, and through the use of water-stop components and asphalt concrete anti-seepage layer. Drainage pipes and osmotic pressure monitoring equipment achieve anti-seepage effect.
The crack leakage problem in the foundation corridor is effectively controlled, the long-term safe operation of the asphalt concrete core wall dam is ensured, and the leakage risk is reduced through silo-stage pouring and water-stop construction joints is improved, and the anti-seepage effect and structural stability are improved.
Smart Images

Figure CN222044258U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water retaining engineering of asphalt concrete anti-seepage core walls, in particular to a foundation gallery structure of an asphalt concrete core wall dam. Background Art
[0002] Asphalt concrete core wall dams generally use the gallery structure as a combination of foundation anti-seepage and dam body anti-seepage. However, due to the relatively thin shape of the core wall, most of the top area of the gallery is directly exposed to the upper rockfill structure, which will cause the deformation and cracking of the gallery to form a seepage channel. In addition to cracks, structural joints are also an important cause of leakage. Therefore, the gallery of the asphalt concrete core wall dam and its surrounding detailed structure are very important to ensure the overall operation safety of the dam. Utility Model Content
[0003] The utility model aims to provide a foundation gallery structure which can solve the reservoir water leakage problem caused by cracking of the foundation gallery and ensure the long-term safe operation of the asphalt concrete core wall dam.
[0004] To this end, the utility model adopts the following technical solutions:
[0005] An asphalt concrete core wall dam foundation gallery structure, wherein a foundation gallery is arranged in a trough foundation excavated in a dam body, the foundation gallery as a whole is divided into a number of continuous single-storage sections, a first water-stop component is arranged in the construction joints between adjacent single-storage sections, the first water-stop component surrounds the periphery of the gallery cavity arranged in the foundation gallery to promote a balanced state between anti-seepage and structural deformation; an asphalt concrete core wall is arranged on the top of the foundation gallery, the top of the foundation gallery is covered with an asphalt concrete anti-seepage layer, and the side end of the asphalt concrete anti-seepage layer is connected to the upstream end of the asphalt concrete core wall enlarged foot.
[0006] Furthermore: an upstream rockfill area and a downstream rockfill area are respectively arranged on the upstream side and the downstream side of the asphalt concrete core wall, a cushion layer is arranged on the side of the asphalt concrete core wall relative to the upstream rockfill area and the downstream rockfill area, and a covering end covering the asphalt concrete anti-seepage layer is arranged at the bottom of the cushion layer on the upstream side of the asphalt concrete core wall; a transition layer is arranged between the cushion layer on the upstream side and the upstream rockfill area, and between the cushion layer on the downstream side and the downstream rockfill area.
[0007] Furthermore: a polyester grid is laid in the asphalt concrete anti-seepage layer.
[0008] Furthermore: an SR plastic filler layer is provided between the contact surface between the asphalt concrete anti-seepage layer and the end of the foundation corridor.
[0009] Furthermore: an anchor pit is arranged at the bottom of the trough-shaped foundation, and the end of the first water-stopping component is connected to the anchor pit.
[0010] Furthermore: a foundation grouting part is arranged at the bottom of the foundation corridor.
[0011] Furthermore: the foundation gallery is provided with an arc-shaped concave structure on the side end surface relative to the asphalt concrete core wall, and a second water-stopping component connecting the foundation gallery and the asphalt concrete core wall is provided in the arc-shaped concave structure.
[0012] Furthermore: a drainage pipe is buried in the foundation corridor, and the openings at both ends of the drainage pipe are connected to the side of the corridor cavity of the foundation corridor and the top of the foundation corridor respectively, and there is a safety interval between the opening of the drainage pipe at the end of the top side of the foundation corridor and the downstream side of the enlarged foot of the asphalt concrete core wall; a valve is installed on the opening of the drainage pipe, and a seepage pressure monitoring device is arranged on the drainage pipe in the foundation corridor, and the seepage pressure monitoring device includes a piezometer installed inside the drainage pipe and a pressure gauge installed on the drainage pipe.
[0013] Furthermore: a drainage separator is provided at the outlet of the drainage pipe, and a groove for accommodating the drainage separator is provided in the basic corridor.
[0014] Compared with the prior art, the utility model has the following beneficial effects:
[0015] The utility model utilizes the fact that the foundation gallery is deeply buried in the rock trough, which has the advantages of relatively uniform foundation conditions and relatively stable operating conditions. It adopts the method of pouring in phases in compartments, without permanent structural joints, and adopts construction joints with water stops as settlement induction joints, seeking a more favorable balance between permanent anti-seepage and structural deformation. At the same time, a certain range of asphalt concrete anti-seepage layer is set in the upstream area of the asphalt concrete core wall. When cracks occur in the foundation gallery, the risk of gallery leakage is reduced by the anti-seepage effect of the asphalt concrete anti-seepage layer; the SR plastic filler set between the anti-seepage layer and the foundation gallery has the function of improving the anti-seepage effect of the asphalt concrete anti-seepage layer and the foundation surface and filling concrete cracks. The above measures can effectively control the crack leakage problem of the foundation gallery. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a structural schematic diagram of the utility model;
[0017] Figure 2 It is a structural schematic diagram of the utility model.
[0018] The markings in the attached figure are: 1-foundation corridor; 2-asphalt concrete core wall; 3-foundation grouting part; 4-cushion layer; 5-transition layer; 6-upstream rockfill area; 7-downstream rockfill area; 8-second water-stop component; 9-polyester grid; 10-asphalt concrete anti-seepage layer; 11-first water-stop component; 12-anchor pit; 13-drainage pipe; 14-slot; 15-pressure gauge; 16-piezometer; 17-valve. DETAILED DESCRIPTION
[0019] The present invention is further described below in conjunction with the accompanying drawings and embodiments, but they are not intended to limit the present invention.
[0020] like Figure 1-2 As shown, an asphalt concrete core wall dam foundation gallery structure is provided, in which a foundation gallery 1 is arranged in a trough foundation excavated by the dam body, and the foundation gallery 1 is divided into a plurality of continuous single compartment sections as a whole, and a first water-stop component 11 is arranged in the construction joint between adjacent single compartment sections, and the first water-stop component 11 surrounds the periphery of the gallery cavity provided in the foundation gallery 1, and an anchor pit 12 is arranged at the bottom of the trough foundation, and the end of the first water-stop component 11 is connected to the anchor pit 12; an asphalt concrete core wall 2 is arranged on the top of the foundation gallery 1, and the top of the foundation gallery 1 is covered with an asphalt concrete anti-seepage layer 10, and the side end of the asphalt concrete anti-seepage layer 10 is connected to the upstream end of the enlarged foot of the asphalt concrete core wall 2.
[0021] In this embodiment, the foundation gallery 1 is set on the rock foundation surface after the dam body is excavated. Except for the uneven settlement part, the foundation gallery 1 generally has no structural joints. It adopts skipping bin and phased casting, and the length of each single bin section of the foundation gallery 1 is about 8-12m. The control principle is that no temperature cracks will be generated during single bin casting. The second phase section is cast with micro-expansion concrete.
[0022] In this embodiment, the seam surface between the single warehouse sections cast in the first and second phases is treated as a construction seam, and the steel bars pass through the seam. The first water stop component 11 arranged in the construction seam is preferably a D-type copper sheet water stop, and the water stop is embedded in the anchor pit 12 of the foundation using micro-expansion fine stone concrete.
[0023] In this embodiment, a foundation grouting part 3 is provided at the bottom of the foundation corridor 1 to carry out foundation reinforcement and anti-seepage treatment by grouting (consolidation grouting, curtain grouting).
[0024] In this embodiment, the dam body structure of the asphalt concrete core rockfill dam is as follows: Figure 1 As shown, specifically, the asphalt concrete core wall 2 is located on the top of the foundation corridor 1, and an upstream rockfill area 6 and a downstream rockfill area 7 are respectively arranged on the upstream side and the downstream side of the asphalt concrete core wall 2, and a cushion layer 4 is arranged on the asphalt concrete core wall 2 relative to the upstream rockfill area 6 and the downstream rockfill area 7; a transition layer 5 is arranged between the upstream cushion layer 4 and the upstream rockfill area 6 and between the downstream cushion layer 4 and the downstream rockfill area 7.
[0025] The end face of the foundation gallery 1 relative to the asphalt concrete core wall 2 is provided with an arc-shaped concave structure, and a second water-stopping component 8 connecting the foundation gallery 1 and the asphalt concrete core wall 2 is provided in the arc-shaped concave structure. The second water-stopping component 8 is made of copper sheet for water-stopping.
[0026] In this embodiment, the asphalt concrete anti-seepage layer 10 is specifically laid on the top of the foundation gallery 1 on the upstream side of the asphalt concrete core wall 2 and on the rock foundation surface after partial excavation, and a polyester grid 9 is added to the asphalt concrete anti-seepage layer 10. At the same time, the rock foundation surface within the laying range of the asphalt concrete anti-seepage layer 10 is leveled with concrete.
[0027] Specifically, an SR plastic filler layer is provided between the contact surface of the asphalt concrete anti-seepage layer 10 and the end of the foundation corridor 1 to improve the anti-seepage effect of the asphalt concrete anti-seepage layer 10 and the foundation surface of the foundation corridor 1 and fill concrete cracks. In this embodiment, the laying thickness of the SR plastic filler layer is 5 mm. And before the SR plastic filler layer is laid, two coats of asphalt latex can be pre-coated on the contact surface of the foundation corridor 1.
[0028] The bottom of the cushion layer 4 on the upstream side of the asphalt concrete core wall 2 is provided with a covering end covering the asphalt concrete anti-seepage layer 10 .
[0029] In this embodiment, a drainage pipe 13 is buried in the foundation gallery 1, and the openings at both ends of the drainage pipe 13 are respectively connected to the side of the gallery cavity of the foundation gallery 1 and the top of the foundation gallery 1, and there is a safety interval between the opening of the drainage pipe 13 at the top side end of the foundation gallery 1 and the downstream side of the enlarged foot of the asphalt concrete core wall 2 (greater than the maximum sliding distance of the bottom of the asphalt concrete core wall 2 after water storage, and retaining a sufficient safety factor). The drainage pipe 13 is made of stainless steel pipe.
[0030] In this embodiment, in order to better monitor the seepage pressure, a seepage pressure monitoring device is installed in the drainage pipe 13 in the foundation corridor 1. The seepage pressure monitoring device includes a piezometer 16 installed inside the drainage pipe 13 and a mechanical pressure gauge 15 installed on the drainage pipe 13, and a valve 17 is installed on the orifice of the drainage pipe 13. Based on the above content, the drainage pipe 13 is connected to the water of the downstream rockfill area 7, and the piezometer 16 is installed in the steel pipe instead of the traditional dam body, which solves the problem that the seepage pressure monitoring instrument cannot be repaired due to damage, and the problem that the laying of the instrument sensor line interferes with the construction.
[0031] At the same time, the opening of the drain pipe 13 is required to rise to a certain height so as to remove the air in the drain pipe 13 at the initial stage of water storage.
[0032] In this embodiment, in order to ensure the connectivity between the drainage pipe 13 and the water body in the dam body downstream of the asphalt concrete core wall 2 and prevent the stones of the cushion layer 4 from falling into the drainage pipe 13, the opening of the drainage pipe 13 is sealed with a steel plate with a drainage hole drilled therein, and a groove 14 is provided in the foundation corridor 1 at the outlet of the drainage pipe 13, and a sandless concrete drainage body is pre-cast in the groove 14.
[0033] See also Figure 1-2When constructing the foundation corridor structure and the asphalt concrete core wall dam, the specific steps are as follows:
[0034] S1: Excavate and clean the foundation corridor 1 and dam foundation according to structural requirements;
[0035] S2: Casting the foundation gallery 1: Install the first water stop component 11 at the construction joint of the single warehouse section. The foundation of the first water stop component 11 is anchored in the anchor pit 12 with micro-expansion fine stone concrete, and a drainage pipe 13 is pre-buried on the downstream side of the foundation gallery 1. At the same time, a second water stop component 8 is pre-buried longitudinally on the top of the foundation gallery 1;
[0036] S3: Clean the dam foundation within the paving range of the asphalt concrete anti-seepage layer 10 and pour the concrete leveling layer;
[0037] S4: Apply asphalt latex on the foundation surface within the paving range of the asphalt concrete anti-seepage layer 10, and lay a 5mm SR plastic filler layer;
[0038] S5: adding the polyester mesh 9, spreading the asphalt concrete, and constructing the asphalt concrete anti-seepage layer 10;
[0039] S6: Fill the groove 14 of the foundation gallery 1 with sandless concrete, and check whether its drainage effect meets the requirements of free drainage;
[0040] S7: According to the construction procedure of asphalt concrete core wall rockfill dam, the asphalt concrete core wall 2 and the asphalt concrete core wall 2 cushion layer 4 and transition layer 5 on both sides, rockfill area and other dam structures are constructed by layered rolling;
[0041] S8: Perform grouting treatment on the foundation grouting part 3 at the bottom of the foundation corridor 1;
[0042] S9: Before water storage, a piezometer 16 and a mechanical pressure gauge 15 are installed in the foundation gallery 1, and a valve 17 is installed at the orifice of the drainage pipe 13.
[0043] The above embodiment is only a preferred technical solution of the present invention. Those skilled in the art should understand that the technical solutions or parameters in the embodiments can be modified or replaced without departing from the principle and essence of the present invention, and all should be included in the protection scope of the present invention.
Claims
1. An asphalt concrete core wall dam foundation corridor structure, characterized by: A foundation gallery (1) is arranged in the trough foundation excavated in the dam body, the foundation gallery (1) being divided into a plurality of continuous single-storage sections as a whole, a first water-stopping component (11) being arranged in the construction joints between adjacent single-storage sections, the first water-stopping component (11) surrounding the periphery of the gallery cavity arranged in the foundation gallery (1); An asphalt concrete core wall (2) is arranged on the top of the foundation gallery (1), and the top of the foundation gallery (1) is covered with an asphalt concrete anti-seepage layer (10), and the side end of the asphalt concrete anti-seepage layer (10) is connected to the upstream end of the enlarged foot of the asphalt concrete core wall (2).
2. The asphalt concrete core wall dam foundation gallery structure according to claim 1, characterized in that: An upstream rockfill area (6) and a downstream rockfill area (7) are respectively arranged on the upstream side and the downstream side of the asphalt concrete core wall (2); a cushion layer (4) is arranged on the side of the asphalt concrete core wall (2) relative to the upstream rockfill area (6) and the downstream rockfill area (7); a covering end covering the asphalt concrete anti-seepage layer (10) is arranged at the bottom of the cushion layer (4) on the upstream side of the asphalt concrete core wall (2); A transition layer (5) is provided between the cushion layer (4) on the upstream side and the upstream rockfill area (6), and between the cushion layer (4) on the downstream side and the downstream rockfill area (7).
3. An asphalt concrete core wall dam foundation gallery structure according to claim 1 or 2, characterized in that: A polyester grid (9) is laid in the asphalt concrete anti-seepage layer (10).
4. An asphalt concrete core wall dam foundation gallery structure according to claim 1 or 2, characterized in that: An SR plastic filler layer is provided between the contact surface between the asphalt concrete anti-seepage layer (10) and the end of the foundation gallery (1).
5. The asphalt concrete core wall dam foundation gallery structure according to claim 1, characterized in that: An anchoring pit (12) is provided at the bottom of the trough-shaped foundation, and the end of the first water-stopping component (11) is connected to the anchoring pit (12).
6. The asphalt concrete core wall dam foundation gallery structure according to claim 1, characterized in that: A foundation grouting section (3) is provided at the bottom of the foundation corridor (1).
7. The asphalt concrete core wall dam foundation gallery structure according to claim 1, characterized in that: The foundation gallery (1) is provided with an arc-shaped concave structure on the side end surface relative to the asphalt concrete core wall (2), and a second water-stopping component (8) connecting the foundation gallery (1) and the asphalt concrete core wall (2) is provided in the arc-shaped concave structure.
8. The asphalt concrete core wall dam foundation gallery structure according to claim 1, characterized in that: A drainage pipe (13) is buried in the foundation gallery (1), and the openings at both ends of the drainage pipe (13) are respectively connected to the side of the gallery cavity of the foundation gallery (1) and the top of the foundation gallery (1), and a safety gap is provided between the opening of the drainage pipe (13) at the end of the top side of the foundation gallery (1) and the downstream side of the enlarged foot of the asphalt concrete core wall (2); A valve (17) is installed on the orifice of the drainage pipe (13), and a seepage pressure monitoring device is arranged in the foundation gallery (1) of the drainage pipe (13), wherein the seepage pressure monitoring device comprises an osmometer (16) installed inside the drainage pipe (13) and a pressure gauge (15) installed on the drainage pipe (13).
9. The asphalt concrete core wall dam foundation gallery structure according to claim 8, characterized in that: The outlet of the drainage pipe (13) is provided with a drainage partition, and a notch (14) for accommodating the drainage partition is provided in the basic gallery (1).