Construction tool for mortar joints of infilled wall

By designing adjustable frame plates and scrapers, detachable support plates and clamping mechanisms, the shortcomings of existing ash joint construction tools in controlling the position and thickness of the mortar are solved, and efficient and convenient ash joint construction is achieved, adapting to Masonry walls of different widths and thicknesses.

CN222045125UActive Publication Date: 2024-11-22GANSU CONSTR SUPERVISION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420585682.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-26
Publication Date
2024-11-22
Estimated Expiration
2034-03-26

AI Technical Summary

Technical Problem

The existing ash joint construction tools cannot effectively control the position and thickness of the mortar, resulting in low construction efficiency and inability to adapt to masonry walls of different widths and thicknesses, resulting in the problem of blind seams and inaccurate widths of gray joints.

Method used

A filling wall grey joint construction tool including a symmetrical frame plate, adjustable pull screw, adjustable scraper, detachable support plate and clamping mechanism is designed. By adjusting the length of the frame plate and scraper, combined with the arc-shaped grouting part and a detachable mortar bucket to achieve efficient laying and scraping of mortar.

Benefits of technology

The tool can adapt to mortar laying of different widths and thicknesses, improves construction efficiency, simplifies operation, and ensures uniformity of mortar joints and convenient construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222045125U_ABST
    Figure CN222045125U_ABST
Patent Text Reader

Abstract

The utility model discloses an infilled wall mortar joint construction tool which comprises symmetrically-arranged frame plates and a split screw connected between the frame plates, transverse through holes are formed in the two ends of the frame plates, the split screw is arranged in the through holes of the two frame plates in a penetrating mode, two pairs of adjusting nuts are connected to the split screw through threads, and the adjusting nuts are arranged on the split screw. A scraping plate is transversely and fixedly arranged between the frame plates, a supporting plate is connected to the upper portions of the frame plates, a protruding part is arranged on one side of the supporting plate, the protruding part is arranged on the inner side of the frame plate, and a mortar hopper is detachably connected to the upper portion of the supporting plate; the mortar laying device is provided with the frame plates with the adjustable intervals and the detachable supporting plates, the mortar laying device can adapt to mortar laying of infilled walls with different widths, mortar with the corresponding thickness can be laid by replacing the supporting plates with different thicknesses, and the mortar hopper and the scraping plate are arranged on the frame plates, so that the mortar laying device is convenient to use. Mortar can be laid and stricken at a time by pulling the whole device, operation is easy, and the construction efficiency is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of building construction, in particular to a construction tool for filling wall mortar joints. Background Art

[0002] The mortar joint refers to the mortar layer laid between two bricks when the wall is built. During the construction of the mortar joint, it is necessary to first lay mortar on the bricks and level the upper surface of the mortar. The leveling of the mortar requires controlling the mortar laying position, mortar amount, mortar joint thickness, etc. Currently, during the mortar joint construction, workers mostly rely on line of sight for leveling or use some auxiliary tools. When leveling by line of sight, problems such as blind joints and mortar joints that are too small or too large often occur. The existing mortar joint auxiliary tools are not universal enough for masonry walls of different widths and mortar joint thicknesses, and workers are required to repeatedly fill mortar into the auxiliary tool frame and scrape it flat during construction, resulting in low construction efficiency. Utility Model Content

[0003] The utility model aims to provide a construction tool for filling wall mortar joints to solve the problems raised by the above-mentioned background technology.

[0004] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a construction tool for filling wall mortar joints, comprising symmetrically arranged frame plates and tensioning screws connected between the frame plates, transverse through holes being arranged at both ends of the frame plates, the tensioning screws being transversely inserted into the through holes of the two symmetrically arranged frame plates, the tensioning screws being threadedly connected with two pairs of adjusting nuts, and each pair of adjusting nuts being respectively arranged on both sides of the two frame plates, a scraper being transversely fixedly arranged between the frame plates, the scraper comprising a first scraper and a second scraper, one end of the first scraper and the second scraper being respectively fixedly connected to the inner sides of the two frame plates, and the other ends of the first scraper and the second scraper being slidably connected by a guide rail, a support plate being detachably connected to the top of the frame plate, and a protrusion being arranged on one side of the support plate, the protrusion being arranged on the inner side of the frame plate, and a mortar bucket being detachably connected to the top of the support plate.

[0005] Furthermore, the protruding portion is provided with an arc-shaped grouting portion;

[0006] Providing the grouting part can complete the grouting while leveling the mortar, thereby improving work efficiency.

[0007] Furthermore, the first scraper and the second scraper are provided with through slots, and the slots on the first scraper and the second scraper overlap, and one side of the slot is fixedly connected with a guide bolt;

[0008] By setting the notch and inserting bolts in the notch for guiding, the length of the scraper can be adjusted and extended along with the width of the frame plate, and the structure is simple and not easy to be damaged.

[0009] Furthermore, a baffle groove is provided below one side of the mortar bucket, and a baffle matching the baffle groove is inserted into the baffle groove;

[0010] By setting a baffle, mortar can be pre-filled in the mortar bucket. When laying mortar joints, the baffle at the bottom of the mortar bucket can be pulled out to lay the mortar joints, thereby improving the convenience of the device.

[0011] Furthermore, a clamping mechanism is fixedly provided on the outer side surface of the frame plate, and the clamping mechanism includes a fixing plate, a screw, a handwheel, and a clamping plate. The fixing plate is fixedly connected to the outer side surface of the frame plate, and the screw is rotatably connected to the fixing plate through a threaded hole provided on the fixing plate. The handwheel and the clamping plate are fixedly connected to both ends of the screw, and the clamping plate is in contact with the outer side wall of the mortar bucket.

[0012] A clamping mechanism is provided, and the mortar bucket is screwed and clamped by the clamping mechanism, which is easy to operate and convenient for disassembly and assembly of the mortar bucket.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] The utility model is provided with a frame plate with adjustable spacing and a detachable support plate, which can adapt to the mortar laying of filling walls of different widths. Mortar of corresponding thickness can be laid by replacing support plates of different thicknesses. The utility model is provided with a mortar bucket and a scraper on the frame plate. The mortar laying and scraping can be completed at one time by pulling the entire device. The operation is simple and the construction efficiency is high. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a schematic diagram of the overall structure of a wall mortar joint filling construction tool provided by an embodiment of the utility model;

[0016] Figure 2 This is a structural diagram from another perspective of a wall mortar joint filling construction tool provided by an embodiment of the utility model;

[0017] Figure 3 yes Figure 2 Enlarged view of point A in the middle;

[0018] Figure 4 It is a schematic diagram of the scraper structure provided by an embodiment of the utility model;

[0019] Figure 5 It is a schematic diagram of the structure of the mortar bucket provided by the embodiment of the utility model;

[0020] In the figure, 1-frame plate, 2-tension screw, 3-adjusting nut, 4-scraper, 5-mortar bucket, 6-support plate, 7-clamping mechanism, 41-first scraper, 42-second scraper, 43-slot, 44-guide bolt, 51-baffle, 52-baffle groove, 61-protrusion, 62-jointing part, 71-fixing plate, 72-handwheel, 73-screw screw, 74-clamp. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] See also Figure 1-Figure 5 The utility model provides a technical solution: a construction tool for filling wall mortar joints, comprising symmetrically arranged frame plates 1 and tensioning screws 2 connected between the frame plates 1, transverse through holes are arranged at both ends of the frame plates 1, the tensioning screws 2 are transversely penetrated through the through holes on the two symmetrically arranged frame plates 1, and two pairs of adjusting nuts 3 are threadedly connected to the tensioning screws 2, and each pair of adjusting nuts 3 is respectively arranged on both sides of the two frame plates 1.

[0023] A scraper 4 is fixedly arranged transversely between the frame plates 1, and the scraper 4 includes a first scraper 41 and a second scraper 42. One end of the first scraper 41 and the second scraper 42 are respectively fixedly connected to the inner sides of the two frame plates 1, and the other ends of the first scraper 41 and the second scraper 42 are provided with a penetrating slot 43, and the slots 43 on the first scraper 41 and the second scraper 42 overlap. A guide bolt 44 is fixedly connected to one side of the slot 43. When the distance between the two frame plates 1 needs to be adjusted, the guide bolt 44 can slide in the slot 43 as the distance between the frame plates 1 changes, so that the length of the scraper 4 is extended or shortened.

[0024] A support plate 6 is detachably connected to the top of the frame plate 1 by bolts, and a protrusion 61 is provided on one side of the support plate 6. The protrusion 61 is provided on the inner side of the frame plate 1 and an arc-shaped grouting portion 62 is provided on the protrusion 61; a mortar bucket 5 is detachably connected to the top of the support plate 6, and a baffle groove 52 is provided at the lower side of one side of the mortar bucket 5, and a baffle 51 matching the baffle groove 52 is inserted into the baffle groove 52.

[0025] A clamping mechanism 7 is fixedly provided on the outer side surface of the frame plate 1, and the clamping mechanism 7 includes a fixing plate 71, a screw rod 73, a hand wheel 72, and a clamping plate 74. The fixing plate 71 is fixedly connected to the outer side surface of the frame plate 1, and the screw rod 73 is rotatably connected to the fixing plate 71 through a threaded hole provided on the fixing plate 71. The hand wheel 72 and the clamping plate 74 are fixedly connected to both ends of the screw rod 73, and the clamping plate 74 is in contact with the outer wall of the mortar bucket 5.

[0026] During the specific implementation process, first select a support plate 6 of appropriate thickness according to the thickness of the mortar joint to be laid, and fix the support plate 6 to the frame plate 1 with bolts, then loosen the adjusting nut 3 to adjust the width between the frame plates 1, make the width between the frame plates 1 equal to the width of the filling wall, then tighten the adjusting nut 3 to fix it, and then place the device horizontally on the filling wall. At this time, the lower end of the frame plate 1 is clamped on both sides of the filling wall, and the protrusion 61 is erected on the upper end surface of the filling wall. Then place the mortar bucket 5 on the support plate 6, clamp the mortar bucket 5 by turning the hand wheels 72 on both sides, pour mortar into the mortar bucket 5, and finally, pull out the baffle 51 to make the mortar in the mortar bucket 5 flow out, and pull the entire device to complete the laying and leveling of the mortar, thereby completing the entire mortar joint construction.

[0027] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. A construction tool for filling wall mortar joints, comprising symmetrically arranged frame plates and tensioning screws connected between the frame plates, characterized in that: The frame plates are provided with transverse through holes at both ends, the tensioning screws are transversely inserted into the through holes of the two symmetrically arranged frame plates, the tensioning screws are threadedly connected with two pairs of adjusting nuts, and each pair of adjusting nuts is respectively arranged on both sides of the two frame plates, a scraper is transversely fixed between the frame plates, the scraper comprises a first scraper and a second scraper, one ends of the first scraper and the second scraper are respectively fixedly connected to the inner sides of the two frame plates, and the other ends of the first scraper and the second scraper are slidably connected through a guide rail, a support plate is detachably connected to the top of the frame plate, and a protrusion is arranged on one side of the support plate, the protrusion is arranged on the inner side of the frame plate, and a mortar bucket is detachably connected to the top of the support plate.

2. The wall mortar joint filling construction tool according to claim 1, characterized in that: The protruding portion is provided with an arc-shaped grouting portion.

3. The wall mortar joint filling construction tool according to claim 1, characterized in that: The first scraper and the second scraper are provided with penetrating notches, and the notches on the first scraper and the second scraper overlap, and a guide bolt is fixedly connected to one side of the notch.

4. The wall mortar joint filling construction tool according to claim 1, characterized in that: A baffle groove is arranged below one side of the mortar bucket, and a baffle matching the baffle groove is inserted into the baffle groove.

5. The wall mortar joint filling construction tool according to claim 1, characterized in that: The outer side surface of the frame plate is fixedly provided with a clamping mechanism, and the clamping mechanism includes a fixing plate, a screw, a handwheel, and a clamping plate. The fixing plate is fixedly connected to the outer side surface of the frame plate, and the screw is rotatably connected to the fixing plate through a threaded hole provided on the fixing plate. The handwheel and the clamping plate are fixedly connected to both ends of the screw, and the clamping plate is in contact with the outer side wall of the mortar bucket.