Arch quick mounting structure for tunnel construction

By designing a quick installation structure for insertion rods, fixing blocks and elastic connections in tunnel construction, the fast fixing and disassembly of the connecting rods is achieved by using pulling plates and toggling mechanisms, the problem of cumbersome fixing operation of the connecting rods in the prior art is solved. , improves the efficiency of tunnel construction.

CN222045801UActive Publication Date: 2024-11-22CHINA RAILWAY 11TH BUREAU GRP CORP LTD +2
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420855673.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-24
Publication Date
2024-11-22
Estimated Expiration
2034-04-24

AI Technical Summary

Technical Problem

During the installation of the arch frame during the existing tunnel construction, the fixing of the connecting rod requires the screwing of two sets of connecting bolts, which is cumbersome and inconvenient.

Method used

A quick installation structure for tunnel construction arch frame is designed, through insertion rods, fixing blocks and elastic connections, the connecting rods are quickly fixed and disassembled by pulling plates and toggle mechanisms. The insertion rods are under the action of the second spring and its own gravity. The through hole is extended for fixing, and the coordination between the pull plate and the triangle block is moved upward to release the fixing.

Benefits of technology

It realizes rapid fixing and disassembly of connecting rods, improves the efficiency of tunnel construction, and simplifies the installation process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222045801U_ABST
    Figure CN222045801U_ABST
Patent Text Reader

Abstract

The utility model discloses a quick mounting structure of an arch frame for tunnel construction, which comprises an arch frame main body, two mounting holes are formed in the side wall of the arch frame main body in a penetrating manner, and connecting rods for connecting other arch frame main bodies are arranged in the mounting holes; two rectangular cavities are symmetrically formed in the arch frame body, through holes are formed between the rectangular cavities and the mounting holes, inserting rods are arranged in the through holes, and a plurality of inserting holes matched with the inserting rods are formed in the connecting rods at equal intervals; and a shifting mechanism for upwards moving the inserting rod is arranged in the rectangular cavity. When the connecting rod is installed, the inserting rod can be contracted only by pulling the pulling plate, the connecting rod can be conveniently inserted into the installing hole, then the pulling plate is loosened, the inserting rod stretches out of the through hole under the action of the second spring and the gravity of the inserting rod, the inserting rod is rapidly inserted into the inserting hole, and the connecting rod is fixed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tunnel construction, in particular to an arch frame quick installation structure for tunnel construction. Background Art

[0002] The application number is: CN202322338875.X. A quick installation structure of an arch frame for tunnel construction, which includes a plurality of arch frames distributed along the length direction of the tunnel, the arch frames are detachably connected with a plurality of connecting rods, a connecting member is arranged between two adjacent arch frames, the connecting member includes two connecting nuts connected to each other, the two connecting nuts in the same connecting member are respectively threadedly connected to the connecting rods on the two adjacent arch frames, the connecting member also includes a connecting pipe, the two connecting nuts in the same connecting member are respectively rotatably connected to the two ends of the connecting pipe, and the end of the connecting rod is passed through the connecting pipe. This application can improve the speed of arch frame installation in the tunnel, thereby improving the efficiency of tunnel construction;

[0003] In the above patent, the connecting rod is mainly fixed by a pin, but the pin is installed on a block, and the block is installed and fixed by two sets of connecting bolts. When each arch frame fixes the connecting rod, two sets of connecting bolts need to be turned to install the block, which is extremely inconvenient. Utility Model Content

[0004] The purpose of the utility model is to solve the shortcomings existing in the prior art, and to propose a quick installation structure of an arch frame for tunnel construction. When installing the connecting rod, it is only necessary to pull the pull plate to retract the insertion rod, so that the connecting rod is conveniently inserted into the installation hole. Then the pull plate is released, and the insertion rod extends out of the through hole under the action of the second spring and its own gravity, and is quickly inserted into the insertion hole to fix the connecting rod.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] A quick-installation structure for an arch frame for tunnel construction, comprising an arch frame body, a side wall of the arch frame body being penetrated by two installation holes, and a connecting rod for connecting other arch frame bodies being arranged inside the installation holes;

[0007] Two rectangular cavities are symmetrically provided inside the arch frame body, a through hole is provided between the rectangular cavity and the mounting hole, a plug rod is provided inside the through hole, and a plurality of plug holes adapted to the plug rod are provided on the connecting rod at equal intervals;

[0008] A toggle mechanism for moving the insertion rod upward is arranged inside the rectangular cavity.

[0009] Preferably, a fixing block is fixedly mounted on the side wall of the insertion rod, and the fixing block is elastically connected to the rectangular cavity via a second spring.

[0010] Preferably, the toggle mechanism includes a pull plate that is arranged through the arch frame body, the pull plate is slidably connected to the arch frame body, one end of the pull plate extends to the rectangular cavity and is fixedly connected to a first spring, and the other end of the first spring is fixedly connected to the rectangular cavity.

[0011] Preferably, a strip-shaped opening is provided on the insertion rod, and a triangular block is fixedly installed on the inner top of the strip-shaped opening.

[0012] Preferably, the pull plate is located inside the strip-shaped opening, and one end connected to the first spring is a trapezoidal structure.

[0013] Preferably, a limit block for limiting the moving distance of the pull plate is fixedly mounted on the upper surface of the pull plate.

[0014] The utility model has the following beneficial effects:

[0015] 1. Through the design of the plug rod, the fixing block and the second spring, when not being moved, the plug rod extends out of the through hole under the action of the second spring and its own gravity, and is quickly inserted into the jack to fix the connecting rod;

[0016] 2. Through the design of the toggle mechanism, the pull plate moves to contact the triangular block, and squeezes the triangular block and the insertion rod to overcome the elastic force of the second spring and its own gravity to move upward, so as to release the fixation of the connecting rod and facilitate the disassembly of the connecting rod. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a structural schematic diagram of a quick installation structure of an arch frame for tunnel construction proposed by the utility model;

[0018] Figure 2 This is a cross-sectional view of a quick-installation structure of an arch frame for tunnel construction proposed by the utility model;

[0019] Figure 3 for Figure 2 Enlarged view of point A in .

[0020] In the figure: 1 arch frame body, 2 pull plate, 3 plug hole, 4 connecting rod, 5 limit block, 6 triangular block, 7 plug rod, 8 first spring, 9 rectangular cavity, 10 fixed block, 11 second spring, 12 through hole. DETAILED DESCRIPTION

[0021] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0022] In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0023] Reference Figure 1-Figure 3 A quick-installation structure of an arch frame for tunnel construction includes an arch frame body 1, a side wall of the arch frame body 1 is penetrated with two installation holes, and a connecting rod 4 for connecting other arch frame bodies 1 is arranged inside the installation hole;

[0024] Two rectangular cavities 9 are symmetrically provided inside the arch frame body 1, a through hole 12 is provided between the rectangular cavity 9 and the mounting hole, an insertion rod 7 is provided inside the through hole 12, a fixing block 10 is fixedly installed on the side wall of the insertion rod 7, the fixing block 10 is elastically connected to the rectangular cavity 9 by a second spring 11, and a plurality of insertion holes 3 adapted to the insertion rod 7 are provided at equal intervals on the connecting rod 4;

[0025] A toggle mechanism for moving the insertion rod 7 upward is provided inside the rectangular cavity 9, and the toggle mechanism includes a pull plate 2 that is arranged through the arch frame body 1, and the pull plate 2 is slidably connected to the arch frame body 1, one end of the pull plate 2 extends to the rectangular cavity 9 and is fixedly connected to a first spring 8, and the other end of the first spring 8 is fixedly connected to the rectangular cavity 9, and a strip opening is provided on the insertion rod 7, and a triangular block 6 is fixedly installed on the inner top of the strip opening, and the inclined surface of the triangular block 6 faces the direction of the first spring 8, the pull plate 2 is located inside the strip opening, and the end connected to the first spring 8 is a trapezoidal structure, and the inclined surface of the trapezoidal structure has the same inclination angle as the inclined surface of the triangular block 6;

[0026] A limit block 5 for limiting the moving distance of the pull plate 2 is fixedly installed on the upper surface of the pull plate 2 to prevent the pull plate 2 from sliding out of the strip-shaped opening, thus playing a limiting role.

[0027] Working principle:

[0028] During installation, pull the pull plate 2, the pull plate 2 moves and contacts the triangular block 6, and squeezes the triangular block 6 and the insertion rod 7 to overcome the elastic force of the second spring 11 and its own gravity to move upward. When the insertion rod 7 moves upward, the connecting rod 4 is inserted into the installation hole. After the position is determined, release the pull plate 2. Under the action of the first spring 8, the pull plate 2 is reset, so that the triangular block 6 and the insertion rod 7 will not be squeezed. The insertion rod 7 is inserted into the corresponding socket 3 under the action of the second spring 11 and its own gravity, completing the fixation of the connecting rod 4.

[0029] The above are only preferred specific implementation methods of the utility model, but the protection scope of the utility model is not limited to this. Any technician familiar with the technical field within the technical scope disclosed by the utility model, who makes equivalent replacements or changes based on the technical scheme and utility model concept of the utility model, should be covered by the protection scope of the utility model.

Claims

1. A quick-installation structure for an arch frame for tunnel construction, comprising an arch frame body (1), characterized in that: Two mounting holes are provided through the side wall of the arch frame body (1), and connecting rods (4) for connecting other arch frame bodies (1) are provided inside the mounting holes; Two rectangular cavities (9) are symmetrically provided inside the arch frame body (1); a through hole (12) is provided between the rectangular cavity (9) and the mounting hole; an insertion rod (7) is provided inside the through hole (12); and a plurality of insertion holes (3) adapted to the insertion rod (7) are provided at equal intervals on the connecting rod (4); A toggle mechanism for moving the insertion rod (7) upward is arranged inside the rectangular cavity (9).

2. The quick installation structure of an arch frame for tunnel construction according to claim 1, characterized in that: A fixing block (10) is fixedly mounted on the side wall of the insertion rod (7), and the fixing block (10) is elastically connected to the rectangular cavity (9) via a second spring (11).

3. The quick installation structure of an arch frame for tunnel construction according to claim 1, characterized in that: The toggle mechanism comprises a pull plate (2) which is arranged on the arch frame body (1) through the pull plate (2), the pull plate (2) being slidably connected to the arch frame body (1), one end of the pull plate (2) extending to the rectangular cavity (9) and being fixedly connected to a first spring (8), the other end of the first spring (8) being fixedly connected to the rectangular cavity (9).

4. The quick installation structure of an arch frame for tunnel construction according to claim 3, characterized in that: The insert rod (7) is provided with a strip-shaped opening, and a triangular block (6) is fixedly mounted on the inner top of the strip-shaped opening.

5. The quick installation structure of an arch frame for tunnel construction according to claim 4, characterized in that: The pull plate (2) is located inside the strip-shaped opening, and one end connected to the first spring (8) is a trapezoidal structure.

6. The quick installation structure of an arch frame for tunnel construction according to claim 3, characterized in that: A limit block (5) for limiting the moving distance of the pull plate (2) is fixedly mounted on the upper surface of the pull plate (2).