Waterproof and drainage device for tunnel leakage

By setting up initial support, water barriers and dense drainage pipes in the tunnel to form an annular drainage network, the problem of water leakage in the tunnel is solved, and more efficient waterproofing effect and structural safety are achieved.

CN222045859UActive Publication Date: 2024-11-22CCCC THIRD HARBOR ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420563221.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Priority Date
2024-01-09
Filing Date
2024-03-22
Publication Date
2024-11-22
Estimated Expiration
2034-03-22

AI Technical Summary

Technical Problem

The prior art is difficult to effectively solve the problem of tunnel water leakage, especially between secondary lining and initial support, resulting in water leakage and low structural quality.

Method used

A drainage device was designed, including the installation of initial support, water barrier and secondary lining along the cross section of the tunnel. An annular drainage pipe was installed on the outside of the water barrier to form a dense drainage network structure. The water flows through the geotextile and then drains through the drainage. The pipe is discharged, and the drain pipe is hot-melted to the water barrier, avoiding the problem of the drain pipe being placed under the geotextile in the traditional way.

Benefits of technology

It achieves a more efficient waterproofing effect, avoids secondary damage to the water barrier, forms a tight drainage network, and improves the waterproof performance and safety of the tunnel structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222045859U_ABST
    Figure CN222045859U_ABST
Patent Text Reader

Abstract

The utility model provides a waterproof and drainage device for tunnel leakage, which comprises a primary support, a water baffle and a secondary lining which are sequentially arranged in a tunnel along the cross section of the tunnel from outside to inside, the water baffle forms an isolation layer of the secondary lining and the primary support, and the secondary lining is arranged close to the inner wall of the tunnel; the drainage system further comprises a plurality of drainage pipes located on the outer side of the water baffle, the drainage pipes respectively form a plurality of annular drainage paths in the tunnel, and the annular drainage paths are communicated with a main drainage pipe in the tunnel; the annular drainage paths form a drainage net structure parallel to the tunnel in the length direction of the tunnel, so that seepage water on the primary support is drained through the drainage pipe. The waterproof structure is suitable for preventing and draining leakage water between a secondary lining and a primary support, and the overall waterproof efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of leakage and drainage prevention between secondary lining and initial support, in particular to a drainage prevention device for tunnel leakage. Background Art

[0002] In order to promote the high-quality development of railway engineering construction, further improve the technical level of railway engineering construction, eliminate tunnel water leakage defects, avoid a series of disease problems caused by water leakage, and improve the quality of tunnel lining, this process was studied and formed. Utility Model Content

[0003] The utility model aims to provide a tunnel leakage prevention and drainage device, which is particularly suitable for the leakage prevention and drainage between the secondary lining and the initial support, thereby improving the overall waterproofing efficiency.

[0004] In order to achieve the above technical effects, the utility model is implemented through the following technical solutions.

[0005] A tunnel leakage prevention and drainage device, comprising:

[0006] In the tunnel, primary support, water retaining plate and secondary lining are arranged in sequence from outside to inside along the tunnel cross section, the water retaining plate forms an isolation layer between the secondary lining and the primary support, and the secondary lining is arranged close to the inner wall of the tunnel;

[0007] It also includes a plurality of drainage pipes located outside the water retaining plate, wherein the plurality of drainage pipes respectively form a plurality of annular drainage paths along the tunnel, and the plurality of annular drainage paths are connected to the main drainage pipe in the tunnel;

[0008] A plurality of the annular drainage paths form a drainage network structure parallel to the tunnel along the length direction of the tunnel, so that the seepage water on the initial support is discharged through the drainage pipe.

[0009] Furthermore, it also includes a geotextile located on the inner wall of the initial support and between the initial support and the drainage pipe, so that the water in the initial support is filtered by the geotextile and then flows out through the drainage pipe.

[0010] Furthermore, the initial support is fixed to the geotextile by means of nailing gaskets, and the geotextile is attached to the initial support.

[0011] Furthermore, the drainage pipe is provided with a downwardly inclined water inlet at least at the top of the tunnel or near the geotextile.

[0012] Furthermore, along the length direction of the tunnel, a plurality of the drainage pipes are fixedly connected below the water retaining plate in a matrix at intervals of 10 cm to 20 cm.

[0013] Furthermore, the drainage pipe is a plastic fiber pipe, and the diameter of the plastic fiber pipe is 5cm-6cm.

[0014] Furthermore, the water baffle is a polyvinyl chloride baffle, and the plastic fiber pipe is hot-melt connected to the polyvinyl chloride baffle.

[0015] Furthermore, embedded hot-melt welding is adopted between the annularly arranged drainage pipe and the main drainage pipe.

[0016] The beneficial effects of the utility model are as follows:

[0017] The difference between the anti-drainage device in the utility model and the traditional drainage method is that the method of placing the drainage pipe under the geotextile is abandoned, and the drainage pipe and the water retaining plate are integrated and installed on the outside of the geotextile. It can effectively avoid the traditional waterproof plate directly adhering to the geotextile (hot-melt welding damages the water retaining plate twice); the water retaining plate and the annular drainage pipe are combined into a whole, and a dense annular drainage pipe network system is used to closely adhere to the surface of the geotextile, which not only solves the problem of increasing drainage capacity by increasing the density of annular blind pipes in the traditional way, but also avoids secondary damage to the water retaining plate, and forms a tight and smooth drainage network between the initial support and the secondary lining concrete. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 A front view of a tunnel leakage prevention and drainage device provided by the utility model;

[0019] Figure 2 An assembly diagram of the water baffle and the drain pipe provided by the utility model;

[0020] Figure 3 An assembly diagram of the drain pipe and the main drain pipe provided by the utility model;

[0021] In the figure:

[0022] 10. Initial support; 20. Water retaining plate; 30. Secondary lining; 40. Drain pipe; 50. Main drain pipe. DETAILED DESCRIPTION

[0023] The present invention is described in detail below in conjunction with the various embodiments shown in the accompanying drawings, but it should be noted that these embodiments are not limitations of the present invention, and any equivalent transformations or substitutions in functions, methods, or structures made by ordinary technicians in the field based on these embodiments are all within the scope of protection of the present invention.

[0024] In the description of this embodiment, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the invention.

[0025] The terms "installed", "connected", "connected", and "relatively fixed" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the invention can be understood according to specific circumstances.

[0026] See attached Figure 1-3 As shown, a tunnel leakage prevention and drainage device in this embodiment includes an initial support 10, a water retaining plate 20 and a secondary lining 30 which are arranged in sequence from the outside to the inside along the tunnel cross section. The water retaining plate 20 forms an isolation layer between the secondary lining 30 and the initial support 10, and the secondary lining 30 is arranged close to the inner wall of the tunnel. In this embodiment, the initial support 10 and the secondary lining 30 are separated by the water retaining plate 20, the purpose of which is to prevent water seepage from the initial support from corroding the secondary lining concrete.

[0027] In order to achieve better drainage, a drainage pipe 40 is also included above the water retaining plate 20, and the drainage pipe 40 forms an annular drainage path along the tunnel, and the annular drainage path is communicated with the main drainage pipe 50 in the tunnel;

[0028] There are a plurality of drainage pipes 40 , which are arranged below the water retaining plate 20 along the length direction of the tunnel to form a drainage network structure parallel to the tunnel, so that the seepage water on the initial support can be discharged through the drainage pipes.

[0029] In this embodiment, in order to ensure the purity of drainage, etc., a geotextile (not shown in the figure) is provided on the inner wall of the initial support, which is located between the initial support 10 and the drainage pipe 40, so that the water in the initial support 10 is filtered by the geotextile and then flows out through the drainage pipe 40.

[0030] In actual construction, in order to ensure the assembly effect, the initial support 10 is fixed to the geotextile by nailing gaskets, and the geotextile is attached to the initial support.

[0031] Furthermore, in order to facilitate the drainage pipe 40 to collect seepage water, the drainage pipe is provided with a downwardly inclined water inlet (not shown in the figure) at least at the top of the tunnel or near the geotextile. At this time, the principle of water flowing downward is utilized, so that the seepage water can automatically enter the drainage pipe for collection.

[0032] In order to facilitate arrangement and setting, a plurality of drainage pipes 40 are fixedly connected below the water retaining plate 20 in a matrix along the length direction of the tunnel.

[0033] Furthermore, in the drainage pipes 40 arranged in the matrix, the spacing between adjacent drainage pipes 40 is 10cm-20cm. In this embodiment, the spacing between adjacent drainage pipes is set to 10-20cm in order to prevent the initial support surface water flow from being too large and causing poor drainage, and to serve as a drainage backup.

[0034] Specifically, the drainage pipe 40 is a plastic fiber pipe with a diameter of 5-6 cm. In this embodiment, the diameter of 5-6 cm is selected to form a dense drainage network system so that the seepage water flows slowly over a large area in the drainage system to avoid scouring the anti-drainage device.

[0035] Furthermore, the water retaining plate 20 is a polyvinyl chloride retaining plate, and the plastic fiber pipe is hot-melt connected to the polyvinyl chloride retaining plate. In this embodiment, the annular drainage pipe 40 is integrated with the water retaining plate 20, and the drainage pipe is closely attached to the geotextile to form an effective integrated drainage channel.

[0036] In one embodiment, the drain pipe 40 is connected to the main drain pipe 50 by embedded hot-melt welding, thereby achieving an integrated assembly of the two.

[0037] Furthermore, the annular drainage pipe 40 is closely attached to the geotextile, and the water retaining plate is closely attached to the secondary lining. In this embodiment, the drainage pipe is closely attached to the non-woven geotextile on the surface of the initial support, and the water retaining plate is closely attached to the secondary lining.

[0038] In one embodiment, the geotextile and the drainage pipe are welded by hot-melt welding, and an annular drainage pipe is provided between the geotextile and the water retaining plate, so that the overall drainage effect is good.

[0039] The assembly in this embodiment is as follows:

[0040] 1) The flatness of the initial support surface should be ensured before installation. The geotextile can be laid only after leveling the parts with poor initial support flatness.

[0041] 2) The device can only be installed after the initial non-woven geotextile on the support surface is completed.

[0042] 3) The device is overlapped with the geotextile by hot-melt welding. When laying, it should be ensured that the surface of the water retaining board is not damaged before use.

[0043] 4) The circumferential laying shall be carried out in a whole ring to avoid overlap. The longitudinal overlap shall be carried out in the same way as the waterproof board overlap.

[0044] In the utility model, the waterproof drainage device is different from the traditional drainage method in that the method of placing the drainage pipe under the geotextile is abandoned, which can effectively avoid the traditional waterproof board directly sticking to the geotextile (secondary damage to the water retaining plate by hot melt welding); the water retaining plate and the annular drainage pipe are combined into a whole, and a dense annular drainage pipe network system is used to stick to the surface of the geotextile, which not only solves the problem of increasing the drainage capacity by the traditional method of increasing the density of the annular blind pipe, but also avoids the secondary damage of the water retaining plate, and forms a tight and smooth drainage network between the initial support and the secondary lining concrete.

[0045] Referring to the accompanying drawings, a tunnel water leakage prevention and drainage process in this embodiment, in particular, a tunnel water leakage prevention and drainage process implemented between the secondary lining and the initial support. The utility model effectively prevents the accumulation of leakage water and groundwater while ensuring the safety of the tunnel structure by setting a water retaining plate and a dense drainage pipe.

[0046] The device of the utility model is applied to the process, which comprises the following steps:

[0047] (1) Install a water retaining plate between the secondary lining and the primary support to form isolation;

[0048] (2) Install densely maintained plastic fiber drainage pipes under each water retaining plate. The width of the drainage pipes is 5 to 6 cm, the thickness is 2 to 3 cm, and the longitudinal spacing is 10 to 20 cm. The drainage pipes and water retaining plates are connected by hot melt;

[0049] (3) Connect the drainage pipes under each baffle to the main pipeline to drain the water in the tunnel through the main pipeline.

[0050] When implementing the utility model, the intensive drainage pipe and the water retaining plate are first connected by hot melt. After the connection is completed, the drainage pipe and the water retaining plate are installed between the secondary lining and the initial support. The water retaining plate is closely attached to the secondary lining concrete, and the intensive drainage pipe is closely attached to the geotextile on the surface of the initial support concrete. The drainage pipes are all made of maintainable plastic fiber, so that groundwater can enter the drainage pipes. Each drainage pipe is connected to the main pipeline to discharge the water in the tunnel through the main pipeline.

[0051] In order to enhance the waterproof performance of the water retaining plate, each partition in the utility model is made of polyvinyl chloride plastic waterproof material. In addition, in order to ensure the drainage effect, each drainage pipe is arranged above the water retaining plate and connected to the longitudinal main pipeline of the tunnel, so that the drainage pipe can collect water in the tunnel more effectively.

[0052] The utility model adopts a water retaining plate combined with a dense multi-pipe setting, which can effectively prevent the accumulation of seepage water and groundwater in the tunnel, ensuring the safety of the tunnel structure. At the same time, each drainage pipe is connected to a maintainable plastic fiber main pipe of the same material to drain the water in the tunnel, avoiding water retention and pressure increase, and reducing the risk of the tunnel structure.

[0053] The utility model has simple and easy process, can effectively prevent tunnel water leakage and groundwater accumulation, improves the safety and stability of the tunnel, and has practical value and prospects for popularization and application.

[0054] The series of detailed descriptions listed above are only specific descriptions of feasible implementation methods of the utility model. They are not intended to limit the protection scope of the utility model. Any equivalent implementation methods or changes that do not deviate from the technical spirit of the utility model should be included in the protection scope of the utility model.

[0055] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

[0056] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A drainage device for tunnel leakage, It is characterized in that include, In the tunnel, primary support, water retaining plate and secondary lining are arranged in sequence from outside to inside along the tunnel cross section, the water retaining plate forms an isolation layer between the secondary lining and the primary support, and the secondary lining is arranged close to the inner wall of the tunnel; It also includes a plurality of drainage pipes located outside the water retaining plate, wherein the plurality of drainage pipes respectively form a plurality of annular drainage paths along the tunnel, and the plurality of annular drainage paths are connected to the main drainage pipe in the tunnel; A plurality of the annular drainage paths form a drainage network structure parallel to the tunnel along the length direction of the tunnel, so that the seepage water on the initial support is discharged through the drainage pipe.

2. A tunnel leakage prevention and drainage device according to claim 1, It is characterized in that It also includes a geotextile located on the inner wall of the initial support and between the initial support and the drainage pipe, so that water in the initial support is filtered by the geotextile and then flows out through the drainage pipe.

3. A tunnel leakage prevention and drainage device according to claim 2, It is characterized in that The initial support is fixed to the geotextile by means of nailing gaskets, and the geotextile is attached to the initial support.

4. A tunnel leakage prevention and drainage device according to claim 2, It is characterized in that The drainage pipe is provided with a downwardly inclined water inlet at least at the top of the tunnel or near the geotextile.

5. The anti-drainage device for tunnel leakage according to claim 1, It is characterized in that Along the length direction of the tunnel, a plurality of drainage pipes are fixedly connected below the water retaining plate in a matrix at intervals of 10 cm to 20 cm.

6. A tunnel leakage prevention and drainage device according to claim 1, It is characterized in that The drainage pipe is a plastic fiber pipe, and the diameter of the plastic fiber pipe is 5cm-6cm.

7. A tunnel leakage prevention and drainage device according to claim 6, It is characterized in that The water baffle is a polyvinyl chloride baffle, and the plastic fiber pipe is hot-melt connected to the polyvinyl chloride baffle.

8. The anti-drainage device for tunnel leakage according to claim 1, It is characterized in that The annularly arranged drainage pipe and the main drainage pipe are welded by embedded hot-melt welding.