Overwater quick connection device for thin-caliber pipeline

By designing a water rapid connection device, the fast docking of thin-diameter pipelines is achieved using locking parts, rubber cushion layers and pulling components, solving the problem of labor and time-consuming connection of pipelines in the construction of the crimped suction boat, and improving construction efficiency and Equipment utilization.

CN222046884UActive Publication Date: 2024-11-22CCCC TDC ENVIRONMENTAL ENG
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420024900.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-05
Publication Date
2024-11-22
Estimated Expiration
2034-01-05

AI Technical Summary

Technical Problem

During the dredging construction of the crimping suction boat, the connection operation of the thin-diameter pipeline is laborious and time-consuming, which affects the construction efficiency and equipment downtime.

Method used

A water quick connection device is designed, including first and second connection components and pulling components, combined with the end of the pipeline through a clasp and a rubber cushion with a locking member, using a positioning column and a flange Ensure accurate docking and achieve pull-type docking at the ends of the pipeline through pulling components.

Benefits of technology

It reduces the difficulty and time-consuming operation of pipeline connection, reduces the downtime of the dredger, and improves the interest rate and construction efficiency of the crimping boat.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222046884U_ABST
    Figure CN222046884U_ABST
Patent Text Reader

Abstract

The utility model relates to an overwater quick connection device for a thin-caliber pipeline. Comprising a first connection assembly, a second connection assembly and a traction assembly, wherein the first connection assembly and the second connection assembly are used for being combined with the ends of pipelines, and the traction assembly is used for oppositely pulling the two connection assemblies to enable the ends of the pipelines to be in butt joint; the first connection assembly comprises a first hoop with a first locking piece, a first rubber cushion layer is arranged on the inner side of the first hoop, and a plurality of first positioning columns which are equal in length and extend in the axial direction are arranged at the end of the same side of the first hoop. The second connection assembly comprises a second hoop with a second locking piece, a second rubber cushion layer is arranged on the inner side of the second hoop, and a plurality of second positioning columns which are equal in length and extend in the axial direction are arranged at the end of the same side of the second hoop. The pipeline connection device is reasonable in structural design and convenient to operate, the operation difficulty of pipeline connection is reduced, the time consumption of pipeline connection is reduced, the downtime of a dredger is shortened, and the time benefit rate of the cutter suction dredger is increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of pipeline construction, and in particular relates to an above-water quick connection device for narrow-diameter pipelines. Background Art

[0002] At present, due to the poor water flow dynamics, the inland rivers and lakes in cities and towns have a high degree of eutrophication of riverbed mud after long-term sedimentation and are in urgent need of dredging and removal. In order to protect the water environment and water ecology of the river, the construction adopted is all water-based construction by dredger suction boats. During the construction of the dredger suction boat, its blade arm is lowered underwater, and the auger is lowered to the mud surface at the bottom of the water. The rotating auger crushes the riverbed mud and mixes it with the surrounding water to form mud. Under the pumping action of the mud pump, the mud discharge pipeline on the blade arm extracts the mud to achieve dredging operations. Since the dredger suction boat does not have the ability to store mud, the extracted mud needs to be transported to shore using an overwater mud discharge pipeline (equipped with a buoy and self-floating, it is an overwater self-floating mud discharge pipeline), which involves the connection problem between the pipeline at the stern of the dredger suction boat and the mud discharge pipeline. Since most urban rivers are narrow and long, the dredger suction dredgers that shift and dredge along the river need to frequently perform pipeline connection operations during the construction process. How to efficiently connect the mud discharge pipeline is one of the main factors affecting the construction capacity of the dredger suction dredger.

[0003] The existing pipeline connection operation is carried out by on-site construction personnel, who drive small ships or floating platforms to the connection location, connect the tail pipeline of the dredger suction vessel with the end of the water mud discharge pipeline, and complete the pipeline connection operation. There are the following problems in the process of pipeline connection operation: the mud discharge pipeline is usually heavy, so it is laborious to shift the pipeline end, so it is a time-consuming and laborious operation to accurately connect the ends of the two pipelines and install bolts between the pipeline flanges. The dredger suction vessel needs to be shut down during the pipeline connection operation, so the pipeline connection operation seriously affects the dredging construction of the dredger suction vessel.

[0004] In summary, it is necessary to develop and design a supporting auxiliary facility for on-site pipeline connection to reduce the operational difficulty of pipeline connection, reduce the time consumption of pipeline connection, thereby reducing the downtime of the dredger, and further increase the hourly rate of the cutter suction dredger. Utility Model Content

[0005] The utility model aims to solve the technical problems existing in the known technology and provides an on-water quick connection device for narrow-diameter pipelines with reasonable structural design and convenient operation, thereby reducing the operational difficulty of pipeline connection, reducing the time consumption of pipeline connection, thereby reducing the downtime of the dredger and increasing the hourly rate of the cutter suction dredger.

[0006] The utility model adopts a technical solution to solve the technical problems existing in the known technology: an on-water quick connection device for a narrow-diameter pipeline comprises a first connection assembly for combining with the end of the pipeline, a second connection assembly and a pulling assembly for pulling the two connection assemblies to make the pipeline ends docked; the first connection assembly comprises a first clamp with a first locking member, a first rubber cushion layer is provided on the inner side of the first clamp, and a plurality of first positioning columns of equal length and extending in the axial direction are provided at the same side end of the first clamp; the second connection assembly comprises a second clamp with a second locking member, a second rubber cushion layer is provided on the inner side of the second clamp, and a plurality of second positioning columns of equal length and extending in the axial direction are provided at the same side end of the second clamp; the first clamp clamps the end of the first pipeline, the first rubber cushion layer is located between the first clamp and the first pipeline, and the end of each first positioning column is against the first flange, the second clamp clamps the end of the second pipeline, the second rubber cushion layer is located between the second clamp and the second pipeline, and the end of each second positioning column is against the second flange.

[0007] Preferably: the pulling assembly includes a connecting ring installed on the outer wall of the first hoop and a guide wheel installed on the outer wall of the second hoop, and also includes a steel cable with a hook at one end, the hook is hung on the connecting ring, and the steel cable is passed around the guide wheel.

[0008] Preferably, the first rubber cushion layer and the second rubber cushion layer are each formed by winding a thin rubber strip around the pipeline.

[0009] Preferably: the first locking member includes two first connecting members installed on the edge of the first holding piece of the first hoop and two first locking buckles installed on the edge of the second holding piece of the first hoop, which can be combined with and separated from the two first connecting members; the second locking member includes two second connecting members installed on the edge of the first holding piece of the second hoop and two second locking buckles installed on the edge of the second holding piece of the second hoop, which can be combined with and separated from the two second connecting members.

[0010] Preferably: three first positioning columns are provided on the first clamp and are arranged at equal angular intervals in the circumferential direction; three second positioning columns are provided on the second clamp and are arranged at equal angular intervals in the circumferential direction.

[0011] The advantages and positive effects of the utility model are:

[0012] The utility model provides a water rapid connection device for narrow-caliber pipelines with a reasonable structural design. Compared with the existing auxiliary pipeline connection device and connection operation method, the connection device in the utility model realizes the pull-type connection connection of the two pipeline ends by setting a first clamp to be combined with the end of the first pipeline, a second clamp to be combined with the end of the second pipeline, and a pulling component is set between the two connection components, thereby reducing the operational difficulty of pipeline connection and the consumption of manpower. By using the first clamp and the second clamp with locking parts to be fixedly connected to the ends of the two pipelines, the convenience of the operation connection is improved, so that the connection device can be easily disassembled and assembled on the pipeline.

[0013] By providing a rubber pad between the clamp and the end of the pipeline, the bonding strength between the clamp and the pipeline is effectively guaranteed. By constructing rubber pads of different thicknesses, the connection device can be used for connection between pipelines with gears of different outer diameters. At the same time, the rubber pad between the clamp and the pipeline can protect the pipeline to a certain extent, preventing the clamp from pinching the outer wall of the pipeline. By providing a positioning column at the end of the clamp and the end of the positioning column abutting against the end of the flange, a space for installing bolts is formed on the outside of the flange, thereby ensuring the convenience of the connection operation. The utility model of the water rapid connection device reduces the operational difficulty of pipeline connection, reduces the time consumption of pipeline connection, thereby reducing the downtime of the dredger, increases the hourly rate of the suction dredger, and improves the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a structural schematic diagram of the utility model;

[0015] Figure 2 yes Figure 1 A schematic diagram of the structure of the first docking assembly;

[0016] Figure 3 yes Figure 1 A schematic diagram of the structure of the second docking assembly;

[0017] Figure 4 It is a usage state diagram of the utility model.

[0018] In the figure:

[0019] 1. First rubber cushion; 2. First clamp; 3. First locking buckle; 4. First connecting piece; 5. First positioning column; 6. Connecting ring; 7. Hook; 8. Steel cable; 9. Second positioning column; 10. Second rubber cushion; 11. Second locking buckle; 12. Second connecting piece; 13. Second clamp; 14. Guide wheel; 15. First pipeline; 16. First flange; 17. Second flange; 18. Second pipeline. DETAILED DESCRIPTION

[0020] In order to further understand the content, features and effects of the present invention, the following embodiments are given to explain in detail.

[0021] See also Figure 1 The utility model is a water quick docking device for narrow-diameter pipelines, comprising a first docking assembly for combining with the end of the pipeline, a second docking assembly, and a pulling assembly for pulling the two docking assemblies to dock the ends of the pipelines. The docking operation principle is: the first docking assembly is installed on the first pipeline 15, the second docking assembly is installed on the second pipeline 18, the pulling assembly is installed between the first docking assembly and the second docking assembly and pulled, forcing the first docking assembly to move with the first pipeline 15 and the second docking assembly to move with the second pipeline 18, and the port flanges of the two pipelines are finally docked together, and the docking is completed after bolts are installed between the flanges.

[0022] See also Figure 2 , we can see that:

[0023] The first docking assembly includes a first clamp 2 with a first locking member, a first rubber cushion layer 1 is provided on the inner side of the first clamp 2, and a plurality of first positioning columns 5 of equal length and extending in the axial direction are provided on the same side end of the first clamp 2. The first clamp 2 clamps the end of the first pipeline 15, and the first rubber cushion layer 1 is located between the first clamp 2 and the first pipeline 15, and the end of each first positioning column 5 abuts against the first flange 16.

[0024] As shown in the figure, the first clamp 2 includes a first clamping piece and a second clamping piece hingedly connected by a hinge shaft, and the first locking piece is arranged between the edges of the first clamping piece and the second clamping piece. After the two clamping pieces are closed and the first locking piece is operated to lock, the first clamp 2 is combined with the first pipeline 15. By providing the first rubber cushion layer 1, the tightness of the combination between the first clamp 2 and the first pipeline 15 can be improved, and at the same time, the first clamp 2 can be prevented from causing clamping damage to the outer wall of the first pipeline 15.

[0025] In this embodiment, the first locking member includes two first connecting members 4 installed on the edge of the first holding piece of the first hoop 2 and two first locking buckles 3 installed on the edge of the second holding piece of the first hoop 2 and which can be combined with and separated from the two first connecting members 4. The first locking buckle 3 has a handle and a locking ring. When locking, the handle is pulled upward and the locking ring is placed on the first connecting member 4, and then the handle is pushed downward, so that the first locking buckle 3 is combined with the first connecting member 4 to achieve locking and fixation.

[0026] In this embodiment, the first rubber cushion layer 1 is formed by winding a thin rubber strip on the first pipeline 15. In this way, the thickness of the first rubber cushion layer 1 can be set by winding different layers as appropriate to ensure reliable bonding strength between the first clamp 2 and the first pipeline 15. In this way, the first connecting assembly can be installed and used on first pipelines 15 with different outer diameters.

[0027] The first positioning column 5 is used to define the position of the first clamp 2 when the first docking assembly is assembled on the first pipeline 15. By making the end of each first positioning column 5 abut against the first flange 16, the first clamp 2 can be effectively prevented from moving on the first pipeline 15 during the docking pulling process, and a space for installing bolts can be formed between the first clamp 2 and the first flange 16. In this embodiment, three first positioning columns 5 are provided on the first clamp 2 and are arranged at equal angles in the circumferential direction.

[0028] See also Figure 3 , we can see that:

[0029] The second docking assembly includes a second clamp 13 with a second locking member, a second rubber cushion layer 10 is provided on the inner side of the second clamp 13, and a plurality of second positioning columns 9 of equal length extending in the axial direction are provided on the same side end of the second clamp 13. The second clamp 13 clamps the end of the second pipeline 18, and the second rubber cushion layer 10 is located between the second clamp 13 and the second pipeline 18, and the end of each second positioning column 9 abuts against the second flange 17.

[0030] As shown in the figure, the second clamp 13 includes a first clamp piece and a second clamp piece that are hingedly connected by a hinge shaft, and a second locking member is arranged between the edges of the first clamp piece and the second clamp piece. After the two clamp pieces are closed and the second locking member is operated to lock, the second clamp 13 is combined with the second pipeline 18. The second rubber cushion layer 10 can improve the tightness of the combination between the second clamp 13 and the second pipeline 18, and prevent the second clamp 13 from causing clamping damage to the outer wall of the second pipeline 18.

[0031] In this embodiment, the second locking member includes two second connecting members 12 installed on the edge of the first holding piece of the second hoop 13 and two second locking buckles 11 installed on the edge of the second holding piece of the second hoop 13 and can be combined with and separated from the two second connecting members 12. The second locking buckle 11 has a handle and a locking ring. When locking, the handle is pulled upward and the locking ring is placed on the second connecting member 12, and then the handle is pushed downward, so that the second locking buckle 11 is combined with the second connecting member 12 to achieve locking and fixation.

[0032] In this embodiment, the second rubber cushion layer 10 is formed by winding a thin rubber strip on the second pipeline 18. In this way, the thickness of the second rubber cushion layer 10 can be set by winding different layers as appropriate to ensure reliable bonding strength between the second clamp 13 and the second pipeline 18. In this way, the second connecting assembly can be installed and used on second pipelines 18 with different outer diameters.

[0033] The second positioning column 9 is used to limit the position of the second clamp 13 when the second docking assembly is assembled on the second pipeline 18. By making the end of each second positioning column 9 abut against the second flange 17, the second clamp 13 can be effectively prevented from moving on the second pipeline 18 during the docking pulling process, and a space for installing bolts can be formed between the second clamp 13 and the second flange 17. In this embodiment, three second positioning columns 9 are provided on the second clamp 13 and are arranged at equal angles in the circumferential direction.

[0034] See also Figure 1 , we can see that:

[0035] The pulling assembly includes a connecting ring 6 installed on the outer wall of the first hoop 2 and a guide wheel 14 installed on the outer wall of the second hoop 13, and also includes a steel cable 8 with a hook 7 at one end, the hook 7 is hung on the connecting ring 6, and the steel cable 8 passes around the guide wheel 14. By pulling the end of the steel cable 8, the first docking assembly with the first pipeline 15 and the second docking assembly with the second pipeline 18 can be forced to move toward each other, and finally the first flange 16 and the second flange 17 are docked together, and the docking connection of the pipelines is realized after installing multiple bolts.

[0036] In actual operation, the steel cable 8 can be pulled manually or by a winch configured on a ship, pontoon platform, etc. It is worth noting that the quick connection device in the utility model is usually only suitable for connection operations of small-diameter pipelines. For large-diameter pipelines, due to factors such as their weight and size, it is not suitable to use the connection device and connection method in the utility model for pipeline connection.

[0037] For connection operation, please refer to Figure 4 :

[0038] The construction personnel arrive at the connection position, and according to the size of the pipeline, wrap multiple layers of rubber strips around the end of the first pipeline 15 to form a first rubber cushion layer 1 of appropriate thickness, and wrap multiple layers of rubber strips around the end of the second pipeline 18 to form a second rubber cushion layer 10 of appropriate thickness;

[0039] The first clamp 2 is installed on the first rubber cushion layer 1, and the first clamp 2 should be tightly clamped on the first pipeline 15, and the end of each first positioning column 5 should be in contact with the first flange 16. Similarly, the second clamp 13 is installed on the second rubber cushion layer 10, and the second clamp 13 should be tightly clamped on the second pipeline 18, and the end of each second positioning column 9 should be in contact with the second flange 17;

[0040] Between the first docking assembly and the second docking assembly, Figure 1 Install the pulling assembly in the manner shown in the figure, connect the steel cable 8 to the winch configured on site, or directly pull the steel cable 8 by manpower, at this time, the ends of the first pipeline 15 and the second pipeline 18 move, and finally the first flange 16 and the second flange 17 are abutted against each other, and bolts are installed in the connecting holes of the two flanges and tightened to complete the pipeline connection operation. After the connection operation is completed, the quick connection device is disassembled.

Claims

1. A water quick connection device for narrow-diameter pipelines, characterized by: The invention comprises a first docking assembly for combining with the end of a pipeline, a second docking assembly and a pulling assembly for pulling the two docking assemblies toward each other so as to dock the ends of the pipeline; the first docking assembly comprises a first clamp (2) with a first locking member, a first rubber cushion layer (1) is arranged on the inner side of the first clamp (2), and a plurality of first positioning columns (5) of equal length and extending in the axial direction are arranged on the same side end of the first clamp (2); the second docking assembly comprises a second clamp (13) with a second locking member, a second rubber cushion layer (10) is arranged on the inner side of the second clamp (13), and a plurality of first positioning columns (5) of equal length and extending in the axial direction are arranged on the same side end of the first clamp (2); The same side end of the first pipeline (13) is provided with a plurality of second positioning columns (9) of equal length and extending in the axial direction; the first clamp (2) is clamped at the end of the first pipeline (15) and the first rubber cushion layer (1) is located between the first clamp (2) and the first pipeline (15), and the end of each first positioning column (5) abuts against the first flange (16); the second clamp (13) is clamped at the end of the second pipeline (18) and the second rubber cushion layer (10) is located between the second clamp (13) and the second pipeline (18), and the end of each second positioning column (9) abuts against the second flange (17).

2. The water quick connection device for narrow-diameter pipelines according to claim 1, characterized in that: The pulling assembly comprises a connecting ring (6) mounted on the outer wall of the first hoop (2) and a guide wheel (14) mounted on the outer wall of the second hoop (13), and also comprises a steel cable (8) with a hook (7) at one end, the hook (7) being hung on the connecting ring (6), and the steel cable (8) passing around the guide wheel (14).

3. The water quick connection device for narrow-diameter pipelines according to claim 2, characterized in that: The first rubber cushion layer (1) and the second rubber cushion layer (10) are each formed by winding a thin rubber strip around a pipeline.

4. The water quick connection device for narrow-diameter pipelines according to claim 3, characterized in that: The first locking member comprises two first connecting members (4) installed on the edge of the first holding piece of the first holding hoop (2) and two first locking buckles (3) installed on the edge of the second holding piece of the first holding hoop (2) and capable of being combined with and separated from the two first connecting members (4); the second locking member comprises two second connecting members (12) installed on the edge of the first holding piece of the second holding hoop (13) and two second locking buckles (11) installed on the edge of the second holding piece of the second holding hoop (13) and capable of being combined with and separated from the two second connecting members (12).

5. The water quick connection device for narrow-diameter pipelines according to claim 4, characterized in that: Three first positioning posts (5) are provided on the first clamp (2) and are arranged at equal angular intervals in the circumferential direction; three second positioning posts (9) are provided on the second clamp (13) and are arranged at equal angular intervals in the circumferential direction.

Citation Information

Cited By

  • Stone throwing guide pipe, uninterrupted feeding adjusting device of stone throwing guide pipe, using method of uninterrupted feeding adjusting device, stone throwing system and stone throwing method

    CN120401505A