Garbage pool heating device of garbage incineration power plant and garbage pool of garbage incineration power plant
By setting up spouts and air suction ports in the heating device of the garbage pool in the waste incineration power plant, the problem of low load of the incinerator in the low temperature environment of the garbage pool is solved, the equipment stability and maintenance safety are improved, and operating costs and environmental risks are reduced. .
Patent Information
- Application Number
- CN202420606838.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-27
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-03-27
AI Technical Summary
The low temperature environment of waste incineration power plants in cold areas leads to low load and poor combustion conditions of incinerators, which require long-term investment of fuel to help combustion, increase operating costs and bring about environmental unstable factors. At the same time, the existing heating devices are flammable and explosive. In the environment, the equipment is low reliability, high maintenance costs, and high risk of maintenance operations.
Design a garbage incineration power plant garbage pool heating device, set the nozzle on the first wall, and the hot air blows into the garbage pool, the air suction port and the nozzle are connected through the main air duct, and the heating equipment is set on the main air duct, and carbon steel air duct is used The aluminum silicate insulation layer has an inclined downward nozzle and is set on both sides of the discharge door to reduce the risk of equipment corrosion and damage and maintenance.
It improves equipment stability and maintenance safety, reduces equipment corrosion and damage, reduces heating energy consumption, extends waste fermentation time, increases the power generation of tons of waste, reduces fuel combustion demand, and reduces operating costs.
Smart Images

Figure CN222047736U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a garbage pool heating device for a garbage incineration power plant and the garbage pool for the garbage incineration power plant. Background Art
[0002] Due to the cold winter in northern China and the long duration of low temperatures, the temperature in the garbage pool of the domestic waste incineration power plant is affected by the external ambient temperature and remains at a low temperature for a long time. The fermentation temperature and calorific value of the garbage are low, the incinerator load is low, the combustion condition is poor, and the combustion adjustment is difficult. Long-term investment in fuel combustion has caused a significant increase in the operating costs of the waste power plant, and at the same time brought many unstable factors in terms of environmental protection.
[0003] At present, the mainstream heating equipment modes of garbage pool heating in garbage pool incineration power plants are divided into: heating by steam heater in the garbage pool, heating by leachate back-spray, heating by direct steam introduction into the garbage pool, and heating by pre-buried coils at the bottom of the garbage pool.
[0004] A comprehensive analysis of the above four garbage pool heating configurations shows that the steam heater heating in the garbage pool is in a flammable, explosive, toxic and harmful working environment, with high requirements for equipment reliability, high maintenance costs and harsh maintenance environment; the leachate back-spray heating mainly functions to melt ice, but in view of its small coverage area, garbage basically does not freeze in cold regions, and garbage freezing is rare, so this set of equipment is basically idle; direct steam heating and pre-buried coil heating at the bottom of the garbage pool involve huge maintenance risks. Utility Model Content
[0005] The utility model aims to solve the problem of improving the maintenance safety of a garbage pool heating device in a garbage incineration power plant, and provides a garbage pool heating device in a garbage incineration power plant and a garbage pool in a garbage incineration power plant.
[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0007] A garbage pool heating device for a garbage incineration power plant, wherein a discharge hall is arranged next to the garbage pool, a first wall is arranged between the garbage pool and the discharge hall, and the device is arranged in the discharge hall, comprising a nozzle, a main air duct, a heating device and an air suction port. The nozzle is arranged on the first wall and is used to blow hot air into the garbage pool. The air suction port is connected with the nozzle through the main air duct. The heating device is arranged on the main air duct and is used to heat the air sucked in by the air suction port.
[0008] In some embodiments, the unloading hall is isolated from the outside by a second wall, and the air suction port includes an outdoor air suction port and an unloading hall air suction port, both of which are connected to the main air duct, and the outdoor air suction port is arranged on the second wall for sucking air from the outside, and the garbage pool unloading hall air suction port is used for sucking air from the unloading hall.
[0009] In some embodiments, the air duct of the main air duct is stepped, and the diameter of the main air duct gradually decreases from the air intake port to the nozzle port.
[0010] In some embodiments, a condensate drain pipeline is also included, and the condensate drain pipeline is installed in the heating section of the heating device.
[0011] In some embodiments, the main air duct uses a carbon steel air duct and an aluminum silicate insulation layer.
[0012] In some embodiments, more than one discharge door is arranged on the first wall, and the nozzle is arranged on both sides of the discharge door, 1 to 2 meters away from the bottom elevation of the discharge door and 0.3 to 2 meters away from the side of the discharge door.
[0013] In some embodiments, the nozzle is inclined downward by 25° to 45°.
[0014] The present application also provides a garbage pool of a waste incineration power plant, including an air supply system for supplying air into the garbage pool and an exhaust system for exhausting air from the garbage pool to the outside, wherein the air supply system includes the above-mentioned garbage pool heating device of the waste incineration power plant.
[0015] In some embodiments, the exhaust system includes a primary air riser, the primary air riser is connected to a primary air suction port, the primary air suction port is arranged on the top of the garbage pool wall, the primary air riser is provided with a bypass, the bypass is connected to a primary air bypass suction port, and the primary air bypass suction port is arranged at the top of the boiler room.
[0016] In some embodiments, an electric regulating air valve is provided on the primary air bypass air intake port, and the electric regulating air valve is used to adjust the opening.
[0017] The utility model has the following beneficial effects:
[0018] The utility model arranges the nozzle on the first wall to blow hot air into the garbage pool, the air suction port is connected with the nozzle through the main air duct, and the heating device is arranged on the main air duct to heat the wind sucked in by the air suction port. The garbage pool heating device of the garbage incineration power plant can be arranged in the unloading hall. Compared with placing the heating device in the garbage pool, the working environment of the equipment can be significantly changed, the corrosion damage of the equipment can be reduced, the stability of the equipment is improved, and the safety of the maintenance operation is improved.
[0019] Other beneficial effects of the embodiments of the present invention will be further described below. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a structural schematic diagram of a garbage pool heating device in a garbage incineration power plant in the prior art;
[0021] Figure 2 This is a schematic diagram of the structure of a garbage pool heating device for a garbage incineration power plant in an embodiment of the utility model.
[0022] Figure 3 It is a schematic diagram of the nozzle structure in the embodiment of the utility model;
[0023] Figure 4 This is a schematic diagram of the air suction port structure in an embodiment of the utility model;
[0024] Figure 5 The utility model is a circuit diagram of a garbage pool heating device in a garbage incineration power plant in an embodiment of the present invention.
[0025] Figure 6 It is a schematic diagram of the primary air suction port structure in an embodiment of the utility model.
[0026] Description of reference numerals:
[0027] 1-garbage pool, 2-unloading hall, 3-heater, 4-first wall, 41-unloading door, 5-nozzle, 51-garbage pool wall hole casing, 61-outdoor air suction port, 62-unloading hall air suction port, 7-main air duct, 71-expansion joint, 8-heating equipment, 9-condensate drain pipeline, 101-first double-leaf multi-page regulating valve, 102-second double-leaf multi-page regulating valve, 103-third double-leaf multi-page regulating valve, 11-second wall, 12-fan, 13-remote temperature signal, 14-gate valve, 15-filter, 16-electric regulating door, 17-pressure gauge, 18-thermometer, 19-stop valve, 20-drain trap, 21-check valve, 23-corbel stiffening plate, 24-primary air suction port, 25-primary air bypass suction port, 26-electric regulating air valve. DETAILED DESCRIPTION
[0028] The following is a detailed description of the implementation of the utility model. It should be emphasized that the following description is only exemplary and is not intended to limit the scope and application of the utility model.
[0029] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it can be directly on the other element or indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element. In addition, connection can be used for fixing as well as for coupling or communication.
[0030] It should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the accompanying drawings, and are only for the convenience of describing the embodiments of the utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the utility model.
[0031] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the embodiments of the present utility model, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined.
[0032] Figure 1 It is a structural schematic diagram of the prior art. The figure shows that the hot air heating device of the garbage pool of the garbage incineration power plant in the prior art includes a garbage pool 1, a discharge hall 2, and a heater 3. The figure shows that the heater 3 is arranged on both sides of the garbage pool 1, and the heated hot air is blown directly into the pool. This method has a huge maintenance operation risk, and the equipment is prone to corrosion and damage.
[0033] refer to Figure 2 The embodiment of the utility model proposes a garbage pool heating device for a garbage incineration power plant, wherein a discharge hall 2 is arranged next to the garbage pool 1, and a first wall 4 is arranged between the garbage pool 1 and the discharge hall 2. The garbage pool heating device for the garbage incineration power plant is arranged in the discharge hall 2. The garbage pool heating device for the garbage incineration power plant comprises a nozzle 5, a main air duct 7, a heating device 8 and an air suction port. The nozzle 5 is arranged on the first wall 4 for blowing hot air into the garbage pool 1. The air suction port is connected with the nozzle 5 through the main air duct 7. The heating device 8 is arranged on the main air duct 7 for heating the air sucked in by the air suction port.
[0034] In a preferred embodiment, the heating device 8 is a combined heating cabinet. After the cold air passes through the heating device 8 of the garbage pool 1 for heat exchange, it is distributed to the nozzle 5 on the wall of the garbage pool 1 through the main air duct 7 and sprayed into the garbage pool 1.
[0035] In a preferred embodiment, the unloading hall 2 is isolated from the outside by a second wall, and the air inlet includes an outdoor air inlet 61 and an unloading hall air inlet 62, both of which are connected to the main air duct 7, and the outdoor air inlet 61 is arranged on the second wall for sucking air from the outside, and the unloading hall air inlet 62 is used for sucking air from the unloading hall 2. In this embodiment, the outdoor air inlet 61 is equipped with a first double-opening multi-page regulating valve 101 and a second double-opening multi-page regulating valve 102, wherein the first double-opening multi-page regulating valve 101 is a manual double-opening multi-page regulating valve, and the second double-opening multi-page regulating valve 102 is an automatic double-opening multi-page regulating valve, and the unloading hall air inlet 62 is equipped with a third double-opening multi-page regulating valve 103, and the above regulating valves can realize the switching of indoor and outdoor air suction, and change the air inlet to two ways of taking air outdoors and inside the unloading hall 2, which can reduce the amount of cold air intrusion into the unloading hall 2.
[0036] In a preferred embodiment, the air duct of the main air duct 7 is stepped, and the diameter of the main air duct 7 gradually decreases from the air intake port to the nozzle 5. The stepped form ensures that the hot air has sufficient pressure and flow rate at the end, and ensures the wind pressure of the nozzle 5 on the wall of the garbage pool 1. The main air duct 7 is arranged above the unloading hall 2, and is a hot air delivery pipeline, which is used to evenly distribute the hot air to the nozzle 5 on the wall of the garbage pool 1. In some embodiments, the main air duct 7 uses a carbon steel air duct and an aluminum silicate insulation layer. Since the air duct of the main air duct 7 is placed in the unloading hall 2, a gradually variable diameter carbon steel air duct and an aluminum silicate insulation layer are selected to ensure that the air duct is lightweight, high in strength, and the wind pressure at each air outlet is stable, reducing the heat loss of the pipeline along the way. In one embodiment, an expansion joint 71 is also installed on the main air duct 7. The expansion joint 71 is used for the expansion of the pipeline due to heat to eliminate stress.
[0037] In a preferred embodiment, it also includes a condensate drain pipeline 9, which is installed in the heating section of the garbage pit heating equipment 8 and is used to recover the working medium for heat exchange between steam and cold air through the steam heating section of the garbage pit heating equipment 8.
[0038] In a preferred embodiment, one or more discharge doors 41 are provided on the first wall 4, and the discharge doors 41 are used for garbage truck unloading. The nozzles 5 are provided on both sides of the discharge doors 41, and are 1 to 2 meters above the bottom of the discharge doors 41. At present, the large-caliber φ450 jet nozzles on the market are all made of aluminum, using a die-casting process, and the nozzles are fixed at about 1 / 3 of the height of the entire garbage pool 1. This nozzle needs to be fixed on the inner wall of the garbage pool 1. The overall exposed length of the jet nozzle is relatively long, and it is easy to be accidentally hit by the garbage grab bucket. The nozzle does not have sufficient strength and is easy to change. Therefore, when personnel are replaced, they need to enter the garbage pool to perform operations without effective protection measures, which is a high-risk operation. In the garbage pool 1 of the utility model, the hot air nozzle is changed from a jet nozzle to a prefabricated nozzle. The prefabricated nozzle is made of straight pipes at both ends welded at an angle of 25° to 45°, and the end is welded to the nozzle outlet section with a 16-mesh stainless steel wire mesh. The nozzle 5 is arranged on both sides of the discharge door 41 and is fixed to the first wall 4 through a sleeve 51 with holes in the garbage pool wall. The nozzle 5 is 1 to 2m away from the bottom elevation of the discharge door and 0.3-2m away from the side of the discharge door, ensuring that the hot air outlet has sufficient wind speed and wind temperature, enhancing the contact heat exchange of garbage and enhancing the replaceability of the nozzle.
[0039] In a preferred embodiment, the nozzle 5 is inclined downward by 25° to 45°, and more preferably, the nozzle 5 is inclined downward by 30°. In this embodiment, the nozzle 5 is changed in form, and a carbon steel pipe is used to make it inclined downward by 30°. A stainless steel wire is installed at the air outlet, and a manual regulating valve and a check valve are installed at each horizontal branch pipe. This method increases the practicality of the nozzle.
[0040] refer to Figure 5 The main parts of the box body are an air inlet filter section, a heating section, and an air outlet section; the air inlet filter section is provided with a fan 12 and a filter screen 15, the filter screen is a coarse filter screen, and the air inlet filter section is used to inhale cold air from the outdoor air intake 61 and the unloading hall air intake 62; the heating section is provided with heat exchange fins, and the steam whose pressure and flow rate are controlled by the electric regulating door 16 flows through the heating section through the steam pipeline, exchanges heat with the cold air blown in by the filter section fan, and is blown into the air outlet section to become hot air with a certain temperature. After heat exchange, the steam becomes condensed water, which is transported to the condensate tank through the condensate pipeline steam trap 20; the measured value of the temperature measuring device set in the air outlet section is compared with the target value to adjust the opening of the electric regulating door 16, and then adjust the air outlet temperature. The remote temperature signal 13 in the figure is used to measure and feedback the outlet temperature;
[0041] The gate valve 14 is used to shut off the medium; the filter 15 is used to filter impurities; the electric regulating gate 16 is used to adjust the medium flow; the pressure gauge 17 is used to measure the pressure; the thermometer 18 is used to measure the temperature, and the stop valve 19 is used to shut off the medium; the steam trap 20 is used to separate different media; the check valve 21 is used for one-way passage of the medium; the condensate drain pipeline 9 is used for system draining.
[0042] Compared with placing the heating device in the garbage pool, the garbage pool heating device of the waste incineration power plant of this embodiment can significantly change the working environment of the equipment, reduce equipment corrosion damage, improve equipment stability, and improve the safety of maintenance operations.
[0043] This embodiment also discloses a garbage pool of a garbage incineration power plant, including an air supply system for supplying air to the garbage pool and an exhaust system for exhausting air from the garbage pool to the outside, and the air supply system includes the above-mentioned garbage pool heating device of the garbage incineration power plant. The unloading hall is provided with a discharge port leading to the garbage pool, and the garbage unloaded into the garbage pool is grabbed by a grab bucket and incinerated in the incinerator. The three are arranged in the order of the process flow: unloading hall-garbage pool-incinerator; since the incinerator needs air to assist combustion for garbage incineration, in order to prevent the odor from the garbage pool from overflowing, air is taken from the garbage pool, and the air sucked away is replenished into the garbage pool by the unloading hall.
[0044] The unloading door should be opened as little as possible to ensure normal unloading of the garbage truck. According to the experimental data of harmful gases from the fume hood window, the gas in the cabinet can be better controlled when the air inlet speed is guaranteed to be 0.4-0.6m / s. Too high wind speed and too low wind speed are not conducive to airflow suppression, and at the same time affect the actual effect and generate unnecessary energy consumption. Therefore, when different incinerators are put into operation, the cold air intrusion wind speed of the normally open unloading door can be obtained based on the air volume balance calculation: calculate the difference between the air volume A extracted from the garbage pool and the sum of the cold air intrusion B into the garbage pool and its related maintenance structure, and the air supply C of the garbage pool, and get the cold air intrusion volume D at the normally open unloading door, that is, D = A-(B+C). The cold air intrusion wind speed of the normally open unloading door can be known from the cold air intrusion volume D at the unloading door. Under the condition of ensuring that the odor does not overflow, external air suction ports are added in the unloading hall, outside the unloading hall, and in the primary air duct on the boiler side to ensure that the garbage pool is in a slightly negative pressure state (air inlet speed 0.4-0.6m / s). At the same time, the air flow in the garbage pool is reduced as much as possible, which is more conducive to heat storage.
[0045] In a preferred embodiment, the exhaust system of the garbage pool of the waste incineration power plant includes a primary air riser, and the primary air riser is connected to a primary air suction port. Figure 6 The primary air suction port is set at the top of the garbage pool wall, a bypass is set on the primary air riser, the bypass is connected to the primary air bypass suction port, the primary air bypass suction port is set at the top of the boiler room, and an electric regulating air valve is set on the primary air bypass suction port, which is used to adjust the opening. Figure 6The primary air suction port 24 on the boiler side includes a bracket stiffening plate 23, which is used to fix the pipeline. The primary air suction port 24 is used to take air from the top of the pool wall in the garbage pool. The primary air duct of the incinerator is arranged on the boiler side. A primary air bypass suction port 25 is arranged on the primary air riser. The primary air bypass suction port 25 is arranged in the boiler room, which can also improve the furnace top temperature in summer. The difference between the supply air and the suction air in the garbage pool 1 can be calculated according to the air volume balance, so as to adjust the opening of the electric regulating air valve 26 to increase or decrease the ventilation volume of the gas in the garbage pool 1.
[0046] In this embodiment, when two or three incinerators are running, the air inlet speed is greater than 0.6m / s according to the air volume balance calculation. Figure 6 The electric regulating air valve 26 of the primary air bypass air inlet 25 at the top of the middle boiler is opened. Figure 4 Compared with the prior art, the middle outdoor air intake 61 can effectively reduce the gas flow speed in the unloading hall 2 and the garbage pool 1, and enhance heat storage; when a single incinerator is running, the air intake speed is less than 0 / s according to the air volume balance calculation, that is, positive pressure, at this time, the electric regulating air valve 26 needs to be closed, the primary air intake 24 is opened, and the Figure 4 The air inlet 62 in the middle unloading hall can effectively reduce the problem of odor from the garbage pool overflowing outside the factory.
[0047] In some embodiments, flow meters can be installed on the air supply pipes and exhaust pipes to the garbage pool, and the flow meter values of each part are communicated to the DCS. At the same time, the air volume balance calculation is performed based on the data provided by the flow meter. The air volume extracted from the garbage pool proposed in the utility model is mainly taken in through the primary and secondary air suction ports set on the walls of the garbage pool of the three incinerators. The air suction volume is calculated as the sum of the rated air volumes of the primary and secondary air of each incinerator. The air supply volume of the garbage pool in this experimental object is mainly composed of three parts: air supply from the air fan between the leachate channels of the main plant, odor from the leachate treatment system to the garbage pool, and air supply from the hot air heating system of the garbage pool. The calculation method is the sum of the rated output air volumes of the fans of each system. The cold air intrusion into the garbage pool and its related enclosure structures mainly includes the infiltration of doors and windows, the infiltration of roof and concrete joints, the infiltration of normally closed doors, and the intrusion of open doors. The specific values are calculated by formula F.0.2 in Appendix F of the "Design Code for Heating, Ventilation and Air Conditioning of Industrial Buildings" (GB50019-2015), L = L0l1m b, where L0 is the theoretical air infiltration volume per meter of door and window gaps entering the room, calculated according to Appendix F.0.3 of GB50019-2015 Industrial Building Heating, Ventilation and Air Conditioning Design Code; e1 is the length of the external door and window gaps, which should be calculated according to the length of the door and window gaps that can be opened in each direction; m is the comprehensive correction coefficient of the cold air penetration pressure of doors and windows, selected as 1; b is the penetration index of the door and window gaps, selected as 0.67. Calculate the difference between the air volume A extracted from the garbage pool and the sum of the cold air infiltration volume B of the garbage pool and its related maintenance structures and the air supply volume C of the garbage pool, and obtain the cold air intrusion volume D at the normally open unloading door, that is, D = A-(B+C).
[0048] In this embodiment, the waste incineration power plant is selected as the analysis object with a daily waste treatment capacity of 2,250 tons, three 750-ton incinerators, a garbage pool of 94 meters long, 32 meters wide, a pool wall of 24 meters high, and an average winter ambient temperature of -9.8°C.
[0049] Table 1
[0050]
[0051] From Table 1 above, we can see that when the three furnaces are in operation, the air suction volume from the garbage pool is about 270,000 Nm 3 / h, the sum of the cold air infiltration into the garbage bin enclosure structure and the air supply volume of the garbage pool is about 90,000 Nm 3 / h, so considering that the primary air is extracted from the garbage pool, the garbage pool can completely maintain negative pressure, and there will be no odor escaping. When unloading, two doors are opened at the same time, and the wind speed of the unloading door is 1.85m / s, which is much higher than 0.4m / s. This will cause the wind speed in the garbage pool to flow too fast, which is not conducive to heat storage. Therefore, it is considered that part of the garbage pool sucks air from the top of the incineration room. Make a bypass on the primary air riser, and set an electric regulating air valve on the bypass to adjust the opening of the electric air valve. In winter, while maintaining the negative pressure of the garbage pool and preventing odor from escaping, extract as little cold air as possible to avoid freezing of the ramp and unloading hall, which is more conducive to heat storage in the garbage pool. Because most of the air in the garbage pool is supplemented, it eventually enters the ramp from the outdoors to the unloading hall and then enters the garbage pool through the normally open unloading door. When a single furnace is in operation, in order to suppress the overflow of odor, the garbage pool heating system draws air from the unloading hall to ensure that the unloading hall and the garbage pool are under negative pressure as a whole and reduce the overflow of odor; when two or three furnaces are in operation, consideration is given to drawing air from the outside of the unloading hall to reduce the freezing of the bridge ramp and the unloading hall.
[0052] Taking into account the complex airflow organization in the garbage pit, the primary air inlet of the incinerator is set on the top of the garbage pool. According to the direction of the airflow organization, part of the hot air in the garbage pool will be directly drawn away by the primary air, without direct contact and heat exchange with the garbage. By increasing the total pressure of the hot air heating equipment outlet in the garbage pool and increasing the wind speed of the hot air nozzle, the outlet wind speed of 12-14m / s is selected on the premise of meeting the heating, ventilation and air-conditioning specifications of industrial buildings to ensure that the hot air has sufficient kinetic energy and heat coverage area to contact the garbage; in order to reduce the collision of the garbage grab on the air inlet and to heat the garbage more effectively with hot air, the nozzle is extended as short as possible into the garbage pool, and the nozzle angle is 30° horizontally downward to enhance the contact between the hot air and the garbage.
[0053] This embodiment reduces the intake of cold air into the garbage pool by reasonably setting the air intake port, heats the less garbage pool makeup air to the expected temperature, and reduces heating energy consumption; cancels the operation of the leachate backspray system to save equipment fixed asset investment; optimizes the layout of the hot air heating system, replaces the heating coil from stainless steel to carbon steel, and reduces the equipment cost; enhances the heat exchange effect between hot air and garbage, shortens the garbage fermentation time, increases the power generation per ton of garbage, and reduces the fuel combustion on the furnace side, so as to achieve the purpose of reducing costs and increasing efficiency. At the same time, the operating personnel can adjust the equipment operation mode according to different working conditions, thereby controlling the negative pressure of the garbage pool, controlling the overflow of odor, and enhancing the heat exchange effect between hot air and garbage.
[0054] The above content is a further detailed description of the utility model in combination with specific / preferred embodiments, and it cannot be determined that the specific implementation of the utility model is limited to these descriptions. For ordinary technicians in the technical field to which the utility model belongs, without departing from the concept of the utility model, it can also make several substitutions or modifications to these described embodiments, and these substitutions or modifications should be regarded as belonging to the protection scope of the utility model. In the description of this specification, the description of the reference terms "an embodiment", "some embodiments", "preferred embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in combination with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily target the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner. In the absence of mutual contradiction, those skilled in the art can combine and combine the different embodiments or examples described in this specification and the features of different embodiments or examples. Although the embodiments of the present invention and their advantages have been described in detail, it should be understood that various changes, substitutions and alterations may be made herein without departing from the scope of protection of the patent application.
Claims
1. A garbage pool heating device for a garbage incineration power plant, wherein a discharge hall is arranged next to the garbage pool, and a first wall is arranged between the garbage pool and the discharge hall. It is characterized in that It is arranged in the unloading hall, and includes a nozzle, a main air duct, a heating device and an air suction port. The nozzle is arranged on the first wall and is used to blow hot air into the garbage pool. The air suction port is connected with the nozzle through the main air duct. The heating device is arranged on the main air duct and is used to heat the air sucked in by the air suction port.
2. The garbage pool heating device for a garbage incineration power plant according to claim 1, It is characterized in that The unloading hall is isolated from the outside world by a second wall. The air suction port includes an outdoor air suction port and an unloading hall air suction port. Both the outdoor air suction port and the unloading hall air suction port are connected to the main air duct. The outdoor air suction port is arranged on the second wall for sucking air from the outside. The garbage pool unloading hall air suction port is used for sucking air from the unloading hall.
3. The garbage pool heating device for a garbage incineration power plant according to claim 1, It is characterized in that The air duct of the main air duct is of stepped diameter, and the diameter of the main air duct gradually decreases from the air inlet to the nozzle.
4. The garbage pool heating device for a garbage incineration power plant according to claim 1, It is characterized in that It also includes a condensate drain pipeline, which is installed in the heating section of the heating equipment.
5. The garbage pool heating device for a garbage incineration power plant according to claim 1, It is characterized in that The main air duct adopts a carbon steel air duct and an aluminum silicate insulation layer.
6. The garbage pool heating device for a garbage incineration power plant as claimed in claim 3, It is characterized in that More than one discharge door is arranged on the first wall, and the nozzles are arranged on both sides of the discharge door, 1 to 2 meters away from the bottom elevation of the discharge door and 0.3 to 2 meters away from the side of the discharge door.
7. The garbage pool heating device for a garbage incineration power plant according to claim 1, It is characterized in that The nozzle is inclined downward by 25° to 45°.
8. A garbage pool in a waste incineration power plant, It is characterized in that It comprises an air supply system for supplying air into a garbage pit and an exhaust system for exhausting air from the garbage pit to the outside, and the air supply system comprises the garbage pit heating device of a garbage incineration power plant as described in any one of claims 1-6.
9. The garbage pool of a waste incineration power plant as claimed in claim 8, It is characterized in that The exhaust system includes a primary air riser, the primary air riser is connected to a primary air suction port, the primary air suction port is arranged on the top of the garbage pool wall, the primary air riser is provided with a bypass, the bypass is connected to a primary air bypass suction port, and the primary air bypass suction port is arranged on the top of the boiler room.
10. The garbage pool of a waste incineration power plant as claimed in claim 9, It is characterized in that The primary air bypass air inlet is provided with an electric regulating air valve, and the electric regulating air valve is used to adjust the opening.