Pre-splitting blasting energy-gathered cutting guide structure for surface mine side slope
By designing a combined structure of support components, adjustment components and connection components in open-pit mine slope pre-crack blasting, the detonator installation stability in the prior art is solved by using the combination of guide rods and frames and the matching of fasteners and brackets. The problems of low and difficult adjustment achieve a more stable energy-concentrating cutting effect.
Patent Information
- Application Number
- CN202420875266.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-25
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-04-25
AI Technical Summary
The existing blasting energy-concentrating cutting guide structure has low installation stability, and it is prone to deviation during the detonator installation, making it difficult to adjust the installation position.
A pre-cracking and energy-intensive cutting guide structure on the open-pit mine slope including support components, adjustment components and connection components is designed. Through the combination of guide rods and frames, the detonator can be movable and installed through fasteners and brackets. The seat matches the fixed explosives to ensure energy-concentrating cutting angle and stable support.
It improves the installation guide stability of the detonator, facilitates in-depth adjustment of the blasting hole position, ensures the accuracy of the energy-concentrating cutting angle and the stable fixation of the explosive, and avoids detonator offset and movement.
Smart Images

Figure CN222048769U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of electric power logistics material placement, in particular to an open-pit mine slope pre-splitting blasting energy-gathering cutting guide structure. Background Art
[0002] Mining blasting belongs to the application of engineering blasting technology in mining. In mining engineering, various blasting technologies are used in the process of shaft and tunnel excavation, open-pit mining, and underground mining. Mining blasting is to peel off the ore from the rock mass and the surrounding rock of the ore body roof, and blast it into a certain blast pile according to the engineering requirements, and break it into a certain size, creating conditions for subsequent shoveling and transportation. In mining construction and production, blasting energy cutting is one of the main means of crushing ore and rock, and energy cutting uses the energy effect, that is, after the explosives explode, the explosion products are under high temperature and high pressure to cut metal materials, and the blasting fragments basically fly outward along the normal direction of the explosive surface.
[0003] The existing blasting energy-gathering cutting guide has low installation stability during use, and is prone to displacement during the placement of detonators, making it inconvenient to adjust its installation position. Therefore, we propose a pre-splitting blasting energy-gathering cutting guide structure for open-pit mine slopes. Utility Model Content
[0004] The utility model aims to provide an open-pit mine slope pre-splitting blasting energy-gathering cutting guide structure to solve the problems raised in the above-mentioned background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an open-pit mine slope pre-splitting blasting energy-gathering cutting guide structure, comprising a supporting assembly, an adjusting assembly and a connecting assembly, an adjusting assembly is arranged in the middle of the supporting assembly, and a connecting assembly is arranged in the middle of the adjusting assembly, the adjusting assembly comprises a frame, a clamp, a through groove, a through hole, a first blasting pipe support seat, a second blasting pipe support seat and a fastener, and a clamp is arranged on the side of the frame, a through groove is arranged in the middle of both ends of the frame, a through hole is arranged in the middle of the frame, and a first blasting pipe support seat is arranged at the bottom of the through hole, a second blasting pipe support seat is arranged at the top of the through hole, and a fastener is arranged on the top of the second blasting pipe support seat.
[0006] Furthermore, the frame is connected to the support assembly, and the clamp is matched with the support assembly.
[0007] Furthermore, the fastener is threadedly connected to the second blasting tube support seat, and the second blasting tube support seat matches the first blasting tube support seat.
[0008] Furthermore, the connection assembly includes a tube body, a positioning sleeve and a limiting ring, and the positioning sleeve is arranged inside the tube body, and the limiting ring is arranged in the middle of the positioning sleeve.
[0009] Furthermore, the tube body wraps the positioning sleeve, and the positioning sleeve and the limiting ring are integrated.
[0010] Furthermore, the support assembly includes a base and a guide rod, and the guide rod is provided at the tip of the base.
[0011] Furthermore, the adjusting assembly is inserted through the guide rod, and the adjusting assembly and the guide rod are slidably connected.
[0012] Compared with the prior art, the beneficial effects of the utility model are: the detonator is fixed by the frame, and the frame is supported by the guide rod. Since the guide rod is inserted and embedded in the frame through the through groove, the detonator placement frame is movable, which is convenient for adjusting the depth of the detonator into the blasting hole. The clamp is fixed on the guide rod to block the frame and prevent the detonator frame from moving out. The detonator is fixed by the frame to ensure the energy-focusing cutting angle.
[0013] The detonator is fixed by the frame, and the brackets on both sides of the through hole in the middle of the frame have the same size. The detonator is passed through the through hole as needed, and the second blasting tube bracket is extended and fitted to the detonator by rotating the top fastener, so that the first blasting tube bracket and the second blasting tube bracket fix the detonator, limit the explosives, complete the stable support, and ensure the energy-focusing cutting angle.
[0014] The detonator is fixed by the frame, and the frame is supported by the guide rod. Since the guide rod is inserted and embedded in the frame through the through groove, the detonator placement frame is movable, which is convenient for adjusting the depth of the detonator into the blasting hole. Two guide rods are provided to facilitate stable guided sliding of the frame. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;
[0016] Figure 2 This is a side view structural diagram of the adjustment component of the utility model;
[0017] Figure 3 It is a schematic diagram of the three-dimensional structure of the connection component of the utility model.
[0018] In the figure: 1. Support assembly; 101. Base; 102. Guide rod; 2. Adjustment assembly; 201. Frame; 202. Hoop; 203. Through groove; 204. Through hole; 205. First blasting pipe support; 206. Second blasting pipe support; 207. Fastener; 3. Connection assembly; 301. Pipe body; 302. Positioning sleeve; 303. Limiting ring. DETAILED DESCRIPTION
[0019] like Figure 1-2 As shown, an open-pit mine slope pre-splitting blasting energy-gathering cutting guide structure includes a support component 1, an adjustment component 2 and a connection component 3. The middle of the support component 1 is provided with the adjustment component 2, and the middle of the adjustment component 2 is provided with the connection component 3. The adjustment component 2 includes a frame 201, a hoop 202, a through groove 203, a through hole 204, a first blasting pipe support seat 205, a second blasting pipe support seat 206 and a fastener 207. The side of the frame 201 is provided with a hoop 202, the middle of both ends of the frame 201 is provided with a through groove 203, and the middle of the frame 201 is provided with a through hole 204. 04, and a first blasting tube support 205 is provided at the bottom of the through hole 204, a second blasting tube support 206 is provided at the top of the through hole 204, and a fastener 207 is provided at the top of the second blasting tube support 206, the frame 201 is connected to the support assembly 1, and the clamp 202 is matched with the support assembly 1, the frame 201 slides horizontally on the guide rod 102, and the clamp 202 is fixed on the guide rod 102, and is used to block the frame 201 according to the horizontal movement size to prevent the detonator frame 201 from moving out, thereby improving the stability of the detonator installation guide The fastener 207 is threadedly connected to the second blasting tube support 206, and the second blasting tube support 206 matches the first blasting tube support 205. The detonator is fixed by the frame 201, and the brackets on both sides of the through hole 204 in the middle of the frame 201 have the same size. The detonator is passed through the through hole 204 as needed, and the second blasting tube support 206 is extended and fitted to the detonator by rotating the top fastener 207, so that the first blasting tube support 205 and the second blasting tube support 206 fix the detonator, limit the explosive, complete the stable support, ensure the energy-gathering cutting angle, and support the assembly. 1 comprises a base 101 and a guide rod 102, wherein the tip of the base 101 is provided with the guide rod 102, the adjusting assembly 2 is inserted through the guide rod 102, and the adjusting assembly 2 and the guide rod 102 are slidably connected, the detonator is fixed by the frame 201, and the frame 201 is supported by the guide rod 102, since the guide rod 102 is inserted and embedded with the frame 201 through the through groove 203, the detonator placement frame 201 is movable, which is convenient for adjusting the deep position of the detonator into the blasting hole, and two guide rods 102 are provided, which is convenient for the frame 201 to stably guide and slide.
[0020] like Figure 3As shown, a pre-splitting blasting energy-gathering cutting guide structure for an open-pit mine slope, wherein a connecting component 3 comprises a tube body 301, a positioning sleeve 302 and a limiting ring 303, and a positioning sleeve 302 is arranged inside the tube body 301, and a limiting ring 303 is arranged in the middle of the positioning sleeve 302, the tube body 301 wraps the positioning sleeve 302, and the positioning sleeve 302 and the limiting ring 303 are integrated, by arranging the tube body 301, protection can be provided for the detonators installed inside, and a positioning sleeve 302 is arranged inside the tube body 301, and the positioning sleeve 302 and the limiting ring 303 are integrated, and the blasting detonators can be fixed and limited, so as to avoid the displacement of the blasting detonators and accidents in the blasting process.
[0021] Working principle: First, the detonator is fixed by the frame 201, and the frame 201 is supported by the guide rod 102. Since the guide rod 102 is inserted and embedded in the frame 201 through the through slot 203, the detonator placement frame 201 is movable, which is convenient for adjusting the depth of the detonator into the blasting hole. The hoop 202 is fixed on the guide rod 102 and is used to block the frame 201 according to the horizontal movement size to prevent the detonator frame 201 from moving out. Then the detonator is fixed by the frame 201 and the detonator is moved from the through slot 203 as needed. The hole 204 is passed through, and the top fastener 207 is rotated to make the second blasting tube support 206 stretch and fit the detonator, so that the first blasting tube support 205 and the second blasting tube support 206 fix the detonator to ensure the energy-gathering cutting angle. The setting of the tube body 301 can provide protection for the detonator installed inside. At the same time, a positioning sleeve 302 is arranged inside the tube body 301 to fix and limit the blasting detonator. Finally, there are four limiting rings 303 on the positioning sleeve 302, which can meet the high-density arrangement requirements of multiple blasting tubes at the same mine blasting point.
[0022] Finally, it should be noted that the above is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model should be included in the protection scope of the present utility model.
Claims
1. An open-pit mine slope pre-splitting blasting energy-gathering cutting guide structure, characterized in that: The invention comprises a support assembly (1), an adjustment assembly (2) and a connection assembly (3), wherein the middle part of the support assembly (1) is provided with the adjustment assembly (2), and the middle part of the adjustment assembly (2) is provided with the connection assembly (3), wherein the adjustment assembly (2) comprises a frame (201), a hoop (202), a through groove (203), a through hole (204), a first blasting tube support seat (205), a second blasting tube support seat (206) and a fastener (207), and the frame A clamp (202) is provided on the side of the frame (201), through grooves (203) are provided in the middle of both ends of the frame (201), a through hole (204) is provided in the middle of the frame (201), and a first blasting pipe support seat (205) is provided at the bottom of the through hole (204), a second blasting pipe support seat (206) is provided at the top of the through hole (204), and a fastener (207) is provided at the top of the second blasting pipe support seat (206).
2. The open-pit mine slope pre-splitting blasting energy-gathering cutting guide structure according to claim 1, characterized in that: The frame (201) is connected to the support assembly (1), and the hoop (202) is matched with the support assembly (1).
3. The open-pit mine slope pre-splitting blasting energy-gathering cutting guide structure according to claim 1, characterized in that: The fastener (207) is threadedly connected to the second blasting tube support seat (206), and the second blasting tube support seat (206) matches the first blasting tube support seat (205).
4. The open-pit mine slope pre-splitting blasting energy-gathering cutting guide structure according to claim 1, characterized in that: The connection assembly (3) comprises a tube body (301), a positioning sleeve (302) and a limiting ring (303), wherein the positioning sleeve (302) is arranged inside the tube body (301), and the limiting ring (303) is arranged in the middle of the positioning sleeve (302).
5. The open-pit mine slope pre-splitting blasting energy-gathering cutting guide structure according to claim 4, characterized in that: The tube body (301) wraps the positioning sleeve (302), and the positioning sleeve (302) and the limiting ring (303) are integrated.
6. The open-pit mine slope pre-splitting blasting energy-gathering cutting guide structure according to claim 1, characterized in that: The support assembly (1) comprises a base (101) and a guide rod (102), and the guide rod (102) is arranged at the tip of the base (101).
7. The open-pit mine slope pre-splitting blasting energy-gathering cutting guide structure according to claim 6, characterized in that: The adjusting component (2) is inserted into the guide rod (102), and the adjusting component (2) and the guide rod (102) are slidably connected.
Citation Information
Cited By
Pre-splitting blasting energy-gathered cutting guide structure for surface mine side slope