Three-section layered control preheating kiln for lime production and processing

By designing a three-stage layered preheating kiln in a lime production and processing kiln, the problem of difficult preheating and calcining time is solved by using the linkage of the preheating silo, hydraulic plate and nozzle burner, and the lime product activity is achieved and calcining efficiency.

CN222064389UActive Publication Date: 2024-11-26XINXIANG TONGJIA IND EQUIP TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420228871.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-31
Publication Date
2024-11-26
Estimated Expiration
2034-01-31

AI Technical Summary

Technical Problem

In the existing lime production and processing kilns, the preheating and calcining time cannot be controlled separately, resulting in too long calcining time or too long preheating time, affecting the activity of lime products.

Method used

A three-stage layered control preheating kiln for lime production and processing is designed. The preheating and calcining process is separately controlled through the linkage of preheating bins, hydraulic plates, hydraulic push rods, connecting blocks, air ducts and nozzle burners. , realize multi-stage preheating and calcining of limestone, shorten preheating time and improve calcining efficiency.

Benefits of technology

It effectively shortens the preheating time in the lime production process, improves the activity of lime products, and improves the calcination efficiency and product quality by separately controlling the preheating and calcination time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222064389U_ABST
    Figure CN222064389U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of lime production, and discloses a three-section layered control preheating kiln for lime production and processing, which comprises a base, a transition block is fixedly connected to the middle position of the top of the base, the top of the transition block penetrates through and is fixedly connected with a main kiln, and a cooling bin is fixedly connected to the interior of the transition block. The outer wall of the main kiln is fixedly connected with reinforcing angle steel which is evenly distributed, and a first movable table top is fixedly connected to the lower portion of the middle of the outer wall of the main kiln. According to the preheating device, through linkage among the preheating bin, the hydraulic plate, the second hydraulic push rod, the third connecting block, the second connecting block, the first connecting block, the air pipe, the second nozzle combustor and the discharging pipe, materials needing to be preheated are divided into multiple parts to be preheated in the using process, the preheating temperature can be controlled in the heating process, and the preheating efficiency is improved. The preheating time of the lime in the production process is shortened, and the activity of the lime product is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of lime production, in particular to a three-stage stratified controlled preheating kiln for lime production and processing. Background Art

[0002] Lime is an air-hardening inorganic cementitious material with calcium oxide as the main component. Lime is a product with high calcium carbonate content such as limestone, dolomite, chalk, and shells, which is calcined at 900-1100℃. Lime is the earliest cementitious material used by humans. Lime is widely used in civil engineering and can also be used in medicine in my country. At the same time, in the process of lime production and processing, a preheating kiln is needed to calcine and heat the limestone.

[0003] At present, most of the existing kiln types are straight-through type, and preheating and calcination are carried out simultaneously. The preheating and calcination time cannot be controlled separately, resulting in too long calcination time, or too long preheating time cannot well determine the activity of the product. Utility Model Content

[0004] The utility model aims to provide a three-stage layered controlled preheating kiln for lime production and processing, which solves the problem in the background technology that the preheating and calcining time cannot be controlled separately, resulting in too long calcining time, or too long preheating time cannot well determine the product activity.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a three-stage layered controlled preheating kiln for lime production and processing, comprising a base, a transition block is fixedly connected to the middle position of the top of the base, the top of the transition block penetrates and is fixedly connected to the main kiln, the interior of the transition block is fixedly connected to a cooling bin, the outer wall of the main kiln is fixedly connected to uniformly distributed reinforcement angle steels, a first movable table is fixedly connected to the lower middle position of the outer wall of the main kiln, two nozzle connecting pipes are fixedly connected to the middle position of the outer wall of the main kiln, adjacent sides of the two nozzle connecting pipes penetrate and are fixedly connected to uniformly distributed second connecting pipes, the outer wall of the upper nozzle connecting pipe penetrates and is fixedly connected to a third connecting pipe, the inner sides of the two nozzle connecting pipes are fixedly connected to uniformly distributed first nozzle burners, and the output ends of the first nozzle burners penetrate the main kiln and are fixedly connected.

[0006] As a further description of the above technical solution: a second movable table top is fixedly connected to the upper middle position of the outer wall of the main kiln, a preheating bin is fixedly connected to the top of the main kiln, an air duct is fixedly connected to the upper outer wall of the preheating bin, and the output ends of the air ducts all pass through the preheating bin and are fixedly connected, a connecting air duct passes through and is fixedly connected to the outer wall of the air duct, a cold air valve is provided on the outer wall of the output end of the air duct, and evenly distributed connecting angle steels are fixedly connected to the top of the preheating bin, and a material bin is fixedly connected to the inner side of the connecting angle steel.

[0007] As a further description of the above technical solution: the bottom of the silo is penetrated and fixedly connected with evenly distributed feed pipes, and the output ends of the feed pipes are penetrated through the preheating bin and fixedly connected, a second nozzle burner is fixedly connected to the front middle position of the preheating bin, and the output end of the second nozzle burner is penetrated through the preheating bin and fixedly connected.

[0008] As a further description of the above technical solution: a second hydraulic push rod evenly distributed is fixedly connected to the lower part of the outer wall of the preheating bin, the output end of the second hydraulic push rod passes through and is rotatably connected to the first connecting block, and a third connecting block is fixedly connected to the middle position below the outer walls on both sides of the preheating bin, a hydraulic plate is fixedly connected to the front side of the first connecting block, and the inner side of the hydraulic plate is rotatably connected to the third connecting block, a second connecting block is fixedly connected to the middle position of the inner side of the hydraulic plate, and the output end of the second connecting block passes through and is fixedly connected to a material guide pipe.

[0009] As a further description of the above technical solution: a feed pipe passes through and is fixedly connected to the middle position of the top of the silo, a first guardrail is fixedly connected to the top outer ring of the silo, a second guardrail is fixedly connected to the top outer ring of the second movable table top, a third guardrail is fixedly connected to the top outer ring of the first movable table top, and a main guardrail is fixedly connected to the top outer ring of the base.

[0010] As a further description of the above technical solution: a mixing block is rotated inside the cooling bin, the outer wall of the mixing block is fixedly connected to a rotating disk, the interior of the transition block is provided with evenly distributed installation grooves, the interior of the installation groove is fixedly connected to a first hydraulic push rod, the output end of the first hydraulic push rod is fixedly connected to a push block, and the output end of the push block passes through and is rotatably connected to a rotating wheel.

[0011] As a further description of the above technical solution: a first connecting pipe is fixedly connected to the bottom of the cooling bin, an air lock valve is provided at the output end of the first connecting pipe, and a discharge bin is fixedly connected to the output end of the air lock valve.

[0012] As a further description of the above technical solution: a discharge valve is provided on the outer wall of the discharge bin, and support columns are fixedly connected to the four corners of the bottom of the base.

[0013] Compared with the prior art, the beneficial effects of the utility model are as follows:

[0014] 1. The utility model provides a three-stage layered controlled preheating kiln for lime production and processing. First, through the linkage between the preheating bin, the hydraulic plate, the second hydraulic push rod, the third connecting block, the second connecting block, the first connecting block, the air duct, the second nozzle burner and the discharge pipe, the materials to be preheated are divided into multiple parts for preheating during use, and the preheating temperature can be controlled during the heating process, thereby shortening the preheating time of lime in the production process and improving the activity of the lime product.

[0015] 2. The utility model provides a three-stage layered controlled preheating kiln for lime production and processing. Through the linkage between the nozzle connecting pipe, the second nozzle burner, the transition block, the cooling bin, the mixing block, the first hydraulic push rod, the rotating disk, the push block, the mounting groove and the rotating wheel, the length of time in the calcination process can be changed during the use of the preheating kiln, and large pieces of material can be crushed after the calcination is completed. The activity of the lime product is effectively improved by separately controlling the preheating and calcination time. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a three-dimensional diagram of the utility model;

[0017] Figure 2 This is a schematic diagram of the second nozzle burner of the utility model;

[0018] Figure 3 This is a schematic diagram of the discharge pipe of the utility model;

[0019] Figure 4 This is the internal structure diagram of the transition block of the utility model;

[0020] Figure 5 This is the external structure diagram of the preheating chamber of the utility model;

[0021] Figure 6 It is a cross-sectional view of the utility model;

[0022] Figure 7 It is a top view of the utility model.

[0023] In the figure: 1, base; 2, transition block; 3, first movable table; 4, nozzle connecting pipe; 5, first connecting block; 6, hydraulic plate; 7, feed pipe; 8, connecting angle steel; 9, feed pipe; 10, first guardrail; 11, silo; 12, preheating bin; 13, air duct; 14, connecting air duct; 15, second guardrail; 16, second movable table; 17, third guardrail; 18, main guardrail; 19, first connecting pipeline; 20, air lock valve; 21, support column; 2 2. Main kiln; 23. Discharging bin; 24. Second connecting pipe; 25. Reinforcement angle steel; 26. First nozzle burner; 27. Third connecting pipe; 28. Push block; 29. ​​Mixing block; 30. First hydraulic push rod; 31. Mounting groove; 32. Turning wheel; 33. Second hydraulic push rod; 34. Discharging valve; 35. Cooling bin; 36. Second connecting block; 37. Third connecting block; 38. Material guide pipe; 39. Second nozzle burner; 40. Turning disk; 41. Cold air valve. DETAILED DESCRIPTION

[0024] The following will refer to the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] In order to further understand the content of the utility model, the utility model is described in detail with reference to the accompanying drawings.

[0026] Reference Figure 1 , Figure 4 and Figure 6The utility model discloses a three-stage layered controlled preheating kiln for lime production and processing, comprising a base 1, a transition block 2 is fixedly connected to the middle position of the top of the base 1, a main kiln 22 is penetrated and fixedly connected to the top of the transition block 2, the main kiln 22 is used for calcining limestone materials, a cooling bin 35 is fixedly connected to the interior of the transition block 2, the cooling bin 35 is used for cooling the materials after calcination, the outer wall of the main kiln 22 is fixedly connected with uniformly distributed reinforcement angle steels 25, the reinforcement angle steels 25 are used to reinforce the main kiln 22 and improve the strength of the main kiln 22, a first movable table 3 is fixedly connected to the lower middle position of the outer wall of the main kiln 22, the first movable table 3 can realize construction Personnel pass, two nozzle connecting pipes 4 are fixedly connected to the middle position of the outer wall of the main kiln 22, and the adjacent sides of the two nozzle connecting pipes 4 are penetrated and fixedly connected with a uniformly distributed second connecting pipe 24, and the outer wall of the upper nozzle connecting pipe 4 is penetrated and fixedly connected with a third connecting pipe 27, and the inner sides of the two nozzle connecting pipes 4 are fixedly connected with uniformly distributed first nozzle burners 26, and the output ends of the first nozzle burners 26 are penetrated and fixedly connected to the main kiln 22. The start-up of the first nozzle burner 26 generates high-temperature spray to the inside of the main kiln 22 to calcine the limestone after preheating. A second movable table 16 is fixedly connected to the upper middle position of the outer wall of the main kiln 22, and the second The movable table 16 is used for the passage of construction workers. The top of the main kiln 22 is fixedly connected to the preheating bin 12. The upper part of the outer wall of the preheating bin 12 is fixedly connected to the air duct 13, and the output ends of the air duct 13 all penetrate the preheating bin 12 and are fixedly connected. The outer wall of the air duct 13 penetrates and is fixedly connected to the connecting air duct 14. The outer wall of the output end of the air duct 13 is provided with a cold air valve 41. The separation generated by the fan is poured into the preheating bin 12 through the output end by starting the cold air valve 41 to avoid the situation where the temperature of the preheating bin 12 is too high during the preheating process. The top of the preheating bin 12 is fixedly connected with evenly distributed connecting angle steels 8, and the inner side of the connecting angle steels 8 is fixedly connected with the material bin 11. The material bin 11 Used for storing materials, a mixing block 29 is rotated inside the cooling bin 35, and the outer wall of the mixing block 29 is fixedly connected to the rotating disk 40. Evenly distributed installation grooves 31 are opened inside the transition block 2, and the first hydraulic push rod 30 is fixedly connected inside the installation groove 31. The output end of the first hydraulic push rod 30 is fixedly connected to a push block 28, and the output end of the push block 28 penetrates and is rotatably connected to a rotating wheel 32. The push block 28 fixed at the output end is driven to run by starting the first hydraulic push rod 30. During the operation of the push block 28, the rotating wheel 32 is driven to contact the outer side of the rotating disk 40. By starting the first hydraulic push rod 30 one by one, the rotation of the mixing block 29 is realized to crush large pieces of material.

[0027] Reference Figure 2 , Figure 3 and Figure 5, the bottom of the silo 11 is penetrated and fixedly connected with uniformly distributed feed pipes 7, and the output ends of the feed pipes 7 are penetrated and fixedly connected to the preheating bin 12. The interior of the preheating bin 12 is divided into 6-12 independent chambers, and the materials in the feed pipes 7 randomly enter the independent chambers. A second nozzle burner 39 is fixedly connected to the middle position of the front side of the preheating bin 12, and the output end of the second nozzle burner 39 penetrates the preheating bin 12 and is fixedly connected. The preheating bin 12 is preheated by starting the second nozzle burner 39. Uniformly distributed second hydraulic push rods 33 are fixedly connected to the lower part of the outer wall of the preheating bin 12, and the output end of the second hydraulic push rod 33 penetrates and is rotatably connected to the first connecting block 5. The third connecting blocks 37 are fixedly connected to the middle position below the outer walls of both sides of the preheating bin 12, and the front side of the first connecting block 5 is fixedly connected to the hydraulic plate 6, and the inner side of the hydraulic plate 6 and the third connecting block 37 are connected. Rotationally connected, a second connecting block 36 is fixedly connected to the middle position of the inner side of the hydraulic plate 6, and a material guide pipe 38 is passed through and fixedly connected to the output end of the second connecting block 36. The operation of the hydraulic plate 6 is driven by the activation of the second hydraulic push rod 33, which correspondingly drives the second connecting block 36 to drive the material guide pipe 38 to push the material in the independent preheating bin 12 into the main kiln 22, thereby changing the original preheating residence time in the bin. The bottom of the cooling bin 35 is fixedly connected to the first connecting pipe 19, and the output end of the first connecting pipe 19 is provided with an air lock valve 20. The output end of the air lock valve 20 is fixedly connected to the discharge bin 23. By activating the air lock valve 20, cold air is provided in the cooling bin 35 to achieve rapid cooling of the material. The outer wall of the discharge bin 23 is provided with a discharge valve 34. The four corners of the bottom of the base 1 are fixedly connected with support columns 21. The cooled material is discharged through the discharge bin 23 by activating the discharge valve 34.

[0028] A feed pipe 9 is passed through and fixedly connected to the middle position of the top of the silo 11, and the material enters the silo 11 through the feed pipe 9. A first guardrail 10 is fixedly connected to the top outer ring of the silo 11, a second guardrail 15 is fixedly connected to the top outer ring of the second movable table 16, a third guardrail 17 is fixedly connected to the top outer ring of the first movable table 3, and a main guardrail 18 is fixedly connected to the top outer ring of the base 1. By arranging the first guardrail 10, the second guardrail 15, the third guardrail 17 and the main guardrail 18, safety accidents of the staff can be prevented during use.

[0029] Working principle: First, put the limestone into the silo 11 through the feed pipe 9. At this time, the limestone enters the preheating bin through the discharge pipe 7 on the silo 11 for preheating. At this time, start the second nozzle burner 39. The start-up of the second nozzle burner 39 generates temperature to heat the limestone. When the temperature is too high, connect the fan to the connecting air duct 14, start the fan and, the fan blows high-speed wind into the preheating bin and supplements the preheating bin with external cold wind in coordination with the second nozzle burner 39 to avoid high temperature causing the limestone to appear in the preheating bin. High temperature occurs inside. When preheating is completed, the second hydraulic push rod 33 is started. The start of the second hydraulic push rod 33 pushes the hydraulic plate 6. Under the action of the third connecting block 37, the hydraulic plate 6 is operated. During the operation of the hydraulic plate 6, the guide pipe 38 is driven to operate. The limestone falls into the main kiln 22 through the movement of the guide pipe 38. Since the interior of the preheating bin is divided into multiple independent chambers, the original preheating residence time in the chamber can be flexibly changed during use. During the falling process of the limestone, the second nozzle burner 39 is started. The start of the second nozzle burner 39 generates temperature to calcine the limestone after it falls. When the limestone falls into the main kiln 22, the second nozzle burner 39 and the nozzle connecting pipe 4 are started at the same time. When the second nozzle burner 39 and the nozzle connecting pipe 4 cooperate to burn, the calcination efficiency is improved and the calcination time is shortened. The calcined limestone falls into the interior of the cooling bin 35. At this time, the first hydraulic push rods 30 are started one by one. The start of the first hydraulic push rod 30 drives the operation of the push block 28 at the output end. During the operation of the push block 28, the rotating wheel 32 on the push block 28 contacts the side of the rotating disk 40, thereby pushing the rotating disk 40 to rotate. During the rotation of the rotating disk 40, the mixing block 29 is driven to rotate. When the mixing block 29 rotates, the large block materials sintered at high temperature are crushed under the action of torque. The crushed materials pass through the cooling bin 35 and fall into the first connecting pipe 19. At this time, the air lock valve 20 and the discharge valve 34 are started, so that the crushed materials pass through the discharge bin 2311 and fall into the outside of the preheating kiln.

[0030] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0031] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A three-stage stratified controlled preheating kiln for lime production and processing, comprising a base (1), characterized in that: A transition block (2) is fixedly connected to the middle position of the top of the base (1), the top of the transition block (2) penetrates and is fixedly connected to the main kiln (22), the interior of the transition block (2) is fixedly connected to a cooling bin (35), the outer wall of the main kiln (22) is fixedly connected to uniformly distributed reinforcing angle steels (25), the middle and lower position of the outer wall of the main kiln (22) is fixedly connected to a first movable table top (3), two nozzle connecting pipes (4) are fixedly connected to the middle position of the outer wall of the main kiln (22), adjacent sides of the two nozzle connecting pipes (4) penetrate and are fixedly connected to uniformly distributed second connecting pipes (24), the outer wall of the upper nozzle connecting pipe (4) penetrates and is fixedly connected to a third connecting pipe (27), the inner sides of the two nozzle connecting pipes (4) are fixedly connected to uniformly distributed first nozzle burners (26), and the output ends of the first nozzle burners (26) penetrate the main kiln (22) and are fixedly connected.

2. A three-stage stratified controlled preheating kiln for lime production and processing according to claim 1, characterized in that: A second movable table top (16) is fixedly connected to the upper middle position of the outer wall of the main kiln (22); a preheating bin (12) is fixedly connected to the top of the main kiln (22); an air duct (13) is fixedly connected to the upper outer wall of the preheating bin (12); the output end of the air duct (13) passes through the preheating bin (12) and is fixedly connected; a connecting air duct (14) passes through and is fixedly connected to the outer wall of the air duct (13); a cold air valve (41) is arranged on the outer wall of the output end of the air duct (13); the top of the preheating bin (12) is fixedly connected to evenly distributed connecting angle steels (8); the inner side of the connecting angle steel (8) is fixedly connected to the material bin (11).

3. A three-stage stratified controlled preheating kiln for lime production and processing according to claim 2, characterized in that: The bottom of the silo (11) is penetrated by and fixedly connected with uniformly distributed feed pipes (7), and the output ends of the feed pipes (7) are penetrated by and fixedly connected with the preheating bin (12), and a second nozzle burner (39) is fixedly connected to the front middle position of the preheating bin (12), and the output end of the second nozzle burner (39) is penetrated by and fixedly connected with the preheating bin (12).

4. The three-stage stratified controlled preheating kiln for lime production and processing according to claim 2, characterized in that: A uniformly distributed second hydraulic push rod (33) is fixedly connected below the outer wall of the preheating bin (12); the output end of the second hydraulic push rod (33) penetrates and is rotatably connected to a first connection block (5); third connection blocks (37) are fixedly connected at the middle position below the outer walls of both sides of the preheating bin (12); a hydraulic plate (6) is fixedly connected to the front side of the first connection block (5); the inner side of the hydraulic plate (6) is rotatably connected to the third connection block (37); a second connection block (36) is fixedly connected to the middle position of the inner side of the hydraulic plate (6); and the output end of the second connection block (36) penetrates and is fixedly connected to a material guide pipe (38).

5. The three-stage stratified controlled preheating kiln for lime production and processing according to claim 2, characterized in that: A feed pipe (9) passes through and is fixedly connected to the middle position of the top of the silo (11); a first guardrail (10) is fixedly connected to the top outer ring of the silo (11); a second guardrail (15) is fixedly connected to the top outer ring of the second movable table (16); a third guardrail (17) is fixedly connected to the top outer ring of the first movable table (3); and a main guardrail (18) is fixedly connected to the top outer ring of the base (1).

6. The three-stage stratified controlled preheating kiln for lime production and processing according to claim 1, characterized in that: A mixing block (29) is rotatably arranged inside the cooling bin (35), and the outer wall of the mixing block (29) is fixedly connected to a rotating disk (40). The interior of the transition block (2) is provided with evenly distributed mounting grooves (31), and the interior of the mounting groove (31) is fixedly connected to a first hydraulic push rod (30), and the output end of the first hydraulic push rod (30) is fixedly connected to a push block (28), and the output end of the push block (28) passes through and is rotatably connected to a rotating wheel (32).

7. The three-stage stratified controlled preheating kiln for lime production and processing according to claim 1, characterized in that: A first connecting pipe (19) is fixedly connected to the bottom of the cooling bin (35), an air lock valve (20) is provided at the output end of the first connecting pipe (19), and a discharge bin (23) is fixedly connected to the output end of the air lock valve (20).

8. A three-stage stratified controlled preheating kiln for lime production and processing according to claim 7, characterized in that: The outer wall of the discharge bin (23) is provided with a discharge valve (34), and the four corners of the bottom of the base (1) are fixedly connected with support columns (21).