By designing secondary aluminum ash treatment equipment including grinding, screening and calcination, the problems of high labor intensity and low recovery rate of workers in traditional aluminum ash treatment are solved, and efficient recycling and automated processing of aluminum ash is achieved.
Patent Information
- Application Number
- CN202323488262.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-21
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2033-12-21
AI Technical Summary
During the traditional aluminum ash treatment process, workers have high labor intensity and low recovery rate, making it difficult to efficiently recover useful ingredients in aluminum ash.
A secondary aluminum ash treatment equipment is designed, including a first grinder, a screener, a second grinder and a calciner. The mesh of aluminum ash is adjusted to the target range by grinding and screening, and further processed by a calciner. , and ultimately achieve efficient recycling of aluminum ash.
It reduces the labor intensity of workers, improves the recycling efficiency of aluminum ash, and can automatically complete the recycling process of aluminum ash.
Smart Images

Figure CN222064629U_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of aluminum ash processing devices, and more specifically, to a secondary aluminum ash processing equipment. Background Art
[0002] Aluminum ash is the waste from aluminum plants and various aluminum processing industries, and is the secondary industrial waste left after aluminum recycling. Aluminum ash is silver-gray and powdery in appearance, and its main components are metallic aluminum, aluminum oxide, silicon dioxide, iron oxide, and chlorides of potassium, sodium, calcium, and magnesium. Therefore, it is of great significance to recycle the useful components in aluminum ash.
[0003] In the traditional aluminum ash processing process, the aluminum ash slag is cooled naturally or air-cooled, then crushed mechanically or manually, and the aluminum in the ash slag is recovered. This process is labor-intensive for workers and has a low recovery rate. Summary of the invention
[0004] The purpose of the embodiments of the present application is to provide a secondary aluminum ash processing equipment to solve the technical problems existing in the prior art.
[0005] In order to achieve the above purpose, the technical solution adopted in this application is: to provide a secondary aluminum ash processing equipment, including:
[0006] First feed hopper;
[0007] a first grinder, wherein a feed end of the first grinder is in communication with the first feed hopper;
[0008] A screening machine, connected to the discharge end of the first grinding machine, and having a first discharge port and a second discharge port, wherein the first discharge port is used to discharge aluminum ash with a mesh number smaller than a preset mesh number, and the second discharge port is used to discharge aluminum ash with a mesh number larger than the preset mesh number;
[0009] A second grinder, wherein the feed end of the second grinder is connected to the second discharge port, and is used for grinding aluminum ash having a mesh number greater than the preset mesh number, and grinding aluminum ash having a mesh number greater than the preset mesh number to aluminum ash having a mesh number less than the preset mesh number;
[0010] a calcining furnace, wherein a feed inlet of the calcining furnace is connected to a discharge end of the second grinder;
[0011] A discharge hopper, a discharge end of the calcining furnace is connected to the discharge hopper.
[0012] Preferably, the number of the second grinders is two, the feed ends of the two second grinders are both connected to the second discharge port, and the discharge ends of the two second grinders are both connected to the feed port of the calcining furnace.
[0013] Preferably, it also includes:
[0014] Storage hopper;
[0015] a first screw conveyor, wherein a feed end of the first screw conveyor is connected to the second discharge port, and a discharge end of the first screw conveyor is connected to the discharge hopper;
[0016] a first bucket elevator, wherein a feeding end of the first bucket elevator is disposed in the storage hopper;
[0017] The second screw conveyor, the discharge end of the first bucket elevator is connected to the feed end of the second screw conveyor, and the discharge end of the second screw conveyor is connected to the feed ends of the two second grinders.
[0018] Preferably, a first scraper conveyor is provided between the two second grinders and the calcining furnace;
[0019] The feeding end of the first scraper conveyor is communicated with the discharging ends of the two second grinders, and the discharging end of the first scraper conveyor is communicated with the feeding end of the calcining furnace.
[0020] Preferably, a third screw conveyor is provided between the discharge end of the first scraper conveyor and the feed end of the calcining furnace;
[0021] The extension direction of the third screw conveyor is set at an angle to the extension direction of the first scraper conveyor, and the feed end of the third screw conveyor is connected to the feed end of the first scraper conveyor, and the discharge end of the third screw conveyor is connected to the feed end of the calcining furnace.
[0022] Preferably, the discharge hopper and the calcining furnace are provided with a second scraper conveyor and a second bucket elevator;
[0023] The feeding end of the second scraper conveyor is connected to the discharging end of the calcining furnace, and the discharging end of the second scraper conveyor is connected to the feeding end of the second bucket elevator;
[0024] The discharging end of the second bucket is communicated with the discharging hopper.
[0025] Preferably, the calcining furnace is provided with a fixed base, and a driving cylinder is provided on the fixed base;
[0026] One end of the calcining furnace is rotatably connected to the fixed base;
[0027] One end of the driving cylinder is rotatably connected to the fixed base, and the other end of the driving cylinder is rotatably connected to the other end of the calcining furnace. The driving cylinder is used to drive the calcining furnace to be set at an angle to the horizontal direction so that the calcining furnace can discharge the aluminum ash.
[0028] Preferably, the first grinding mill is a ball mill.
[0029] Preferably, the second grinding machine is a Raymond mill.
[0030] The beneficial effect of the secondary aluminum ash processing equipment provided by the present application is that compared with the prior art, the secondary aluminum ash processing equipment provided by the present application includes a first feed hopper, a first grinder, a screening machine, a second grinder, a calcining furnace, and a discharge hopper. The first grinder and the second grinder are used to grind the aluminum ash and grind the aluminum ash to a target mesh size. The screening machine is used to screen the aluminum powder that is ground by the first grinder to a mesh size smaller than the target mesh size, and transport the aluminum ash with a mesh size larger than the target mesh size to the second grinder for further grinding. The aluminum ash ground by the second grinder is calcined in the calcining furnace and then transported to the discharge hopper for subsequent filling and bagging. The secondary aluminum ash processing equipment provided by the present application can replace manual recycling of aluminum ash, reduce the labor intensity of workers, and improve the recycling efficiency of aluminum ash. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0032] Figure 1 A schematic diagram of the structure of the secondary aluminum ash processing equipment provided in the embodiment of the present application;
[0033] Figure 2 Schematic diagram of the structure of the calcining furnace provided in the embodiment of the present application Figure 1 ;
[0034] Figure 3 Schematic diagram of the structure of the calcining furnace provided in the embodiment of the present application Figure 2 .
[0035] Among them, the reference numerals in the figure are:
[0036] 1. First feed hopper; 2. First grinder; 3. Screener; 301. First discharge port; 302. Second discharge port; 4. Second grinder; 5. Calcinator; 6. Discharge hopper; 7. Storage hopper; 8. First screw conveyor; 9. Second screw conveyor; 10. First bucket elevator; 11. First scraper conveyor; 12. Third screw conveyor; 13. Second scraper conveyor; 14. Second bucket elevator; 15. Second feed hopper; 1501. Third discharge port; 16. Fixed base; 17. Driving cylinder. Implementation
[0037] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0038] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it can be directly on the other element or indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.
[0039] It should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0040] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0041] Please also read Figures 1 to 3 , the secondary aluminum ash processing equipment provided in the embodiment of the present application is now described.
[0042] A secondary aluminum ash processing device comprises a first feed hopper 1, a first grinder 2, a sifter 3, a second grinder 4, a calcining furnace 5, and a discharge hopper 6.
[0043] The first grinder 2 is a ball mill, and the feed end of the first grinder 2 is connected to the first feed hopper 1. The sieving machine 3 is connected to the discharge end of the first grinder 2, and the sieving machine 3 has a first discharge port 301 and a second discharge port 302. The first discharge port 301 is used to discharge aluminum ash with a mesh number smaller than a preset mesh number, and the operator can fill the aluminum ash with a mesh number smaller than the preset mesh number at the first discharge port 301. The second discharge port 302 is used to discharge aluminum ash with a mesh number larger than the preset mesh number.
[0044] The second grinder 4 is a Raymond grinder, and the feed end of the second grinder 4 is connected to the second discharge port 302, and is used to grind aluminum ash with a mesh number greater than a preset mesh number, and grind aluminum ash with a mesh number greater than the preset mesh number to aluminum ash with a mesh number less than the preset mesh number.
[0045] The feed inlet of the calcining furnace 5 is communicated with the discharge end of the second grinder 4. Discharge hopper 6 The discharge end of the calcining furnace 5 is communicated with the discharge hopper 6.
[0046] Compared with the prior art, the secondary aluminum ash processing equipment provided by the present application includes a first feed hopper 1, a first grinder 2, a screening machine 3, a second grinder 4, a calcining furnace 5, and a discharge hopper 6. The first grinder 2 and the second grinder 4 are used to grind the aluminum ash and grind the aluminum ash to a target mesh size. The screening machine 3 is used to screen the aluminum powder that is smaller than the target mesh size after the aluminum ash is ground by the first grinder 2, and to transport the aluminum ash with a mesh size larger than the target mesh size to the second grinder 4 for further grinding. The aluminum ash ground by the second grinder 4 is calcined in the calcining furnace 5 and then transported to the discharge hopper 6 for subsequent filling and bagging. The secondary aluminum ash processing equipment provided by the present application can replace manual recycling of aluminum ash, reduce the labor intensity of workers, and improve the recycling efficiency of aluminum ash.
[0047] In the present application, the number of the second grinders 4 is two, the feed ends of the two second grinders 4 are both connected to the second discharge port 302, and the discharge ends of the two second grinders 4 are both connected to the feed port of the calcining furnace 5. By providing two second grinders 4, the grinding efficiency of the aluminum ash screened by the screening machine 3 with a mesh number greater than the preset mesh number can be improved.
[0048] In the present application, the secondary aluminum ash processing equipment also includes a storage hopper 7, a first screw conveyor 8, a second screw conveyor 9 and a first bucket elevator 10.
[0049] The feed end of the first screw conveyor 8 is connected to the second discharge port 302, and the discharge end of the first screw conveyor 8 is connected to the discharge hopper 6. The feed end of the first bucket elevator 10 is arranged in the storage hopper 7. The discharge end of the first bucket elevator 10 is connected to the feed end of the second screw conveyor 9, and the discharge end of the second screw conveyor 9 is connected to the feed ends of the two second grinders 4. The aluminum ash screened out with a mesh number greater than the preset mesh number is sequentially conveyed to the two second grinders 4 through the storage hopper 7, the first screw conveyor 8, the first bucket elevator 10 and the first bucket elevator 10 for grinding.
[0050] In the present application, a first scraper conveyor 11 is provided between the two second grinders 4 and the calcining furnace 5. The feeding end of the first scraper conveyor 11 is connected to the discharging end of the two second grinders 4, and the discharging end of the first scraper conveyor 11 is connected to the feeding end of the calcining furnace 5. The aluminum ash ground by the two second grinders 4 is transported to the feeding end of the calcining furnace 5 by the first scraper conveyor 11.
[0051] In the present application, a third screw conveyor 12 is provided between the discharge end of the first scraper conveyor 11 and the feed end of the calcining furnace 5. The extension direction of the third screw conveyor 12 is set at an angle to the extension direction of the first scraper conveyor 11, and the feed end of the third screw conveyor 12 is connected to the feed end of the first scraper conveyor 11, and the discharge end of the third screw conveyor 12 is connected to the feed end of the calcining furnace 5. By providing the third screw conveyor 12 between the discharge end of the first scraper conveyor 11 and the feed end of the calcining furnace 5, the operator can stagger the discharge end of the first scraper conveyor 11 and the feed end of the calcining furnace 5 as needed.
[0052] In the present application, the discharge hopper 6 and the calcining furnace 5 are provided with a second scraper conveyor 13 and a second bucket elevator 14. The feed end of the second scraper conveyor 13 is connected to the discharge end of the calcining furnace 5, and the discharge end of the second scraper conveyor 13 is connected to the feed end of the second bucket elevator. The discharge end of the second bucket elevator is connected to the discharge hopper 6.
[0053] The feed end and the discharge end of the calcining furnace 5 are located on the same side of the calcining furnace 5. A second feed hopper 15 is provided on the calcining furnace 5. The second feed hopper 15 is connected to the discharge end of the third screw conveyor 12, and a third discharge port 1501 is provided on the second feed hopper 15. A valve is provided on the third discharge port 1501. When the third screw conveyor 12 conveys aluminum ash to the second feed hopper 15, the valve is closed to allow the aluminum ash to enter the calcining furnace 5. When the valve on the third discharge port 1501 is opened, the aluminum ash in the calcining furnace 5 enters the feed end of the second bucket from the third discharge port 1501.
[0054] In the present application, a cover that can be opened is provided on the feed port of the calcining furnace 5. When it is necessary to transport aluminum ash into the calcining furnace 5 and discharge aluminum ash from the calcining furnace 5, the cover is opened, and when the calcining furnace 5 calcines the aluminum ash, the cover is closed. A fixed base 16 is provided, and a driving cylinder 17 is provided on the fixed base 16; one end of the calcining furnace 5 is rotatably connected to the fixed base 16. One end of the driving cylinder 17 is rotatably connected to the fixed base 16, and the other end of the driving cylinder 17 is rotatably connected to the other end of the calcining furnace 5. The driving cylinder 17 is used to drive the calcining furnace 5 to be set at an angle to the horizontal direction so that the calcining furnace 5 discharges aluminum ash.
[0055] The above are only preferred embodiments of the present application and are not intended to limit the present application. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims
1. A secondary aluminum ash processing equipment, characterized in that: include: First feed hopper; a first grinder, wherein a feed end of the first grinder is in communication with the first feed hopper; A screening machine, connected to the discharge end of the first grinding machine, and having a first discharge port and a second discharge port, wherein the first discharge port is used to discharge aluminum ash with a mesh number smaller than a preset mesh number, and the second discharge port is used to discharge aluminum ash with a mesh number larger than the preset mesh number; A second grinder, wherein the feed end of the second grinder is connected to the second discharge port, and is used for grinding aluminum ash having a mesh number greater than the preset mesh number, and grinding aluminum ash having a mesh number greater than the preset mesh number to aluminum ash having a mesh number less than the preset mesh number; a calcining furnace, wherein a feed inlet of the calcining furnace is connected to a discharge end of the second grinder; A discharge hopper, a discharge end of the calcining furnace is connected to the discharge hopper.
2. The secondary aluminum ash processing equipment according to claim 1, characterized in that: There are two second grinders, the feed ends of the two second grinders are both connected to the second discharge port, and the discharge ends of the two second grinders are both connected to the feed port of the calcining furnace.
3. The secondary aluminum ash processing equipment according to claim 2, characterized in that: Also includes: Storage hopper; a first screw conveyor, wherein a feed end of the first screw conveyor is connected to the second discharge port, and a discharge end of the first screw conveyor is connected to the discharge hopper; a first bucket elevator, wherein a feeding end of the first bucket elevator is disposed in the storage hopper; The second screw conveyor, the discharge end of the first bucket elevator is connected to the feed end of the second screw conveyor, and the discharge end of the second screw conveyor is connected to the feed ends of the two second grinders.
4. The secondary aluminum ash processing equipment according to claim 3, characterized in that: A first scraper conveyor is provided between the two second grinders and the calcining furnace; The feeding end of the first scraper conveyor is communicated with the discharging ends of the two second grinders, and the discharging end of the first scraper conveyor is communicated with the feeding end of the calcining furnace.
5. The secondary aluminum ash processing equipment according to claim 4, characterized in that: A third screw conveyor is provided between the discharge end of the first scraper conveyor and the feed end of the calcining furnace; The extension direction of the third screw conveyor is set at an angle to the extension direction of the first scraper conveyor, and the feed end of the third screw conveyor is connected to the feed end of the first scraper conveyor, and the discharge end of the third screw conveyor is connected to the feed end of the calcining furnace.
6. The secondary aluminum ash processing equipment according to claim 5, characterized in that: The discharge hopper and the calcining furnace are provided with a second scraper conveyor and a second bucket elevator; The feeding end of the second scraper conveyor is connected to the discharging end of the calcining furnace, and the discharging end of the second scraper conveyor is connected to the feeding end of the second bucket elevator; The discharging end of the second bucket is communicated with the discharging hopper.
7. The secondary aluminum ash processing equipment according to claim 1 or 6, characterized in that: The calcining furnace is provided with a fixed base, and a driving cylinder is provided on the fixed base; One end of the calcining furnace is rotatably connected to the fixed base; One end of the driving cylinder is rotatably connected to the fixed base, and the other end of the driving cylinder is rotatably connected to the other end of the calcining furnace. The driving cylinder is used to drive the calcining furnace to be set at an angle to the horizontal direction so that the calcining furnace can discharge the aluminum ash.
8. The secondary aluminum ash processing equipment according to claim 1, characterized in that: The first grinding machine is a ball mill.
9. The secondary aluminum ash processing equipment according to claim 1, characterized in that: The second grinding machine is a Raymond mill.