Pedestrian overpass and operation protection platform

By adopting segmented prefabricated steel arch truss structures and graphene-modified coatings in the construction of pedestrian overpasses, the complexities of bridge structure installation and corrosion prevention were solved, installation efficiency and corrosion resistance were improved, and the service life of the bridge was extended.

CN222065137UActive Publication Date: 2024-11-26GUANGZHOU HENGSHENG CONSTR ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420722814.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-09
Publication Date
2024-11-26
Estimated Expiration
2034-04-09

AI Technical Summary

Technical Problem

Existing pedestrian bridge construction methods suffer from a large workload and complex procedures in splicing the main bridge structure, a low degree of prefabrication, easy deformation of the steel pipes in the piers during concrete pouring, poor anti-corrosion coating effect, and reduced service life.

Method used

The bridge adopts a segmented prefabricated steel arch truss structure, combined with a graphene-modified coating layer and internal stiffening rib design, which improves the ease of installation and corrosion resistance, enhances the bridge span and structural rigidity, and prevents pier deformation.

Benefits of technology

This enabled convenient installation and efficient corrosion protection of the steel bridge arch truss structure, extended the service life of the pedestrian bridge, and ensured the quality of concrete pouring inside the piers and the stability of the bridge.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065137U_ABST
    Figure CN222065137U_ABST
Patent Text Reader

Abstract

The utility model discloses a pedestrian overpass and operation protection platform, said pedestrian overpass comprises truss main bridge and two sets of stairways, the two sets of stairways are respectively connected with the two ends of truss main bridge to form I-shaped structure, the truss main bridge comprises main bridge deck, steel bridge arch truss structure and main bridge pier, the steel bridge arch truss structure is installed on the edge of the main bridge deck, the main bridge pier is installed below the main bridge deck, the surface of the truss main bridge is coated with a layer of anti-corrosion structure, the anti-corrosion structure is a graphene modified coating layer, the steel bridge arch truss structure comprises a steel beam bridge section and two sets of truss sections, and the two sets of truss sections are symmetrically arranged and installed on the steel bridge section. The steel beam bridge sections comprise the first main bridge section and the second main bridge section, and a plurality of stiffening ribs are installed in the main bridge piers. The steel bridge arch truss structure can be prefabricated in a factory in a segmented mode and transported to a platform bridge construction site to be assembled, and transportation and installation of the steel bridge arch truss structure are facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of overpass construction, in particular to a pedestrian overpass and an operation protection platform. Background Art

[0002] The construction process of a pedestrian bridge usually includes the construction steps of pouring concrete for the piers, welding of steel structures and repainting of paint on the bottom surface of the bridge. It is usually necessary to set up working platforms on both sides of the pedestrian bridge to facilitate the work of workers. The working platforms are usually built in the form of ground-mounted steel pipe scaffolding working platforms.

[0003] Traditional pedestrian bridges usually use steel truss concrete beams as the main bridge structure, and set bridge piers under the main bridge. The existing pedestrian bridge structure has the following shortcomings:

[0004] 1) The existing main bridge installation requires the use of bulk rods or large blocks to form a steel truss and then cast or install the concrete top plate. The main bridge structure requires a large amount of splicing work, complicated procedures, low degree of assembly, and high cost.

[0005] 2) Pedestrian overpasses usually use steel pipes as pier structures. The pier column structure is formed by pouring concrete inside the steel pipes. The existing pier steel pipe walls are usually thin, and the lateral pressure during the concrete pouring process causes the steel pipe wall to deform.

[0006] 3) The anti-corrosion layer on the surface of traditional pedestrian overpasses usually uses a zinc-rich coating as the anti-corrosion layer. The thickness of the zinc-rich coating as the anti-corrosion layer usually needs to be applied thicker. The anti-corrosion effect of using the zinc-rich coating as the anti-corrosion layer is not very ideal, and the anti-corrosion effect is relatively poor, which affects the service life of the overpass. Utility Model Content

[0007] In view of the problems existing in the prior art, the technical problem to be solved by the utility model is to provide a kind of pedestrian bridge which can prefabricate the steel bridge arch truss structure in sections in the factory, transport it to the overpass construction site for assembly, facilitate the installation of the steel bridge arch truss structure, improve the convenience of installation of the truss main bridge, adopt the steel bridge arch truss structure as the main load-bearing structure, can adapt to a larger bridge span, the surface of the truss main bridge is coated with a layer of anti-corrosion structure arranged as a graphene modified coating layer, which is light, efficient, has strong anti-corrosion performance, improves the anti-corrosion performance, and extends the service life of the pedestrian bridge, the main bridge piers adopt internal stiffening ribs to prevent the steel pipes of the main bridge piers from deformation when pouring concrete, and ensure the pouring quality of C40 concrete in the main bridge piers.

[0008] In order to solve the above technical problems, on the one hand, the utility model provides a pedestrian bridge and a work protection platform, wherein the pedestrian bridge comprises a truss main bridge and two groups of stairs located at both ends of the truss main bridge, the two groups of stairs are respectively connected to the two ends of the truss main bridge to form an "I"-shaped structure, the truss main bridge comprises a main bridge deck, a steel bridge arch truss structure, and main bridge piers, the steel bridge arch truss structure is installed at the edge of the main bridge deck, the main bridge piers are installed below the main bridge deck, the surface of the truss main bridge is coated with an anti-corrosion structure, the anti-corrosion structure is a graphene modified coating layer, the steel bridge arch truss structure comprises a steel beam bridge section and two groups of truss sections, the two groups of truss sections are symmetrically arranged and installed on the steel bridge section, the steel beam bridge sections are respectively a first main bridge section and a second main bridge section, the first main bridge section is located on one side of the second main bridge section and is connected to it, and a plurality of stiffening ribs are installed inside the main bridge piers.

[0009] In order to further improve the above technical solution, the steel beam bridge section is a horizontal lower chord, and each group of truss sections includes an arched upper chord and a plurality of web members, wherein the web members are connected between the horizontal lower chord and the arched upper chord, and the horizontal lower chord is installed under the arched upper chord through a plurality of web members to realize the installation of the steel beam bridge section and the two groups of truss sections, and the main bridge deck is connected to the horizontal lower chord of the steel bridge arch truss structure.

[0010] As a further improvement to the above technical solution, the truss main bridge includes a fixed support, which is installed between the main bridge piers and the main bridge deck.

[0011] In order to further improve the above technical solution, a triangular support frame is installed on the steel beam bridge section, and the triangular support frame includes a transverse support tube, two groups of vertical support tubes, and two groups of inclined support tubes. The two groups of vertical support tubes are symmetrically arranged below the transverse support tube, and the two ends of each group of inclined support tubes are respectively connected to each group of vertical support tubes and transverse support tubes to form a stable triangular support frame.

[0012] In order to further improve the above technical solution, the main bridge deck is installed with a granite tile layer, a waterproof cement mortar layer, a waterproof protective layer, and a U-shaped steel plate structure in sequence from top to bottom.

[0013] In order to further improve the above technical solution, the main bridge piers are round-end steel tube concrete column structures, the cross-sectional dimensions of the main bridge piers are 2000mm*800mm*20mm, the interior of the main bridge piers is filled with C40 concrete, and a number of stiffening ribs are distributed at intervals along the circumferential direction inside the main bridge piers.

[0014] On the other hand, the utility model also provides a work protection platform, including a work protection platform built on one side of a pedestrian overpass, the work protection platform including a steel structure support frame and a work platform, the work platform is installed above the steel structure support frame, and the steel structure support frame is erected on one side of the steel beam bridge section of the steel bridge arch truss structure.

[0015] In order to further improve the above technical solution, the work protection platform includes a hanging basket and a safety rope. The hanging basket is installed on one side of the steel structure support frame. One end of the safety rope is connected to the hanging basket, and the other end of the safety rope is connected to the steel structure support frame.

[0016] As a further improvement to the above technical solution, the work protection platform includes an anti-fall component, which is installed on one side of the support column and located below the hanging basket.

[0017] In order to further improve the above technical solution, the anti-fall component includes an anti-fall railing and an anti-fall net, and the anti-fall net is installed on the anti-fall railing.

[0018] Compared with the prior art, the solution of the utility model has at least the following beneficial effects:

[0019] (1) The pedestrian overpass of the utility model comprises a truss main bridge and two groups of stairs located at both ends of the truss main bridge, the two groups of stairs are respectively connected to the two ends of the truss main bridge to form an "I"-shaped structure, the truss main bridge comprises a main bridge deck, a steel bridge arch truss structure, and main bridge piers, the steel bridge arch truss structure is installed at the edge of the main bridge deck, the main bridge piers are installed below the main bridge deck, a layer of anti-corrosion structure is coated on the surface of the truss main bridge, the anti-corrosion structure is a graphene modified coating layer, the steel bridge arch truss structure comprises a steel beam bridge section and two groups of truss sections, the two groups of truss sections are symmetrically arranged and installed on the steel bridge section, the steel beam bridge sections are respectively a first main bridge section and a second main bridge section, the first main bridge section is located on one side of the second main bridge section and is connected thereto, the main bridge piers are round-end steel tube concrete column structures, the interior of the main bridge piers is filled with C40 concrete, a plurality of stiffening ribs are installed inside the main bridge piers, and the plurality of stiffening ribs are distributed along the circumferential direction inside the main bridge piers. The pedestrian overpass arranged by the utility model can prefabricate the steel bridge arch truss structure in sections in the factory and transport it to the overpass construction site for assembly, which is convenient for the transportation and installation of the steel bridge arch truss structure and improves the convenience of installation of the truss main bridge. The steel bridge arch truss structure is used as the main load-bearing structure, which can adapt to a larger bridge span. The surface of the truss main bridge is coated with an anti-corrosion structure arranged as a graphene modified coating layer, which is light, efficient and has strong anti-corrosion performance, thereby improving the anti-corrosion performance and extending the service life of the pedestrian overpass. The main bridge piers adopt internal stiffening ribs to prevent the steel pipes of the main bridge piers from deforming when pouring concrete, thereby ensuring the pouring quality of C40 concrete in the main bridge piers.

[0020] (2) The steel beam bridge section of the utility model is a horizontal lower chord. Each group of truss sections includes an arched upper chord and a plurality of webs. The webs are connected between the horizontal lower chord and the arched upper chord. The horizontal lower chord is installed under the arched upper chord through a plurality of webs to realize the installation of the steel beam bridge section and the two groups of truss sections. The main bridge deck is connected to the horizontal lower chord of the steel bridge arch truss structure, which increases the vertical stiffness of the steel bridge arch truss structure. The steel bridge arch truss structure can be transported and hoisted in sections, thereby improving the convenience of transportation. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the technical solution of the embodiment of the utility model, the drawings of the embodiment will be briefly introduced below.

[0022] Figure 1 It is a schematic elevation diagram of the utility model truss main bridge;

[0023] Figure 2 It is a schematic elevation view of a truss section of the utility model;

[0024] Figure 3 It is a top view of the truss main bridge of the utility model;

[0025] Figure 4 It is another angle schematic diagram of the steel bridge arch truss structure in the utility model truss main bridge;

[0026] Figure 5 It is an internal cross-sectional view of the pier of the main bridge of the utility model;

[0027] Figure 6 It is a structural schematic diagram of the main bridge deck of the utility model;

[0028] Figure 7 It is a structural schematic diagram of the triangular support frame of the utility model;

[0029] Figure 8 It is a structural schematic diagram of the utility model operation protection platform;

[0030] Fig. 9 This utility model Figure 6 A large sample image of part A in the middle.

[0031] In the figure, a truss main bridge 1, a main bridge deck 11, a granite tile layer 111, a waterproof cement mortar layer 112, a waterproof protective layer 113, a U-shaped steel plate structure 113, a steel bridge arch truss structure 12, a steel beam bridge section 121, a truss section 122, an arched upper chord 1221, a web member 1222, a longitudinal beam 1223, a main bridge pier 13, C40 concrete 131, a stiffening rib 132, a triangular support frame 14, a transverse support pipe 141, a vertical support pipe 142, an inclined support pipe 143, a fixed support 15, a support platform 16, an operating protection platform 2, a steel structure support frame 21, an operating platform 23, a hanging basket 24, a safety rope 25, an anti-fall component 26, and an anti-fall net 261. DETAILED DESCRIPTION

[0032] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0033] like Figure 1-7As shown, on the one hand, the utility model provides a pedestrian overpass and a work protection platform 2, the pedestrian overpass includes a truss main bridge 1 and two groups of stairs located at both ends of the truss main bridge 1, the two groups of stairs are respectively connected to the two ends of the truss main bridge 1 to form an "I"-shaped structure, the side beams of the stairs are steel beams, the beam height is 65cm, and the stairs are connected to the truss main bridge 1 with rubber strips. The truss main bridge 1 includes a main bridge deck 11, a steel bridge arch truss structure 12, and a main bridge pier 13. The steel bridge arch truss structure 12 is installed at the edge of the main bridge deck 11, and the main bridge pier 13 is installed below the main bridge deck 11 to support the main bridge deck 11 and the steel bridge arch truss structure 12. A layer of anti-corrosion structure is coated on the surface of the truss main bridge 1, and the anti-corrosion structure is a graphene modified coating layer. The steel bridge arch truss structure 12 includes a steel beam bridge section 121 and two groups of truss sections 122. The two groups of truss sections 122 are symmetrically arranged and installed on the steel beam. On the bridge section 121, the steel beam bridge section 121 is respectively the first main bridge section and the second main bridge section. The first main bridge section is located on one side of the second main bridge section and is connected thereto. A plurality of stiffening ribs 132 are installed inside the main bridge pier 13. The main bridge pier 13 is a round-end steel tube concrete column structure. The cross-sectional dimensions of the main bridge pier 13 are 2000mm*800mm*20mm. The interior of the main bridge pier 13 is filled with C40 concrete 131. A plurality of stiffening ribs 132 are spaced apart from each other along the circumferential direction inside the main bridge pier 13. The steel bridge arch truss structure 12 of the utility model is mainly composed of a steel beam bridge section 121 and two groups of truss sections 122. The steel beam bridge sections 121 are respectively the first main bridge section and the second main bridge section. The steel beam bridge sections 121 and the truss sections 122 can be prefabricated in sections in a factory and transported to the overpass construction site for assembly, which is convenient for the installation of the steel bridge arch truss structure 12, improves the convenience of installation of the truss main bridge 1, and improves the installation efficiency. The pedestrian overpass adopts the steel bridge arch truss structure 12 as the main load-bearing structure, which can give full play to the lightweight and high-strength characteristics of the steel structure, and can adapt to a larger bridge span. The pedestrian overpass passes through the main bridge deck 11 The double combination with the steel bridge arch truss structure 12 increases the structural rigidity of the pedestrian overpass. A layer of anti-corrosion structure is coated on the surface of the truss main bridge 1. The anti-corrosion structure is a graphene-modified coating layer, which is light, thin and efficient. Compared with traditional zinc-rich coatings, it improves the anti-corrosion performance, meets the demand for long-term anti-corrosion of coatings, and extends the service life of the pedestrian overpass. C40 concrete 131 is poured in the main bridge piers 13 to compensate for the shrinkage of concrete. The internal stiffening ribs 132 are used to prevent the steel pipes of the main bridge piers 13 from deforming when pouring concrete, thereby ensuring the pouring quality of C40 concrete 131 in the main bridge piers 13.

[0034] The graphene modified coating layer is a high-performance anti-corrosion coating obtained by combining graphene with zinc-rich coating. It is light, thin and efficient, and has improved anti-corrosion performance compared to traditional zinc-rich coatings.

[0035] The graphene-modified coating layer mainly forms a graphene network in the coating system through dispersion technology, and then embeds zinc powder on the graphene network. Graphene has excellent conductivity, so it can increase the electrochemical anti-corrosion efficiency of zinc powder from 10% of traditional zinc-rich coatings to 90%. The excellent shielding effect of the graphene network can greatly increase the difficulty of penetration of chloride ions and water molecules in corrosive media.

[0036] Performance comparison between graphene modified coating layer and zinc-rich primer

[0037] Table 1 Comparison of graphene modified coating layer and zinc-rich primer technology

[0038]

[0039]

[0040] A support platform 16 is formed at the connection between the truss main bridge 1 and the stairway of the utility model.

[0041] When the utility model is implemented specifically, the steel beam bridge section 121 is a horizontal lower chord, and each group of truss sections 122 includes an arched upper chord 1221 and a plurality of web members 1222. The web members 1222 are connected between the horizontal lower chord and the arched upper chord 1221. The horizontal lower chord is installed under the arched upper chord 1221 through a plurality of web members 1222 to realize the installation of the steel beam bridge section 121 and the two groups of truss sections 122. The main bridge deck 11 is connected to the horizontal lower chord of the steel bridge arch truss structure 12. The arched upper chord 1221 is a horizontal straight rod structure, and the arched upper chord 1221 is parabolic in shape. The arched upper chord 1221 and the horizontal lower chord are mutually consolidated by the web rod 1222, thereby improving the vertical stiffness of the steel bridge arch truss structure, and the steel bridge arch truss structure 12 can be transported and hoisted in sections, thereby improving the convenience of transportation. At the same time, the arched upper chord 1221 adopts a curved structure design, which can make the steel bridge arch truss structure 12 transparent and beautiful in shape, and longitudinal beams 1223 spaced apart from each other are installed at the top of the arched upper chord 1221.

[0042] The truss main bridge of the utility model comprises a fixed support 15, which is installed between the main bridge pier 13 and the main bridge deck 11. In specific implementation, the fixed support 15 is a plate-type rubber support.

[0043] The web member 1222 of the utility model is provided with two structures, one is a straight web member 1222, and the other is an oblique web member 1222. When the web member 1222 is set as the oblique web member 1222, a plurality of oblique web members 1222 between the arched upper chord 1221 and the horizontal lower chord can be connected end to end in sequence to form a sawtooth structure, and a plurality of oblique web members 1222 between the arched upper chord 1221 and the horizontal lower chord can be connected end to end in sequence to form a sawtooth structure, which can improve the aesthetics and strength of the steel bridge arch truss structure 12.

[0044] The utility model can also install a triangular support frame 14 on the steel beam bridge section 121, and the triangular support frame 14 includes a transverse support tube 141, two groups of vertical support tubes 142, and two groups of inclined support tubes 143. The two groups of vertical support tubes 142 are symmetrically arranged below the transverse support tube 141 at intervals, and the two ends of each group of inclined support tubes 143 are respectively connected to each group of vertical support tubes 142 and transverse support tubes 141 to form a stable triangular support frame 14.

[0045] The main bridge deck 11 of the utility model is sequentially installed with a granite tile layer 111, a waterproof cement mortar layer 112, a waterproof protective layer 113, and a U-shaped steel plate structure 113 from top to bottom. The granite tile layer 111 is paved with granite tiles, and the thickness of the granite tile layer 111 is 20 mm. The waterproof cement mortar layer 112 is cast by M10 premixed waterproof cement mortar, and the thickness of the waterproof cement mortar layer 112 is 20 mm. The waterproof protective layer 113 is cast by C30S6 fine stone waterproof concrete, and the thickness of the waterproof protective layer 113 is 50-75 mm. The height of the U-shaped steel plate is 30 mm. The load bearing strength and waterproofness of the main bridge deck 11 are improved.

[0046] On the other hand, Figure 8-9As shown, the utility model also provides a work protection platform 2, including a work protection platform 2 built on one side of the pedestrian overpass, the work protection platform 2 includes a steel structure support frame 21 and a work platform 23, the work platform 23 is installed above the steel structure support frame 21, and the steel structure support frame 21 is erected on one side of the steel beam bridge section 121 of the steel bridge arch truss structure 12. The work protection platform 2 includes a hanging basket 24 and a safety rope 25, the hanging basket 24 is installed on one side of the steel structure support frame 21, one end of the safety rope 25 is connected to the hanging basket 24, and the other end of the safety rope 25 is installed on the steel structure support frame 21. The work protection platform 2 also includes an anti-falling component 26, the anti-falling component 26 is installed on one side of the steel structure support frame 21 and is located below the hanging basket 24, the anti-falling component 26 includes an anti-falling railing and an anti-falling net 261, and the anti-falling net 261 is installed on the anti-falling railing. The working protection platform 2 of the utility model can provide a construction platform for construction workers to build a pedestrian bridge by cooperating with the steel structure support frame 21 and the working platform 23. By setting the anti-fall component 26, the safety of construction workers standing on the working platform 23 can be improved and safety hazards can be reduced.

[0047] The above disclosure is only a preferred embodiment of the present invention, and certainly cannot be used to limit the scope of rights of the present invention. Therefore, equivalent changes made according to the claims of the present invention are still within the scope covered by the present invention.

Claims

1. A pedestrian bridge, Features: The pedestrian overpass includes a truss main bridge and two groups of stairs located at both ends of the truss main bridge, the two groups of stairs are respectively connected to the two ends of the truss main bridge to form an "I" shaped structure, the truss main bridge includes a main bridge deck, a steel bridge arch truss structure, and main bridge piers, the steel bridge arch truss structure is installed at the edge of the main bridge deck, the main bridge piers are installed below the main bridge deck, the surface of the truss main bridge is coated with an anti-corrosion structure, and the anti-corrosion structure is a graphene modified coating layer, the steel bridge arch truss structure includes a steel beam bridge section and two groups of truss sections, the two groups of truss sections are symmetrically arranged and installed on the steel bridge section, the steel beam bridge sections are respectively the first main bridge section and the second main bridge section, the first main bridge section is located on one side of the second main bridge section and is connected to it, and a plurality of stiffening ribs are installed inside the main bridge piers.

2. The pedestrian bridge according to claim 1, Features: The steel beam bridge section is a horizontal lower chord, and each group of truss sections includes an arched upper chord and a plurality of web members, wherein the web members are connected between the horizontal lower chord and the arched upper chord, and the horizontal lower chord is installed under the arched upper chord through a plurality of web members to realize the installation of the steel beam bridge section and the two groups of truss sections, and the main bridge deck is connected to the horizontal lower chord of the steel bridge arch truss structure.

3. The pedestrian bridge according to claim 1, Features: The truss main bridge includes a fixed support, which is installed between the main bridge piers and the main bridge deck.

4. The pedestrian bridge according to claim 1, Features: A triangular support frame is installed on the steel beam bridge section, and the triangular support frame includes a transverse support tube, two groups of vertical support tubes, and two groups of inclined support tubes. The two groups of vertical support tubes are symmetrically arranged below the transverse support tube, and the two ends of each group of inclined support tubes are respectively connected to each group of vertical support tubes and transverse support tubes to form a stable triangular support frame.

5. The pedestrian bridge according to claim 1, Features: The main bridge deck is sequentially installed with a granite tile layer, a waterproof cement mortar layer, a waterproof protective layer, and a U-shaped steel plate structure from top to bottom.

6. The pedestrian bridge according to claim 1, Features: The main bridge piers are round-end steel tube concrete column structures with a cross-sectional size of 2000mm*800mm*20mm. The interior of the main bridge piers is filled with C40 concrete, and a number of stiffening ribs are spaced apart from each other along the circumferential direction inside the main bridge piers.

7. A work protection platform, comprising a work protection platform built on one side of the pedestrian bridge as claimed in claim 1, Features: The work protection platform includes a steel structure support frame and a work platform. The work platform is installed above the steel structure support frame, and the steel structure support frame is erected on one side of the steel beam bridge section of the steel bridge arch truss structure.

8. The work protection platform according to claim 7, Features: The work protection platform includes a hanging basket and a safety rope. The hanging basket is installed on one side of a steel structure support frame. One end of the safety rope is connected to the hanging basket, and the other end of the safety rope is connected to the steel structure support frame.

9. The work protection platform according to claim 7, Features: The work protection platform comprises an anti-falling component, which is installed on one side of the steel structure support frame and is located below the hanging basket.

10. The work protection platform according to claim 9, Features: The anti-falling component comprises an anti-falling railing and an anti-falling net, and the anti-falling net is installed on the anti-falling railing.