Steel bottom die for cast-in-place bridge deck slab of narrow steel-concrete composite beam
Through the design of the cast-in-place bridge deck steel bottom mold of narrow-width steel-mixed composite beam cast-in-place bridge deck, the problem of easy deformation of wooden formwork in the existing technology is solved, and more efficient and safe bridge deck construction is achieved, reducing costs and construction cycles.
Patent Information
- Application Number
- CN202323384317.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-11
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2033-12-11
AI Technical Summary
The use of full-house bracket method in the construction of existing cast-in-place bridge decks causes the wooden formwork to be easily deformed, the process is complicated, the cost is high, the cycle is long and the safety and quality is difficult to control.
The cast-in-place steel-mixed composite beam steel-concrete steel-in-place bridge deck steel bottom mold is used to design the steel plate and the barrier plate, and the steel bottom mold is bolted to the narrow-side steel box beam by using high-strength bolt connectors to provide support and transmit pressure. , avoid deformation of the template, and improve the stiffness of the steel base mold and facilitate assembly through stiffening plates and connecting plates.
The structural strength of the steel base mold is improved, the formwork deformation is avoided, the construction cycle is shortened, the cost and safety and quality risks are reduced, and the construction efficiency and formwork utilization is improved.
Smart Images

Figure CN222065181U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of bridge deck steel bottom molds, in particular to a narrow-width steel-concrete composite beam cast-in-place bridge deck steel bottom mold. Background Art
[0002] The cast-in-place bridge deck in the prior art is usually made by the full-frame scaffold cast-in-place method. First, the site is leveled and rolled until the compaction degree meets the specification requirements. C20 concrete is used to harden the site. After the concrete strength is built up, a full-frame scaffold is erected. Square wooden horizontal and vertical beams are set on the top of the scaffold. Adjustable square timbers are set on the horizontal and vertical beams according to the elevation requirements. The cast-in-place bridge deck wooden bottom formwork is laid on the adjustable square timber. Finally, steel bar binding and concrete pouring are carried out. After the construction is completed, the full-frame scaffold is removed from top to bottom in sequence. This construction method has complicated processes, high investment costs, long construction periods, and greater difficulty in safety and quality control, which can easily affect the overall construction progress of the project. At the same time, the wooden formwork is prone to deformation during construction. Utility Model Content
[0003] In view of the above-mentioned problems in the prior art, the utility model aims to provide a narrow-width steel-concrete composite beam cast-in-place bridge deck steel bottom formwork, which solves the problem that the wooden formwork is easily deformed during construction when the cast-in-place bridge deck is produced using the full-height bracket cast-in-place method in the prior art.
[0004] In order to achieve the above utility model purpose, the technical solution adopted by the utility model is as follows:
[0005] A narrow steel-concrete composite beam cast-in-place bridge deck steel bottom form is provided, which includes a steel plate, the length of the steel plate matches the length of the cast-in-place bridge deck, and the width of the steel plate matches the width of the cast-in-place bridge deck;
[0006] The upper end surface of the steel plate is the supporting surface, which is used to support the reinforced concrete of the cast-in-place bridge deck;
[0007] Blocking plates are arranged on both sides of the steel plate in the width direction, and the blocking plates are arranged along the length direction of the steel plate. The height of the blocking plates matches the thickness of the reinforced concrete of the cast-in-place bridge deck. Bolt connectors are arranged on the blocking plates, and the blocking plates are bolted to the narrow steel box girder through the bolt connectors.
[0008] The basic principle of the steel bottom formwork for the cast-in-place bridge deck of the medium-narrow steel-concrete composite beam of the utility model is: first, the entire steel bottom formwork is manufactured on the ground, and then the entire steel bottom formwork is bolted to the narrow steel box beam through high-strength bolt connectors, the upper end surface of the steel plate is the supporting surface, which supports the cast-in-place bridge deck reinforced concrete, the area surrounded by the blocking plate and the upper end surface of the steel plate is the molding area of the cast-in-place bridge deck reinforced concrete, and the cast-in-place bridge deck is formed after the cast-in-place bridge deck reinforced concrete solidifies; the steel bottom formwork for the cast-in-place bridge deck of the medium-narrow steel-concrete composite beam of the utility model has good structural strength, and the pressure borne by the steel bottom formwork is transmitted to the narrow steel box beam box body through high-strength bolt connectors, and it is not easy to deform during the construction of the cast-in-place bridge deck, thereby improving the utilization rate of the formwork, accelerating the overall construction progress, reducing the cost investment and construction safety and quality risks, and solving the problem that the existing wooden formwork is easy to deform during construction.
[0009] Furthermore, the steel plate includes a middle span steel plate and a first side span steel plate and a second side span steel plate arranged on both sides of the middle span steel plate in the width direction; the middle span steel plate, the first side span steel plate and the second side span steel plate are all arranged along the length direction of the cast-in-place bridge deck;
[0010] A gap is provided between the first side span steel plate, the second side span steel plate and the middle span steel plate, and a connecting plate is provided in the gap; the first side span steel plate and the second side span steel plate are fixedly connected to the middle span steel plate through the connecting plate;
[0011] A blocking plate is disposed on the outer sides of the first side span steel plate and the second side span steel plate in the width direction.
[0012] In the above technical scheme, the entire steel plate is divided into a middle span steel plate, a first side span steel plate and a second side span steel plate in order to facilitate pre-fabrication and transportation in the factory and assembly at the construction site, thereby improving the production efficiency of the steel bottom formwork of the narrow-width steel-concrete composite beam cast-in-place bridge deck and shortening the construction period.
[0013] Furthermore, support feet are provided under each connecting plate. When the steel bottom formwork of the cast-in-place bridge deck of the narrow-width steel-concrete composite beam is completed and has not been connected and fixed to the narrow-width steel box girder, the support feet provide temporary support for the entire steel bottom formwork to facilitate subsequent lifting and installation of the steel bottom formwork.
[0014] Furthermore, multiple stiffening plates are evenly spaced on the upper end surfaces of the middle span steel plate, the first side span steel plate, and the second side span steel plate along their own length direction, and the stiffening plates are arranged along the width direction of the middle span steel plate, the first side span steel plate, and the second side span steel plate. The arrangement of multiple stiffening plates can strengthen the rigidity of the entire steel bottom mold, avoid deformation of the steel bottom mold during the construction of the reinforced concrete of the bridge deck, improve the molding quality of the cast-in-place bridge deck, and reduce the construction safety and quality risks.
[0015] Furthermore, each stiffening plate is provided with a plurality of through holes at intervals along its own length direction. During the process of casting the bridge deck, concrete can flow through the through holes to quickly fill the area surrounded by the upper end surface of the blocking plate and the steel plate, thereby improving the production efficiency of the cast-in-place bridge deck.
[0016] Furthermore, the middle span steel plate, the first side span steel plate and the second side span steel plate are divided into a plurality of sections in the length direction, and two adjacent sections are fixedly connected. When making a long-span steel bottom formwork, the middle span steel plate, the first side span steel plate and the second side span steel plate are divided into a plurality of sections, which is not only convenient for factory prefabrication and transportation, but also convenient for on-site assembly.
[0017] The beneficial effects of the utility model are as follows: the narrow-width steel-concrete composite beam cast-in-place bridge deck steel bottom formwork structure of the utility model has good strength, is not easy to deform during construction, is easy to recycle to improve the utilization rate of the formwork, speeds up the overall construction progress, reduces cost investment and construction safety and quality risks, and solves the problem that the existing wooden formwork is easy to deform during construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a schematic diagram of the top view of the steel bottom formwork for the cast-in-place bridge deck of a narrow steel-concrete composite beam.
[0019] Figure 2 This is a side view structural diagram of the steel bottom formwork of the narrow steel-concrete composite beam cast-in-place bridge deck.
[0020] Figure 3 This is a structural schematic diagram of the mid-span steel plate segment.
[0021] Figure 4 This is a schematic diagram of the structure of the first side span steel plate segment.
[0022] Figure 5 This is a schematic diagram of the structure of the second side span steel plate segment.
[0023] Among them, 1. steel plate; 101. middle span steel plate; 102. first side span steel plate; 103. second side span steel plate; 2. blocking plate; 3. connecting plate; 4. supporting foot; 5. stiffening plate; 6. through hole. DETAILED DESCRIPTION
[0024] The specific implementation modes of the present invention are described below to facilitate the understanding of the present invention by those skilled in the art. However, it should be clear that the present invention is not limited to the scope of the specific implementation modes. For those skilled in the art, as long as various changes are within the spirit and scope of the present invention as defined and determined by the attached claims, these changes are obvious, and all inventions and creations utilizing the concept of the present invention are protected.
[0025] like Figures 1-2As shown, the utility model provides a narrow steel-concrete composite beam cast-in-place bridge deck steel bottom mold, which includes a steel plate 1, the length of the steel plate 1 matches the length of the cast-in-place bridge deck, and the width of the steel plate 1 matches the width of the cast-in-place bridge deck;
[0026] The upper end surface of the steel plate 1 is a supporting surface for supporting the cast-in-place bridge deck reinforced concrete;
[0027] Blocking plates 2 are arranged on both sides of the steel plate 1 in the width direction. The blocking plates 2 are arranged along the length direction of the steel plate 1. The height of the blocking plates 2 matches the thickness of the reinforced concrete of the cast-in-place bridge deck. Bolt connectors are arranged on the blocking plates 2, and the blocking plates 2 are bolted to the narrow steel box girder through the bolt connectors.
[0028] The basic principle of the steel bottom formwork for the cast-in-place bridge deck of the medium-narrow steel-concrete composite beam of the utility model is as follows: first, the entire steel bottom formwork is manufactured on the ground, and then the entire steel bottom formwork is bolted to the narrow steel box beam through high-strength bolt connectors, the upper end surface of the steel plate 1 is the supporting surface, supporting the cast-in-place bridge deck reinforced concrete, the area surrounded by the blocking plate 2 and the upper end surface of the steel plate 1 is the molding area of the cast-in-place bridge deck reinforced concrete, and the cast-in-place bridge deck is formed after the cast-in-place bridge deck reinforced concrete solidifies; the steel bottom formwork for the cast-in-place bridge deck of the medium-narrow steel-concrete composite beam of the utility model has good structural strength, the pressure borne by the steel bottom formwork is transmitted to the narrow steel box beam box body through high-strength bolt connectors, and it is not easy to deform during the construction of the cast-in-place bridge deck, thereby improving the utilization rate of the formwork, accelerating the overall construction progress, reducing the cost investment and construction safety and quality risks, and solving the problem that the existing wooden formwork is easy to deform during construction.
[0029] Preferably, but not limited to, the steel plate 1 includes a middle span steel plate 101 and a first side span steel plate 102 and a second side span steel plate 103 arranged on both sides of the middle span steel plate 101 in the width direction; the middle span steel plate 101, the first side span steel plate 102 and the second side span steel plate 103 are all arranged along the length direction of the cast-in-place bridge deck;
[0030] A gap is provided between the first side span steel plate 102 and the second side span steel plate 103 and the middle span steel plate 101, and a connecting plate 3 is provided in the gap; the first side span steel plate 102 and the second side span steel plate 103 are fixedly connected to the middle span steel plate 101 through the connecting plate 3;
[0031] A blocking plate 2 is provided on the outer sides of the first side span steel plate 102 and the second side span steel plate 103 in the width direction.
[0032] In the above technical solution, the entire steel plate 1 is divided into a middle span steel plate 101, a first side span steel plate 102 and a second side span steel plate 103. This is to facilitate pre-fabrication and transportation in the factory and assembly at the construction site, thereby improving the production efficiency of the steel bottom formwork of the narrow-width steel-concrete composite beam cast-in-place bridge deck and shortening the construction period.
[0033] A supporting foot 4 is provided under each connecting plate 3. When the steel bottom formwork of the narrow-width steel-concrete composite beam cast-in-place bridge deck is completed and not connected and fixed with the narrow-width steel box girder, the supporting foot 4 temporarily supports the entire steel bottom formwork to facilitate the subsequent lifting and installation of the steel bottom formwork.
[0034] The upper end surfaces of the middle span steel plate 101, the first side span steel plate 102 and the second side span steel plate 103 are evenly spaced along their own length direction and the stiffening plates 5 are arranged along the width direction of the middle span steel plate 101, the first side span steel plate 102 and the second side span steel plate 103. The arrangement of the plurality of stiffening plates 5 can strengthen the rigidity of the entire steel bottom formwork, avoid deformation of the steel bottom formwork during the construction of the reinforced concrete of the bridge deck, improve the molding quality of the cast-in-place bridge deck and reduce the construction safety and quality risks.
[0035] Preferably, but not limited to, each stiffening plate 5 is provided with a plurality of through holes 6 at intervals along its own length direction. During the process of casting the bridge deck, concrete can flow from the through holes 6 to quickly fill the area surrounded by the upper end surface of the blocking plate 2 and the steel plate 1, thereby improving the production efficiency of the cast-in-place bridge deck.
[0036] like Figure 3 to Figure 5 As shown, the middle span steel plate 101, the first side span steel plate 102 and the second side span steel plate 103 are all divided into a plurality of sections in the length direction, and two adjacent sections are fixedly connected. When making a long-span steel bottom formwork, the middle span steel plate 101, the first side span steel plate 102 and the second side span steel plate 103 are divided into a plurality of sections, which is not only convenient for factory prefabrication and transportation, but also convenient for on-site assembly.
[0037] To sum up, the narrow-width steel-concrete composite beam cast-in-place bridge deck steel bottom formwork structure of the utility model has good strength, is not easy to deform during construction, is easy to recycle to improve the utilization rate of the formwork, speeds up the overall construction progress, reduces cost investment and construction safety and quality risks, and solves the problem of easy deformation of existing wooden formworks during construction.
Claims
1. The steel bottom formwork of the narrow steel-concrete composite beam cast-in-place bridge deck is characterized by: It comprises a steel plate, the length of which matches the length of the cast-in-place bridge deck, and the width of which matches the width of the cast-in-place bridge deck; The upper end surface of the steel plate is the supporting surface, which is used to support the reinforced concrete of the cast-in-place bridge deck; Blocking plates are arranged on both sides of the steel plate in the width direction. The blocking plates are arranged along the length direction of the steel plate, and the height of the blocking plates matches the thickness of the reinforced concrete of the cast-in-place bridge deck. Bolt connectors are arranged on the blocking plates, and the blocking plates are bolted to the narrow steel box girder through the bolt connectors.
2. The narrow steel-concrete composite beam cast-in-place bridge deck steel bottom formwork according to claim 1 is characterized in that: The steel plate comprises a middle span steel plate and a first side span steel plate and a second side span steel plate arranged on both sides of the middle span steel plate in a width direction; the middle span steel plate, the first side span steel plate and the second side span steel plate are all arranged along the length direction of the cast-in-place bridge deck; A gap is provided between the first side span steel plate, the second side span steel plate and the middle span steel plate, and a connecting plate is provided in the gap; the first side span steel plate and the second side span steel plate are fixedly connected to the middle span steel plate through the connecting plate; A blocking plate is disposed on the outer sides of the first side span steel plate and the second side span steel plate in the width direction.
3. The narrow steel-concrete composite beam cast-in-place bridge deck steel bottom formwork according to claim 2 is characterized in that: A supporting foot is arranged below each of the connecting plates.
4. The narrow steel-concrete composite beam cast-in-place bridge deck steel bottom formwork according to claim 2 is characterized in that: The upper end surfaces of the middle span steel plate, the first side span steel plate and the second side span steel plate are evenly spaced along their own length directions and a plurality of stiffening plates are arranged along the width directions of the middle span steel plate, the first side span steel plate and the second side span steel plate.
5. The narrow steel-concrete composite beam cast-in-place bridge deck steel bottom formwork according to claim 4 is characterized in that: Each of the stiffening plates is provided with a plurality of through holes at intervals along its own length direction.
6. The narrow steel-concrete composite beam cast-in-place bridge deck steel bottom formwork according to claim 5 is characterized in that: The middle span steel plate, the first side span steel plate and the second side span steel plate are all divided into a plurality of sections in the length direction, and two adjacent sections are fixedly connected.