Reinforcing steel bar binding auxiliary jig frame for high pier construction

By designing the auxiliary tire frame for steel bars for high pier construction, using frames, channels, ladders, spraying and buffer modules, the problems of low efficiency, poor accuracy and difficulty in maintaining the steel bars of high pier bridges are solved, and efficient and safe steel bars are achieved Tie and maintain.

CN222065215UActive Publication Date: 2024-11-26SHANDONG LUQIAO GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420681323.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-03
Publication Date
2024-11-26
Estimated Expiration
2034-04-03

AI Technical Summary

Technical Problem

During the process of binding steel bars of high pier bridges, due to limited working space and lack of effective maintenance systems, the binding efficiency and poor accuracy are low, the crane drivers are involved, and the safety guarantee is insufficient.

Method used

A reinforced steel bar-binding auxiliary tire frame including frame module, channel module, ladder module, spray module and buffer module is designed. The channel is formed through support and pedals, and the ladder and spray system are set up, and the pneumatic pull rod and rubber block buffering are used. The water tank is stable, achieving rapid binding and effective maintenance of high-altitude operations.

Benefits of technology

The efficiency and accuracy of steel bar binding are improved, the participation of crane drivers is reduced, and safety is improved. The problem of difficult maintenance of high piers is solved through the spray module and the buffer module, and the guarantee rate of the steel bar protection layer is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065215U_ABST
    Figure CN222065215U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of highway engineering bridge high pier construction, and provides a reinforcing steel bar binding auxiliary jig frame for high pier construction, which comprises a framework module, a channel module, a ladder stand module, a spraying module and a buffer module, a channel module is arranged in the framework module through a supporting piece, and the channel module is defined by four pedals; the crawling ladder module is arranged at one corner of the channel modules and is connected with the upper and lower channel modules; the spraying module is arranged at the other corner of the channel module and comprises a water tank and a spraying pipe, the water tank is connected with the pedals through the buffer module, the spraying pipe is arranged at the output end of the water tank and arranged along the four pedals, the problem that high piers are high and difficult to maintain is solved, the working efficiency and the steel bar binding precision are improved, and the participation degree of crane drivers in the construction process is reduced; and the safety guarantee is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of high pier construction of highway engineering bridges, in particular to a steel bar binding auxiliary tire frame for high pier construction. Background Art

[0002] Reinforced concrete structure is the main material for bridge construction nowadays. The conventional process is to tie and install steel bars, erect formwork, and pour concrete. For the steel bar tying operation of high pier bridges, it is generally necessary to reduce the steel bar joints as much as possible, and the length of the steel bar is generally 9m. During the process, because the work is off the ground, especially for hollow thin-walled structures, there are open surfaces inside and outside, and the working space is severely limited. Conventionally, tower cranes or cranes are required to cooperate with manual labor to tie the steel bars. The smoothness and accuracy of the tying are directly related to the operating proficiency of the crane driver. Using the existing construction technology, it is difficult to improve the efficiency and the tying accuracy is poor.

[0003] Application No. 201920557392.X discloses an internal support frame for a steel bar binding jig, which belongs to the technical field of auxiliary equipment for prefabricated steel bar binding jigs, and can solve the problem of inconvenient use of existing internal support frames. It includes two parallel vertical legs, and the tops of the legs are provided with cross bars perpendicular to the legs. The tops of the cross bars are provided with a number of connecting blocks longitudinally connected to the bottom layer of the steel bar top plate, and the connecting blocks are arranged vertically to the cross bars. The connecting blocks are angle steels, and one side of the angle steel is connected to the top of the cross bar by a pin. The top of the angle steel is provided with a groove connected to the steel bar top plate, and the bottom of the leg is provided with a movable sleeve connected to a reserved pipe of the bottom plate of the steel bar binding jig. When in use, it needs to cooperate with a gantry crane, which will result in low efficiency and the binding accuracy cannot be guaranteed. At the same time, during the working process, there is a lack of a spray maintenance system, and the maintenance effect is poor.

[0004] Therefore, in view of the above problems, a steel bar binding auxiliary tire frame for high pier construction is proposed to solve the above problems. Utility Model Content

[0005] In view of the deficiencies in the prior art, the utility model develops an auxiliary tire frame for steel bar binding for high pier construction, which solves the problem of difficult maintenance due to the height of the high pier, improves work efficiency and steel bar binding accuracy, reduces the participation of crane drivers in the construction process, and greatly improves safety assurance.

[0006] The technical solution of the utility model to solve the technical problem is as follows: the utility model provides a steel bar binding auxiliary tire frame for high pier construction, including a skeleton module, a channel module, a ladder module, a spray module and a buffer module;

[0007] A channel module is arranged in the skeleton module through a supporting member, and the channel module is composed of four pedals.

[0008] The ladder module is arranged at a corner of the channel module, and the ladder module connects the upper and lower channel modules;

[0009] The spray module is arranged at another corner of the channel module, including a water tank and a spray pipe. The water tank is connected to the pedal through the buffer module. The spray pipe is arranged at the output end of the water tank, and the spray pipe is arranged along the four pedals.

[0010] As an optimization, the skeleton module includes a horizontal rectangular frame and vertical bars. The horizontal rectangular frame is sequentially penetrated by a number of evenly distributed vertical bars, and a number of horizontal rectangular frames are evenly arranged along the length direction of the vertical bars.

[0011] As an optimization, the skeleton module also includes a diagonal brace, which is arranged between the two bottom support members, with one end of the diagonal brace connected to the support member and the other end connected to the vertical rod.

[0012] As an optimization, a number of support members are provided, including four rectangular support frames connected end to end, pedals are clamped in the rectangular cavities of the rectangular support frames, and clamping plates are provided at the ends of the pedals.

[0013] As an optimization, the ladder module includes a ladder and a passage hole. The ladder is arranged between two adjacent upper and lower support members, and the passage hole is provided on the pedal at the support member at the top of the ladder.

[0014] As an optimization, the buffer module includes side panels, water tank placement groove plates and buffer parts arranged on the pedal. Two side panels are arranged along the length direction of the water tank. A water tank placement groove plate for holding the water tank is arranged on the top of the two side panels. Several groups of buffer parts are evenly arranged between the two side panels and the water tank placement groove plates.

[0015] As an optimization, the buffer includes a pneumatic pull rod, a connecting seat and a rubber block. The rubber block is located under the water tank placement trough plate and is arranged on the connecting seat. A pneumatic pull rod is symmetrically hinged on both sides of the connecting seat, and the two pneumatic pull rods are hinged on the two side panels at their ends away from the connecting seat.

[0016] The effects provided in the utility model content are only the effects of the embodiments, not all the effects of the utility model. The above technical solution has the following advantages or beneficial effects:

[0017] This auxiliary cradle is provided with a skeleton module and a channel module. By utilizing the cradle, two persons can quickly and efficiently carry out high pier steel bar binding work in an aerial working environment, effectively reducing labor input, improving work efficiency and steel bar binding accuracy, and increasing the steel bar protection layer guarantee rate. At the same time, the involvement of crane drivers in the construction process is reduced, thereby greatly improving safety assurance. By providing a spray module and a buffer module, the problem of high piers being difficult to maintain due to their height can be effectively solved. The spray module has a dust reduction effect, and the buffer module ensures the smooth operation of the spray module, thus providing a buffering and protective effect on the water tank. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. They are used together with the embodiments of the present invention to explain the present invention and do not constitute a limitation to the present invention.

[0019] Figure 1 It is a schematic diagram of the overall structure of the utility model.

[0020] Figure 2 This is a structural diagram of the support member of the utility model.

[0021] Figure 3 It is a structural diagram of the pedal of the utility model.

[0022] Figure 4 This is a structural diagram of the spray module of the utility model.

[0023] Figure 5 It is a cross-sectional view of the buffer module of the utility model.

[0024] In the figure, 1. skeleton module; 2. channel module; 3. ladder module; 4. spray module; 5. support; 6. pedal; 7. buffer module; 8. spray pipe; 9. water tank; 10. horizontal rectangular frame; 11. vertical rod; 12. rectangular support frame; 13. pallet; 14. ladder; 15. passage hole; 16. side panel; 17. water tank placement slot; 18. buffer; 19. pneumatic pull rod; 20. connecting seat; 21. rubber block. DETAILED DESCRIPTION

[0025] In order to clearly illustrate the technical features of this solution, the utility model is described in detail below through specific implementation methods and in combination with the accompanying drawings. The disclosure below provides many different embodiments or examples for realizing different structures of the utility model. In order to simplify the disclosure of the utility model, the components and settings of specific examples are described below. In addition, the utility model can repeat reference numbers and / or letters in different examples. This repetition is for the purpose of simplification and clarity, and does not itself indicate the relationship between the various embodiments and / or settings discussed. It should be noted that the components illustrated in the accompanying drawings are not necessarily drawn to scale. The utility model omits the description of known components and processing technologies and processes to avoid unnecessary limitations on the utility model. The terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate the orientation or position relationship based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the utility model. In addition, the terms "first", "second", and "third" are used for descriptive purposes only and should not be understood as indicating or implying relative importance. In the description of the present utility model, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be internal communication between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.

[0026] like Figures 1 to 5 As shown, a steel bar binding auxiliary frame for high pier construction includes a skeleton module 1, a channel module 2, a ladder module 3, a spray module 4 and a buffer module 7; the channel module 2 is arranged in the skeleton module 1 through a support member 5, and the channel module 2 is surrounded by four pedals 6; the ladder module 3 is arranged at a corner of the channel module 2, and the ladder module 3 connects the upper and lower channel modules 2; the spray module 4 is arranged at the other corner of the channel module 2, including a water tank 9 and a spray pipe 8, the water tank 9 is connected to the pedal 6 through the buffer module 7, and the spray pipe 8 is arranged at the output end of the water tank 9, and the spray pipe 8 is arranged along the four pedals 6. After the concrete pouring is completed, the spraying maintenance of the entire high pier can be integrated into the entire working platform, which is convenient for maintenance. At the same time, the water supply rate is increased and the shape of the sprayed water is adjusted, which can achieve the effect of sprinkling water and reducing dust in the air.

[0027] The auxiliary frame is provided with a skeleton module 1 and a channel module 2. By utilizing the frame, two persons can quickly and efficiently carry out high pier steel bar binding work in an aerial working environment, effectively reducing the manpower input, improving the work efficiency and steel bar binding accuracy, and increasing the steel bar protection layer guarantee rate. At the same time, the participation of the crane driver in the construction process is reduced, and the safety guarantee is greatly improved. By providing a spray module 4 and a buffer module 7, the problem of high piers being difficult to maintain due to their height can be effectively solved. The spray module 4 has a dust reduction effect, and the buffer module 7 ensures the smooth operation of the spray module 4, and has a buffering and protective effect on the water tank 9.

[0028] In this embodiment, the skeleton module 1 includes a horizontal rectangular frame 10 and vertical rods 11. The horizontal rectangular frame 10 is sequentially penetrated by a number of evenly distributed vertical rods 11, and the horizontal rectangular frame 10 is evenly arranged along the length direction of the vertical rods 11. The vertical rods 11 can be welded with angle steels, and the welding size is set according to the working platform. The horizontal rectangular frame 10 is used to support the entire auxiliary tire frame and protect the staff. It can be a welded steel pipe. A hook can be set on the outside of the horizontal rectangular frame 10 for installing a safety protection plate and hanging safety warning slogans.

[0029] The skeleton module 1 also includes a diagonal brace, which is arranged between the two bottom support members 5. One end of the diagonal brace is connected to the support member 5, and the other end is connected to the vertical rod 11. The diagonal brace is used to consolidate the supporting force of the auxiliary tire frame and improve the stability and strength of the entire tire frame.

[0030] In this embodiment, a plurality of support members 5 are provided, including four rectangular support frames 12 connected end to end, a pedal 6 is clamped in the rectangular cavity of the rectangular support frame 12, a clamping plate 13 is provided at the end of the pedal 6, and a plurality of support members 5 provide a multi-layer working platform. The upper working platform can be used as a support for the erection of a single steel bar, and at the same time as a binding working platform for the upper transverse auxiliary steel bars. The standing height for a person is 1.7m. Considering the walking space for people and the length of the steel bars on site, the single-layer height can be rounded to 2m, and the number of layers can be three.

[0031] The ladder module 3 includes a ladder 14 and a passage hole 15 . The ladder 14 is arranged between two adjacent upper and lower support members 5 . The pedal 6 at the support member 5 at the top of the ladder 14 is provided with the passage hole 15 .

[0032] In this embodiment, the buffer module 7 includes a side plate 16, a water tank placement slot plate 17 and a buffer 18 arranged on the pedal 6. Two side plates 16 are arranged along the length direction of the water tank. The water tank placement slot plates 17 for holding the water tank 9 are arranged on the top of the two side plates 16. Several groups of buffers 18 are evenly arranged between the two side plates 16 and the water tank placement slot plates 17. When the staff walks on the pedal 6 and generates vibrations that cause the water tank 9 to vibrate in the upper and lower positions, the water tank placement slot plates 17 will be squeezed, and the buffer 18 is arranged at the bottom of the water tank placement slot plates 17, which can effectively buffer the shaking of the water tank 9, thereby improving the efficiency of the spraying and avoiding the loosening of the spray pipe 8 due to the shaking, which affects the service life.

[0033] The buffer 18 includes a pneumatic pull rod 19, a connecting seat 20 and a rubber block 21. The rubber block 21 is located below the water tank placement slot 17 and is arranged on the connecting seat 20. A pneumatic pull rod 19 is symmetrically hinged on both sides of the connecting seat 20, and the ends of the two pneumatic pull rods 19 away from the connecting seat 20 are respectively hinged on the two side panels 16. The water tank placement slot plate 17 and the side plate 16 are squeezed, which will produce a certain degree of deformation, so that the two side plates 16 are tilted in the direction of approaching each other, and the water tank placement slot plate 17 continues to deform downward under the action of the water tank's gravity, thereby reducing the distance between the two side plates 16, further clamping the water tank 9. At the same time, the water tank placement slot plate 17 squeezes the rubber block 21, and the rubber block 21 is deformed and continues to squeeze the connecting seat 20 downward, which has a buffering effect on the water tank 9. The connecting seat 20 moves downward to drive the pneumatic pull rod 19 to extend slightly. Under the resilience of the pneumatic pull rod 19 itself, it continues to pull the two side plates 16 to tilt in the direction of approaching each other, clamping the water tank 9.

[0034] During the construction of the auxiliary frame for rebar binding, two people stand on the upper and lower working platforms respectively, with the upper and lower positions consistent. The worker on the upper level carries the entire rebar and goes deep into the lower level, while the worker on the lower level aligns the rebar to be bound, and after alignment, the rebar connecting sleeve is installed in time and the torque wrench is used for threading. The two people cooperate to install a circle of main reinforcement, and then the two people work separately to install the horizontal stirrups of each layer and tie them tightly with wire.

[0035] Although the specific implementation methods of the utility model are described above in conjunction with the accompanying drawings, this does not limit the scope of protection of the utility model. On the basis of the technical solution of the utility model, various modifications or deformations that can be made by technical personnel in this field without creative work are still within the scope of protection of the utility model.

Claims

1. A steel bar binding auxiliary tire frame for high pier construction, characterized by: It comprises a skeleton module (1), a passage module (2), a ladder module (3), a spray module (4) and a buffer module (7); A channel module (2) is arranged in the skeleton module (1) via a support member (5), and the channel module (2) is composed of four pedals (6); The ladder module (3) is arranged at a corner of the passage module (2), and the ladder module (3) connects the upper and lower passage modules (2); The spray module (4) is arranged at another corner of the channel module (2), and comprises a water tank (9) and a spray pipe (8). The water tank (9) is connected to the pedal (6) via the buffer module (7). The spray pipe (8) is arranged at the output end of the water tank (9). The spray pipe (8) is arranged along the four pedals (6).

2. The auxiliary steel bar tying frame for high pier construction according to claim 1 is characterized in that: The skeleton module (1) comprises a horizontal rectangular frame (10) and vertical rods (11); a plurality of evenly distributed vertical rods (11) are sequentially passed through the horizontal rectangular frame (10); and a plurality of horizontal rectangular frames (10) are evenly arranged along the length direction of the vertical rods (11).

3. The auxiliary steel bar tying frame for high pier construction according to claim 2 is characterized in that: The skeleton module (1) further comprises an oblique brace, which is arranged between the two bottom support members (5), one end of the oblique brace is connected to the support member (5), and the other end is connected to the vertical rod (11).

4. The auxiliary steel bar tying frame for high pier construction according to claim 1 or 2 is characterized in that: A plurality of support members (5) are provided, including four rectangular support frames (12) connected end to end, a pedal (6) is clamped in a rectangular cavity of the rectangular support frame (12), and a clamping plate (13) is provided at the end of the pedal (6).

5. The auxiliary steel bar tying frame for high pier construction according to claim 4 is characterized in that: The ladder module (3) comprises a ladder (14) and a passage hole (15); the ladder (14) is arranged between two adjacent upper and lower support members (5); and a pedal (6) at the support member (5) at the top of the ladder (14) is provided with the passage hole (15).

6. The auxiliary steel bar tying frame for high pier construction according to claim 1 or 2 is characterized in that: The buffer module (7) comprises a side plate (16) arranged on the pedal (6), a water tank placement groove plate (17) and a buffer member (18); two side plates (16) are arranged along the length direction of the water tank; a water tank placement groove plate (17) for holding the water tank (9) is arranged on top of the two side plates (16); and a plurality of groups of buffer members (18) are evenly arranged between the two side plates (16) and the water tank placement groove plate (17).

7. The auxiliary steel bar tying frame for high pier construction according to claim 6 is characterized by: The buffer member (18) comprises a pneumatic pull rod (19), a connecting seat (20) and a rubber block (21). The rubber block (21) is located below the water tank placement slot plate (17) and is arranged on the connecting seat (20). A pneumatic pull rod (19) is symmetrically hinged on both sides of the connecting seat (20). The ends of the two pneumatic pull rods (19) away from the connecting seat (20) are respectively hinged on the two side plates (16).