Double-hoop outer mold pipe gallery construction mold
By designing double-hook outer mold pipe corridor construction molds, and using advance construction and lifting and installation methods, the safety hazards and high time cost of building brackets in high places in traditional construction are solved, and a safer and more efficient construction process is achieved.
Patent Information
- Application Number
- CN202420165260.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-23
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-01-23
AI Technical Summary
In the construction of traditional pipe corridors, brackets need to be built at high places, which poses safety hazards and has long construction time and high cost.
A double-hung outer mold pipe corridor construction mold is designed, including two spaced outer molds, vertical ribs, embedded nuts, horizontal pull rods and locking bolts. By building and hoisting and installing in advance, the brackets are avoided on-site.
It greatly shortens construction time, reduces costs, and prevents external mold deformation through vertical ribs, improving construction safety and efficiency.
Smart Images

Figure CN222065551U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of molds, in particular to a double-hoop outer mold pipe gallery construction mold. Background Art
[0002] In the traditional pipe gallery construction process, it is necessary to assemble and build an outer formwork made of steel structure, and then pour concrete on the outer formwork to form the pipe gallery. In the process of building the outer formwork, the traditional method is to build a bracket on the outside of the wall of the pipe gallery. The bracket acts like a scaffold, and the construction workers climb up the bracket and gradually build the outer formwork upwards. Due to the high height of the bracket, it is very dangerous for the workers to carry out construction on the bracket. In addition, it is necessary to build a bracket on site at the location where the pipe gallery is to be built, and then use the bracket to build the outer formwork, which not only takes a long time to construct, but also has high costs. Utility Model Content
[0003] The purpose of the utility model is to provide a double-hoop outer mold pipe gallery construction mold, which can propose solutions to the deficiencies of the existing technology. The pipe gallery construction mold can be built in advance and installed by hoisting. The operation is simple and there is no need to build a bracket on site at the location where the pipe gallery is to be built, which greatly shortens the construction time and reduces the construction cost.
[0004] The technical solution adopted by the utility model is:
[0005] An embodiment of the present application provides a double-hoop outer mold pipe gallery construction mold, including an outer mold and a cushion layer. The number of outer molds is two and they are arranged at intervals. A vertical rib is provided on the outward side of any outer mold, and a first connecting piece is provided at the bottom of the vertical rib. The first connecting piece is detachably connected to the cushion layer.
[0006] Furthermore, in some embodiments of the present invention, the cushion layer is provided with embedded nuts and also includes mounting bolts, which pass through the first connecting piece and are threadedly connected to the embedded nuts.
[0007] Furthermore, in some embodiments of the utility model, a tie rod is provided in the cushion layer, and an end of the tie rod is provided with an external thread; the embedded nut is provided with a screw hole, and the embedded nut is threadedly connected to the tie rod.
[0008] Furthermore, in some embodiments of the present invention, the vertical rib is provided with a first locking bolt and also includes a first locking nut, and the first locking bolt passes through the first connecting member and is threadedly connected to the first locking nut.
[0009] Furthermore, in some embodiments of the present invention, the above also includes a second locking bolt and a second locking nut, and one end of the second locking bolt passes through the vertical rib and the outer mold and is threadedly connected to the second locking nut.
[0010] Furthermore, in some embodiments of the present invention, a horizontal tie beam is provided between the two outer molds, the horizontal tie beam is located at the top of the outer molds, and the two outer molds are detachably connected to the horizontal tie beam.
[0011] Furthermore, in some embodiments of the present invention, the above also includes a second connecting member, a third locking bolt and a third locking nut, the second connecting member is welded to the outer mold; one end of the third locking bolt passes through the cross-bracing beam and the second connecting member and is threadedly connected to the third locking nut.
[0012] Compared with the prior art, the embodiments of the present invention have at least the following advantages or beneficial effects:
[0013] An embodiment of the utility model provides a double-hoop outer mold pipe gallery construction mold, including an outer mold and a cushion layer. The number of outer molds is two and they are arranged at intervals. A vertical rib is provided on the outward side of any outer mold, and a first connecting piece is provided at the bottom of the vertical rib. The first connecting piece is detachably connected to the cushion layer.
[0014] The tunnel construction mold can be built in advance and installed by hoisting. The operation is simple and there is no need to build a bracket on site at the tunnel construction location, which greatly shortens the construction time and reduces the construction cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.
[0016] Figure 1 A front view of a double-hoop outer mold pipe gallery construction mold provided by an embodiment of the utility model;
[0017] Figure 2 for Figure 1 The enlarged view of point A in the middle;
[0018] Figure 3 for Figure 1 Enlarged view of point B in the middle.
[0019] Icons: 1-external formwork; 2-cushion; 3-vertical rib; 4-first connecting piece; 5-embedded nut; 6-mounting bolt; 7-transverse tie rod; 8-first locking bolt; 9-first locking nut; 10-second locking bolt; 11-second locking nut; 12-transverse tie beam; 13-second connecting piece; 14-third locking bolt; 15-third locking nut; 16-foundation. DETAILED DESCRIPTION
[0020] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Generally, the components of the embodiments of the utility model described and shown in the drawings here can be arranged and designed in various different configurations.
[0021] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the present invention to be protected, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0022] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0023] In the description of the embodiments of the present utility model, it should be noted that if the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the drawings, or the orientation or position relationship in which the utility model product is usually placed when in use. It is only for the convenience of describing the utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, if the terms "first", "second", etc. appear, they are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0024] In addition, the use of terms such as "horizontal" and "vertical" does not mean that the components must be absolutely horizontal or vertical, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.
[0025] In the description of the embodiments of the present utility model, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "setting" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.
[0026] Example
[0027] Please refer to Figure 1-Figure 3 The present embodiment provides a double-hoop outer mold pipe gallery construction mold, including an outer mold 1 and a cushion layer 2. The number of outer molds 1 is two and they are arranged at intervals. A vertical rib 3 is provided on the outward side of any outer mold 1, and a first connecting piece 4 is provided at the bottom of the vertical rib 3. The first connecting piece 4 is detachably connected to the cushion layer 2.
[0028] The cushion layer 2 is provided with an embedded nut 5 and also includes a mounting bolt 6, which passes through the first connecting member 4 and is threadedly connected to the embedded nut 5. A tie rod 7 is provided in the cushion layer 2, and an external thread is provided at the end of the tie rod 7; the embedded nut 5 is provided with a screw hole, and the embedded nut 5 is threadedly connected to the tie rod 7.
[0029] The cushion layer 2 of this embodiment is cast by concrete. Figure 1 As shown, after the trench for the construction of the pipe gallery is dug on the foundation 16, a cushion layer 2 is poured at the bottom of the trench. Before pouring, the embedded nuts 5 are threadedly connected to the horizontal tie rods 7, and the horizontal tie rods 7 are poured into the cushion layer 2 for fixing. The outer mold 1 and the vertical ribs 3 are built in advance. When the pipe gallery is built, it is only necessary to hoist the outer mold 1 and the vertical ribs 3 into the trench by means of a crane or other tools, and the bolts 6 are installed to pass through the first connecting piece 4 and are threadedly connected to the embedded nuts 5. In this way, the outer mold 1 and the vertical ribs 3 can be fixed to the cushion layer 2 as a whole, which is easy to operate. There is no need to build a bracket on site at the location where the pipe gallery is built, which greatly shortens the construction time and reduces the construction cost. By setting the vertical ribs 3, it is possible to prevent the outer mold 1 from being deformed by the lateral pressure during pouring.
[0030] like Figure 1-Figure 3 As shown, in some embodiments of the present invention, the vertical rib 3 is provided with a first locking bolt 8 and a first locking nut 9. The first locking bolt 8 passes through the first connecting member 4 and is threadedly connected to the first locking nut 9. The present invention facilitates fixing the first connecting member 4 to the vertical rib 3 by providing the first locking bolt 8 and the first locking nut 9.
[0031] like Figure 1-Figure 3 As shown, in some embodiments of the present invention, the above also includes a second locking bolt 10 and a second locking nut 11, one end of the second locking bolt 10 passes through the vertical rib 3 and the outer mold 1 and is threadedly connected with the second locking nut 11. The utility model provides the second locking bolt 10 and the second locking nut 11, so that the vertical rib 3 and the outer mold 1 are fixed together by the second locking bolt 10 and the second locking nut 11.
[0032] like Figure 1-Figure 3As shown, in some embodiments of the utility model, a horizontal tie beam 12 is provided between the two outer molds 1, the horizontal tie beam 12 is located at the top of the outer mold 1, and the two outer molds 1 are detachably connected to the horizontal tie beam 12. A second connecting member 13, a third locking bolt 14 and a third locking nut 15 are also included, the second connecting member 13 is welded to the outer mold 1; one end of the third locking bolt 14 passes through the horizontal tie beam 12 and the second connecting member 13 and is threadedly connected to the third locking nut 15.
[0033] The utility model provides a transverse tie beam 12, and after the two outer molds 1 are installed, the transverse tie beam 12 is fixed to the two outer molds 1 through the second connecting member 13, so as to improve the stability of the outer mold 1 during pouring.
[0034] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. It is obvious to those skilled in the art that the present application is not limited to the details of the above exemplary embodiments and that the present application can be implemented in other specific forms without departing from the spirit or basic features of the present application.
[0035] Therefore, no matter from which point of view, the embodiments should be regarded as illustrative and non-restrictive, and the scope of the present application is limited by the attached claims rather than the above description, so it is intended to include all changes that fall within the meaning and scope of the equivalent elements of the claims in the present application. Any figure mark in the claims should not be regarded as limiting the claims involved. For those skilled in the art, the utility model can have various changes and variations. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the utility model should be included in the scope of protection of the utility model.
Claims
1. A double-hoop outer mold pipe gallery construction mold, including an outer mold, characterized in that: It also includes a cushion layer. The number of the outer molds is two and they are arranged at intervals. A vertical rib is provided on the outward side of any of the outer molds. A first connecting piece is provided at the bottom of the vertical rib. The first connecting piece is detachably connected to the cushion layer.
2. A double-hoop outer mold pipe gallery construction mold according to claim 1, characterized in that: The cushion layer is provided with embedded nuts and also includes mounting bolts, which pass through the first connecting piece and are threadedly connected with the embedded nuts.
3. A double-hoop outer mold pipe gallery construction mold according to claim 2, characterized in that: A transverse tie rod is arranged in the cushion layer, and an external thread is arranged at the end of the transverse tie rod; a screw hole is arranged in the embedded nut, and the embedded nut is threadedly connected with the transverse tie rod.
4. A double-hoop outer mold pipe gallery construction mold according to claim 1, characterized in that: The vertical rib is provided with a first locking bolt and also includes a first locking nut, wherein the first locking bolt passes through the first connecting member and is threadedly connected to the first locking nut.
5. A double-hoop outer mold pipe gallery construction mold according to claim 1, characterized in that: It also includes a second locking bolt and a second locking nut, one end of the second locking bolt passes through the vertical rib and the outer mold and is threadedly connected to the second locking nut.
6. A double-hoop outer mold pipe gallery construction mold according to claim 1, characterized in that: A transverse tie beam is provided between the two outer molds, the transverse tie beam is located at the top of the outer molds, and the two outer molds are respectively detachably connected to the transverse tie beam.
7. A double-hoop outer mold pipe gallery construction mold according to claim 6, characterized in that: It also includes a second connecting member, a third locking bolt and a third locking nut, wherein the second connecting member is welded to the outer mold; one end of the third locking bolt passes through the transverse beam and the second connecting member and is threadedly connected to the third locking nut.