By designing the concrete prefabricated cable trench positioning construction device, using components such as clamps, rulers, telescopic cylinders and rubber pads, the problem of skewed cable trench during construction is solved, and the precise positioning of the spacing between the concrete prefabricated cable trench and the underground concrete wall is achieved. and linear installation improves construction quality.

CN222065555UActive Publication Date: 2024-11-26CHINA CONSTR SECOND ENG BUREAU LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420695621.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-07
Publication Date
2024-11-26
Estimated Expiration
2034-04-07

AI Technical Summary

Technical Problem

During the construction of concrete prefabricated cable trench, it is difficult for workers to ensure that the distance between concrete prefabricated cable trench and underground concrete wall is consistent, resulting in the gradually tilted cable trench, affecting the quality of cable laying in the later stage.

Method used

A concrete prefabricated cable trench positioning construction device is designed, including clamps, ruler, ruler positioning device and threaded block. The positioning plate is positioned with the outer wall of the underground concrete wall, and the positioning cylinder and latch are used to adjust the position of the ruler, combined with Rubber pads and telescopic springs ensure straight installation of the cable trench.

Benefits of technology

It effectively ensures the linear installation of concrete prefabricated cable trench, improves construction quality, facilitates the installation and construction of later cables, and avoids the difficulty of precision control of manual adjustment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065555U_ABST
    Figure CN222065555U_ABST
Patent Text Reader

Abstract

The utility model discloses a positioning construction device for a concrete prefabricated cable trench. The positioning construction device comprises a clamping block, a ruler plate, a ruler plate positioning device and a threaded block, the clamping block comprises a first clamping plate, a second clamping plate and a middle connecting part, and the first clamping plate and the second clamping plate are connected into a whole through the middle connecting part; a space between the first clamping plate and the second clamping plate is used for clamping a concrete prefabricated cable trench; one side of the ruler plate is fixedly connected with a positioning plate, and the other side of the ruler plate is fixed with a limiting block; a strip-shaped hole for the ruler plate to pass through is formed in the middle connecting part of the clamping block; the ruler plate positioning device is arranged between the ruler plate and the clamping block; an internal thread is arranged in the threaded block, a through hole is formed in a second clamping plate of the clamping block, the threaded block is fixedly connected with the outer side of the second clamping plate, and a threaded hole of the threaded block and the through hole are coaxially formed; the threaded column is provided with an external thread corresponding to the internal thread of the threaded block. After construction is completed, it can be guaranteed that the concrete prefabricated cable trench is in a straight line, construction quality is improved, and later cable installation and construction are facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of concrete prefabricated cable trench construction auxiliary equipment, in particular to a concrete prefabricated cable trench positioning construction device. Background Art

[0002] Cable trench refers to the trench or pipe dug for laying various cables such as power, communication, and network. There are rectangular, circular, arched and other pipeline structures. Cable trenches are usually used for laying cables in buildings, factories, roads, bridges and other places to protect cables and facilitate maintenance. Cable trenches can be dug manually, mechanically or drilled. During the construction process, attention should be paid to keeping the trench wall flat and firm to ensure the safe laying of cables. The current construction process of cable trenches includes trench excavation and installation of prefabricated concrete parts, as well as earth backfilling and other processes.

[0003] After the trench excavation is completed, the trench adjacent to the underground concrete wall needs to be laid through a prefabricated concrete cable trench. Due to the long trench excavation length, it is difficult for workers to ensure that the spacing distance between the prefabricated concrete cable trench and the underground concrete wall is consistent when laying the prefabricated concrete cable trench, causing the prefabricated concrete cable trench to gradually tilt, affecting the later laying of cables. Utility Model Content

[0004] The utility model aims to provide a positioning construction device for a concrete prefabricated cable trench.

[0005] The utility model solves the above-mentioned technical problems with the following technical solutions: a kind of concrete prefabricated cable trench positioning construction device, comprising: a clamping block, a ruler plate, a ruler plate positioning device and a threaded block; the clamping block comprises a first clamping plate, a second clamping plate and an intermediate connecting portion, the intermediate connecting portion connects the first clamping plate and the second clamping plate into a whole; the space between the first clamping plate and the second clamping plate is used to clamp the concrete prefabricated cable trench; the surface of the ruler plate is provided with scale lines; one side of the ruler plate is fixedly connected to the positioning plate, and the other side of the ruler plate is fixed with a limit block; a strip hole for the ruler plate to pass through is provided on the intermediate connecting portion of the clamping block; the ruler plate positioning device is installed between the ruler plate and the clamping block, and is used to fix the relative position of the ruler plate and the clamping block; an internal thread is provided in the threaded block, the second clamping plate of the clamping block is provided with a through hole, the threaded block is fixedly connected to the outer side of the second clamping plate, and the threaded hole of the threaded block is coaxially arranged with the through hole; the threaded column is provided with an external thread corresponding to the internal thread of the threaded block.

[0006] The utility model is a concrete prefabricated cable trench positioning construction device as described above, further, the ruler plate positioning device includes a fixed block, a telescopic cylinder, a connecting block and a pin; the fixed block is connected to the middle connecting part of the clamping block, one end of the telescopic cylinder is connected to the fixed block, and the other end of the telescopic cylinder is connected to the connecting block, and a first socket is provided on the connecting block; a second socket is provided at an interval at a corresponding position of the ruler plate, and the pin is inserted into the first socket and the second socket to realize the positioning of the ruler plate.

[0007] The utility model is a concrete prefabricated cable trench positioning construction device as described above, further, the middle connecting portion of the ruler plate is provided with a groove for installing a fixing block; the number of the grooves and the number of the ruler plate positioning devices are both two.

[0008] The concrete prefabricated cable trench positioning construction device of the utility model as described above further includes a telescopic spring, the telescopic spring abuts against the positioning plate of the ruler plate, and the other end of the spring abuts against the first clamping plate of the clamping block.

[0009] The utility model provides the concrete prefabricated cable trench positioning construction device as described above, further, the number of the telescopic springs is two to four, and at least one end of the telescopic spring is fixedly connected to the ruler plate or the clamping block.

[0010] The concrete prefabricated cable trench positioning construction device of the utility model further comprises a rubber pad, which is arranged between the concrete prefabricated cable trench and the threaded column.

[0011] The prefabricated concrete cable trench is hoisted by hand or hoisting equipment and installed in the excavated trench. During the installation process, the positioning plate and the outer wall of the underground concrete wall can be used for positioning, so as to conveniently determine the distance between the prefabricated concrete cable trench and the underground concrete wall, and finally the gap between the prefabricated concrete cable trench and the underground concrete wall is backfilled with earthwork. After the construction is completed, the prefabricated concrete cable trench can be guaranteed to be in a straight line, which improves the construction quality and facilitates the installation of cables in the later stage. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] The above and / or other advantages of the present invention will become clearer and easier to understand through the detailed description made in conjunction with the following drawings, which are only schematic and do not limit the present invention, wherein:

[0013] Figure 1 A three-dimensional schematic diagram of a concrete prefabricated cable trench positioning construction device according to an embodiment;

[0014] Figure 2 It is a schematic diagram of an upper perspective of a concrete prefabricated cable trench positioning construction device according to an embodiment;

[0015] Figure 3 A schematic diagram of a bottom perspective of a concrete prefabricated cable trench positioning construction device according to an embodiment;

[0016] Figure 4 A schematic diagram of a disassembled state of a concrete prefabricated cable trench positioning construction device according to an embodiment.

[0017] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0018] 1. Prefabricated concrete cable trench; 2. Clamp block; 21. Rubber pad; 22. Fixed block; 3. Telescopic cylinder; 31. Connecting block; 4. Latch; 5. Ruler plate; 51. Limit block; 52. Positioning plate; 6. Telescopic spring; 7. Threaded column; 71. Screw head; 8. Threaded block. DETAILED DESCRIPTION

[0019] Hereinafter, an embodiment of the concrete prefabricated cable trench positioning construction device of the present invention will be described with reference to the accompanying drawings.

[0020] The embodiments described herein are specific embodiments of the present invention, which are used to illustrate the concept of the present invention, are explanatory and exemplary, and should not be interpreted as limiting the embodiments of the present invention and the scope of the present invention. In addition to the embodiments described herein, those skilled in the art can also adopt other obvious technical solutions based on the claims and the contents disclosed in the specification of this application, including technical solutions that adopt any obvious replacement and modification of the embodiments described herein.

[0021] The drawings of this specification are schematic diagrams, which assist in explaining the concept of the utility model and schematically show the shapes of various parts and their mutual relationships. Please note that in order to clearly show the structure of various components of the embodiments of the utility model, the drawings are not drawn according to the same scale. The same reference numerals are used to represent the same parts.

[0022] For the construction of prefabricated concrete cable trenches adjacent to underground concrete walls, it is necessary to first excavate trenches at a predetermined interval (e.g., 20 cm). The size of the excavated trenches should be slightly larger than that of the prefabricated concrete cable trenches. Figure 1As shown, the concrete prefabricated cable trench is a П-shaped structure, that is, it includes a first side wall, a second side wall and a connecting portion. For the subsequent installation and construction of the cable, the concrete prefabricated cable trench needs to be installed facing upwards, and at this time, one of the first side wall or the second side wall needs to be installed parallel to the underground concrete wall that has been completed. Since the concrete prefabricated cable trench is a segmented prefabricated structure, such as prefabricated with a length of 60 cm to 200 cm. Due to the long trench excavation length, it is difficult for workers to ensure that the spacing distance between the concrete prefabricated cable trench and the underground concrete wall is consistent when they are embedding the concrete prefabricated cable trench, resulting in the problem that the concrete prefabricated cable trench gradually tilts, affecting the laying of the cables in the later stage. In order to solve the above problems, the utility model provides a concrete prefabricated cable trench positioning construction device in the following embodiments.

[0023] Figures 1 to 4 A concrete prefabricated cable trench positioning construction device according to an embodiment of the utility model is shown, which comprises:

[0024] The clamp block 2 includes a first clamp plate, a second clamp plate and an intermediate connecting portion, wherein the intermediate connecting portion connects the first clamp plate and the second clamp plate into a whole; the space between the first clamp plate and the second clamp plate is used to clamp the prefabricated concrete cable trench 1 (i.e., clamp the first side wall of the prefabricated concrete cable trench 1); the material of the clamp block can be hard plastic or metal (stainless steel, etc.).

[0025] Ruler board 5, such as Figure 2 and Figure 4 As shown, the ruler plate is a rectangular structure; the upper surface of the ruler plate 5 is provided with scale lines, preferably with size scale lines spaced 1 mm apart; one side of the ruler plate 5 is fixedly connected to the positioning plate 52, and the other side of the ruler plate 5 is fixed with a limit block 51; a strip hole for the ruler plate 5 to pass through is provided on the middle connecting portion of the clamping block 2; the above-mentioned ruler plate is installed in the strip hole of the clamping block and can be adjusted in a linear direction; the function of the limit block is to limit the ruler plate by contacting with the outer side of the concrete wall; the function of the limit block is to prevent the ruler plate from falling off when being adjusted in the strip hole.

[0026] The ruler plate positioning device is installed between the ruler plate 5 and the clamping block 2, and is used to fix the relative position of the ruler plate 5 and the clamping block 2; the above-mentioned ruler plate positioning device can be a fixing bolt, and a screw hole is set at the position of the corresponding strip hole of the clamping block. By utilizing the cooperation between the fixing bolt and the screw hole, when the fixing bolt is screwed into the screw hole, the position of the ruler plate is fixed by the contact between the fixing screw and the ruler plate.

[0027] The thread block 8 has an internal thread, the second clamping plate of the clamping block 2 has a through hole, the thread block 8 is fixedly connected to the outer side of the second clamping plate, and the threaded hole of the thread block 8 is coaxially arranged with the through hole; the threaded column 7 has an external thread corresponding to the internal thread of the thread block 8. Figure 3 and Figure 4In a preferred embodiment shown, a screwing head 71 is provided at the end of the threaded column 7, so that the threaded column can be easily selected by fingers. In a further preferred embodiment, a rubber pad 21 is also included, and the rubber pad 21 is arranged between the prefabricated concrete cable trench 1 and the threaded column 7. The arrangement of the rubber pad can prevent the prefabricated concrete cable trench from being squeezed and damaged by the threaded column.

[0028] Since the weight of the prefabricated concrete cable trench can usually reach tens of kilograms, it is difficult to move it and position it at a predetermined position with the underground concrete wall when manually laying it. When using the above-mentioned concrete prefabricated cable trench positioning construction device of the utility model for construction, first adjust the position of the ruler plate on the clamping block according to the designed spacing between the underground concrete wall and the concrete prefabricated cable trench, and fix it using the ruler plate positioning device. Then use the clamping block to install the concrete prefabricated cable trench positioning construction device to the first side wall of the concrete prefabricated cable trench, and use the threaded block and the threaded column to fix the clamping block. The concrete prefabricated cable trench is hoisted by hand or hoisting equipment and installed in the excavated trench. Since the positioning plate and the outer wall of the underground concrete wall can be used for positioning during the installation process, the distance between the concrete prefabricated cable trench and the underground concrete wall can be conveniently determined, and finally the gap between the concrete prefabricated cable trench and the underground concrete wall can be backfilled with earthwork. After the construction is completed, the concrete prefabricated cable trench can be guaranteed to be in a straight line, which improves the construction quality and facilitates the installation and construction of the cable in the later stage.

[0029] In such Figures 2 to 4 In a preferred embodiment of the concrete prefabricated cable trench positioning construction device, the ruler plate positioning device includes a fixed block 22, a telescopic cylinder 3, a connecting block 31 and a latch 4; the fixed block 22 is connected to the middle connecting portion of the clamping block 2, one end of the telescopic cylinder 3 is connected to the fixed block 22, and the other end of the telescopic cylinder 3 is connected to the connecting block 31, and the connecting block 31 is provided with a first plug hole; the corresponding position of the ruler plate 5 is provided with a second plug hole set at intervals, and the latch 4 is inserted into the first plug hole and the second plug hole to realize the positioning of the ruler plate 5. For example, the fixed block 22 is fixedly connected to the middle connecting portion of the clamping block 2, or a detachable connection is realized by providing a groove for installing the fixed block 22 in the middle connecting portion of the ruler plate 5. Figure 2In the embodiment, the number of grooves is two, and the number of corresponding ruler plate positioning devices is two, so that the ruler plate rotation displacement problem caused by fixing the ruler plate on one side can be avoided. Through the improvement of the above embodiment, when it is necessary to adjust the spacing distance between the precast concrete cable trench and the underground concrete wall, it is necessary to adjust the fixed position of the ruler plate. First, unplug the pin, run the telescopic cylinder to a suitable position and insert the pin there to fix the ruler plate position. In addition, after the precast concrete cable trench is placed in the groove but its position needs to be adjusted away from the underground concrete wall, the cylinder can be started to move the ruler plate, and the precast concrete cable trench is pushed to move by the action of the positioning plate and the underground concrete wall, which can avoid manual adjustment and the adjustment accuracy is easy to control.

[0030] Combination Figures 2 to 4 As shown, in a preferred embodiment of the concrete prefabricated cable trench positioning construction device, it also includes a telescopic spring 6, the telescopic spring 6 abuts against the positioning plate 52 of the ruler 5, and the other end of the spring abuts against the first clamping plate of the clamping block 2. The setting of the telescopic spring can make the ruler automatically return to its original position when the pin is pulled out. In a specific embodiment, the number of the telescopic springs 6 is two to four, and at least one end of the telescopic spring 6 is fixedly connected to the ruler 5 or the clamping block 2. Figure 3 In the embodiment, there are two telescopic springs 6, and two ends of the telescopic spring 6 are fixedly connected to the ruler plate 5 and the clamping block 2 respectively.

[0031] The technical features disclosed above are not limited to the disclosed combinations with other features. Those skilled in the art may also make other combinations between the technical features according to the purpose of the utility model to achieve the purpose of the utility model.

Claims

1. A concrete prefabricated cable trench positioning construction device, characterized in that: include: A clamping block (2), a ruler (5), a ruler (5) positioning device and a threaded block (8); the clamping block (2) comprises a first clamping plate, a second clamping plate and an intermediate connecting portion, the intermediate connecting portion connecting the first clamping plate and the second clamping plate into a whole; the space between the first clamping plate and the second clamping plate is used to clamp the concrete prefabricated cable trench (1); scale lines are provided on the surface of the ruler (5); one side of the ruler (5) is fixedly connected to a positioning plate (52), and the other side of the ruler (5) is fixed to a limit block (51); in the middle of the clamping block (2), a positioning plate (52) is fixedly connected to the ruler (5), and a limit block (51) is fixedly connected to the ruler (5). The intermediate connecting portion is provided with a strip-shaped hole for the ruler (5) to pass through; the ruler (5) positioning device is installed between the ruler (5) and the clamping block (2) and is used to fix the relative position of the ruler (5) and the clamping block (2); the threaded block (8) is provided with an internal thread, the second clamping plate of the clamping block (2) is provided with a through hole, the threaded block (8) is fixedly connected to the outer side of the second clamping plate, and the threaded hole of the threaded block (8) is coaxially arranged with the through hole; the threaded column (7) is provided with an external thread corresponding to the internal thread of the threaded block (8).

2. The concrete prefabricated cable trench positioning construction device according to claim 1 is characterized in that: The ruler plate (5) positioning device comprises a fixed block (22), a telescopic cylinder (3), a connecting block (31) and a latch (4); the fixed block (22) is connected to the middle connecting portion of the clamping block (2), one end of the telescopic cylinder (3) is connected to the fixed block (22), and the other end of the telescopic cylinder (3) is connected to the connecting block (31); a first plug hole is provided on the connecting block (31); a second plug hole is provided at a spacing at a corresponding position of the ruler plate (5), and the latch (4) is inserted into the first plug hole and the second plug hole to realize the positioning of the ruler plate (5).

3. The concrete prefabricated cable trench positioning construction device according to claim 2 is characterized in that: The middle connecting portion of the ruler plate (5) is provided with a groove for installing a fixing block (22); the number of the grooves and the number of the positioning devices of the ruler plate (5) are both two.

4. The concrete prefabricated cable trench positioning construction device according to claim 3 is characterized in that: It also includes a telescopic spring (6), the telescopic spring (6) abuts against the positioning plate (52) of the ruler plate (5), and the other end of the spring abuts against the first clamping plate of the clamping block (2).

5. The concrete prefabricated cable trench positioning construction device according to claim 4 is characterized in that: The number of the telescopic springs (6) is two to four, and at least one end of the telescopic spring (6) is fixedly connected to the ruler plate (5) or the clamping block (2).

6. The concrete prefabricated cable trench positioning construction device according to claim 1 is characterized in that: It also comprises a rubber pad (21), wherein the rubber pad (21) is arranged between the prefabricated concrete cable trench (1) and the threaded column (7).