Drainage structure for landscape greening

By using diversion blocks, fixing screws, baffles, drainage tanks and other components in the landscape greening drainage structure, the problem of soil erosion caused by excessive rainwater flow rate is solved, and the beauty, life, and drainage efficiency of landscape greening are achieved.

CN222065699UActive Publication Date: 2024-11-26HAINAN JIUFUCHANG CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420708592.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-08
Publication Date
2024-11-26
Estimated Expiration
2034-04-08

AI Technical Summary

Technical Problem

The existing landscape greening drainage structure cannot slow down the flow rate during rainwater washing, resulting in aggravation of soil erosion, affecting the beauty and life of landscape greening, and may cause blockage of the drainage system and reduce drainage efficiency.

Method used

A drainage structure including flow guide blocks, fixing screws, baffles, drainage tanks, drainage manhole covers, pebbles layers, connecting pipes and auxiliary drainage pipes are designed to slow down the rainwater flow rate through flow guide blocks and baffles, drainage manhole covers and pebbles layers. Filter debris, connect pipes to drain in sections, and landslide design improves drainage efficiency.

Benefits of technology

Effectively reduce soil erosion, extend the life of landscape greening, improve aesthetics, reduce manual maintenance costs, improve drainage efficiency, and prevent system blockage and flooding.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065699U_ABST
    Figure CN222065699U_ABST
Patent Text Reader

Abstract

The utility model provides a drainage structure for landscape greening, which relates to the technical field of drainage for landscape greening and comprises a drainage structure body, a plurality of flow guide blocks are arranged at the top of the drainage structure body, fixing screws are mounted at the tops of the flow guide blocks in a threaded manner, and baffles are fixedly connected to the tops of the flow guide blocks. The flow guide block is fixed to the drainage structure body through the fixing screws, the flow limiting area is enlarged, the flow speed during rainwater washing is reduced, water and soil loss is reduced, the greening area can be protected through the baffles, large-range soil loss caused by washing is prevented, the service life of landscape greening is prolonged, the attractiveness of the landscape greening structure is improved, and the service life of the landscape greening structure is prolonged. The rainwater is differentiated through the drainage well lid and the cobblestone layer, the situation that the drainage system is blocked due to the fact that the rainwater carries large-size sundries is prevented, and therefore the drainage efficiency is improved, the manual overhaul difficulty is reduced, and the labor cost is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of landscape greening drainage, in particular to a landscape greening drainage structure. Background Art

[0002] Greening refers to the planting of shelterbelts, roadside trees, crops, and various plants in residential areas and parks. Greening includes national greening, urban greening, greening of four sides, and greening of roads. Greening can improve environmental sanitation and play a variety of roles in maintaining ecological balance. When arranging certain landscape greening, a separate drainage structure is required for supporting use.

[0003] When the existing landscape greening drainage structure is in use, it usually discharges the washed rainwater quickly through the drainage trough. However, the existing drainage structure cannot slow down the flow rate of rainwater during washing, which aggravates the soil erosion of the landscape greening, thus affecting the beauty and life of the landscape greening. In addition, soil erosion can easily cause the drainage system to be blocked, thus affecting the drainage efficiency. Utility Model Content

[0004] The purpose of the utility model is to solve the problem that the existing technology cannot slow down the flow rate of rainwater scouring, which leads to the aggravation of soil erosion in landscape greening, thus affecting the beauty and life of landscape greening, and soil erosion easily causes clogging of the drainage system, thereby affecting the drainage efficiency, and proposes a drainage structure for landscape greening.

[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical solution: a drainage structure for landscaping, including a drainage structure body, a plurality of guide blocks are arranged on the top of the drainage structure body, fixing screws are threadedly installed on the top of the guide blocks, and a baffle is fixedly connected to the top of the guide block.

[0006] Preferably, a drainage groove is provided on the top of the drainage structure body, a drainage manhole cover is provided on the top of the drainage groove, and a pebble layer is laid on the top of the drainage manhole cover.

[0007] Preferably, one end of the drainage trough is connected to a plurality of connecting pipes, and one end of the connecting pipe is fixedly connected to an auxiliary drainage pipe.

[0008] Preferably, a plurality of greening clusters are arranged on the top of the drainage structure body, and a partition fence is arranged on the side close to the plurality of greening clusters.

[0009] Preferably, a landslide is provided on the top of the drainage structure body, and the angle of the landslide is always greater than 45°.

[0010] Preferably, the guide blocks and baffles are both arranged on the drainage side of the greening bush.

[0011] Preferably, the connecting pipe and the auxiliary drainage pipe are both arranged on the inner side of the drainage structure body.

[0012] Compared with the prior art, the advantages and positive effects of the utility model are:

[0013] 1. In the utility model, a guide block, fixing screws and a baffle are provided. When in use, the guide block is fixed to the drainage structure body by the fixing screws, so as to expand the flow limit area, slow down the flow rate during rainwater scouring, and reduce soil erosion. The baffle can protect the greening area to prevent scouring and causing large-scale soil loss, thereby extending the life of the landscape greening, improving its aesthetics, saving subsequent labor maintenance costs, and preventing the drainage system from being blocked.

[0014] 2. In the utility model, by providing a drainage trough, a drainage manhole cover and a pebble layer, when in use, rainwater is separated by the drainage manhole cover and the pebble layer to prevent rainwater from carrying large volumes of debris and causing clogging of the drainage system, thereby improving drainage efficiency, reducing the difficulty of manual maintenance, and saving labor costs. Straight-line drainage can be achieved through the drainage trough, effectively improving drainage efficiency, and ensuring the simplicity and beauty of the drainage structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 A three-dimensional structural diagram of a drainage structure for landscaping is proposed for the utility model;

[0016] Figure 2 A schematic diagram of one side structure of a drainage structure for landscaping is provided for the utility model;

[0017] Figure 3 A schematic diagram of the auxiliary drainage pipe structure of a drainage structure for landscaping is proposed for the utility model;

[0018] Figure 4 The utility model provides a schematic diagram of the structure of a diversion block of a drainage structure for landscaping.

[0019] Legend: 1. Drainage structure body; 2. Guide block; 3. Fixing screws; 4. Baffle; 5. Drainage trough; 6. Drainage manhole cover; 7. Pebble layer; 8. Greening bush; 9. Dividing fence; 10. Landslide; 11. Connecting pipe; 12. Auxiliary drainage pipe. DETAILED DESCRIPTION

[0020] In order to more clearly understand the above-mentioned purpose, features and advantages of the utility model, the utility model is further described below in conjunction with the accompanying drawings and embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.

[0021] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments of the following disclosure.

[0022] Example 1

[0023] like Figure 1-Figure 4 As shown, the utility model provides a technical solution: a drainage structure for landscaping, comprising a drainage structure body 1, a plurality of guide blocks 2 are arranged on the top of the drainage structure body 1, a fixing screw 3 is threadedly installed on the top of the guide block 2, and a baffle 4 is fixedly connected to the top of the guide block 2.

[0024] In this embodiment, the guide block 2 is fixed to the drainage structure body 1 by fixing screws 3, so as to expand the flow limit area, slow down the flow rate of rainwater during scouring, and reduce soil erosion. The baffle 4 can protect the green area to prevent scouring and large-scale soil loss, thereby extending the life of the landscape greening, improving its aesthetics, saving subsequent labor maintenance costs, and preventing the drainage system from being blocked.

[0025] Example 2

[0026] like Figure 1-Figure 4 As shown, a drainage ditch 5 is provided on the top of the drainage structure body 1, a drainage manhole cover 6 is arranged on the top of the drainage ditch 5, a pebble layer 7 is laid on the top of the drainage manhole cover 6, one end of the drainage ditch 5 is connected to a plurality of connecting pipes 11, one end of the connecting pipe 11 is fixedly connected to an auxiliary drainage pipe 12, a plurality of greening clusters 8 are provided on the top of the drainage structure body 1, a dividing fence 9 is provided on the side close to the plurality of greening clusters 8, a landslide 10 is provided on the top of the drainage structure body 1, and the angle of the landslide 10 is always greater than 45°, the guide block 2 and the baffle 4 are both arranged on the drainage side of the greening cluster 8, and the connecting pipe 11 and the auxiliary drainage pipe 12 are both arranged on the inner side of the drainage structure body 1.

[0027] In this embodiment, rainwater is differentiated by the drainage manhole cover 6 and the pebble layer 7 to prevent rainwater from carrying large-volume debris and causing blockage of the drainage system, thereby improving drainage efficiency, reducing the difficulty of manual maintenance, and saving labor costs. The drainage trough 5 can achieve linear drainage, effectively improving drainage efficiency, and ensuring the simplicity and beauty of the drainage structure. The greening clusters 8 can be separated by the dividing fence 9 to maintain the cleanliness of the landscape. The connecting pipe 11 can be used to make rainwater with excessive runoff flow in sections to be discharged to the auxiliary drainage pipe 12, thereby reducing the drainage pressure of the drainage trough 5 and preventing waterlogging. The slope of the landslide 10 can make the drainage trough 5 at a lower position, so that rainwater can quickly flow from the greening cluster 8 to the drainage trough 5, thereby improving drainage efficiency and preventing rainwater backflow.

[0028] The working principle of this embodiment is as follows: when in use, firstly tighten the fixing screws 3 to fix the guide block 2 and the baffle 4 on the drainage side of the greening cluster 8, and then lay the pebble layer 7 on the drainage manhole cover 6. When rainwater rushes out from the greening cluster 8, it first contacts the guide block 2 to slow down the flow rate and prevent large-scale soil erosion. Then, the rainwater washes down from the landslide 10 with debris, passes through the drainage manhole cover 6 and the pebble layer 7 to filter out the debris, and enters the drainage trough 5 for discharge. Finally, when the water level line inside the drainage trough 5 rises, part of the rainwater flows from the connecting pipe 11 to the auxiliary drainage pipe 12 for discharge, thereby reducing the drainage pressure and preventing waterlogging.

[0029] The above description is only a preferred embodiment of the present invention and does not limit the present invention in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. A drainage structure for landscaping, comprising a drainage structure body (1), Features: A plurality of guide blocks (2) are arranged on the top of the drainage structure body (1); fixing screws (3) are threadedly installed on the top of the guide blocks (2); and a baffle (4) is fixedly connected to the top of the guide blocks (2).

2. The drainage structure for landscaping according to claim 1, Features: A drainage groove (5) is provided on the top of the drainage structure body (1), a drainage manhole cover (6) is provided on the top of the drainage groove (5), and a pebble layer (7) is laid on the top of the drainage manhole cover (6).

3. The drainage structure for landscaping according to claim 2, Features: One end of the drainage trough (5) is connected to a plurality of connecting pipes (11), and one end of the connecting pipe (11) is fixedly connected to an auxiliary drainage pipe (12).

4. The drainage structure for landscaping according to claim 1, Features: A plurality of greening clusters (8) are arranged on the top of the drainage structure body (1), and a partition fence (9) is arranged on one side close to the plurality of greening clusters (8).

5. The drainage structure for landscaping according to claim 1, Features: A landslide (10) is arranged on the top of the drainage structure body (1), and the angle of the landslide (10) is always greater than 45°.

6. The drainage structure for landscaping according to claim 1, Features: The guide block (2) and the baffle plate (4) are both arranged on the drainage side of the greening bush (8).

7. The drainage structure for landscaping according to claim 3, Features: The connecting pipe (11) and the auxiliary drainage pipe (12) are both arranged on the inner side of the drainage structure body (1).

Citation Information

Cited By

  • Drainage structure for landscape greening

    CN224395713U