Flood control and drainage pump station structure for river channel

By using extended screws and clamp structures to fix the connecting pipes in the flood control and drainage pump station for river channels, and installing wires to cut sludge in the reinforced pipes, the problem of the connection pipes falling off and blocking during water pipes is solved, and the working efficiency and equipment stability are improved sex.

CN222065744UActive Publication Date: 2024-11-26FUYANG YINGQUAN WATER CONSERVANCY CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420708951.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-08
Publication Date
2024-11-26
Estimated Expiration
2034-04-08

AI Technical Summary

Technical Problem

During urbanization construction, the height of the sides of some rivers is high, which makes the water pipe unable to enter the water. The internal pressure of the water pipe is high when pumping water, which can easily cause the connecting pipe to fall off the water pipe, affecting work efficiency.

Method used

A flood control and drainage pump station structure for river channels is designed, and the connecting pipe is fixed with extended screws and clamps. The stability of the connecting pipe is increased by locking the adjusting rods and bolts, and iron wire is installed in the reinforcement pipe to cut sludge, reducing the Risk of blockage.

Benefits of technology

It effectively avoids the connection pipe falling off during the pumping process, reduces the possibility of water pipe blockage, and improves the working efficiency and service life of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065744U_ABST
    Figure CN222065744U_ABST
Patent Text Reader

Abstract

The utility model discloses a flood control and drainage pump station structure for a river channel, and belongs to the technical field of flood control and drainage, the flood control and drainage pump station structure comprises a base and a lengthened screw rod, a box body is fixedly arranged at the top end of the base, a water pump is arranged in the box body, a drainage pipe is fixedly connected to one side of the water pump, and a water pipe is fixedly connected to the side, away from the drainage pipe, of the water pump; by sliding the adjusting rod on the fixing cylinder, the adjusting rod can drive the second clamp to move until the second clamp is attached to the outer wall of one side of the connecting pipe, then the bolt is rotated clockwise, the adjusting rod is locked, the position of the second clamp can be fixed, and then the first clamp is clamped to the other side of the connecting pipe. The first clamping hoop and the second clamping hoop are fixed through the lengthened screw rod, the connecting pipe can be reinforced under the action of the fixing cylinder and the adjusting rod, shaking generated when the connecting pipe conveys water can be reduced, and the situation that the connecting pipe falls off from a water pipe is avoided as much as possible.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of flood control and drainage, and in particular to a flood control and drainage pump station structure for a river. Background Art

[0002] With the progress and development of society, urbanization is developing more and more rapidly. In the process of urbanization construction, urban drainage is an extremely important task. When in use, the drainage pump station directly puts the water pipe into the river and uses the water pump to pump water for drainage.

[0003] The banks on both sides of some rivers are too high to allow water pipes to enter underwater. A connecting pipe needs to be connected again to extract water from the river. However, when the water pipe is pumping water, a large pressure will be generated inside, which may easily cause the connecting pipe to fall off the water pipe, affecting work efficiency. Therefore, a flood control and drainage pump station structure for rivers is needed to solve the above problems. Utility Model Content

[0004] The present application proposes a flood control and drainage pump station structure for rivers to solve the problem in the above-mentioned background technology that when pumping water through a water pipe, a large internal pressure will be generated, which may easily cause the connecting pipe to fall off the water pipe and affect work efficiency.

[0005] In order to achieve the above purpose, this application adopts the following technical solutions:

[0006] The top end of the water pump is fixedly provided with a box body, and a water pump is arranged inside the box body. One side of the water pump is fixedly connected with a drainage pipe, and the drainage pipe is penetrated to the outside of the top end of the box body, and the side of the water pump away from the drainage pipe is fixedly connected with a water pipe, and the water pipe is penetrated to the outside of one side of the box body, and the bottom end of the water pipe is threadedly connected with a connecting pipe, and the outer walls of both sides of the connecting pipe are respectively clamped and connected with a first clamp and a second clamp, and the outer walls of both sides of the first clamp and the second clamp are threadedly connected by the extended screw. The bottom end of the base is fixedly provided with a fixing plate, and the fixing plate is located on a side of the connecting pipe close to the base, and the fixing plate is located on a side outer wall of the connecting pipe, and an adjusting rod is slidably arranged inside the fixing tube, and a bolt is threadedly penetrated at the top end of the fixing tube, and the bolt abuts against the adjusting rod, and the adjusting rod is fixedly connected with the second clamp.

[0007] By adopting the above technical solution, the adjusting rod can be slid on the fixed tube to drive the second clamp to move until the second clamp is attached to the outer wall of one side of the connecting pipe, and then the bolt is turned clockwise to lock the adjusting rod. After that, the first clamp is clamped to the other side of the connecting pipe, and the first clamp and the second clamp are fixed by extending the screw, so that the connecting pipe can be reinforced, the shaking generated when the connecting pipe transports water can be reduced, and the situation where the connecting pipe falls off the water pipe is avoided as much as possible.

[0008] As a preferred embodiment, a reinforcing pipe is threadedly connected to the bottom end of the connecting pipe, and an iron wire is fixedly provided inside the water inlet of the reinforcing pipe.

[0009] By adopting the above technical solution, when the sludge block is sucked into the reinforced pipe, it can be cut by the iron wire to avoid clogging the water pipe as much as possible.

[0010] As a preferred implementation, the reinforcement pipe is an L-shaped structure.

[0011] By adopting the above technical solution, it is possible to avoid directly inserting the reinforcement pipe into the silt as much as possible, thereby reducing the possibility of clogging the water pipe.

[0012] As a preferred embodiment, the first clamp and the second clamp are both semicircular structures, and the inner walls of the first clamp and the second clamp are respectively tightly attached to the outer walls on both sides of the connecting pipe.

[0013] By adopting the above technical solution, the gap between the first clamp, the second clamp and the connecting pipe can be reduced.

[0014] As a preferred implementation, rubber pads are fixed to opposite sides of the first clamp and the second clamp by means of waterproof adhesive.

[0015] By adopting the above technical solution, the rubber pad can reduce the wear of the first clamp and the second clamp on the connecting pipe, and can extend its service life.

[0016] As a preferred implementation, fixing frames are fixedly provided on both sides of the fixing tube, and fastening screws are threadedly penetrated through the fixing frames, and the fastening screws are threadedly connected to the fixing plates.

[0017] By adopting the above technical solution, the firmness of the installation of the fixing tube can be increased through the cooperation of the fixing frame and the fastening screws.

[0018] As a preferred embodiment, four support columns are fixedly provided at the bottom end of the base, and the bottom ends of the four support columns are all provided with universal self-locking wheels.

[0019] By adopting the above technical solution, the flexibility of the base movement can be increased.

[0020] As a preferred embodiment, a handle is fixedly provided on the outer wall of the base at one side away from the connecting pipe.

[0021] By adopting the above technical solution, the base can be pushed more flexibly through the handle.

[0022] Beneficial effects of this application:

[0023] 1. By sliding the adjusting rod on the fixed tube, the adjusting rod can drive the second clamp to move until the second clamp fits against the outer wall of one side of the connecting pipe, and then the bolt is turned clockwise to lock the adjusting rod, so that the position of the second clamp can be fixed. Then, the first clamp is clamped on the other side of the connecting pipe, and the first clamp and the second clamp are fixed by the lengthening screw. Under the action of the fixed tube and the adjusting rod, the connecting pipe can be reinforced, which can reduce the shaking of the connecting pipe when conveying water, and avoid the situation that the connecting pipe falls off from the water pipe as much as possible;

[0024] 2. By installing the L-shaped reinforcement pipe at the bottom of the connecting pipe, the connecting pipe can be avoided from being directly inserted into the silt, reducing the possibility of water pipe blockage. In addition, under the action of the iron wire, large pieces of silt entering the reinforcement pipe can be cut, further reducing the possibility of water pipe blockage. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 This is a schematic diagram of the internal structure of this application;

[0026] Figure 2 This is a schematic diagram of the installation structure of the first clamp and the second clamp of the present application;

[0027] Figure 3 It is a side view schematic diagram of the reinforcement tube of the present application.

[0028] Description of reference numerals:

[0029] 1. Water pump; 2. Drain pipe; 3. Box; 4. Handle; 5. Support column; 6. Universal self-locking wheel; 7. Base; 8. Fixing plate; 9. Fixing frame; 10. Fastening screw; 11. Fixing cylinder; 12. Bolt; 13. Adjusting rod; 14. Reinforcement pipe; 15. First clamp; 16. Second clamp; 17. Extension screw; 18. Water pipe; 19. Iron wire; 20. Rubber pad; 21. Connecting pipe. DETAILED DESCRIPTION

[0030] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments.

[0031] Reference Figure 1A flood control and drainage pump station structure for a river includes a base 7 and an extended screw 17. A box body 3 is fixedly arranged on the top of the base 7. A water pump 1 is arranged inside the box body 3. A drainage pipe 2 is fixedly connected to one side of the water pump 1. The drainage pipe 2 is passed through the top outside of the box body 3. A water pipe 18 is fixedly connected to the side of the water pump 1 away from the drainage pipe 2. The water pipe 18 is passed through the outside of one side of the box body 3. The bottom end of the water pipe 18 is threadedly connected with a connecting pipe 21. The connecting pipe 21 can increase the length of the water pipe 18, and the threaded connection facilitates the disassembly and installation of the connecting pipe 21.

[0032] Reference Figure 1 and Figure 2 The outer walls on both sides of the connecting pipe 21 are respectively engaged with the first clamp 15 and the second clamp 16. There are two groups of the first clamp 15 and the second clamp 16, which can improve the firmness of the installation of the connecting pipe 21. The outer walls on both sides of the first clamp 15 and the second clamp 16 are threadedly connected by an extension screw 17. A fixing plate 8 is fixedly provided at the bottom end of the base 7. The fixing plate 8 is located on the side of the connecting pipe 21 close to the base 7. The fixing plate 8 is located on the outer wall of one side of the connecting pipe 21. A fixing cylinder 11 is fixedly provided. An adjusting rod 13 is slidably provided inside the fixing cylinder 11. A bolt 12 is threadedly penetrated at the top end of the fixing cylinder 11. The bolt 12 abuts against the adjusting rod 13, and the adjusting rod 13 is fixedly connected to the second clamp 16.

[0033] Reference Figure 1 and Figure 3 The bottom end of the connecting pipe 21 is threadedly connected to the reinforcing pipe 14, and an iron wire 19 is fixed inside the water inlet of the reinforcing pipe 14. When the silt block is sucked into the reinforcing pipe 14, it can be cut by the iron wire 19 to avoid clogging the water pipe 18 as much as possible.

[0034] Reference Figure 1 The reinforcement pipe 14 is an L-shaped structure, which can avoid the reinforcement pipe 14 from being directly inserted into the silt as much as possible, thereby reducing the possibility of clogging the water pipe 18.

[0035] Reference Figure 2 The first clamp 15 and the second clamp 16 are both semicircular structures, and the inner walls of the first clamp 15 and the second clamp 16 are respectively tightly attached to the outer walls of both sides of the connecting pipe 21, which can improve the firmness of the connection between the first clamp 15 and the second clamp 16 and the connecting pipe 21.

[0036] Reference Figure 2 The first clamp 15 and the second clamp 16 are both fixed with a rubber pad 20 on one side opposite to the other by means of waterproof adhesive. The rubber pad 20 can reduce the wear of the first clamp 15 and the second clamp 16 on the connecting pipe 21 and extend its service life.

[0037] Reference Figure 1A fixing frame 9 is fixedly provided on both sides of the fixing tube 11, and a fastening screw 10 is threadedly passed through the fixing frame 9. The fastening screw 10 is threadedly connected to the fixing plate 8. Through the cooperation of the fixing frame 9 and the fastening screw 10, the firmness of the installation of the fixing tube 11 can be increased.

[0038] Reference Figure 1 Four support columns 5 are fixedly arranged at the bottom end of the base 7 , and universal self-locking wheels 6 are arranged at the bottom ends of the four support columns 5 , which can increase the flexibility of the movement of the base 7 .

[0039] Reference Figure 1 A handle 4 is fixedly provided on the outer wall of the base 7 away from the connecting pipe 21 , and two handles 4 are provided in total, so that the operator can push the base 7 more flexibly through the handle 4 .

[0040] Working principle: When in use, the operator can start the water pump 1 through the external power switch. The water pump 1 can extract river water under the action of the water pipe 18 and the connecting pipe 21, and drain the water through the drain pipe 2. The L-shaped reinforcement pipe 14 can avoid the connecting pipe 21 from being directly inserted into the silt as much as possible, reducing the situation of clogging the water pipe 18, and under the action of the iron wire 19, the large silt entering the reinforcement pipe 14 can be cut, further reducing the situation of clogging the water pipe 18. The operator can slide on the fixed cylinder 11 The adjusting rod 13 is used to drive the second clamp 16 to move until the second clamp 16 is attached to the outer wall of one side of the connecting pipe 21, and then the bolt 12 is turned clockwise to lock the adjusting rod 13 to fix the position of the second clamp 16. After that, the first clamp 15 is engaged with the other side of the connecting pipe 21, and the first clamp 15 and the second clamp 16 are fixed by extending the screw 17, which can reduce the shaking of the connecting pipe 21 when conveying water and avoid the connecting pipe 21 from falling off the water pipe 18 as much as possible.

[0041] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicating orientations or positional relationships are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0042] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0043] The above is only a preferred specific implementation manner of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can make equivalent substitutions or changes within the technical scope disclosed in the present application according to the technical solution and utility model concept of the present application, which should be covered by the protection scope of the present application.

Claims

1. A flood control and drainage pump station structure for a river, comprising a base (7) and an extended screw (17), Features: A box body (3) is fixedly arranged at the top of the base (7), a water pump (1) is arranged inside the box body (3), a drainage pipe (2) is fixedly connected to one side of the water pump (1), the drainage pipe (2) is passed through the top of the box body (3), a water pipe (18) is fixedly connected to the side of the water pump (1) away from the drainage pipe (2), the water pipe (18) is passed through the outside of one side of the box body (3), a connecting pipe (21) is threadedly connected to the bottom end of the water pipe (18), and the outer walls of both sides of the connecting pipe (21) are respectively clamped and connected to a first clamp (15) and a second clamp (16), the first clamp (15) ) and the outer walls on both sides of the second clamp (16) are threadedly connected by an extended screw (17); a fixing plate (8) is fixedly provided at the bottom end of the base (7); the fixing plate (8) is located on a side of the connecting tube (21) close to the base (7); a fixing cylinder (11) is fixedly provided on the outer wall of one side of the connecting tube (21); an adjusting rod (13) is slidably provided inside the fixing cylinder (11); a bolt (12) is threadedly passed through the top end of the fixing cylinder (11); the bolt (12) abuts against the adjusting rod (13); and the adjusting rod (13) is fixedly connected to the second clamp (16).

2. A flood control and drainage pump station structure for a river according to claim 1, Features: The bottom end of the connecting pipe (21) is threadedly connected to a reinforcing pipe (14), and an iron wire (19) is fixedly disposed inside the water inlet of the reinforcing pipe (14).

3. A flood control and drainage pump station structure for a river according to claim 2, Features: The reinforcement pipe (14) is an L-shaped structure.

4. A flood control and drainage pump station structure for a river according to claim 1, Features: The first clamp (15) and the second clamp (16) are both semicircular structures, and the inner walls of the first clamp (15) and the second clamp (16) are respectively tightly attached to the outer walls of both sides of the connecting pipe (21).

5. A flood control and drainage pump station structure for a river according to claim 4, Features: A rubber pad (20) is fixed to the opposite side of the first clamp (15) and the second clamp (16) by means of waterproof adhesive.

6. A flood control and drainage pump station structure for a river according to claim 1, Features: A fixing frame (9) is fixedly provided on both sides of the fixing cylinder (11), a fastening screw (10) is threadedly passed through the fixing frame (9), and the fastening screw (10) is threadedly connected to the fixing plate (8).

7. A flood control and drainage pump station structure for a river according to claim 1, Features: Four support columns (5) are fixedly arranged at the bottom end of the base (7), and universal self-locking wheels (6) are arranged at the bottom ends of the four support columns (5).

8. A flood control and drainage pump station structure for a river according to claim 1, Features: A handle (4) is fixedly provided on an outer wall of a side of the base (7) away from the connecting pipe (21).