Multi-sensor building temperature control system arrangement structure

By rationally arranging sensors and signal transit equipment in the building temperature control system and using a layered connection method, the problem of too long distance of sensor communication cables is solved, cost and maintenance difficulty is reduced, and more efficient system layout and maintenance is achieved.

CN222068660UActive Publication Date: 2024-11-26中南建筑设计院股份有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323421473.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-15
Publication Date
2024-11-26
Estimated Expiration
2033-12-15

AI Technical Summary

Technical Problem

In the existing multi-sensor building temperature control system, the sensor communication cable distance is too long, resulting in large consumption, high cost and inconvenient maintenance.

Method used

By installing temperature sensors and pressure sensors on HVAC and return pipes on each floor of buildings, and connecting them to the signal transfer box, which is then connected to the building temperature control host, and shortens communication using a layered connection method Cable distance, reduce cable specification requirements.

Benefits of technology

It effectively reduces the consumption of sensor communication cables, reduces wiring costs, simplifies the difficulty of cable maintenance, and improves the convenience of system installation and maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222068660U_ABST
    Figure CN222068660U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of building temperature control systems, and particularly relates to a multi-sensor building temperature control system arrangement structure. According to the utility model, the positions of the building temperature control host, the signal transfer equipment and each pipeline sensor are reasonably arranged, so that the communication cable consumption of the temperature control system sensor can be greatly reduced, the cable specification requirement is reduced, and the wiring cost of the large building temperature control system sensor is saved; according to the utility model, the pipeline sensors in each floor are connected with the signal transfer boxes arranged on the same floor, and are gathered by the signal transfer modules in the signal transfer boxes and then connected with the building temperature control host, so that the cable communication distance can be effectively shortened, the long-distance communication of the sensors is avoided, and the communication efficiency is improved. And the maintenance difficulty of the sensor communication cable can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of building temperature control systems, and in particular relates to a multi-sensor building temperature control system arrangement structure. Background Art

[0002] The cold / hot water in the building's HVAC water system is delivered to each terminal device on each floor by a water pump and a water supply pipe for heat exchange. The water after heat exchange then flows back to the HVAC water pipeline through the return pipe. The building's HVAC water system cooperates with the temperature control system in the building, and through a variety of sensors, jointly adjusts the real-time temperature of the indoor areas at the terminals of each floor of the building.

[0003] The existing multi-sensor building temperature control system layout plan usually connects the sensors near each terminal device directly to the building temperature control host. For large buildings with multiple terminal devices on high floors, the communication distance of the sensor communication cable is too long, and the performance requirements of the communication cable are very high, resulting in large consumption and high cost of communication cables, and complex wiring, which is not convenient for cable maintenance. Utility Model Content

[0004] The technical problem to be solved by the utility model is: in view of the deficiencies of the prior art, a multi-sensor building temperature control system layout structure is provided, which can effectively shorten the communication distance of the communication cables, and is easy to arrange, install and maintain.

[0005] The technical solution adopted by the utility model to solve the above technical problems is:

[0006] A multi-sensor building temperature control system arrangement structure, comprising a HVAC water supply pipeline 1 and a HVAC water return pipeline 2 arranged on each floor of the building, wherein the HVAC water supply pipeline 1 and the HVAC water return pipeline 2 are respectively connected to the water supply port and the water return port of the terminal heat exchange device 3 on the same floor;

[0007] The HVAC water supply pipeline 1 is installed with a temperature sensor 4, a pressure sensor 6 and a flow sensor 8, and the temperature sensor 4, the pressure sensor 6 and the flow sensor 8 are all arranged at the HVAC water supply pipeline 1 close to the equipment room on the same floor. The HVAC water return pipeline 2 is installed with a temperature sensor 2 7 and a pressure sensor 2 10, and the temperature sensor 2 7 and the pressure sensor 2 10 are all arranged at the HVAC water return pipeline 2 close to the equipment room on the same floor.

[0008] A signal transfer box 9 is arranged in the equipment room on each floor of the building, and a building temperature control host 11 is also arranged in the equipment room on the middle floor of the building.

[0009] Preferably, the HVAC water supply pipeline 1 and the HVAC water return pipeline 2 are both connected to the HVAC water main circuit in the building.

[0010] Preferably, the temperature sensor 1 4 , pressure sensor 1 6 , flow sensor 8 , temperature sensor 2 7 and pressure sensor 2 10 are all connected to the signal transfer box 9 in the equipment room on the same floor via a communication cable 1 5 .

[0011] Preferably, the signal transfer boxes 9 are connected to the building temperature control host 11 in the equipment room on the middle floor of the building through the communication cable 2 12 .

[0012] Preferably, the building temperature control host 11 is arranged in an equipment room on the middle floor of the building.

[0013] Preferably, a plurality of terminal heat exchange devices 3 are provided on each floor of the building.

[0014] Preferably, a flow regulating valve is provided between the water supply port of the terminal heat exchange device 3 and the HVAC water supply pipeline 1 on the same floor.

[0015] Preferably, the communication cable-5 signal transfer module adopts Category 5e Ethernet cable.

[0016] Preferably, the communication cable 2 12 is a Category 6 Ethernet cable.

[0017] Preferably, the signal transfer box 9 is provided with a signal transfer module, and the signal transfer module is specifically a switch.

[0018] Compared with the prior art, the utility model has the following main advantages:

[0019] 1. The utility model proposes a multi-sensor building temperature control system layout structure. By reasonably arranging the positions of the building temperature control host, signal transfer equipment and various pipeline sensors, the communication cable consumption of the temperature control system sensors can be greatly reduced, the cable specification requirements can be reduced, and the wiring cost of the temperature control system sensors of large buildings can be saved;

[0020] 2. The utility model connects the pipeline sensors in each floor to the signal transfer box arranged on the same floor, and then connects them to the building temperature control host after being aggregated through the signal transfer module in the signal transfer box. Through this layered connection method, the cable communication distance can be effectively shortened, the long-distance communication of the sensor can be avoided, and the maintenance difficulty of the sensor communication cable can be reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the layout structure of a multi-sensor building temperature control system in an embodiment of the utility model.

[0022] In the figure: 1- HVAC water supply pipeline; 2- HVAC water return pipeline; 3- terminal heat exchange equipment; 4- temperature sensor 1; 5- communication cable 1; 6- pressure sensor 1; 7- temperature sensor 2; 8- flow sensor; 9- signal transfer box; 10- pressure sensor 2; 11- building temperature control host; 12- communication cable 2. DETAILED DESCRIPTION

[0023] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the utility model and are not used to limit the utility model. In addition, the technical features involved in each embodiment of the utility model described below can be combined with each other as long as they do not conflict with each other.

[0024] It should be pointed out that, according to the needs of implementation, the various steps / components described in this application can be split into more steps / components, and two or more steps / components or partial operations of steps / components can be combined into new steps / components to achieve the purpose of the present utility model.

[0025] Embodiment 1: This embodiment provides a multi-sensor building temperature control system layout structure, such as Figure 1 As shown, it mainly includes a HVAC water supply pipeline 1 and a HVAC water return pipeline 2 arranged on each floor of the building, and the HVAC water supply pipeline 1 and the HVAC water return pipeline 2 are respectively connected to the water supply port and the water return port of the terminal heat exchange device 3 on the same floor;

[0026] The HVAC water supply pipeline 1 is installed with a temperature sensor 4, a pressure sensor 6 and a flow sensor 8, and the temperature sensor 4, the pressure sensor 6 and the flow sensor 8 are all arranged at the HVAC water supply pipeline 1 close to the equipment room on the same floor. The HVAC water return pipeline 2 is installed with a temperature sensor 2 7 and a pressure sensor 2 10, and the temperature sensor 2 7 and the pressure sensor 2 10 are all arranged at the HVAC water return pipeline 2 close to the equipment room on the same floor.

[0027] A signal transfer box 9 is arranged in the equipment room on each floor of the building, and a building temperature control host 11 is also arranged in the equipment room on the middle floor of the building.

[0028] Furthermore, the HVAC water supply pipeline 1 and the HVAC water return pipeline 2 are both connected to the HVAC water main circuit in the building.

[0029] Furthermore, the temperature sensor 1 4 , pressure sensor 1 6 , flow sensor 8 , temperature sensor 2 7 and pressure sensor 2 10 are all connected to the signal transfer box 9 in the equipment room on the same floor via a communication cable 1 5 .

[0030] Furthermore, the signal transfer boxes 9 are connected to the building temperature control host 11 in the equipment room on the middle floor of the building through the communication cable 2 12 .

[0031] Furthermore, the building temperature control host 11 is arranged in an equipment room on the middle floor of the building.

[0032] Furthermore, each floor of the building is provided with a plurality of terminal heat exchange devices 3 .

[0033] Furthermore, a flow regulating valve is provided between the water supply port of the terminal heat exchange device 3 and the HVAC water supply pipeline 1 on the same floor.

[0034] Furthermore, the communication cable-5 signal transfer module adopts Category 5e Ethernet cable.

[0035] Furthermore, the communication cable 2 12 specifically adopts a Category 6 Ethernet cable.

[0036] Furthermore, the signal transfer box 9 is provided with a signal transfer module, and the signal transfer module is specifically a switch.

[0037] Furthermore, all parts involved in this application that are not described in detail are the same as the prior art or are implemented using the prior art.

[0038] In summary:

[0039] 1. The utility model proposes a multi-sensor building temperature control system layout structure. By reasonably arranging the positions of the building temperature control host, signal transfer equipment and various pipeline sensors, the communication cable consumption of the temperature control system sensors can be greatly reduced, the cable specification requirements can be reduced, and the wiring cost of the temperature control system sensors of large buildings can be saved;

[0040] 2. The utility model connects the pipeline sensors in each floor to the signal transfer box arranged on the same floor, and then connects them to the building temperature control host after being aggregated through the signal transfer module in the signal transfer box. Through this layered connection method, the cable communication distance can be effectively shortened, the long-distance communication of the sensor can be avoided, and the maintenance difficulty of the sensor communication cable can be reduced.

[0041] The above embodiments are only used to illustrate the design ideas and features of the utility model, and their purpose is to enable those skilled in the art to understand the content of the utility model and implement it accordingly. The protection scope of the utility model is not limited to the above embodiments. Therefore, any equivalent changes or modifications made based on the principles and design ideas disclosed by the utility model are within the protection scope of the utility model.

Claims

1. A multi-sensor building temperature control system layout structure, characterized in that: It comprises a HVAC water supply pipeline (1) and a HVAC water return pipeline (2) arranged on each floor of the building, wherein the HVAC water supply pipeline (1) and the HVAC water return pipeline (2) are respectively connected to the water supply port and the water return port of the terminal heat exchange equipment (3) on the same floor; The HVAC water supply pipeline (1) is installed with a temperature sensor (4), a pressure sensor (6) and a flow sensor (8), and the temperature sensor (4), the pressure sensor (6) and the flow sensor (8) are all arranged at a position of the HVAC water supply pipeline (1) close to the equipment room on the same floor; the HVAC water return pipeline (2) is installed with a temperature sensor (7) and a pressure sensor (10), and the temperature sensor (7) and the pressure sensor (10) are all arranged at a position of the HVAC water return pipeline (2) close to the equipment room on the same floor; A signal transfer box (9) is arranged in the equipment room on each floor of the building, and a building temperature control host (11) is also arranged in the equipment room on the middle floor of the building.

2. The multi-sensor building temperature control system arrangement structure according to claim 1, characterized in that: The HVAC water supply pipeline (1) and the HVAC water return pipeline (2) are both connected to the HVAC water main circuit in the building.

3. The multi-sensor building temperature control system arrangement structure according to claim 1, characterized in that: The temperature sensor 1 (4), pressure sensor 1 (6), flow sensor (8), temperature sensor 2 (7) and pressure sensor 2 (10) are all connected to a signal transfer box (9) in the equipment room on the same floor via a communication cable 1 (5).

4. The multi-sensor building temperature control system arrangement structure according to claim 1, characterized in that: The signal transfer boxes (9) are connected to the building temperature control host (11) in the equipment room on the middle floor of the building through the second communication cable (12).

5. The multi-sensor building temperature control system arrangement structure according to claim 1, characterized in that: The building temperature control host (11) is arranged in an equipment room on the middle floor of the building.

6. The multi-sensor building temperature control system arrangement structure according to claim 1, characterized in that: Each floor of the building is provided with a plurality of terminal heat exchange devices (3).

7. The multi-sensor building temperature control system arrangement structure according to claim 6, characterized in that: A flow regulating valve is provided between the water supply port of the terminal heat exchange device (3) and the HVAC water supply pipeline (1) on the same floor.

8. The multi-sensor building temperature control system arrangement structure according to claim 3, characterized in that: The communication cable one (5) signal transfer module adopts Category 5e Ethernet cable.

9. The multi-sensor building temperature control system arrangement structure according to claim 4, characterized in that: The communication cable 2 (12) specifically adopts Category 6 Ethernet cable.

10. The multi-sensor building temperature control system arrangement structure according to claim 3, characterized in that: The signal transfer box (9) is provided with a signal transfer module, and the signal transfer module is specifically a switch.