Field surveying device for construction cost

By designing the device of the material storage pipe and spring mechanism, the problems of large volume and difficult operation of the engineering cost site survey device in the prior art are solved, small and convenient marking operations are achieved, and construction efficiency and marking accuracy are improved.

CN222069686UInactive Publication Date: 2024-11-26HUACHEN ZHONGDA PROJECT MANAGEMENT CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420728555.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-10
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing engineering cost site surveying devices are large in size, high in operating strength and inconvenient to carry, resulting in low construction efficiency and inability to intuitively record calibration position information.

Method used

A device including storage pipe, partition, leak hole, plug head and top rod is designed. The plug head is marked at a designated position by hand-held storage pipe, and the spring mechanism is used to realize automatic plugging of the plug head and storage pipe. Stable support, simplify operation and improve marking efficiency.

Benefits of technology

It realizes a small size and convenient operation marking process, improves construction efficiency, and can quickly and accurately mark at designated locations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222069686U_ABST
    Figure CN222069686U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of engineering cost, and discloses an on-site surveying device for engineering cost, which comprises a material storage pipe, a partition plate is fixedly arranged on the inner wall of the lower end of the material storage pipe, paint is arranged above the partition plate, a leak hole is formed in the middle of the partition plate, a plug is arranged in the leak hole, and the plug is connected with the material storage pipe. An ejector rod is fixedly arranged at the lower end of the plugging head, and the lower end of the ejector rod extends out of the material storage pipe; sliding blocks are fixedly arranged on the two sides of the ejector rod, sliding rods are fixedly arranged on the two sides of the lower surface of the partition plate, the sliding blocks are in sliding fit with the sliding rods, first springs are arranged on the rod walls of the sliding rods, and the two ends of the first springs are fixedly connected with the sliding blocks and the partition plate respectively. An auxiliary supporting mechanism is arranged on the outer wall of the lower end of the storage pipe. The device is small in size and convenient to operate, so that a constructor can quickly mark at a specified position, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of engineering cost, in particular to a field survey device for engineering cost. Background Art

[0002] In the current on-site survey process of construction project cost, most of the time, tape measures or distance measuring wheels are used to measure the distance of the construction project site to complete the distance survey. However, in the process of distance survey, the survey location and the survey distance need to be recorded manually. In the process of manual recording, the calibration locations are mostly calibrated by flagging or other methods, and the calibration locations cannot be digitally calibrated and recorded. Flagging or other methods may cause confusion in the records, and the calibration location information cannot be intuitively observed.

[0003] For example, the patent number CN219798333U discloses a field survey device for construction project cost, including a base plate, a carrying box is installed on the base plate, a fixed-point digital calibration structure is installed inside the carrying box, the fixed-point digital calibration structure includes a paint storage tank, the paint storage tank is arranged inside the carrying box, a horizontal linear module is installed on the base plate, a vertical linear module is installed on the horizontal linear module, a mounting seat is fixedly connected to the slide of the vertical linear module, an electric spray gun head is installed on the outside of the mounting seat, the feed port of the electric spray gun head is connected to a hose, the end of the hose away from the electric spray gun head is connected to the discharge port of the paint storage tank, and a through groove is opened on the outside of the base plate.

[0004] In the above scheme, a mobile device is used to spray paint marks at designated positions through an electric spray gun head, but the device is large in size and needs to be manually pushed to move the device. The marking operation is relatively strong and it is not easy to carry, resulting in reduced construction efficiency. Therefore, a site survey device for engineering cost is proposed. Utility Model Content

[0005] The utility model aims to solve the problems raised by the background technology and provides a field survey device for engineering cost.

[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0007] A field survey device for engineering cost includes a material storage tube, a partition is fixedly provided on the inner wall of the lower end of the material storage tube, paint is provided on the upper part of the partition, a leakage hole is opened in the middle of the partition, a plugging head is provided inside the leakage hole, a push rod is fixedly provided on the lower end of the plugging head, and the lower end of the push rod extends to the outside of the material storage tube; sliders are fixedly provided on both sides of the push rod, slide rods are fixedly provided on both sides of the lower surface of the partition, the sliders are slidably matched with the slide rods, a first spring is provided on the rod wall of the slide rod, and the two ends of the first spring are respectively fixedly connected to the slider and the partition; an auxiliary support mechanism is provided on the outer wall of the lower end of the material storage tube.

[0008] Preferably, the auxiliary support mechanism includes a support ring, a support rod, a slide and a second spring, the support ring is located below the top rod, the support rod is symmetrically fixed on the top of the support ring, the slide is fixed on the side wall of the storage tube, and the slide is slidably matched with the support rod, the second spring is arranged on the rod wall of the support rod, and the two ends of the second spring are respectively fixedly connected to the slide and the upper end of the support rod.

[0009] Preferably, the push rod can be arranged through the interior of the support ring.

[0010] Preferably, the leakage hole is an inverted trapezoidal hole, and the plugging head is an inverted trapezoidal block.

[0011] Preferably, an adding tube is fixedly provided on the tube wall of the material storage tube, and a tube cover is provided at the end of the adding tube.

[0012] Preferably, a gripping bracelet is fixedly provided on the upper end of the storage tube.

[0013] Compared with the prior art, the utility model provides a field survey device for engineering cost, which has the following beneficial effects:

[0014] 1. The on-site survey device for the engineering cost is equipped with a storage tube, a partition, a leakage hole, a plugging head and a push rod. The storage tube is manually held to align the push rod with the designated position, so that the push rod is squeezed and moved upward, and the upper end of the push rod pushes the plugging head to move upward and move out of the leakage hole. At this time, the paint in the storage tube can be discharged, and the paint is discharged along the gap between the push rod and the storage tube, so that the designated position can be marked. When the push rod is lifted upward, the first spring applies a downward elastic force to the push rod and the plugging head, so that the plugging head blocks the leakage hole and stops the discharge of paint.

[0015] 2. The on-site survey device for engineering cost has a support ring, a support rod, a slide seat and a second spring arranged at the lower end of the storage tube. When the lower end of the storage tube is aligned with the specified position, the support ring contacts the specified position first, and then the storage tube is firmly supported. Then the storage tube is moved downward, and the slide seats on both sides move on the support rod, thereby realizing the function of smooth downward movement of the storage tube. The second spring can reset the storage tube and the support ring.

[0016] The parts not involved in the device are the same as the existing technology or can be implemented by using the existing technology. The utility model is small in size and easy to operate, so that construction workers can quickly mark the designated position, thereby improving construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a structural schematic diagram of a field survey device for engineering cost proposed by the utility model;

[0018] Figure 2 for Figure 1 The structure enlarged diagram of the local A part;

[0019] Figure 3 for Figure 1 Top view of the middle support ring and support rod.

[0020] In the figure: 1. material storage tube; 2. partition; 3. leakage hole; 4. plugging head; 5. push rod; 6. slider; 7. slide rod; 8. first spring; 9. support ring; 10. support rod; 11. slide seat; 12. second spring; 13. adding tube; 14. holding bracelet. DETAILED DESCRIPTION

[0021] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0022] Reference Figure 1-3The top of the bottle cap 2 is provided with a plurality of springs, each of which is provided with a plurality of springs, each of which is provided with a plurality of springs, each of which is provided with a plurality of springs.

[0023] Among them, an auxiliary supporting mechanism is provided on the outer wall of the lower end of the storage tube 1, and the auxiliary supporting mechanism includes a supporting ring 9, a supporting rod 10, a sliding seat 11 and a second spring 12. The supporting ring 9 is located below the top rod 5, and the top rod 5 can pass through the internal arrangement of the supporting ring 9. The support rod 10 is symmetrically fixed on the top of the supporting ring 9, and the sliding seat 11 is fixed on the side wall of the storage tube 1, and the sliding seat 11 and the supporting rod 10 are slidably matched. The second spring 12 is arranged on the rod wall of the support rod 10, and the two ends of the second spring 12 are respectively fixedly connected to the sliding seat 11 and the upper end of the support rod 10. When the lower end of the storage tube 1 is aligned with the specified position, the supporting ring 9 contacts the specified position first. At this time, the storage tube 1 can be firmly supported, and then the storage tube 1 is moved downward, so that the sliding seats 11 on both sides move on the support rod 10, thereby realizing the function of smooth downward movement of the storage tube 1, and the setting of the second spring 12 can make the storage tube 1 and the support ring 9 quickly reset.

[0024] At the same time, an adding tube 13 is fixedly provided on the tube wall of the storage tube 1, and a tube cover is provided at the end of the adding tube 13, so that the adding tube 13 can add paint to the interior of the storage tube 1; a holding bracelet 14 is fixedly provided on the upper end of the storage tube 1, and the storage tube 1 can be taken for use by holding the bracelet 14.

[0025] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A site survey device for construction cost, comprising a material storage pipe (1), Features: A partition (2) is fixedly provided on the inner wall of the lower end of the material storage pipe (1), paint is provided above the partition (2), a leakage hole (3) is opened in the middle of the partition (2), a plugging head (4) is provided inside the leakage hole (3), a push rod (5) is fixedly provided at the lower end of the plugging head (4), and the lower end of the push rod (5) extends to the outside of the material storage pipe (1); Slide blocks (6) are fixedly provided on both sides of the top rod (5), slide bars (7) are fixedly provided on both sides of the lower surface of the partition (2), the slide blocks (6) and the slide bars (7) are slidably matched, a first spring (8) is provided on the rod wall of the slide bar (7), and the two ends of the first spring (8) are fixedly connected to the slide blocks (6) and the partition (2) respectively; The outer wall of the lower end of the material storage pipe (1) is provided with an auxiliary supporting mechanism.

2. A construction cost on-site survey device according to claim 1, Features: The auxiliary support mechanism comprises a support ring (9), a support rod (10), a slide seat (11) and a second spring (12); the support ring (9) is located below the top rod (5); the support rod (10) is symmetrically fixedly arranged on the top of the support ring (9); the slide seat (11) is fixedly arranged on the side wall of the material storage tube (1), and the slide seat (11) and the support rod (10) are slidably matched; the second spring (12) is arranged on the rod wall of the support rod (10), and the two ends of the second spring (12) are respectively fixedly connected to the slide seat (11) and the upper end of the support rod (10).

3. A construction cost on-site survey device according to claim 2, Features: The push rod (5) can be arranged through the interior of the support ring (9).

4. The on-site survey device for construction cost according to claim 1, Features: The leakage hole (3) is an inverted trapezoidal hole, and the plugging head (4) is an inverted trapezoidal block.

5. The on-site survey device for construction cost according to claim 1, Features: An addition pipe (13) is fixedly provided on the pipe wall of the material storage pipe (1), and a pipe cover is provided at the end of the addition pipe (13).

6. The on-site survey device for construction cost according to claim 1, Features: A holding bracelet (14) is fixedly provided on the upper end of the material storage tube (1).

Citation Information

Cited By

  • Field surveying device for engineering cost