Ash clogging alarm device of flue gas deacidification tower
By designing a combination device of water level sensor, temperature sensor and jet system in the flue gas deacidification tower, the problem of slight ash blockage in existing devices is solved, reducing the number of repairs and improving discharge The smoothness of the gray mouth.
Patent Information
- Application Number
- CN202420021217.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-04
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-01-04
AI Technical Summary
The existing flue gas deacidification tower ash blocking alarm device also needs to be shut down and cleaned when a slight ash blockage is detected, which increases the number of repairs of the device and is not convenient to assist in cleaning the ash discharge outlet.
A dust-blocking alarm device including water level sensor, temperature sensor, drive motor, driving gear, driven gear, stirring rod, air pump, nozzle and other components is designed. By detecting water level and temperature abnormality, buzzer and flash alarm are activated. The air pump is used to pump air into the ash plug through the nozzle to spray the ash plug, and automatically clear the ash drain.
When ash is blocked, the ash discharge opening is automatically unblocked by jet stirring, which reduces the number of disassembly and repairs of the device, improves the smoothness of the ash discharge opening, and reduces the frequency of shutdown and repairs.
Smart Images

Figure CN222076303U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of flue gas deacidification towers, in particular to a ash blocking alarm device for a flue gas deacidification tower. Background Art
[0002] The flue gas deacidification tower is a device for flue gas deacidification treatment. It is mainly used for the flue gas from garbage incineration to treat acidic hydrogen chloride, sulfide, HF, etc. However, the discharge port is easily blocked during the deacidification process. The existing ash blockage alarm device usually detects ash blockage through temperature sensors and water level sensors, and alarms when the threshold is exceeded. However, even if the existing device has a minor ash blockage, it still needs to be shut down for cleaning, which is not convenient for auxiliary cleaning of the ash discharge port, increasing the number of shutdowns for maintenance of the device. Utility Model Content
[0003] In view of the above problems, the purpose of the utility model is to provide an ash blockage alarm device for a flue gas deacidification tower, so as to solve the problem that even minor ash blockages in existing devices require shutdown for cleaning, which is inconvenient for auxiliary cleaning of the ash discharge port and increases the number of shutdowns for maintenance of the device.
[0004] To achieve the above objectives, the utility model adopts the following technical solution: an ash blockage alarm device for a flue gas deacidification tower, comprising a deacidification tower body and an air pump, a water level sensor and a temperature sensor are installed on the bottom inner wall of the deacidification tower body, the water level sensor cooperates with the temperature sensor to detect the water level and temperature inside the deacidification tower body, when an increase in water level and abnormal temperature are detected, an external buzzer and a flash light alarm to remind the staff to repair in time, an ash discharge pipe is installed below the deacidification tower body, and a driving motor is installed inside the ash discharge pipe, the output end of the driving motor is connected to a driving gear, the outer side of the driving gear is meshingly connected to a driven gear, and two stirring rods are symmetrically installed above the driven gear, a sealing gasket is installed at the connection between the ash discharge pipe and the deacidification tower body, an air pump is installed on the outer side of the ash discharge pipe, and an annular pipe is connected above the air pump, nozzles are circumferentially distributed on the outer side of the annular pipe, and a conveying pipe is connected below the ash discharge pipe.
[0005] The beneficial effects of the utility model are as follows: when there is dust blockage, the air pump draws external air into the interior of the annular tube, and then discharges it through the nozzle to spray air to the ash discharge port. The gas will stir and increase the dust blockage, which can loosen the dust blockage at the ash discharge port, making it easier to clear the ash discharge port. When there is dust blockage, it will be automatically cleared, thereby reducing the number of times the device needs to be disassembled and repaired.
[0006] In order to facilitate the installation of the ash discharge pipe and the deacidification tower body:
[0007] As a further improvement of the above technical solution: the ash discharge pipe is fixed to the deacidification tower body by bolts.
[0008] The beneficial effect of this improvement is that bolt fixing can make the connection between the ash discharge pipe and the deacidification tower body more firm and reliable.
[0009] To facilitate the rotation of the driven gear:
[0010] As a further improvement of the above technical solution: a bearing is installed at the axis center of the driven gear, and the bearing is installed on the conveying pipe.
[0011] The beneficial effect of this improvement is that the bearing can reduce the friction force when the driven gear rotates, thereby facilitating the rotation of the driven gear.
[0012] As a further improvement of the above technical solution: an annular groove is provided in the ash discharge pipe near the driven gear.
[0013] The beneficial effect of this improvement is that the setting of the annular groove can facilitate the rotation of the driven gear, and can also facilitate the stirring rod to stir the ash discharge port under the drive of the driven gear, thereby reducing the probability of ash blockage.
[0014] In order to facilitate the dredging of ash blockage:
[0015] As a further improvement of the above technical solution: the nozzles are arranged in two layers, and the nozzles on the top layer are arranged inclined.
[0016] The beneficial effect of this improvement is that the tilted nozzle can more conveniently clear the ash blockage.
[0017] To facilitate the fixing of the ring tube:
[0018] As a further improvement of the above technical solution: the ring pipe and the ash discharge pipe are fixed by means of buckles.
[0019] The beneficial effect of this improvement is that the buckle can firmly fix the ring pipe inside the ash discharge pipe.
[0020] To facilitate the installation of the ash discharge pipe:
[0021] As a further improvement of the above technical solution: the ash discharge pipe and the deacidification tower body are plug-in connected.
[0022] The beneficial effect of this improvement is that the plug-in connection can make the connection between the ash discharge pipe and the deacidification tower body more firm and reliable.
[0023] To increase the sealing of the device:
[0024] As a further improvement of the above technical solution: a rubber ring is installed at the connection between the conveying pipe and the ash discharge pipe.
[0025] The beneficial effect of this improvement is that the rubber sleeve can ensure the sealing of the connection between the conveying pipe and the ash discharge pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of the local main view structure.
[0027] Figure 2 It is a schematic diagram of the main structure of the ash discharge pipe and the conveying pipe.
[0028] Figure 3 It is a schematic diagram of the enlarged axonometric section of the ash discharge pipe and the conveying pipe.
[0029] Figure 4 It is a schematic diagram of the axonometric structure of the annular tube and the nozzle.
[0030] In the figure: 1. Deacidification tower body; 11. Water level sensor; 12. Temperature sensor; 2. Ash discharge pipe; 21. Driving motor; 22. Driving gear; 23. Driven gear; 24. Stirring rod; 25. Sealing pad; 3. Air pump; 31. Ring pipe; 32. Nozzle; 4. Delivery pipe. DETAILED DESCRIPTION
[0031] In order to enable those skilled in the art to better understand the technical solution of the utility model, the utility model is described in detail below in conjunction with the accompanying drawings. The description in this part is only exemplary and explanatory and should not have any limiting effect on the protection scope of the utility model.
[0032] like Figure 1-4As shown, a dust blocking alarm device for a flue gas deacidification tower comprises a deacidification tower body 1 and an air pump 3. A water level sensor 11 and a temperature sensor 12 are installed on the bottom inner wall of the deacidification tower body 1. The water level sensor 11 cooperates with the temperature sensor 12 to detect the water level and temperature inside the deacidification tower body 1. When the water level rises and the temperature is abnormal, an external buzzer and a flash light alarm to remind the staff to repair in time. An ash discharge pipe 2 is installed below the deacidification tower body 1, and a driving motor 21 is installed inside the ash discharge pipe 2. The output end of the driving motor 21 is connected to a driving gear 22. The outer end of the driving gear 22 is connected to the outer end of the driving gear 22. A driven gear 23 is meshedly connected to the side, and two stirring rods 24 are symmetrically installed above the driven gear 23. A sealing pad layer 25 is installed at the connection between the ash discharge pipe 2 and the deacidification tower body 1. An air pump 3 is installed on the outside of the ash discharge pipe 2, and an annular tube 31 is connected above the air pump 3. Nozzles 32 are distributed circumferentially on the outside of the annular tube 31. A conveying pipe 4 is connected below the ash discharge pipe 2. When ash is blocked, the air pump 3 pumps external air into the inside of the annular tube 31, and then discharges it through the nozzle 32 to spray the ash discharge port. The gas will stir and increase the blockage, which can loosen the ash blockage at the ash discharge port and facilitate the dredging of the ash discharge port. When the ash is blocked, it is automatically unblocked, thereby reducing the number of times the device is disassembled and repaired. The ash discharge pipe 2 is fixed to the deacidification tower body 1 by bolts. Bolt fixing can make the connection between the ash discharge pipe 2 and the deacidification tower body 1 more firm and reliable. A bearing is installed at the axis of the driven gear 23, and the bearing is installed on the conveying pipe 4. The bearing can reduce the friction force when the driven gear 23 rotates, and facilitate the rotation of the driven gear 23. The ash discharge pipe 2 is provided with an annular groove near the driven gear 23. The setting of the annular groove can facilitate the rotation of the driven gear 23, and can also facilitate the stirring rod 24 driven by the driven gear 23. The ash discharge port is stirred to reduce the probability of ash blockage. The nozzle 32 is provided with two layers, and the nozzle 32 on the top layer is inclined. The inclined nozzle 32 can more conveniently clear the ash blockage. The annular tube 31 and the ash discharge pipe 2 are fixed by a buckle, and the buckle can firmly fix the annular tube 31 inside the ash discharge pipe 2. The ash discharge pipe 2 and the deacidification tower body 1 are plug-in connected, and the plug-in connection can make the connection between the ash discharge pipe 2 and the deacidification tower body 1 more firm and reliable. The connection between the conveying pipe 4 and the ash discharge pipe 2 is installed with a rubber ring, and the rubber ring can ensure the sealing of the connection between the conveying pipe 4 and the ash discharge pipe 2.
[0033] The working principle of the utility model is as follows: when the device is used, when the ash outlet is discharging ash, the driving motor 21 drives the driven gear 23 to rotate through the active gear 22, and then drives the stirring rod 24 to stir the ash outlet, thereby reducing the probability of blockage of the ash outlet. The water level sensor 11 cooperates with the temperature sensor 12 to detect the water level and temperature inside the deacidification tower body 1. When the water level rises and the temperature is abnormal, the external buzzer and flash light alarm to remind the staff to repair in time. At the same time, the air pump 3 draws external air into the inside of the annular tube 31, and then discharges it through the nozzle 32 to spray the ash outlet. The gas will stir and increase the blockage, which can loosen the blockage of the ash outlet, and facilitate the dredging of the ash outlet. When the ash is blocked, it is automatically dredged, thereby reducing the number of times the device is disassembled and repaired.
[0034] It should be noted that, in this article, the terms "comprises", "includes" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or apparatus that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or apparatus.
[0035] This article uses specific examples to illustrate the principles and implementation methods of the utility model. The above examples are only used to help understand the method and core ideas of the utility model. The above is only the preferred implementation method of the utility model. It should be pointed out that due to the limitations of textual expression, there are objectively infinite specific structures. For ordinary technicians in this technical field, without departing from the principle of the utility model, they can make several improvements, embellishments or changes, and can also combine the above technical features in an appropriate manner; these improvements, embellishments, changes or combinations, or the direct application of the concept and technical solution of the utility model to other occasions without improvement, should be regarded as the protection scope of the utility model.
Claims
1. A dust blocking alarm device for a flue gas deacidification tower, comprising a deacidification tower body (1) and an air pump (3), characterized in that: A water level sensor (11) and a temperature sensor (12) are installed on the inner wall of the bottom of the deacidification tower body (1). The water level sensor (11) cooperates with the temperature sensor (12) to detect the water level and temperature inside the deacidification tower body (1). When a water level rise and abnormal temperature are detected, an external buzzer and a flash light alarm to remind the staff to repair in time. An ash discharge pipe (2) is installed below the deacidification tower body (1), and a drive motor (21) is installed inside the ash discharge pipe (2). The output end of the drive motor (21) is connected to A driving gear (22) is connected, the outer side of the driving gear (22) is meshedly connected with a driven gear (23), and two stirring rods (24) are symmetrically installed above the driven gear (23), a sealing pad layer (25) is installed at the connection between the ash discharge pipe (2) and the deacidification tower body (1), an air pump (3) is installed on the outer side of the ash discharge pipe (2), and an annular pipe (31) is connected above the air pump (3), and nozzles (32) are distributed circumferentially on the outer side of the annular pipe (31), and a conveying pipe (4) is connected below the ash discharge pipe (2).
2. The ash blockage alarm device for a flue gas deacidification tower according to claim 1, characterized in that: The ash discharge pipe (2) is fixed to the deacidification tower body (1) by means of bolts.
3. The ash blockage alarm device for a flue gas deacidification tower according to claim 1, characterized in that: A bearing is installed at the axis center of the driven gear (23), and the bearing is installed on the conveying pipe (4).
4. The ash blockage alarm device for a flue gas deacidification tower according to claim 1, characterized in that: The ash discharge pipe (2) is provided with an annular groove at a position close to the driven gear (23).
5. The ash blockage alarm device for a flue gas deacidification tower according to claim 1, characterized in that: The nozzles (32) are arranged in two layers, and the nozzles (32) in the top layer are arranged at an angle.
6. The ash blocking alarm device for a flue gas deacidification tower according to claim 1, characterized in that: The annular pipe (31) and the ash discharge pipe (2) are fixed by means of buckles.
7. The ash blockage alarm device for a flue gas deacidification tower according to claim 1, characterized in that: The ash discharge pipe (2) and the deacidification tower body (1) are connected by plugging.
8. The ash blockage alarm device for a flue gas deacidification tower according to claim 1, characterized in that: A rubber sleeve ring is installed at the connection between the conveying pipe (4) and the ash discharge pipe (2).