Full-automatic base assembling and dotting machine
By designing a fully automatic base assembly and decorating machine in the decorating assembly equipment, using precise clamping and motion trajectory optimization technology, the problems of inaccurate loading and low efficiency of existing equipment are solved, and an efficient assembly process is achieved.
Patent Information
- Application Number
- CN202420660858.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-02
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-04-02
AI Technical Summary
The existing dot assembly equipment has problems of inaccurate materials and low efficiency during the loading process, especially when dealing with cylindrical antennas.
A fully automatic base assembly and decorating machine is designed, including the first material preparation mechanism, the second material preparation mechanism, the assembly mechanism, the decoding mechanism and the recycling mechanism. Through precise clamping and motion trajectory optimization, the material is ensured in each mechanism. efficient transmission and assembly between.
The accuracy and production efficiency of material loading are improved, ensuring the efficiency and accuracy of the assembly process.
Smart Images

Figure CN222078508U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of automation equipment, in particular to a full-automatic base assembly dotting machine. Background Art
[0002] Dotting assembly refers to assembling two or more parts together by dotting. Common dotting assemblies on the market include: ink core and metal pen tip, antenna and base, etc. There are some dotting assembly equipment on the market, but some equipment has the problem of inaccurate material feeding and low work efficiency.
[0003] For example, Chinese patent application number: CN202222821097.5 discloses a dotting machine for installing antenna tube tail plugs, which specifically discloses that "the conveying assembly includes a placement plate, a conveying plate, a connecting rod, a first motor, a first slider, a first slide rail, a second slider and a second slide rail, one end of the placement plate is arranged below the discharge hole, a plurality of placement slots are arranged at equal distances on the top of the placement plate, a plurality of through holes perpendicular to the placement slots are arranged at equal distances on the placement plate, a conveying plate is arranged in each through hole, a card slot is arranged at a position opposite to the placement slot of each conveying plate, and a card slot is arranged at the bottom of the placement plate There is a connecting rod, the lower end of the connecting rod is connected to the output shaft of the first motor, the lower end of the connecting rod is installed with a first slider, the first slider is slidably installed on the first slide rail, the upper end of the first slide rail is installed with a second slider, and the second slider is slidably installed on the second slide rail. When the antenna tube is placed in the slot, the antenna tube is inserted into the slot of the conveying plate. When the first motor rotates one circle, the first motor can cooperate with the connection, the first slider, the first slide rail, the second slider and the second slide rail to transport the antenna tube in one slot to another adjacent slot, thereby transporting the antenna tube. "In this design, when the conveying plate pushes the antenna to different slots, the antenna may roll off, and the feeding of the wire is inaccurate and inefficient. In addition, the antenna is usually cylindrical, and this design aggravates the problems of inaccurate feeding and low feeding efficiency. Utility Model Content
[0004] In view of this, the present invention aims at the deficiencies of the prior art, and its main purpose is to provide a fully automatic base assembly dotting machine, which not only has accurate material feeding but also has higher efficiency, thereby overcoming the deficiencies of the prior art.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] The present application provides a fully automatic base assembly dotting machine, comprising a first material preparation mechanism and a feeding mechanism, wherein the first material preparation mechanism is arranged beside the feeding mechanism, and a first material taking component of the feeding mechanism can obtain a first material in the first material preparation mechanism;
[0007] The second material preparation mechanism is connected to the assembling mechanism;
[0008] The assembling mechanism and the dotting mechanism are arranged on the motion track of the first material taking component; the assembling mechanism can assemble the first material and the second material together; the dotting mechanism can press the first material and the second material together;
[0009] The recovery mechanism is arranged beside the feeding mechanism, and the first material taking component can load the finished product into the recovery bin of the recovery mechanism.
[0010] Preferably, the first material preparation mechanism includes a first material bin, and a first feeding assembly arranged at the first material outlet of the first material bin; the first feeding assembly includes a first feeding plate, a first pushing component, and a first waiting plate; a first material trough is arranged on the first feeding plate; a second material trough is arranged on the first waiting plate; the first material trough can be connected to or separated from the first outlet and the second material trough, and the first pushing component can extend into the second material trough.
[0011] Preferably, the bottom of the first silo is inclined, and a movable first partition plate is provided inside the first silo.
[0012] Preferably, the second material preparation mechanism includes a vibrating material tray and a material rail connected to the vibrating material tray; the material rail is connected to the assembly mechanism from top to bottom.
[0013] Preferably, the assembly mechanism includes a second material picking component, a second material pushing component, a material fixing seat, and an assembly seat; the second material picking component is arranged on the first side of the feeding mechanism, and the second material picking component can move toward the assembly seat; the assembly seat, the material fixing seat, and the second material pushing component are sequentially arranged on the second side of the feeding mechanism, and the second material pushing component can penetrate into the material fixing seat and the assembly seat.
[0014] Preferably, an openable and closable assembly channel is provided inside the assembly seat, and the assembly channel is adapted to the size of the first material and the second material.
[0015] Preferably, the dotting mechanism includes a third material picking component, a dotting head, and a hydraulic cylinder; the third material picking component is arranged on the first side of the feeding mechanism, and the third material picking component can move toward the dotting head; the output end of the hydraulic cylinder is connected to the dotting head.
[0016] Preferably, the dotting head includes a seat body, a dotting part, and a guide frame; the dotting part can be movably arranged on the seat body; the dotting part has a guide groove, the guide frame has a guide part, the output rod of the hydraulic cylinder is connected to the dotting part, and the guide groove can move on the guide part.
[0017] Preferably, the recovery mechanism further comprises a material plate arranged obliquely; the material plate slopes toward the recovery bin.
[0018] Preferably, an adjustable second partition plate is provided in the recovery bin.
[0019] Compared with the prior art, the utility model has obvious advantages and beneficial effects. Specifically, it can be known from the above technical scheme that the fully automatic base assembly and dotting machine includes a first material preparation mechanism, a feeding mechanism, a second material preparation mechanism, an assembly mechanism, a dotting mechanism, and a recycling mechanism. Among them, the first material preparation mechanism is arranged on the side of the feeding mechanism and is connected to the feeding mechanism. The second material preparation mechanism is arranged on the side of the assembly mechanism and is connected to the assembly mechanism. The feeding mechanism has the first material picking component, and the assembly mechanism and the dotting mechanism are arranged on the motion trajectory of the first material picking component. The recycling mechanism is arranged on the side of the feeding mechanism for recycling finished products. The first material picking component clamps the first material coming out of the first material preparation mechanism, and can accurately load the first material into the assembly mechanism, the dotting mechanism, and the recycling mechanism, so the feeding success rate is high, which is conducive to improving production.
[0020] During operation, 1. The first material picking component accurately clamps the first material coming out of the first material preparation mechanism, and then moves to the assembly mechanism position to wait for assembly with the second material. 2. The second material preparation mechanism loads the second material into the assembly mechanism, and then the assembly mechanism assembles the first material and the second material together. 3. The first material picking component clamps the assembled semi-finished product and moves it to the dotting mechanism, and then the dotting mechanism assembles the first material and the second material together. 4. The first material picking component clamps the assembled finished product and loads it into the recycling mechanism. It can be seen that after setting up the feeding mechanism, the coordination of each mechanism is more precise and the production efficiency is higher. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the utility model.
[0022] Figure 2 It is a top view schematic diagram of an embodiment of the utility model.
[0023] Figure 3 It is a partial structural schematic diagram of an embodiment of the utility model.
[0024] Figure 4 It is a schematic diagram of a part of the first feeding assembly and the loading mechanism of an embodiment of the utility model.
[0025] Figure 5 It is an embodiment of the utility model Figure 4 Schematic diagram of the middle part structure.
[0026] Figure 6It is a schematic diagram of a partial assembly mechanism of an embodiment of the utility model.
[0027] Figure 7 It is a schematic diagram of a part of the dotting mechanism of an embodiment of the utility model.
[0028] Figure 8 It is a bottom view schematic diagram of a partial structure of an embodiment of the utility model.
[0029] Description of the accompanying drawings:
[0030] 10. First material preparation mechanism; 11. First material bin; 12. First partition plate; 13. First material 110. First material feeding assembly; 111. First cylinder; 112. First linear die; 113. First material feeding plate; 114. First material trough; 115. First material pushing component; 116. Second cylinder; 117. First material waiting plate; 118. Second material trough; 20. Material loading mechanism; 21. Third cylinder; 22. Second linear die set; 23. First material taking component; 30. Second material preparation mechanism; 31. Vibrating material tray; 32. Material rail; 40. Assembly mechanism; 41. Fourth cylinder ; 42. The third linear module; 43. The second material picking component; 44. The fifth cylinder; 45. The fourth linear module; 46. The second material pushing component; 47. The material fixing seat; 48. The seventh cylinder; 49. The assembly seat; 50. The dotting mechanism; 51. The sixth cylinder; 52. The fifth linear module; 53. The third material picking component; 54. The hydraulic cylinder; 510. The dotting head; 511. The seat body; 512. The dotting part; 513. The guide groove 514. The guide frame; 515. The guide part; 516. The output rod; 60. The recovery mechanism; 61. The material plate; 62. The recovery bin; 63. The second partition plate. DETAILED DESCRIPTION
[0031] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined purpose of the utility model, the specific implementation method, structure, characteristics and effects of the present invention are described in detail below in combination with the accompanying drawings and preferred embodiments.
[0032] Please refer to Figures 1 to 8 As shown, it shows the specific structure of the preferred embodiment of the utility model, which is a fully automatic base assembly dotting machine.
[0033] Among them, the first material taking component 23 of the feeding mechanism 20 can accurately distribute and load the first material 13 to the assembly mechanism 40, the dotting mechanism 50, and the recovery mechanism 60, with better accuracy and higher work efficiency.
[0034] Please refer to Figure 1-3As shown, the present application provides a fully automatic base assembly and dotting machine, including a first material preparation mechanism 10 and a feeding mechanism 20, wherein the first material preparation mechanism 10 is arranged beside the feeding mechanism 20, and the first material picking component 23 of the feeding mechanism 20 can obtain the first material 13 in the first material preparation mechanism 10; the second material preparation mechanism 30 is connected to the assembly mechanism 40; the assembly mechanism 40 and the dotting mechanism 50 are arranged on the movement track of the first material picking component 23; the assembly mechanism 40 can assemble the first material 13 and the second material together; the dotting mechanism 50 can press the first material 13 and the second material together; the recycling mechanism 60 is arranged beside the feeding mechanism 20, and the first material picking component 23 can load the finished product into the recycling bin 62 of the recycling mechanism 60. The first material preparation mechanism 10 is used to prepare the first material 13 (for example, the antenna pole); the second material preparation mechanism 30 is used to equip the second material (for example, the base of the antenna); the assembly mechanism 40 is used to assemble the first material 13 and the second material together; the recycling mechanism 60 is used to recycle the finished product. The feeding mechanism 20 is used to load the first material 13 into the assembly mechanism 40, the dotting mechanism 50, and the recycling mechanism 60. The first material picking component 23 is preferably a clamp. The first material picking component 23 can be one or more. In this embodiment, there are three first material picking components 23, and the three first material picking components 23 reciprocate to further improve the efficiency of feeding. The preferred working steps are as follows: 1. The first material picking component 23 accurately clamps the first material 13 from the first material preparation mechanism 10, and then moves to the position of the assembly mechanism 40 to wait for assembly with the second material. 2. The second material preparation mechanism 30 loads the second material into the assembly mechanism 40, and then the assembly mechanism 40 assembles the first material 13 and the second material together. 3. The first material picking component 23 clamps the assembled semi-finished product and moves to the dotting mechanism 50, and then the dotting mechanism 50 assembles the first material 13 and the second material together. 4. The first material picking component 23 clamps the assembled finished product and loads it to the recycling mechanism 60. The plurality of first material taking components 23 work reciprocatingly, which reduces the movement distance of each of the first material taking components 23 and improves the working efficiency.
[0035] Please refer to Figure 3-5 As shown, the first material preparation mechanism 10 includes a first material bin 11, and a first feeding component 110 arranged at the first discharge port of the first material bin 11; the first feeding component 110 includes a first feeding plate 113, a first pushing component 115, and a first waiting plate 117; a first material trough 114 is arranged on the first feeding plate 113; a second material trough 118 is arranged on the first waiting plate 117; the first material trough 114 can be connected to or separated from the first discharge port and the second material trough 118, and the first pushing component 115 can extend into the second material trough 118.
[0036] The bottom of the first silo 11 is inclined, and a movable first partition plate 12 is provided inside the first silo 11. A large amount of first material 13 is placed in the first silo 11. The first partition plate 12 can be adjusted so that the first silo 11 can adapt to first materials 13 of different lengths. The first material 13 falls from the first discharge port at the bottom of the first silo 11 into the first feeding assembly 110 under the action of gravity. The first feeding plate 113 is arranged on a first linear die 112 group driven by a first cylinder 111. The first cylinder 111 pushes the first trough 114 on the first feeding plate 113 to communicate with the first discharge port, and then the first material 13 falls into the first trough 114, and then the first feeding plate 113 continues to move so that the first material 13 falls into the second trough 118.
[0037] The second cylinder 116 drives the first material pushing component 115 to push the first material 13 in the second material trough 118 to achieve the positioning of the first material 13. The second material trough 118 is provided with an escape port. After the first material 13 is positioned, the first first material taking component 23 of the feeding mechanism 20 clamps the first material 13 at the escape port position of the second material trough 118, and then loads the first material 13 to the assembly mechanism 40 for assembly, and then the first first material taking component 23 returns to the escape port to continue to clamp the first material 13, and the process is repeated continuously. The first material pushing component 115 is preferably rod-shaped or needle-shaped.
[0038] Please refer to Figure 1 As shown, preferably, the second material preparation mechanism 30 includes a vibrating material tray 31, and a material rail 32 connected to the vibrating material tray 31; the material rail 32 is connected to the assembly mechanism 40 from top to bottom. A large amount of second material (such as the base of the antenna) is contained in the vibrating material tray 31. The second material goes from the vibrating material tray 31 to the material rail 32, and then enters the assembly mechanism 40. The first material picking component 23 is arranged on the second linear module 22 driven by the third cylinder 21, and the first material picking component 23 can continuously reciprocate.
[0039] Please refer to Figure 3 , Figure 4 , Figure 6As shown, preferably, the assembly mechanism 40 includes a second material picking component 43, a second material pushing component 46, a material fixing seat 47, and an assembly seat 49; the second material picking component 43 is arranged on the first side of the feeding mechanism 20, and the second material picking component 43 can move toward the assembly seat 49; the assembly seat 49, the material fixing seat 47, and the second material pushing component 46 are arranged in sequence on the second side of the feeding mechanism 20, and the second material pushing component 46 can penetrate the material fixing seat 47 and the assembly seat 49. The second material picking component 43 is preferably a clamp. The second material picking component 43 is arranged on the third linear module 42 driven by the fourth cylinder 41; the second material pushing component 46 is arranged on the fourth linear module 45 driven by the fifth cylinder 44. The second material pushing component 46 is preferably one of a rod-shaped, a bar-shaped, and a needle-shaped. The assembly steps of the assembly mechanism 40 are as follows: 1. The second material picking component 43 clamps the first material 13, and then the first first material picking component 23 releases the first material 13. 2. The second material picking component 43 clamps the first material 13 and moves toward the assembly seat 49, and the assembly seat 49 clamps the first material 13. 3. The second material pushing component 46 pushes the second material in the fixed material seat 47 into the assembly seat 49, so that the first material 13 and the second material are assembled together. 4. After the assembly is completed, the second first material picking component 23 clamps the assembled semi-finished product and loads the semi-finished product into the dotting mechanism 50 to wait for further processing.
[0040] Preferably, the assembly seat 49 is provided with an openable assembly channel inside, and the assembly channel is adapted to the size of the first material 13 and the second material. The seventh cylinder 48 drives the assembly seat 49 to open or close. The inner diameter R1 of the assembly channel is adapted to the size of the first material 13, and the inner diameter R2 of the assembly channel is adapted to the size of the second material. The first material 13 extends to the inner diameter R2 position, the second pushing component 46 pushes the second material, and then the second material passes through the first material 13, so that the two are assembled.
[0041] Preferably, the dotting mechanism 50 includes a third material picking component 53, a dotting head 510, and a hydraulic cylinder 54; the third material picking component 53 is arranged on the first side of the feeding mechanism 20, and the third material picking component 53 can move toward the dotting head 510; the output end of the hydraulic cylinder 54 is connected to the dotting head 510. The third material picking component 53 is preferably a clamp. The third material picking component 53 is arranged on the fifth linear module 52 driven by the sixth cylinder 51. The steps of the dotting mechanism 50: 1. The second first material picking component 23 transports the semi-finished product to the position of the dotting mechanism 50. 2. The third material picking component 53 clamps the first material 13 and then moves toward the dotting head 510. 3. The first material 13 and the second material are inserted into the dotting head 510, and the hydraulic cylinder 54 drives the dotting head 510 to work, so that the first material 13 and the second material are pressed together. 4. The finished product after the point pressing is clamped by the third first material picking component 23 and thrown into the recycling bin 62 of the recycling mechanism 60. The first material picking component 23, the second material pushing component 46, and the third material picking component 53 are preferably clamps.
[0042] Please refer to Figure 7 As shown, preferably, the dotting head 510 includes a seat body 511, a dotting part 512, and a guide frame 514; the dotting part 512 is movably arranged on the seat body 511; the dotting part 512 has a guide groove 513, the guide frame 514 has a guide part 515, the output rod 516 of the hydraulic cylinder 54 is connected to the dotting part 512, and the guide groove 513 can move on the guide part 515. The dotting part 512 is provided with a plurality of dotting needles, and a plurality of dotting parts 512 are connected to the output rod 516 of the hydraulic cylinder 54, and are driven by the output rod 516 of the hydraulic cylinder 54 to move synchronously. The seat body 511 is provided with a mounting groove for mounting the dotting part 512, and the dotting part 512 can move in the mounting groove. The working principle of the dotting head 510 is as follows: when the output rod 516 of the hydraulic cylinder 54 pushes the dotting part 512, the guide groove 513 and the guide part 515 cooperate to move the dotting part 512 radially away from each other, so that the dotting needle can be released. When the output rod 516 of the hydraulic cylinder 54 pulls the dotting part 512, the guide groove 513 and the guide part 515 cooperate to move the dotting part 512 radially closer to each other, so that the dotting needle can press the first material 13 and the second material together.
[0043] Preferably, the recycling mechanism 60 further includes a material plate 61 arranged obliquely; the material plate 61 slopes toward the recycling bin 62. An adjustable second partition plate 63 is arranged in the recycling bin 62 to accommodate products of different sizes. After the third second material taking component 43 grabs the finished product, it throws the product onto the material plate 61, and the finished product will roll into the recycling bin 62 by itself under the action of gravity, which is more efficient. The first partition plate 12 and the second partition plate 63 are preferably fixed and adjusted by screws, bolts, etc.
[0044] In summary, the design focus of the utility model is that the first material picking component 23 of the feeding mechanism 20 can accurately distribute and load the first material 13 to the assembly mechanism 40, the dotting mechanism 50, and the recovery mechanism 60, with better accuracy, improved coordination between the mechanisms, and higher work efficiency.
[0045] The above description is only a preferred embodiment of the present invention and does not constitute any form of limitation to the present invention. Although the present invention has been disclosed as a preferred embodiment as above, it is not intended to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any brief modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention are still within the scope of the technical solution of the present invention.
Claims
1. A fully automatic base assembly dotting machine, characterized in that: It comprises a first material preparation mechanism and a feeding mechanism, wherein the first material preparation mechanism is arranged beside the feeding mechanism, and a first material taking component of the feeding mechanism can take the first material in the first material preparation mechanism; The second material preparation mechanism is connected to the assembly mechanism; The assembling mechanism and the dotting mechanism are arranged on the motion track of the first material taking component; the assembling mechanism can assemble the first material and the second material together; the dotting mechanism can press the first material and the second material together; The recovery mechanism is arranged beside the feeding mechanism, and the first material taking component can load the finished product into the recovery bin of the recovery mechanism.
2. The fully automatic base assembly marking machine according to claim 1, characterized in that: The first material preparation mechanism includes a first material bin, and a first feeding assembly arranged at a first material outlet of the first material bin; the first feeding assembly includes a first feeding plate, a first pushing component, and a first waiting plate; a first material trough is arranged on the first feeding plate; a second material trough is arranged on the first waiting plate; the first material trough can be connected to or separated from the first outlet and the second material trough, and the first pushing component can extend into the second material trough.
3. The fully automatic base assembly marking machine according to claim 2, characterized in that: The bottom of the first material bin is inclined, and a movable first partition plate is arranged inside the first material bin.
4. The fully automatic base assembly marking machine according to claim 1, characterized in that: The second material preparation mechanism includes a vibrating material tray and a material rail connected to the vibrating material tray; the material rail is connected to the assembly mechanism from top to bottom.
5. The fully automatic base assembly dotting machine according to claim 1, characterized in that: The assembly mechanism includes a second material picking component, a second material pushing component, a material fixing seat, and an assembly seat; the second material picking component is arranged on the first side of the feeding mechanism, and the second material picking component can move toward the assembly seat; the assembly seat, the material fixing seat, and the second material pushing component are arranged in sequence on the second side of the feeding mechanism, and the second material pushing component can penetrate into the material fixing seat and the assembly seat.
6. The fully automatic base assembly marking machine according to claim 5, characterized in that: An openable and closable assembly channel is provided inside the assembly seat, and the assembly channel is adapted to the size of the first material and the second material.
7. The fully automatic base assembly marking machine according to claim 1, characterized in that: The dotting mechanism includes a third material picking component, a dotting head, and a hydraulic cylinder; the third material picking component is arranged on the first side of the feeding mechanism, and the third material picking component can move toward the dotting head; the output end of the hydraulic cylinder is connected to the dotting head.
8. The fully automatic base assembly dotting machine according to claim 7, characterized in that: The dotting head includes a seat body, a dotting part, and a guide frame; the dotting part can be movably arranged on the seat body; the dotting part is provided with a guide groove, the guide frame is provided with a guide part, the output rod of the hydraulic cylinder is connected to the dotting part, and the guide groove can move on the guide part.
9. The fully automatic base assembly marking machine according to claim 1, characterized in that: The recovery mechanism also includes a material plate that is tilted toward the recovery bin.
10. A fully automatic base assembly dotting machine according to claim 1 or 9, characterized in that: An adjustable second partition plate is arranged in the recovery bin.