Automatic detection leveling device for bridge deck pavement

By introducing automatic detection and control systems into concrete pavement maintenance equipment, combined with height sensors and vibrators, the problem of low efficiency of traditional equipment is solved, and efficient automated construction and better flattening effects are achieved.

CN222083333UActive Publication Date: 2024-11-29ZHEJIANG COMM CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202322940898.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-01
Publication Date
2024-11-29
Estimated Expiration
2033-11-01

AI Technical Summary

Technical Problem

Traditional concrete pavement maintenance equipment is inefficient and cannot detect pavement flatness, resulting in low construction efficiency and high labor consumption.

Method used

An automatic detection and leveling device is designed, equipped with a height sensor and a controller, which automatically controls the start and stop of the walking device by detecting the road height, and adds a vibrator and a spray unit to the leveling assembly to improve the leveling effect and construction efficiency.

Benefits of technology

It realizes automated construction, saves construction time, improves the flatness and coating effect of concrete pavement, and reduces equipment wear and labor consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222083333U_ABST
    Figure CN222083333U_ABST
Patent Text Reader

Abstract

The utility model aims to provide an automatic detection leveling device for bridge deck pavement, which comprises a main frame, a leveling assembly connected with the main frame and a walking device connected with the main frame, the leveling assembly comprises a leveling rod, the main frame is provided with a height sensor for detecting the ground height, and the walking device is connected with the leveling rod. The main frame is connected with a controller which is in communication connection with the height sensor and used for controlling the walking device to start and stop. According to the device, concrete can be leveled and troweled, the construction efficiency can be improved, and the construction time is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction engineering equipment, in particular to a concrete pavement maintenance device. Background Art

[0002] At present, with the rapid development of bridge engineering technology, expressways or first-class highways are basically composed of composite bridge decks, and the requirements for the appearance quality of concrete pavement of composite bridge decks of high-grade highways are also increasing. In particular, the requirements for the flatness and crack control of concrete pavement are more stringent. The traditional process directly uses manual leveling for maintenance after the concrete is poured. The workers use a push plate to push the concrete flat, and then use a leveling device to level and compact the concrete, resulting in low operating efficiency and a large amount of labor consumed for large-scale bridge deck pavement construction.

[0003] For example, the Chinese patent document with publication number CN112144354A discloses an effective automatic concrete leveling device. The leveling of concrete is achieved through the linkage of the moving mechanism and the leveling mechanism, and the leveling device is realized by a rotating rod and a roller. The roller is sleeved on the rotating rod, and the rotating rod drives the roller to level the concrete pavement. At the same time, the linkage adopts a purely mechanical mechanism, avoiding the use of electronic components, improving the stability and service life of the device, and also improving the efficiency of construction.

[0004] However, this device has certain defects. In actual application, the leveling mechanism of this device cannot detect the flatness of the road surface. The concrete road surface that does not need to be leveled is also leveled. The leveling mechanism is always in working state, the construction efficiency is low, and it takes a long time. Utility Model Content

[0005] The utility model aims to provide an automatic detection and leveling device for bridge deck paving, which can not only level and smooth concrete, but also improve construction efficiency and reduce construction time.

[0006] The above technical objectives of the utility model are achieved through the following technical solutions:

[0007] An automatic detection and leveling device for bridge deck paving comprises a main frame, a leveling assembly connected to the main frame and a traveling device connected to the main frame, the leveling assembly comprises a leveling rod, a height sensor for detecting the ground height is installed on the main frame, and a controller is connected to the main frame, which is in communication with the height sensor and is used to control the start and stop of the traveling device.

[0008] In actual application, the main frame can be a common steel structure in the market in the prior art, which has the advantages of simple node form, material saving, simple construction and good geometric characteristics. The device as a whole can be controlled by the controller to realize automatic walking; the leveling component is arranged on the main frame. The controller receives the height value of the height sensor and compares it with the preset height value. If it is within the preset height value, it will move normally. If it is higher than the preset height value, the walking device is controlled to stop. The height sensor and the walking device can be selected from common types in the market in the prior art. After the operator fills the road surface concrete, the controller controls the device to work after comparing it with the set value. When the height sensor detects that the road surface is within the normal value, the device will continue to move forward. Save the time required for the construction process, avoid continuous construction when leveling the road surface, reduce the wear of the equipment, and extend the service life. In addition, the leveling effect of the concrete road surface is better and the construction time is shorter.

[0009] As a preferred embodiment of the present invention, a film coating unit is further included, and the film coating unit includes a film coating rod and a film cloth cylinder sleeved on the film coating rod.

[0010] In the film coating unit, the film coating rod is arranged at the bottom layer of the main frame, and is equal to the length of the long side of the main frame. One end of the film coating rod is welded to the main frame, and the other end is detachably connected to the main frame. The connection method can be selected from threads and pin holes in the prior art. The film cloth tube can be selected from plastic films commonly available on the market in the prior art. The film cloth tube is sleeved on the film coating rod. In actual application, when the equipment is ready to start moving forward, the operator first pulls out a part of the film cloth and fixes it to the concrete pavement that needs film coating and maintenance, and then starts the device to move towards the construction pavement. At this time, the film cloth can be pulled out to a corresponding length according to the travel distance of the device to complete the film coating and maintenance operation of the concrete pavement, saving construction time.

[0011] As a preferred embodiment of the present invention, a spray unit for spraying the membrane cloth is also included, and the spray unit includes a water tank installed on the main frame, a water pipe connected to the water tank, and a plurality of spray heads.

[0012] The water pipe is installed at the bottom layer of the main frame, and is located in front of the film coating unit in the working direction. In actual application, the water tank is installed on one side of the main frame, and water is injected into the water tank and connected to the water tank through the water pipe, while the other end of the water pipe is sealed. So that the water flow can be sprayed out through the nozzle on the water pipe. The water tank is installed in the middle layer of the main frame. Water is sprayed out from the nozzle according to the principle of fluid dynamics. The nozzle can be provided with multiple nozzles according to actual needs. When water flows through the nozzle from the water pipe, the internal structure of the nozzle changes the flow mode of the fluid, thereby converting the water flow into one or more fine jets. The nozzle is usually composed of one or more small holes, which control the direction and flow rate of the jet through the shape and size of the nozzle. When water passes through the small holes of the nozzle, the water flow speed will increase due to the small size of the small holes, thereby increasing the kinetic energy of the water. At this time, the nozzle can spray evenly to wet the film cloth, and due to the characteristic of enhanced adsorption of plastic film cloth when it encounters water, the film cloth is more closely attached to the road surface. The effect of road maintenance is improved.

[0013] As a preferred embodiment of the present invention, a booster pump is provided on one side of the main frame close to the water tank, one end of the booster pump is connected to the water tank, and the other end is connected to the water pipe.

[0014] In actual application, by adding the booster pump between the water tank and the water pipe, the water pressure can be increased. When the water flow pressure of the water tank is not enough to deliver water to the nozzle, the booster pump can increase the water pressure so that the water can flow smoothly to the required place. The water in the water tank is pressurized by the booster pump and then delivered to the nozzle through the water pipe, so that the water flow is stably delivered to the nozzle. The nozzle can spray continuously and stably to ensure the wetting of the membrane cloth.

[0015] As a preferred embodiment of the present invention, the main frame is provided with an operating pedal on one side of the forward travel direction of the equipment.

[0016] In actual application, during construction, when the controller determines that the road surface is lower than the set value, the operator fills the soil road surface with concrete. The maintenance device fails and needs to be repaired, or the membrane needs to be replaced. The concrete of the construction road surface is not dry, and the operator cannot step on it. By installing the operating pedal on the main frame, the operator can step on it to solve the above problems and other problems that arise during the construction process.

[0017] As a preferred embodiment of the present invention, the operating pedal includes a hollow treading layer.

[0018] The treading layer is arranged on the operating pedal. Compared with the common pedal, the treading layer is a hollow structure and is lighter than the traditional pedal, which can reduce the weight of the equipment and save the power required for the equipment during the movement. When the operator needs to perform construction work on the operating pedal, the hollow treading layer can increase the friction with the sole of the operator's shoe, thereby increasing the safety of the operator during the construction work.

[0019] As a preferred embodiment of the present invention, the leveling assembly further comprises a driver communicatively connected to the controller, and the driver is connected to a rotating member for controlling the lifting and lowering of the leveling rod.

[0020] In this solution, the controller controls the driver according to the set value, thereby raising and lowering the leveling rod. The driver can be a common driving device in the prior art, such as a motor and an oil pump. In this solution, the driver is an oil pump and an oil pipe. When the oil pressure of the oil pump drops, the oil pressure in the oil pipe connected to the oil pump is relaxed. The oil pipe is connected to the rotating part of the leveling rod through a rotating part, and the leveling rod is controlled to drop by oil pressure to start the leveling operation. The controller controls the raising and lowering of the leveling rod according to the road surface information, and can control the operation of the leveling rod according to demand, reducing the wear of the equipment while avoiding unnecessary waste of resources.

[0021] As a preferred embodiment of the present invention, a wire cutting knife is provided on the bottom layer of the main frame located above the laminating unit.

[0022] By arranging a wire-pulling cutter above the film-coating unit, the wire-pulling cutter can be selected from common types in the market in the prior art. After the film coating is completed, the operator pulls the cutter through the pull ropes connected on both sides. The cutter moves to cut the film cloth, increasing the convenience of using the maintenance device.

[0023] As a preferred embodiment of the present invention, a side of the main frame extending close to the membrane cloth is connected with a geotextile for compacting a gap between the membrane cloth and a concrete pavement.

[0024] In actual application, after the maintenance device is coated, bubbles or gaps will still appear after being attached to the road surface because the film is a plastic film. The geotextile connected to the side of the main frame near the extended film is soaked, and the geotextile itself and the weight after soaking are used to further compact the film and the road surface. By soaking the geotextile, static electricity can be avoided after the dry cloth and the plastic film are in friction contact, and the plastic film can be adsorbed instead.

[0025] As a preferred embodiment of the present invention, the leveling rod is provided with a vibrator for enhancing the leveling effect of the concrete pavement.

[0026] The vibrator is connected to the leveling rod, and the power of the vibrator comes from the internal motor carried by the vibrator. There can be multiple vibrators, and the vibrators can be selected from common types on the market in the prior art. The vibration range of the vibrator can be expanded by the leveling rod, and the vibration wave generated by the vibrator is transmitted to the concrete through the leveling rod connected thereto. The vibration wave can eliminate the air in the concrete and the bubbles between the cement slurry, reduce the cracking of the concrete, and make the concrete road surface more leveled.

[0027] As a preferred embodiment of the utility model, the coating units are provided in multiple groups, and there is partial overlap between each group. In actual application, since the membrane cloth adopts the common plastic membrane cloth on the market in the prior art and is easy to purchase, there is no membrane cloth size suitable for the bridge deck that is too wide. At this time, the coating units are set to multiple groups. On the one hand, it is convenient to purchase membrane cloth of existing specifications on the market, avoiding the need to customize the membrane cloth due to setting up a group of longer coating units, and on the other hand, it is convenient to replace the membrane cloth on the coating bearing. In addition, multiple groups of coating units are provided, and there are overlapping parts between each group of coating units, so as to avoid gaps in the membrane cloth on the construction road surface due to too many coating units, resulting in insufficient coverage of the membrane cloth and poor maintenance effect.

[0028] In summary, the utility model has the following beneficial effects:

[0029] 1. Placing geotextile on the main frame and soaking the geotextile can avoid static electricity generated by friction between the dry cloth and the plastic film. Instead, the plastic film will be adsorbed to further compact the gap between the geotextile and the concrete pavement.

[0030] 2. A film covering unit is set at the bottom of the main frame. The film cloth can be pulled out to a corresponding length according to the travel distance of the device to complete the film covering and maintenance operation of the concrete pavement, saving construction time.

[0031] 3. A spray unit for spraying the membrane cloth is arranged at the bottom layer of the main frame and located in front of the film-coating unit in the working direction. The spray unit comprises a water tank installed on the main frame, a water pipe connected to the water tank and a plurality of nozzles, which can wet the membrane cloth to make it fit better with the concrete floor. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 It is a schematic diagram of Example 1.

[0033] Figure 2 Schematic diagram of geotextile in Example 1.

[0034] Figure 3 It is a schematic diagram of the laminating unit and the wire cutting knife in Example 1.

[0035] In the figure: 1. main frame, 2. leveling rod, 3. height sensor, 4. controller, 5. vibrator, 6. film covering rod, 7. water tank, 8. water pipe, 9. nozzle, 10. booster pump, 11. operating pedal, 12. geotextile, 13. wire cutting knife. DETAILED DESCRIPTION

[0036] The utility model is further described in detail below in conjunction with the accompanying drawings.

[0037] This specific embodiment is merely an explanation of the present invention and is not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to the present embodiment as needed, but such modifications are protected by patent law as long as they are within the scope of the claims of the present invention.

[0038] The motors are respectively arranged at the positions near the bottom on the left and right sides of the main frame 1, and the rollers are respectively arranged at the bottoms on the left and right sides of the main frame 1 and are connected to the motors in a transmission connection manner. The transmission connection method can be a transmission belt and a chain. There can be multiple rollers. In this scheme, two rollers are provided to connect the motors. Through the two rollers, the force points between the whole device and the ground can be increased, so that the stability of the whole device is improved. The rollers are driven to rotate by the motor as a power point, so that the whole device can move forward. The motor is connected to the controller 4 through the height sensor 3 and controls the start and stop of the motor. In the actual application process, the main frame 1 can use the common steel structure in the market in the prior art, which has the advantages of simple node form, material saving, simple construction and good geometric characteristics. The whole device can be controlled by the controller 4 to realize automatic walking; the leveling assembly is arranged on the main frame 1. The controller 4 receives the height value of the height sensor 3 and compares it with the preset height value. If it is within the preset height value, it moves normally. If it is higher than the preset height value, the walking device is controlled to stop. The height sensor 3 and the walking device can be selected from common types in the market in the prior art. After the operator fills the road surface with concrete, the controller 4 controls the device to work after comparison according to the set value. When the height sensor 3 detects that the road surface is within the normal value, the device will continue to move forward. Save the time required for the construction process, avoid continuous construction when leveling the road surface, reduce the wear of the equipment, and extend the service life. In addition, the leveling effect of the concrete road surface is better, and the construction time is shorter.

[0039] The detection assembly is arranged on the main frame 1. The controller 4 controls the height sensor 3 connected thereto and controls the oil pressure rise and fall of the oil pump. The flatness of the concrete pavement is detected by the laser height sensor 3. When the laser height sensor 3 detects that the pavement is higher than the set value, the laser height sensor 3 transmits a signal to the controller 4. After receiving the signal, the controller 4 controls the oil pressure of the oil pump to drop according to the set comparison value, and the oil pressure in the oil pipe connected to the oil pump is relaxed, and the connecting piece controls the leveling rod 2 to drop, and the leveling operation starts. When the laser height sensor 3 detects that the pavement is lower than the set value, the controller 4 controls the motor to stop working, and the device stops moving forward. After the operator fills the pavement concrete, the laser height sensor 3 transmits the detected pavement information to the controller 4, and the control box controls the device to work after comparing the set value. When the laser height sensor 3 detects that the pavement is within the normal value, the device will continue to move forward. Save the time required for the construction process, avoid continuous construction when leveling the pavement, reduce the wear of the equipment, and extend the service life. In addition, the leveling effect of the concrete pavement is better and the construction time is shorter.

[0040] In the coating unit, the coating rod 6 is arranged at the bottom layer of the main frame 1, and is equal to the length of the long side of the main frame 1. One end of the coating rod 6 is welded to the main frame 1, and the other end is detachably connected to the main frame 1. The connection method can be selected from threads and pin holes in the prior art. The film cloth tube can be selected from plastic films commonly available on the market in the prior art. The film cloth tube is sleeved on the coating rod 6. In actual application, when the equipment is ready to start moving forward, the operator first pulls out a part of the film cloth and fixes it to the concrete pavement that needs coating and maintenance, and then starts the device to move toward the construction pavement. At this time, the film cloth can be pulled out to a corresponding length according to the travel distance of the device to complete the coating and maintenance operation of the concrete pavement, saving construction time.

[0041] The water pipe 8 is installed at the bottom layer of the main frame 1, and is located in front of the working direction of the coating unit. In actual application, the water tank 7 is installed on one side of the main frame 1, and after water is injected into the water tank 7, it is connected to the water tank 7 through the water pipe 8, and the other end of the water pipe 8 is in a sealed state. A booster pump 10 is provided on the side of the main frame 1 close to the water tank 7, and one end of the booster pump 10 is connected to the water tank 7, and the other end is connected to the water pipe 8. The water flow can be sprayed out through the nozzle 9 on the water pipe 8. The water tank 7 is installed in the middle layer of the main frame 1. The nozzle 9 can spray evenly at this time to wet the film cloth. Due to the enhanced adsorption of the plastic film cloth when it encounters water, the film cloth fits more closely with the road surface. The effect of maintaining the road surface is improved. The booster pump 10 is added between the water tank 7 and the water pipe 8 to increase the water pressure. The water in the water tank 7 is pressurized by the booster pump 10 and then transported to the nozzle 9 through the water pipe 8, so that the water flow is stably transported to the nozzle 9. The nozzle 9 can spray continuously and stably to ensure the wetting of the membrane cloth.

[0042] During construction, when the controller 4 determines that the road surface is lower than the set value, the operator fills the earth road surface with concrete. The maintenance device fails and needs to be repaired, or the membrane cloth needs to be replaced. The concrete of the construction road surface is not dry, and the operator cannot step on it. By installing the operating pedal 11 on the main frame 1, the operating pedal 11 includes a hollow treading layer. When the operator needs to perform construction work on the operating pedal 11, the hollow treading layer can increase the friction with the sole of the operator's shoe. Increase the safety of the operator during the construction work.

[0043] In this solution, the controller 4 controls the driver according to the set value, thereby raising and lowering the leveling rod 2. The driver can be a common driving device in the prior art, such as a motor and an oil pump. In this solution, the driver is an oil pump and an oil pipe. When the oil pressure of the oil pump drops, the oil pressure in the oil pipe connected to the oil pump is relaxed. The oil pipe is connected to the rotating part of the leveling rod 2 through a rotating part, and the leveling rod 2 is controlled to drop by oil pressure to start the leveling operation. The controller 4 controls the raising and lowering of the leveling rod 2 according to the road surface information, and can control the operation of the leveling rod according to demand, reducing the wear of the equipment while avoiding unnecessary waste of resources.

[0044] By setting a wire cutter 13 above the laminating unit, the wire cutter 13 can be selected from common types in the market in the prior art. After the laminating is completed, the operator pulls the cutter through the pull ropes connected on both sides, and the wire cutter 13 is equal in length to the main frame 1. The cutter moves to cut the film cloth, increasing the convenience of using the maintenance device.

[0045] Arranging the geotextile 12 on the main frame 1 and soaking the geotextile 12 can avoid static electricity generated by the frictional contact between the dry cloth and the plastic film, but adsorb the plastic film to further compact the gap between the film cloth and the concrete pavement. In actual application, after the maintenance device is coated, since the film cloth is a plastic film, bubbles or gaps will still be generated after it is attached to the road surface. By soaking the geotextile 12 connected to the side of the main frame 1 where the film cloth extends, the geotextile is soaked, and the weight of the geotextile itself and after being soaked is used to further compact the film cloth and the road surface. By soaking the geotextile 12, static electricity generated by the frictional contact between the dry cloth and the plastic film can be avoided, but the plastic film can be adsorbed.

[0046] The vibrator 5 is connected to the leveling rod 2, and the power of the vibrator 5 comes from the internal motor carried by the vibrator 5. There can be multiple vibrators 5, and the vibrators 5 can be selected from common types in the market in the prior art. The vibration range of the vibrator 5 can be expanded by the leveling rod 2, and the vibration wave generated by the vibrator 5 is transmitted to the concrete through the leveling rod 2 connected thereto. The vibration wave can eliminate the air in the concrete and the bubbles between the cement slurry, reduce the cracking of the concrete, and make the concrete road surface more leveled.

[0047] The coating units are provided in multiple groups, and each group has some overlap. Since the film cloth adopts the common plastic film cloth in the market in the prior art, it is easy to purchase, so there is no film cloth size suitable for the bridge deck that is too wide. At this time, the coating units are set as multiple groups. On the one hand, it is convenient to purchase the existing specifications of the film cloth on the market, avoiding the need to customize the film cloth due to setting a longer set of coating units. On the other hand, it is convenient to replace the film cloth on the coating bearing. In addition, multiple groups of coating units are provided, and there are overlapped parts between each group of coating units, so as to avoid the film cloth from having gaps on the construction road surface due to too many coating units, resulting in insufficient coverage of the film cloth and poor maintenance effect.

[0048] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. An automatic detection and leveling device for bridge deck paving, comprising a main frame (1), a leveling assembly connected to the main frame (1), and a walking device connected to the main frame (1), characterized in that: The leveling assembly comprises a leveling rod (2), a height sensor (3) for detecting the height of the ground is mounted on the main frame (1), and a controller (4) is connected to the main frame (1) for communicating with the height sensor (3) and for controlling the start and stop of the walking device; It also comprises a film coating unit, the film coating unit comprising a film coating rod (6) and a film cloth cylinder sleeved on the film coating rod (6); It also comprises a spray unit for spraying the membrane cloth, the spray unit comprising a water tank (7) mounted on the main frame (1), a water pipe (8) connected to the water tank (7), and a plurality of spray heads (9).

2. The automatic detection and leveling device for bridge deck paving according to claim 1 is characterized in that: A booster pump (10) is provided on one side of the main frame (1) close to the water tank (7); one end of the booster pump (10) is connected to the water tank (7), and the other end is connected to the water pipe (8).

3. The automatic detection and leveling device for bridge deck paving according to claim 1 is characterized in that: The main frame (1) is provided with an operating pedal (11) on one side of the forward moving direction of the equipment.

4. The automatic detection and leveling device for bridge deck paving according to claim 3 is characterized in that: The operating pedal (11) comprises a hollowed-out treading layer.

5. The automatic detection and leveling device for bridge deck paving according to claim 1 is characterized in that: The leveling assembly also includes a driver that is in communication with the controller (4), and the driver is connected to the rotating member to control the lifting and lowering of the leveling rod (2).

6. The automatic detection and leveling device for bridge deck paving according to claim 1 is characterized in that: A wire cutting knife (13) is provided on the bottom layer of the main frame (1) located above the film coating unit.

7. The automatic detection and leveling device for bridge deck paving according to claim 1 is characterized in that: A geotextile (12) for compacting the gap between the membrane cloth and the concrete pavement is connected to the side of the main frame (1) extending close to the membrane cloth.

8. The automatic detection and leveling device for bridge deck paving according to claim 5 is characterized in that: The leveling rod (2) is provided with a vibrator (5) for enhancing the leveling effect of the concrete pavement.