Purified water heating system and water purifier
By introducing a preheating module and an instant faucet module into the water purifier to heat the water in two stages, the problem of low efficiency of the existing water purification heating system is solved, faster hot water supply is achieved, and user experience is improved.
Patent Information
- Application Number
- CN202420040160.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-05
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-01-05
AI Technical Summary
The existing water purification heating system has low heating efficiency, which causes users to wait for hot water for a long time.
A water purification heating system was designed. By introducing a preheating module and an instant faucet module into the water purifier, the pure water in the water circuit was heated in two stages, and the preheating module was used for preliminary heating, and then the instant faucet module was carried out. The second heating ensures that the waiting time for hot water is reduced while supplying water at a high flow rate.
It effectively improves the efficiency of hot water output by the water purifier, shortens the preparation time for hot water, and improves the user experience.
Smart Images

Figure CN222086270U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of water purification technology, and in particular to a water purification heating system and a water purifier. Background Art
[0002] As people's living standards improve, they pay more and more attention to drinking water health, and water purifiers as health products are getting more and more attention and are widely used in people's daily lives. The maximum heating power of a general household water purifier can only reach 2200W. Therefore, users need to wait for dozens of seconds to get a cup of 300mL of water. It can be seen that the efficiency of the current water purification heating system in producing hot water is poor. Utility Model Content
[0003] The present application provides a water purification heating system and a water purifier, which can reduce the time for the water purification heating system to produce hot water, thereby improving the efficiency of the water purification heating system to produce hot water. The present application provides a water purification heating system, including:
[0004] Water inlet;
[0005] A filter module, wherein the filter module is connected to the water inlet through a water inlet pipeline;
[0006] A preheating module, wherein a first end of the preheating module is connected to the filtering module;
[0007] An instant hot tap module, wherein a first end of the instant hot tap module is connected to a second end of the preheating module;
[0008] A water outlet, the second end of the instant faucet module is connected to the water outlet.
[0009] Optionally, in some embodiments of the present application, the preheating module includes a hot water valve, a preheating water tank and a one-way valve;
[0010] The first end of the hot water valve is connected to the filter module, the second end of the hot water valve is connected to the cold water side of the preheating water tank, and the hot water side of the preheating water tank is connected to the instant faucet module through the one-way valve.
[0011] Optionally, in some embodiments of the present application, a wastewater outlet is further included, the preheating module also includes a pressure relief plug, the pressure relief plug is arranged in the wastewater pipeline, the preheating water tank is connected to the wastewater outlet through the wastewater pipeline, the preheating module also includes a water replenishment valve, the water replenishment valve is arranged in the water replenishment pipeline, and the preheating water tank is connected to the pure water outlet of the filtration module through the water replenishment pipeline.
[0012] Optionally, in some embodiments of the present application, a pipeline machine interface is further included, and the pipeline machine interface is connected to the water outlet end of the filter module.
[0013] Optionally, in some embodiments of the present application, the instant hot faucet module includes a regulating valve, a heating unit and a water outlet unit;
[0014] Wherein, the regulating valve is connected to the one-way valve and the filter module through a clean water pipeline, and the water outlet unit is connected to the regulating valve through the heating unit.
[0015] Optionally, in some embodiments of the present application, the one-way valve and the filter module are connected to the first end of the regulating valve, the second end of the regulating valve is connected to the heating unit, and the third section of the regulating valve is connected to the water outlet unit.
[0016] Optionally, in some embodiments of the present application, the water outlet unit includes a water vapor separation box and a water outlet nozzle;
[0017] The preheating module and the third section of the regulating valve are connected to one side of the water vapor separation box, and the other side of the water vapor separation box is connected to the water outlet.
[0018] Optionally, in some embodiments of the present application, the filtration module includes a pre-filter element, a water inlet valve, a booster pump, a reverse osmosis filter element, a post-filter element, and a reflux valve group;
[0019] Among them, the water inlet is connected to the pre-filter element through the water inlet pipeline, the pre-filter element is connected to the water inlet side of the reverse osmosis filter element through the water inlet valve and the booster pump, the pure water side of the reverse osmosis filter element is connected to the post-filter element, and the post-filter element is also connected to the preheating module.
[0020] Optionally, in some embodiments of the present application, the filtration module further includes a wastewater valve group, which is connected to the concentrate side of the reverse osmosis filter element, and the wastewater valve group is arranged on a wastewater branch and connected to a wastewater pipeline through the wastewater branch.
[0021] In a second aspect, a water purifier is provided, comprising the purified water heating system provided in any embodiment of the present application.
[0022] As described above, the present application provides a water purification heating system and a water purifier, the water purification heating system includes a water inlet; a filter module, the filter module is connected to the water inlet through a water inlet pipeline; a preheating module, the first end of the preheating module is connected to the filter module; an instant hot tap module, the first end of the instant hot tap module is connected to the second end of the preheating module; a water outlet, the second end of the instant hot tap module is connected to the water outlet. When the water purifier produces water, the preheating module and the instant hot tap module are used to perform two-stage heating on the pure water in the water path, while ensuring a large flow of water supply, reducing the time for the water purifier to output hot water, thereby improving the efficiency of hot water supply. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0024] in:
[0025] Figure 1 This is a water circuit structure diagram of a first embodiment of a water purification and heating system provided in an embodiment of the present application;
[0026] Figure 2 This is a water circuit structure diagram of a second embodiment of the water purification and heating system provided in the embodiments of the present application;
[0027] Figure 3 This is a water circuit structure diagram of a third embodiment of the water purification and heating system provided in the embodiments of the present application;
[0028] Figure 4 This is a water circuit structure diagram of a fourth embodiment of the water purification and heating system provided in the embodiments of the present application;
[0029] Figure 5 This is a water circuit structure diagram of a fifth embodiment of the water purification and heating system provided in the embodiments of the present application;
[0030] Figure 6 This is a water circuit structure diagram of a sixth embodiment of the water purification and heating system provided in the embodiments of the present application;
[0031] Figure 7 This is a water circuit structure diagram of a seventh embodiment of the water purification and heating system provided in the embodiments of the present application;
[0032] Figure 8 This is a water circuit structure diagram of the eighth embodiment of the water purification and heating system provided in the embodiments of the present application. DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0034] In addition, the described features, structures or characteristics may be combined in one or more embodiments in any suitable manner. In the following description, many specific details are provided to provide a full understanding of the embodiments of the present disclosure. However, those skilled in the art will appreciate that the technical solutions of the present disclosure may be practiced while omitting one or more of the specific details, or other methods, components, devices, steps, etc. may be adopted. In other cases, known structures, methods, devices, implementations, materials or operations are not shown or described in detail to avoid obscuring various aspects of the present disclosure.
[0035] In the present disclosure, unless otherwise clearly specified and limited, the terms "connected", "connection" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be an electrical connection, or it can communicate with each other; it can be directly connected, or it can be indirectly connected through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present disclosure can be understood according to specific circumstances.
[0036] In addition, in the description of the present application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically limited. "And / or" describes the association relationship of associated objects, indicating that three relationships may exist, such as A and / or B, which may indicate the existence of A alone, B alone, and the simultaneous existence of A and B. The symbol " / " generally indicates that the objects associated with each other are in an "or" relationship. The terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features.
[0037] See also Figure 1 , Figure 1 1 is a water circuit structure diagram of the first embodiment of the water purification heating system provided in the embodiment of the present application. The present application provides a water purification heating system, which includes a water inlet 10, a filter module 20, a preheating module 30, an instant hot tap module 40 and a water outlet 50. Among them, the filter module 20 is connected to the water inlet 10 through a water purification pipeline, the first end of the preheating module 30 is connected to the filter module 20 through a water purification pipeline, the first end of the instant hot tap module 40 is connected to the second end of the preheating module 30, and the water outlet 50 is connected to the second end of the instant hot tap module 40.
[0038] Among them, the water inlet 10 is used to access tap water, which can be specifically connected to the tap water pipeline. The filter module 20 is used to purify the tap water connected to the water inlet 10, and specifically can filter large particle impurities in the water, as well as dissolved solids, dissolved organic matter, heavy metal ions, microorganisms and other pollutants in the water. The preheating module 30 is used to heat the filtered water (hereinafter referred to as pure water). Optionally, in some embodiments, the preheating module 30 can pre-heat the pure water to 80°C, and then the instant faucet module 40 heats it from 80°C to 95°C. This application defines water greater than or equal to 95°C as boiling water. The water outlet 50 can be used to connect to the instant faucet module 40.
[0039] Optionally, in some embodiments, see Figure 2 The preheating module 30 may specifically include a hot water valve 301, a preheating water tank 302 and a one-way valve 303; wherein the first end of the hot water valve 301 is connected to the filter module 20, the second end of the hot water valve 301 is connected to the cold water side of the preheating water tank 302, and the hot water side of the preheating water tank 302 is connected to the instant faucet module 40 through the one-way valve 303.
[0040] Further, the water purification preheating module provided in the present application may further include a wastewater outlet 60, and the preheating module 30 may further include a pressure relief plug 304, which is arranged in the wastewater pipeline, and the preheating water tank 302 is connected to the pressure relief plug 304, and is connected to the wastewater outlet 60 through the wastewater pipeline, that is, it can be understood that when the pressure inside the preheating water tank 302 is too high, the pressure relief plug 304 can be opened to discharge the water inside the preheating water tank 302, thereby achieving the purpose of pressure relief. Optionally, in some embodiments, the switch and closing of the hot water valve 301 can be controlled to achieve flow regulation of the waterway.
[0041] Optionally, in some embodiments, see Figure 3 The water purification preheating module provided in the present application may further include a pipeline machine interface 70 , and the pipeline machine interface 70 is connected to the water outlet end of the filter module 20 .
[0042] The preheating module 30 may further include a water supply valve 305 , which is disposed in a water supply pipeline. The preheating water tank 302 is connected to the water supply valve 305 and is connected to the pure water outlet of the filter module 20 through the water supply pipeline.
[0043] According to the water outlet method, pipeline water dispensers are divided into mechanical water outlet method, solenoid valve controlled water outlet method and induction controlled water outlet method. Mechanical water outlet refers to mechanical pressing. Water will be discharged when the button is pressed once, and the water will stop when the button is stopped. Mechanical water outlet method can discharge water when the power is on or off. Solenoid valve control can only discharge water when the power is on. Press the solenoid valve once to open the water, and press the solenoid valve again to close the water. Induction controlled water outlet refers to water outlet through the induction coil of the IC card.
[0044] When the pipeline machine interface 70 is opened, the pure water flowing out of the water outlet of the filter module 20 can be discharged through the pipeline machine interface 70 .
[0045] When the water tank 302 needs to be replenished with water, the water replenishment valve 305 is opened, and the pure water flowing out of the water outlet of the filter module 20 can replenish the preheated water tank 302 .
[0046] For further information, see Figure 4 The instant hot water faucet module 40 provided in the present application includes a regulating valve 401, a heating unit 402 and a water outlet unit 403, wherein the regulating valve 401 is connected to the one-way valve 303 and the filter module 20 through a clean water pipeline, and the water outlet unit 403 is connected to the regulating valve 401 through the heating unit 402.
[0047] Further, the regulating valve 401 may specifically include a first end 401a, a second end 401b and a third end 401c, wherein the one-way valve 303 and the filter module 20 are connected to the first end 401a of the regulating valve 401, the second end 401b of the regulating valve 401 is connected to the heating unit 402, and the third end 401c of the regulating valve 401 is connected to the water outlet unit 402. The water outlet unit 403 includes a water vapor separation box 4031 and a water outlet nozzle 4032; wherein the preheating module 30 and the third end 401c of the regulating valve 401 are connected to one side of the water vapor separation box 4031, and the other side of the water vapor separation box 4031 is connected to the water outlet nozzle 4032.
[0048] Optionally, in some embodiments, see Figure 5 The filtration module 20 may specifically include a pre-filter element 201, an inlet valve 202, a booster pump 203, a reverse osmosis filter element 204, a post-filter element 205 and a reflux valve group 206; wherein the water inlet 10 is connected to the pre-filter element 201 through an inlet pipe, the pre-filter element 201 is connected to the water inlet side of the reverse osmosis filter element 204 through the inlet valve 202 and the booster pump 203, the pure water side of the reverse osmosis filter element 204 is connected to the post-filter element 205, and the post-filter element 205 is also connected to the preheating module 30.
[0049] Specifically, when making water, tap water enters the pre-filter 201 from the water inlet 10, and under the action of the booster pump 203, the tap water filtered by the pre-filter 201 is pressed out from the water inlet side of the reverse osmosis filter 203 to the pure water side of the reverse osmosis filter 203, and then passes through the post-filter 204, and finally passes through the preheating module 30 and the instant faucet module 40 to achieve the purpose of making hot water; in addition, when the water purifier is turned off, the hot water valve 301 is closed and the reflux valve group 206 is opened. At this time, the water purification heating system prepares pure water, and the prepared pure water flows into the pre-filter 201 through the reflux pipeline, and under the action of the booster pump 203, the reverse osmosis filter 204 is rinsed, thereby improving the water quality of the first cup of water. It should be noted that the outlet TDS (Total dissolved solids) is the main indicator for measuring the filtering effect of the reverse osmosis water purifier. When the reverse osmosis water purifier is working normally, water molecules pass through the membrane into the pure water side under the action of external pressure, and salt ions are retained on the concentrated water side. Therefore, the TDS removal rate can reach a normal state. However, when the reverse osmosis water purifier stops working, the TDS in the raw water will penetrate the membrane through the action of forward osmosis, causing the TDS value on the pure water side to increase. Therefore, whenever the reverse osmosis water purifier stops for a period of time and then restarts water production, the TDS value of the first cup of water will be relatively high, and the longer the downtime, the higher the TDS value.
[0050] For further information, see Figure 6 The filter module 20 may further include a wastewater valve group 207, which is connected to the concentrated water side of the reverse osmosis filter element, and the wastewater valve group 207 is arranged on the wastewater branch and connected to the wastewater pipeline through the wastewater branch. The water filtered by the pre-filter element 201 is discharged from the pure water side of the reverse osmosis filter element 204 under the action of the booster pump 203, and the other part (low water quality) is discharged from the wastewater side of the reverse osmosis filter element 204, and is discharged to the wastewater outlet 60 through the wastewater branch and the wastewater pipeline.
[0051] The water source filtered by the pre-filter element 201 is pressed into the reverse osmosis filter element 201,4 through the booster pump 203 to filter out dissolved solids, dissolved organic matter, heavy metal ions, microorganisms and other pollutants in the water, and the filtered wastewater is discharged through the wastewater outlet 60, thereby completing the purification of the water source. After the water source is purified, the purified water can be heated by the preheating module 30 and the instant faucet module 40 to complete the purification and heating of the tap water.
[0052] After the water purifier is turned off (i.e. the water purifier stops making water), the water remaining in the preheating module 30 and / or the water at the end of the water purification pipeline can be discharged from the wastewater outlet 60 through the wastewater pipeline, so that there is no residual water in the discharge channel of the water purifier, ensuring that when the user receives hot water, the water purifier always discharges hot water, thereby saving water resources and improving the user experience. It should be noted that the water in the preheating water tank does not contact the water flowing to the water outlet. When the preheating water tank is heated, the water in the preheating water tank will be heated to a certain temperature (e.g., 80°C), and then the water flowing to the water outlet flows through the preheating water tank according to the actual application scenario, and heat is exchanged with the water in the preheating water tank, the temperature of the water flowing to the water outlet is increased, and then the water is heated again through the instant faucet module. And the pipe in the preheating water tank is a spiral tube, which can make the water flowing to the water outlet go around many times in the preheating water tank, extend the path, and achieve heat exchange with the water temperature in the preheating water tank.
[0053] For further information, see Figure 7 The reflux valve group 206 of the present application may include a reflux check valve 2061 and a reflux valve 2062, the wastewater valve group 207 may include a first wastewater valve 2071 and a second wastewater valve 2072, and a first water quality detector 801, a second water quality detector 802, a first temperature detector 803, a second temperature detector 804 and a pressure detector 805 may also be provided on the clean water pipeline, wherein the first water quality detector 801 and the first temperature detector 803 are provided between the water inlet valve 202 and the booster pump 203, the second water quality detector 802 and the pressure detector 805 are provided between the post filter element 205 and the hot water valve 301, and the second temperature detector 804 is provided between the preheating water tank 302 and the check valve 303. In addition, a third temperature detector 806 is provided between the regulating valve 401 and the heating unit 402.
[0054] See also Figure 7 The first end of the hot water valve 301 is connected to the filter module 20, the second end of the hot water valve 301 is connected to the cold water side of the preheating water tank 302, the third end of the hot water valve 301 is connected to the first end of the regulating valve 401, the second end of the regulating valve 401 is connected to the water outlet unit 402, and the third end of the regulating valve 401 is connected to the water vapor separation box 4031.
[0055] See also Figure 7 Optionally, in an application scenario (such as when pure water at 25 degrees Celsius is required), when the water inlet 10 introduces normal temperature water after tap water is filtered by the post-filter element 205, the hot water valve 301 and the preheated water tank 302 are closed, and the regulating valve 401 is opened to allow the normal temperature water to flow to the water outlet 50 through the third end 401c of the regulating valve 401, so that the normal temperature water is discharged from the water outlet 50. At this time, the second end 401b of the regulating valve 401 is closed and the second end of the hot water valve 301 is closed.
[0056] See also Figure 7 Optionally, in an application scenario (such as when pure water above 80 degrees Celsius is required), when the water inlet 10 introduces normal temperature water after tap water is filtered by the post-filter element 205, the hot water valve 301 and the preheating water tank 302 are opened, and the regulating valve 401 is opened, so that the normal temperature water is preheated by the preheating water tank 302, and then flows to the water outlet unit 402 through the second end 401b of the regulating valve 401 for secondary heating and then flows to the water outlet 50, so that water above 80 degrees Celsius is discharged from the water outlet 50. At this time, the second end 401b of the regulating valve 401 is closed and the third end of the hot water valve 301 is closed.
[0057] See also Figure 7 Optionally, in an application scenario (such as when pure water at 55 degrees Celsius to 80 degrees Celsius is required), when the water inlet 10 introduces normal temperature water after tap water is filtered by the post-filter element 205, the hot water valve 301 and the preheating water tank 302 are opened, and the regulating valve 401 is opened, so that part of the normal temperature water filtered by the post-filter element 205 is heated by the preheating water tank 302 and another part of the normal temperature water filtered by the post-filter element 205 is mixed through the regulating valve 401, and then flows to the water outlet 50 after secondary heating through the water outlet unit 402 through the second end 401b of the regulating valve 401, so as to realize water discharged from the water outlet 50 at a temperature of 55 degrees Celsius to 80 degrees Celsius. At this time, the third end 401c of the regulating valve 401 is closed.
[0058] See also Figure 7 Optionally, in an application scenario (such as when pure water at a normal temperature of 25 degrees Celsius to 55 degrees Celsius is required), when the water inlet 10 introduces normal temperature water filtered by the post-filter element 205, the hot water valve 301 and the preheated water tank 302 are closed, and the regulating valve 401 is opened, so that the normal temperature water passes through the second end 401b of the regulating valve 401 and is heated by the water outlet unit 402 and flows to the water outlet 50, so that water at a normal temperature of 25 degrees Celsius to 55 degrees Celsius is discharged from the water outlet 50. At this time, the third end 401c of the regulating valve 401 is closed and the second end of the hot water valve 301 is closed.
[0059] See also Figure 8 Optionally, in an application scenario (such as requiring normal temperature water of 20 degrees Celsius), when the water inlet 10 introduces normal temperature water (such as pure water of 25 degrees Celsius) filtered by the post-filter 205, the hot water valve 301 and the preheated water tank 302 are closed, and the regulating valve 401 is opened to allow the normal temperature water to flow to the water outlet 50 through the third end 401c of the regulating valve 401, so as to discharge pure water at normal temperature from the water outlet 50. At this time, the second end 401b of the regulating valve 401 is closed.
[0060] See also Figure 8Optionally, in an application scenario (such as when water above 80 degrees Celsius is required), when the water inlet 10 introduces normal temperature water after tap water is filtered by the post-filter element 205, the hot water valve 301 and the preheating water tank 302 are opened, and the regulating valve 401 is opened to heat the normal temperature water through the preheating water tank 302 (for example, 80 degrees Celsius water can be obtained), and then the normal temperature water flows to the water outlet 50 through the water outlet unit 402 through the second end 401b of the regulating valve 401 after secondary heating (for example, 80 degrees Celsius water is secondary heated to obtain pure water above 80 degrees Celsius) to achieve water above 80 degrees Celsius discharged from the water outlet 50. At this time, the third end 401c of the regulating valve 401 is closed.
[0061] See also Figure 8 Optionally, in an application scenario (such as when pure water at 55 degrees Celsius to 80 degrees Celsius is required), when the water inlet 10 introduces normal temperature water after tap water is filtered by the post-filter element 205, the hot water valve 301 and the preheating water tank 302 are opened, and the regulating valve 401 is opened, so that part of the normal temperature water filtered by the post-filter element 205 is heated by the preheating water tank 302 and another part of the normal temperature water filtered by the post-filter element 205 is mixed through the regulating valve 401, and then flows to the water outlet 50 after secondary heating through the water outlet unit 402 through the second end 401b of the regulating valve 401, so as to realize water discharged from the water outlet 50 at a temperature of 55 degrees Celsius to 80 degrees Celsius. At this time, the third end 401c of the regulating valve 401 is closed.
[0062] See also Figure 8 Optionally, in an application scenario (such as when pure water at a normal temperature of 25 degrees Celsius to 55 degrees Celsius is required), when the water inlet 10 introduces normal temperature water filtered by the post-filter element 205, the hot water valve 301 and the preheated water tank 302 are closed, and the regulating valve 401 is opened, so that the normal temperature water passes through the second end 401b of the regulating valve 401 and is heated by the water outlet unit 402 and flows to the water outlet 50, so that water at a normal temperature of 25 degrees Celsius to 55 degrees Celsius is discharged from the water outlet 50. At this time, the third end 401c of the regulating valve 401 is closed.
[0063] As can be seen from the above, when the water purifier produces water, the present application utilizes the preheating module 20 to perform the first stage heating of the pure water in the water circuit, and utilizes the instant faucet module 30 to perform the second stage heating of the pure water, while ensuring a large flow of water supply, reducing the time for the water purifier to produce hot water, thereby improving the efficiency of hot water supply.
[0064] The present application also provides a water purifier (not shown), which includes a water purification heating system. The specific structure of the water purification heating system refers to the above-mentioned embodiment. Since the water purifier proposed in the present application adopts all the technical solutions of all the above-mentioned embodiments, it has at least all the beneficial effects brought by the technical solutions of the above-mentioned embodiments, which will not be described one by one here.
[0065] The above disclosure is only the preferred embodiment of the present application, which certainly cannot be used to limit the scope of rights of the present application. Therefore, equivalent changes made according to the claims of the present application are still within the scope covered by the present application.
Claims
1. A water purification heating system, It is characterized in that include: Water inlet; A filter module, wherein the filter module is connected to the water inlet through a water inlet pipeline; A preheating module, wherein a first end of the preheating module is connected to the filtering module; An instant hot tap module, wherein a first end of the instant hot tap module is connected to a second end of the preheating module; A water outlet, the second end of the instant faucet module is connected to the water outlet.
2. The water purification heating system according to claim 1, It is characterized in that The preheating module includes a hot water valve, a preheating water tank and a one-way valve; The first end of the hot water valve is connected to the filter module, the second end of the hot water valve is connected to the cold water side of the preheating water tank, and the hot water side of the preheating water tank is connected to the instant faucet module through the one-way valve.
3. The water purification heating system according to claim 2, It is characterized in that It also includes a wastewater outlet, the preheating module also includes a pressure relief plug, the pressure relief plug is arranged in the wastewater pipeline, the preheating water tank is connected to the wastewater outlet through the wastewater pipeline, the preheating module also includes a water replenishment valve, the water replenishment valve is arranged in the water replenishment pipeline, and the preheating water tank is connected to the pure water outlet end of the filtration module through the water replenishment pipeline.
4. The clean water heating system according to claim 2, It is characterized in that It also includes a pipeline machine interface, which is connected to the water outlet end of the filter module.
5. The clean water heating system according to claim 2, It is characterized in that The instant hot water faucet module includes a regulating valve, a heating unit and a water outlet unit; Wherein, the regulating valve is connected to the one-way valve and the filter module through a clean water pipeline, and the water outlet unit is connected to the regulating valve through the heating unit.
6. The clean water heating system according to claim 5, It is characterized in that The one-way valve and the filter module are connected to the first end of the regulating valve, the second end of the regulating valve is connected to the heating unit, and the third section of the regulating valve is connected to the water outlet unit.
7. The clean water heating system according to claim 6, It is characterized in that The water outlet unit comprises a water vapor separation box and a water outlet nozzle; The preheating module and the third section of the regulating valve are connected to one side of the water vapor separation box, and the other side of the water vapor separation box is connected to the water outlet.
8. The clean water heating system according to any one of claims 1 to 7, It is characterized in that The filtration module includes a pre-filter element, a water inlet valve, a booster pump, a reverse osmosis filter element, a post-filter element and a reflux valve group; Among them, the water inlet is connected to the pre-filter element through the water inlet pipeline, the pre-filter element is connected to the water inlet side of the reverse osmosis filter element through the water inlet valve and the booster pump, the pure water side of the reverse osmosis filter element is connected to the post-filter element, and the post-filter element is also connected to the preheating module.
9. The clean water heating system according to claim 8, It is characterized in that The filtration module further comprises a wastewater valve group, which is connected to the concentrated water side of the reverse osmosis filter element, and the wastewater valve group is arranged on a wastewater branch line and connected to a wastewater pipeline through the wastewater branch line.
10. A water purifier, It is characterized in that The invention comprises the clean water heating system according to any one of claims 1 to 9.