Steel bridge detection device
By using a crawler assembly and wire management mechanism in the bridge detection device, cable power and strong magnets are used to achieve cable suspension and fixation, the problems of insufficient power supply and insufficient adsorption power of existing bridge detection robots are solved, and detection efficiency and stability are improved , suitable for steel structure bridges.
Patent Information
- Application Number
- CN202420885835.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-25
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-04-25
AI Technical Summary
When detecting steel structure bridges, existing bridge detection robots have low detection efficiency and high maintenance costs due to insufficient power supply and insufficient adsorption force. They are especially suitable for steel structure bridges and are not suitable for concrete bridges.
A steel bridge detection device was designed, using a crawler assembly and wire management mechanism, which powered the crawler assembly and wire management mechanism through cables, canceled the battery, and used strong magnets and wire management parts to achieve cable suspension and fixation, reducing the Power supply requirements and adsorption requirements.
It realizes a bridge detection device with sufficient power supply and lighter structure, reduces the cable suspended length and adsorption requirements, improves detection efficiency and stability, is suitable for steel structure bridges, and reduces maintenance costs.
Smart Images

Figure CN222087050U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of bridge detection, and in particular relates to a steel bridge detection device. Background Art
[0002] During the use of bridges, multiple factors such as environmental erosion, material aging, dynamic and static loads may cause safety hazards to the bridges. Therefore, regular and continuous maintenance is required. The older the bridge is, the higher the maintenance frequency.
[0003] In the prior art, bridge inspection vehicles are usually used for inspection and maintenance. Bridge inspection vehicles refer to motor vehicles with retractable guardrails installed on them. The vehicles are parked on one side of the bridge, and then the guardrails are unfolded and extended into the bottom of the bridge for inspection. This method has extremely high maintenance costs. At present, a bridge monitoring robot has appeared on the market. Please refer to the utility model patent with application number CN201620506213.6 and patent name "A wheeled magnetic adsorption wall climbing robot". It can be fixed to the bridge body by magnetic adsorption or vacuum adsorption, and can move along the surface of the bridge body. This magnetic adsorption robot is usually only suitable for steel structure bridges and is not suitable for concrete bridges. However, the current market usually does not connect cables, and only relies on the robot's built-in power supply to provide power. However, due to the large length of the bridge and the long detection time, the power supply is difficult to meet the use, and due to the large quality of the power supply, the adsorption requirements of the robot will be increased. Utility Model Content
[0004] In view of this, the purpose of the utility model is to provide a steel bridge detection device, which provides power to the track assembly and the wire management mechanism through cables, so that the power supply is sufficient, the battery is eliminated, the structure of the track assembly is lighter, and because the wire management part can suspend the cable, the suspended length of the cable is smaller, the adsorption requirements of the track assembly are smaller, and it is not easy to fall off from the surface of the steel structure bridge.
[0005] The technical solution of the utility model is as follows:
[0006] The utility model provides a steel bridge detection device, including a track assembly and a wire management mechanism; the track assembly includes a main body and a walking track, the walking track is arranged on both sides of the main body, strong magnets are arranged around the walking track, and the tail end of the main body is connected to a cable; the wire management mechanism includes a plurality of wire management parts, the wire management parts are arranged on the main body, the wire management parts are slidably matched with the cables and are used to be detachably connected to the steel structure bridge.
[0007] As an optional solution, the cable management mechanism also includes a placement piece, which is slidably mounted on the cable, and the cable management piece includes a cable management bracket and a cable management pulley. The cable management bracket is provided with an adsorption piece for adsorbing on the steel structure bridge, and the cable management pulley is rotatably arranged on the cable management bracket and used to support the cable, and the placement piece is used to move the cable management piece between the main body and the steel structure bridge to fix the cable management piece to the steel structure bridge.
[0008] As an optional solution, a temporary storage area is provided on the main body, the adsorption member is a magnet, the adsorption member is magnetically adsorbed to the temporary storage area, and the placement member is a robot arm, which is provided on the main body.
[0009] As an optional solution, the cable management mechanism further comprises a cable winder, which is installed on the ground and is used to release or retract the cables.
[0010] As an optional solution, the cable management bracket includes two side panels arranged opposite to each other, one of which is provided with a movable plate, which is rotatably arranged on the side panel and reset by a reset spring to allow cables to enter or leave the cable management bracket.
[0011] As an optional solution, the cable management bracket includes a frame body and a ball joint, the ball joint includes a ball shell, a rotating ball and two limit rods, limit notches are arranged on opposite sides of the ball shell, the rotating ball is rotatably arranged in the ball shell, the limit rods are arranged at both ends of the rotating ball, the two limit rods are cylindrical and are coaxially arranged along the radial direction of the rotating ball, and the limit rods can be rotatably and slidably arranged in the limit notches.
[0012] As an optional solution, a temporary storage area is provided on the main body, the adsorption member is a vacuum suction cup, the adsorption member is vacuum adsorbed on the temporary storage area, and the placement member is a robot arm, which is provided on the main body.
[0013] As an optional solution, the track assembly further includes two swing arms, which are respectively located at both sides of the front end of the track assembly. The swing arms are provided with auxiliary tracks, and auxiliary magnets are provided around the auxiliary tracks.
[0014] As an optional solution, the swing arm and the track assembly are connected via a connecting frame, the swing arm and the track assembly are hinged to two ends of the connecting frame respectively, and there is a preset distance between the hinged end of the swing arm and the outer surface of the hinged end of the track assembly.
[0015] The beneficial effects of the utility model are:
[0016] The steel bridge detection device provided by the utility model has a crawler assembly that can be adsorbed on the surface of the steel structure bridge and can move along the surface of the steel structure bridge. The cable is used to provide power for the crawler assembly and the wire management mechanism, etc. The wire management mechanism can fix the wire management member on the surface of the steel structure bridge, thereby playing the role of hanging the cable. Such a configuration ensures sufficient power supply, eliminates the battery, and makes the structure of the crawler assembly lighter. In addition, since the wire management member can suspend the cable, the suspended length of the cable is smaller, the adsorption requirement for the crawler assembly is smaller, and it is not easy to fall off from the surface of the steel structure bridge. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the following will briefly introduce the drawings required for use in the embodiments. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can also be obtained based on these drawings without creative work. As shown in the drawings, the above and other purposes, features and advantages of the utility model will be clearer. The same reference numerals in all the drawings indicate the same parts. The drawings are not deliberately scaled according to the actual size, and the focus is on showing the main purpose of the utility model.
[0018] Figure 1 A schematic diagram of the structure of a steel bridge detection device provided by an embodiment of the utility model;
[0019] Figure 2 A reference diagram of the use status of the steel bridge detection device provided by the embodiment of the utility model;
[0020] Figure 3 for Figure 1 A partial enlarged schematic diagram of part A;
[0021] Figure 4 A schematic diagram of the use status of the wire management member of the steel bridge detection device provided by the embodiment of the utility model;
[0022] Figure 5 for Figure 4 A partial enlarged schematic diagram of part B.
[0023] Icons: 10-Steel bridge detection device; 20-Steel structure bridge; 11-Track assembly; 12-Wire management mechanism; 110-Main body; 111-Walking track; 112-Strong magnet; 113-Cable; 114-Swing arm; 120-Placement piece; 121-Wire management piece; 122-Wire management bracket; 123-Wire management pulley; 124-Adsorption piece; 125-Temporary storage area; 130-Frame; 131-Ball joint; 132-Ball shell; 133-Rotating ball; 134-Limiting rod; 135-Limiting notch. DETAILED DESCRIPTION
[0024] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Generally, the components of the embodiments of the utility model described and shown in the drawings here can be arranged and designed in various different configurations.
[0025] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the present invention to be protected, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0026] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0027] Please refer to Figure 1 , Figure 2 As shown, an embodiment of the utility model provides a steel bridge detection device 10, which is mainly used for inspection and detection of steel structure bridges 20. The detection object can be the main body 110 of the steel structure bridge 20, or a steel structure column, etc.
[0028] Among them, the steel bridge detection device 10 is mainly composed of a track assembly 11 and a wire management mechanism 12. The wire management mechanism 12 is arranged on the track assembly 11. The track assembly 11 is used for walking, and the wire management mechanism 12 is used for arranging cables.
[0029] The structure of the track assembly 11 may refer to the prior art. For example, the track assembly 11 includes a main body 110 and two walking tracks 111, and the two walking tracks 111 are arranged on both sides of the main body 110. A camera, a visual recognition mechanism, etc. may be arranged at the front end of the main body 110. The camera is used to check the state of the bridge, check the route, etc. In addition, in some embodiments, a light source may be arranged on the main body 110 for supplementary lighting to make the camera's field of view clearer.
[0030] Please combine Figure 3As shown, a plurality of strong magnets 112 are provided on the outer surface of the walking track 111. The strong magnets 112 can ensure that it can be firmly adsorbed on the steel structure bridge 20. Compared with the wheeled magnetic suction robot, since the contact area between the walking track 111 and the steel structure bridge 20 is larger, the adsorption area of the strong magnet 112 is larger and the adsorption capacity is stronger. The strong magnet 112 refers to the NdFeB strong magnet 112. The NdFeB magnet has the characteristics of small size, light weight and strong magnetism. The number of strong magnets 112 is not limited. Generally speaking, the more strong magnets 112 there are, the greater the adsorption force is, and the stronger the track assembly 11 is. In this embodiment, the reason for using strong magnets 112 instead of electromagnets is that if the steel bridge detection device 10 fails, such as the power supply is interrupted, the steel bridge detection device 10 can still be firmly adsorbed on the steel structure bridge 20 and will not fall off.
[0031] There is no limit to the installation method of the strong magnet 112. In this embodiment, the following schemes can be adopted but are not limited to: the walking track 111 on each side of the main body 110 is composed of two chains and a plurality of connecting channel steels. The two chains are arranged side by side, and each chain includes a plurality of chain links. The corresponding chain links of the two chains are connected by connecting channel steels. The connecting channel steels are open toward the outside of the walking track 111. The strong magnet 112 is embedded and fixed in the connecting channel steel. The connection method between the two is not limited, such as clamping, bonding, etc.
[0032] The bottom sides of the front and rear ends of the walking crawler 111 are inclined, so that the strong magnet 112 here can smoothly detach from the steel structure bridge 20 and can overcome obstacles. In some embodiments, an electromagnet or a strong magnet 112 can also be set on the side of the main body 110 close to the steel structure bridge 20, and there can be a certain gap between the electromagnet or the strong magnet 112 and the steel structure bridge 20, so that the suction between the crawler assembly 11 and the steel structure bridge 20 is stronger.
[0033] Of course, in some embodiments, the track assembly 11 may also include a swing arm 114, and the number of the swing arms 114 is not limited, for example, two swing arms 114, the two swing arms 114 are respectively located on both sides of the front end of the track assembly 11, and the swing arm 114 adopts a crawler structure. The swing arm 114 of the crawler structure can assist the track assembly 11 to climb over obstacles, and the structure of the swing arm 114 can refer to the structure of the walking crawler 111. The swing arm 114 is provided with an auxiliary crawler, and auxiliary magnets are provided around the auxiliary crawler. The auxiliary magnets can also be neodymium iron boron strong magnets 112. When climbing over obstacles, the swing arm 114 can be adsorbed on the surface of the steel structure bridge 20.
[0034] In addition, the swing arm 114 is connected to the crawler assembly 11 through a connecting frame, the swing arm 114 and the crawler assembly 11 are respectively hinged to the two ends of the connecting frame, and there is a preset distance between the hinged end of the swing arm 114 and the outer surface of the hinged end of the crawler assembly 11. Specifically, the connecting frame includes a first hinged end and a second hinged end, the swing arm 114 is hinged to the first hinged end, the crawler assembly 11 is hinged to the second hinged end, the diameter of the swing arm 114 at the first hinged end is the first diameter, the diameter of the crawler assembly 11 at the second hinged end is the second diameter, and the distance between the first hinged end and the second hinged end is greater than the sum of the first diameter and the second diameter. Compared with the existing connection relationship between the swing arm 114 and the track assembly 11, such a configuration enables the steel bridge detection device 10 to have two states, a first state in which the swing arm 114 and the track assembly 11 are simultaneously in contact with the same plane, and a second state in which one side of the swing arm 114 is opposite to the bottom surface of the track assembly 11, so that it can better climb over a plate-like portion, such as the side wall of a channel steel. During the operation of the steel bridge detection device 10, it is not only required to climb over a 90° obstacle, but also to be able to flip over a 180° obstacle, for example, an iron plate has a front and a back. When the steel bridge detection device 10 moves on the front, the swing arm 114 and the track assembly 11 are simultaneously in contact with the front. Of course, it is also possible for the swing arm 114 to tilt upward and not be in contact with the front. When the steel bridge inspection device 10 needs to move from the front to the back, first, the swing arm 114 is separated from the front. At this time, the track assembly 11 is in contact with the front. Through the relative rotation between the swing arm 114 and the connecting frame, and the relative rotation between the track assembly 11 and the connecting frame, the bottom surface of the swing arm 114 is gradually opposite to the bottom surface of the track assembly 11 with a certain gap. Then the bottom surface of the swing arm 114 is in contact with the back of the iron plate. At this time, the track assembly 11 is still in contact with the front. Then, the track assembly 11 rotates relative to the connecting frame, so that the track assembly 11 is separated from the front, the swing arm 114 moves, and the track assembly 11 is brought to the back.
[0035] The tail end of the main body 110 is connected with a cable 113, which is used to connect to the cable 113 on the ground. The length of the cable 113 can be set as needed, such as ten meters, fifty meters, one hundred meters, etc. The cable 113 is used to provide power to the steel bridge detection device 10, which can effectively prevent the steel bridge detection device 10 from failing to work due to insufficient power. Due to the large length of the bridge, if a passive robot is used for detection, the size of the power supply is large. Using the cable 113 for power supply cancels the power supply in the main body 110, which can effectively reduce the weight and has lower requirements for adsorption force. In addition, in some embodiments, the cable 113 can also transmit control signals, etc., which is more accurate than wireless remote control. In addition, due to the existence of the cable 113, if the bridge health detection system falls abnormally from the steel structure bridge 20, it can be pulled back by pulling the cable 113 at the initial position.
[0036] When the cable 113 is used for power supply, if the steel bridge detection device 10 is too far from the initial point, the cable 113 will be suspended in the air, which will exert a considerable gravity on the track assembly 11. When the gravity of the cable 113 reaches a certain level, the steel bridge detection device 10 will be pulled down. Therefore, in this embodiment, the improvement is made by the wire management mechanism 12. Specifically, the wire management mechanism 12 includes a plurality of wire management components 121. The number of wire management components 121 is not limited. Generally speaking, the longer the cable 113 is, the more wire management components 121 are required. The wire management component 121 is arranged on the main body 110, and the wire management component 121 is connected to the cable 113. At each distance, the wire management mechanism 12 can be used to fix the cable 113 to the steel structure bridge 20.
[0037] The structure of the cable management member 121 is not limited. In this embodiment, the following solutions can be adopted but are not limited to: the cable management member 121 is slidably sleeved on the cable 113, wherein, please combine Figure 4 As shown, the cable management member 121 includes a cable management bracket 122 and a cable management pulley 123 .
[0038] The cable management bracket 122 is provided with an adsorption member 124, which can be a magnet or a vacuum suction cup. In this embodiment, the adsorption member 124 is a magnet, and the adsorption member 124 can be adsorbed on the steel structure bridge 20 of the steel structure, so as to fix the cable management member 121. The cable management pulley 123 is rotatably arranged on the cable management bracket 122, and the cable 113 is passed through the cable management bracket 122 and embedded in the slide groove of the cable management pulley 123. The cable management pulley 123 is used to support the cable 113.
[0039] In addition, in order to fix or unlock the cable 113, the cable management mechanism 12 also includes a placement piece 120. The style of the placement piece 120 is not limited. For example, the placement piece 120 can be a manipulator, which is arranged on the main body 110. The manipulator has a clamping claw, which is used to clamp the cable management piece 121. The clamping claw can be made of non-metallic materials, etc., so as to avoid magnetic adsorption between the clamping claw and the adsorption piece 124. A temporary storage area 125 is arranged on the main body 110. The adsorption piece 124 is magnetically adsorbed to the temporary storage area 125. The temporary storage area 125 can be made of metal materials. The placement piece 120 is used to move the cable management piece 121 between the main body 110 and the steel structure bridge 20. When the robot clamps the cable management piece 121 and places the cable management piece 121 on the main body 110, the suction piece 124 is suctioned onto the temporary storage area 125. At this time, the cable 113 at the rear end of the cable management piece 121 is unlocked; when the robot clamps the cable management piece 121 and places the cable management piece 121 from the temporary storage area 125 onto the steel structure bridge 20, the suction piece 124 is suctioned onto the steel structure bridge 20, thereby fixing the cable management piece 121 to the steel structure bridge 20.
[0040] In addition, the cable management mechanism 12 may also include a cable winder, which is placed on the ground. The cable winder may be electrically wound, manually wound, or the like. The cable winder is mainly used to release or reel in the cable 113 so that the released length of the cable 113 is close to the travel distance of the track assembly 11, thereby preventing too much cable 113 from being released and drooping.
[0041] In some embodiments, in order to facilitate the sleeve installation of the cable management bracket 122 on the cable 113, in some embodiments, the following solutions may also be adopted but are not limited to: the cable management bracket 122 includes two side panels arranged opposite to each other, one of which is provided with an installation notch, and a movable plate is provided at the installation notch, the movable plate is hinged to the side panel, the movable plate can be flipped toward the inside of the side panel, the movable plate is reset by a reset spring, and the movable plate is used to close the installation notch to prevent the cable 113 from escaping from the cable management bracket 122. When the cable management bracket 122 needs to be installed on the cable 113, the cable 113 is approached from the outside, the cable 113 presses the movable plate, the movable plate is flipped, and the installation notch is exposed, so that the cable 113 can enter or leave the cable management bracket 122. After the cable 113 enters the cable management bracket 122, the movable plate returns to its original position under the action of the reset spring, the installation notch is closed, and the cable 113 cannot escaping from the cable management bracket 122. In addition, in some embodiments, a plurality of wire management brackets 122 may be pre-installed on the main body 110. These wire management brackets 122 are not put on the cables 113 and can be put on the cables 113 by a robot only when they are needed.
[0042] In addition, since the route of the bridge health detection system is not a straight line, for example, the bridge health detection system walks along the top surface, walks along the vertical surface, turns, etc., the direction of the cable 113 will change, and the cable support bracket 122 is connected to the surface of the steel structure bridge 20, which may cause the cable 113 to not be well embedded in the cable pulley 123. Therefore, in this embodiment, the following solutions can be adopted but are not limited to: Please combine Figure 5 As shown, the cable management bracket 122 includes a frame 130 and a ball joint 131, the ball joint 131 includes a ball shell 132, a rotating ball 133 and two limiting rods 134, limiting notches 135 are arranged on opposite sides of the ball shell 132, the rotating ball 133 is rotatably arranged in the ball shell 132, and limiting rods 134 are arranged at both ends of the rotating ball 133, the two limiting rods 134 are cylindrical and coaxially arranged along the radial direction of the rotating ball 133, and the limiting rods 134 are rotatably and slidably arranged in the limiting notches 135. With such an arrangement, no matter where the cable management member 121 is connected to the steel structure bridge 20, the center line of the cable management roller can be horizontal or nearly horizontal, and the cable 113 can be completely embedded in the peripheral groove of the cable management roller under the action of its own gravity, which can make the release of the cable 113 smoother.
[0043] In some embodiments, the steel bridge inspection device 10 may further include a functional mechanism, which is used to implement various predetermined functions.
[0044] The method of using the steel bridge detection device 10 provided in this embodiment is as follows:
[0045] The steel bridge detection device 10 is placed on the surface of the steel structure bridge 20 of the steel structure bridge 20, so that the strong magnet 112 of the crawler assembly 11 is adsorbed on the surface of the steel structure bridge 20;
[0046] The cable 113 is energized to provide power to the steel bridge detection device 10;
[0047] Control the crawler track of the crawler track assembly 11 to rotate, and the steel bridge detection device 10 moves forward;
[0048] When the steel bridge detection device 10 moves forward to a preset distance threshold, the placement member 120 removes a cable management member 121 from the temporary storage area 125 and brings it close to the surface of the steel structure bridge 20. The adsorption member 124 is magnetically adsorbed on the surface of the steel structure bridge 20, so that the cable 113 is suspended on the cable management pulley 123. Figure 2 As shown;
[0049] The crawler assembly 11 continues to move forward, the cable 113 can be pulled, and the cable 113 causes the cable management pulley 123 to rotate;
[0050] Repeat the above steps until the steel bridge inspection device 10 has inspected the preset area;
[0051] When the steel bridge inspection device 10 is recovered, it is returned along the original route, at which time the cable 113 can be gradually retracted by controlling the winding device;
[0052] When the steel bridge inspection device 10 reaches the wire-manipulating member 121 adsorbed on the surface of the steel structure bridge 20, the placement member 120 removes the wire-manipulating member 121 from the surface of the steel structure bridge 20 and places it in the temporary storage area 125, and the wire-manipulating member 121 is adsorbed on the temporary storage area 125;
[0053] The plurality of wire management members 121 are recovered in sequence until the steel bridge inspection device 10 reaches the starting position.
[0054] The above steps can be increased, decreased, modified, or the order can be adjusted as needed. For example, if the cable management component 121 adopts other structures, corresponding installation steps can be adopted.
[0055] The above description is only the preferred embodiment of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A steel bridge detection device, characterized in that: It includes a track assembly and a wire management mechanism; the track assembly includes a main body and a walking track, the walking track is arranged on both sides of the main body, strong magnets are arranged around the walking track, and the tail end of the main body is connected to a cable; the wire management mechanism includes a plurality of wire management parts, the wire management parts are arranged on the main body, the wire management parts are slidably matched with the cables and are used to be detachably connected to the steel structure bridge.
2. The steel bridge detection device according to claim 1, characterized in that: The cable management mechanism also includes a placement piece, which is slidably mounted on the cable. The cable management piece includes a cable management bracket and a cable management pulley. The cable management bracket is provided with an adsorption piece for adsorbing on the steel structure bridge. The cable management pulley is rotatably arranged on the cable management bracket and is used to support the cable. The placement piece is used to move the cable management piece between the main body and the steel structure bridge to fix the cable management piece to the steel structure bridge.
3. The steel bridge detection device according to claim 2, characterized in that: The main body is provided with a temporary storage area, the adsorption member is a magnet, the adsorption member is magnetically adsorbed to the temporary storage area, the placement member is a robot, and the robot is provided on the main body.
4. The steel bridge detection device according to claim 2, characterized in that: The cable management mechanism further comprises a cable winder which is installed on the ground and is used for releasing or collecting the cables.
5. The steel bridge detection device according to claim 2, characterized in that: The cable management bracket comprises two side plates arranged opposite to each other, one of which is provided with a movable plate, which is rotatably arranged on the side plate and reset by a reset spring so that the cable can enter or leave the cable management bracket.
6. The steel bridge detection device according to claim 2, characterized in that: The cable management bracket includes a frame body and a ball joint, the ball joint includes a ball shell, a rotating ball and two limit rods, limit notches are arranged on opposite sides of the ball shell, the rotating ball is rotatably arranged in the ball shell, the limit rods are arranged at both ends of the rotating ball, the two limit rods are cylindrical and are coaxially arranged along the radial direction of the rotating ball, and the limit rods are rotatably and slidably arranged in the limit notches.
7. The steel bridge detection device according to claim 2, characterized in that: The main body is provided with a temporary storage area, the adsorption member adopts a vacuum suction cup, and the adsorption member is vacuum adsorbed on the temporary storage area, and the placement member adopts a robot, and the robot is arranged on the main body.
8. The steel bridge detection device according to claim 1, characterized in that: The crawler track assembly also includes two swing arms, which are respectively located at both sides of the front end of the crawler track assembly. The swing arms are provided with auxiliary crawlers, and auxiliary magnets are arranged around the auxiliary crawlers.
9. The steel bridge detection device according to claim 8, characterized in that: The swing arm and the crawler assembly are connected via a connecting frame, and the swing arm and the crawler assembly are hinged to two ends of the connecting frame respectively. There is a preset distance between the hinged end of the swing arm and the outer surface of the hinged end of the crawler assembly.
