Servo driver regenerative braking discharge control system

By real-time detection of bus voltage and dynamically adjusting the PWM duty cycle signal, combined with PID control and alarm judgment module, the problem of voltage fluctuation and overheating during regenerative braking of the servo driver is solved, and voltage stability and system performance are improved.

CN222089291UActive Publication Date: 2024-11-29BEIJING NUOXINTAI SERVO TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420624350.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-28
Publication Date
2024-11-29
Estimated Expiration
2034-03-28

AI Technical Summary

Technical Problem

In the prior art, the bus voltage fluctuates greatly due to fixed discharge parameters during regenerative braking, which affects the control performance, and may cause overheating or insufficient discharge, and cannot adapt to changes in the motor and load.

Method used

By real-time detection of the bus voltage value and the preset discharge voltage threshold difference, adjust the PWM duty cycle signal, combine it with the PID controller and the alarm judgment module, dynamically adjust the discharge intensity to ensure voltage stability and system performance.

Benefits of technology

It realizes automatic adjustment of the discharge intensity according to the regenerative braking energy magnitude, avoids large fluctuations in the bus voltage, ensures the working performance and energy saving of the servo driver, and prevents overheating of the discharge resistor.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222089291U_ABST
    Figure CN222089291U_ABST
Patent Text Reader

Abstract

The utility model discloses a regenerative braking discharge control system of a servo driver, which comprises a PWM (Pulse-Width Modulation) control unit for controlling a functional module of a power tube unit to be switched on or switched off so as to switch on or switch off a discharge resistor circuit, and the PWM control unit adjusts a currently output PWM duty ratio signal according to a difference value between a bus voltage value detected in real time and a preset discharge voltage threshold value so as to control the power tube unit function module to be switched on or switched off. According to the regenerative braking discharge control system of the servo driver, the PWM duty ratio signal is adjusted according to the difference value between the actually detected bus voltage value and the preset discharge voltage threshold value, so that the system can automatically adjust the discharge intensity according to the energy generated by regenerative braking; therefore, the large fluctuation of the bus voltage is avoided, and the working performance of the servo driver is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a control system, in particular to a servo drive regenerative braking discharge control system. Background Art

[0002] The servo motor will enter the power generation state during the braking and deceleration process or when being dragged in the reverse direction. This is a process of converting mechanical energy into electrical energy. This part of electrical energy is called "regenerative" electrical energy, and this process is called regenerative braking. The regenerative electrical energy is fed back to the DC bus through the inverter circuit. If this electrical energy cannot be absorbed or released in some way, the DC bus voltage of the power supply will increase. If the increase in bus voltage exceeds the tolerance range of the power supply, it may damage the servo drive or other equipment connected to the bus.

[0003] To solve the above problems, Figure 1 As shown, in the prior art, a bus capacitor and a discharge resistor are arranged on the DC bus, as well as a power tube for controlling the on and off of the discharge resistor circuit, and the power tube is controlled by a PWM control unit. When the servo motor enters regenerative braking, the bus voltage will increase, and at this time, part of the electric energy will be absorbed by the bus capacitor. When the bus capacitor can no longer absorb excess electric energy and the bus voltage exceeds the discharge voltage threshold, the MCU of the servo driver will control the power tube to control the on and off of the power tube according to a pre-set PWM duty cycle. In this way, when the power tube is turned on, the excess electric energy can be released in the form of heat through the discharge resistor.

[0004] In the prior art, since the resistance of the discharge resistor used for discharge and the PWM duty cycle of the power tube control signal used to control the discharge are both fixed values, the same discharge PWM duty cycle and the same discharge resistor are defined regardless of the size of the regenerative braking energy in actual applications, which will result in inappropriate PWM duty cycle and inappropriate discharge resistor value. If the resistance is small, the discharge is too fast and the resistor will quickly overheat. If the resistance is large, the discharge is too slow, which will result in failure to achieve the purpose of protection. Moreover, ignoring the level of the regenerative braking voltage and adopting a fixed discharge method will also cause the bus voltage to fluctuate greatly during the discharge process, which will have an adverse effect on the control performance of the servo motor.

[0005] Therefore, in the prior art, fixed regenerative braking discharge parameters are selected according to fixed working conditions, so that when the motor, load or acceleration / deceleration time changes, the discharge parameters selected according to the original conditions are no longer suitable, and ultimately the system cannot work in a relatively optimized state. Utility Model Content

[0006] The utility model aims at the drawbacks of the prior art and provides a servo drive regenerative braking discharge control system.

[0007] The servo drive regenerative braking discharge control system described in the utility model includes a PWM control unit for controlling the power tube unit function module to be turned on or off to connect or cut off the discharge resistance circuit. The PWM control unit adjusts the currently output PWM duty cycle signal according to the difference between the real-time detected bus voltage value and the preset discharge voltage threshold value to control the power tube unit function module to be turned on or off.

[0008] In the servo drive regenerative braking discharge control system described in the utility model, the power tube unit functional module includes a power tube drive module and a power tube module;

[0009] The power tube driving module is connected to the output end of the PWM control unit, and outputs a turn-on instruction or a turn-off instruction to the power tube module according to the PWM duty cycle signal;

[0010] The power tube module turns on or off the discharge resistance circuit according to the on instruction or off instruction of the power tube driving module.

[0011] In the servo drive regenerative braking discharge control system described in the utility model, the PWM control unit includes an amplitude judgment module and a PID controller module;

[0012] The amplitude judgment module compares the bus voltage value detected in real time with the preset discharge voltage threshold and outputs the difference between the two;

[0013] The PID controller module performs PID control adjustment according to the difference and outputs a corresponding PWM duty cycle signal.

[0014] In the servo drive regenerative braking discharge control system described in the utility model, the PWM control unit also includes an alarm judgment module;

[0015] The alarm determination module outputs a corresponding alarm signal after integrating the PWM duty cycle signal according to time.

[0016] The servo drive regenerative braking discharge control system described in the utility model also includes a voltage setting module for presetting a discharge voltage threshold, and the output end of the voltage setting module is connected to the amplitude judgment module.

[0017] The servo drive regenerative braking discharge control system described in the utility model also includes a bus voltage detection module for real-time detection of the bus voltage value, and the output end of the bus voltage detection module is connected to the amplitude judgment module.

[0018] In the servo drive regenerative braking discharge control system described in the utility model, the PWM duty cycle signal is adjusted according to the difference between the actually detected bus voltage value and the preset discharge voltage threshold value, so that the system can automatically adjust the discharge intensity according to the energy generated by the regenerative braking, thereby not causing a large fluctuation in the bus voltage and ensuring the working performance of the servo drive. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 A schematic diagram of a servo drive regenerative braking discharge system in the prior art;

[0020] Figure 2 It is a schematic diagram of the servo drive regenerative braking discharge control system of the utility model. DETAILED DESCRIPTION

[0021] The present invention will be further described in detail below in conjunction with the accompanying drawings so that those skilled in the art can implement the invention with reference to the description.

[0022] like Figure 2 As shown, the servo drive regenerative braking discharge control system described in the utility model includes a PWM control unit for controlling the power tube unit function module to be turned on or off to connect or cut off the discharge resistance circuit. The PWM control unit adjusts the currently output PWM duty cycle signal according to the difference between the real-time detected bus voltage value and the preset discharge voltage threshold value to control the power tube unit function module to be turned on or off.

[0023] That is to say, the discharge voltage threshold is preset, and when the actually detected bus voltage value exceeds the preset discharge voltage threshold, the currently output PWM duty cycle signal is adjusted according to the difference between the real-time detected bus voltage value and the preset discharge voltage threshold, thereby controlling the conduction of the power tube unit functional module. When the actually detected bus voltage value is lower than the preset discharge voltage threshold, the output PWM duty cycle signal is directly controlled to be 0, that is, the power tube unit functional module is turned off, so that the discharge resistance circuit is cut off, and the resistance of the discharge resistance circuit does not need to release excess electrical energy in the form of heat.

[0024] In other words, when the discharge resistor circuit needs to be turned on, the PWM duty cycle signal output by the PWM control unit is not fixed, but is adjusted according to the difference between the actual detected bus voltage value and the preset discharge voltage threshold. This allows the system to automatically adjust the discharge intensity according to the energy generated by regenerative braking, thereby not causing large fluctuations in the bus voltage and ensuring the working performance of the servo drive.

[0025] In the servo drive regenerative braking discharge control system described in the utility model, the power tube unit functional module includes a power tube drive module and a power tube module. The power tube drive module is connected to the output end of the PWM control unit and outputs a turn-on instruction or a turn-off instruction to the power tube module according to the PWM duty cycle signal. The power tube module turns on or off the discharge resistance circuit according to the turn-on instruction or the turn-off instruction of the power tube drive module.

[0026] In the servo drive regenerative braking discharge control system described in the utility model, the PWM control unit specifically includes an amplitude judgment module and a PID controller module. The amplitude judgment module compares the bus voltage value detected in real time with the preset discharge voltage threshold and outputs the difference between the two, and the PID controller module is arranged at the rear end of the amplitude judgment module, and performs PID control adjustment according to the difference between the bus voltage value detected in real time and the preset discharge voltage threshold and outputs the corresponding PWM duty cycle signal.

[0027] In a specific application, the preset discharge voltage threshold is defined as VOLT set , the bus voltage value detected in real time is defined as VOLT act , the difference output by the amplitude judgment module is defined as ΔVOLT, then ΔVOLT is specifically:

[0028] When VOLT act Greater than VOLT set When ΔVOLT=VOLT act -VOLT set ;

[0029] When VOLT act Smaller than VOLT set , ΔVOLT=0.

[0030] Furthermore, the input signal of the PID controller module is the aforementioned ΔVOLT, and the output signal of the PID controller module is defined as PWM dutycycle ,

[0031] PWM dutycycle =K p *ΔVOLT+K i *∫ΔVOLT dt+K d *(dΔVOLT / dt)

[0032] Where: K p , K i , K d They are the proportional gain, integral gain and differential gain of the PID controller respectively.

[0033] In the present invention, the PID controller module is used to control the discharge of regenerative braking, and its input is the voltage difference, and its output is the PWM duty cycle signal. The regenerative braking discharge process of the present invention has the following characteristics:

[0034] 1. When the bus voltage value detected in real time is greater than or exceeds the set discharge voltage threshold, the PID controller module outputs the PWM duty cycle according to the input voltage difference and the PID control algorithm. When the bus voltage value detected in real time is less than the set discharge voltage threshold, the PID controller module directly outputs a PWM duty cycle signal of 0.

[0035] 2. Under the same PID control gain, if ΔVOLT is larger, the output PWM duty cycle is larger and the discharge effect is stronger. Conversely, if ΔVOLT is smaller, the PWM duty cycle is smaller and the discharge effect is weaker.

[0036] According to the above, when the electric energy generated by regenerative braking is more, that is, the bus voltage is higher, the PWM duty cycle is larger, the current passing through the discharge resistor is larger, and the energy is released faster. When the electric energy generated by regenerative braking is less or as the discharge process continues, the bus voltage decreases after the regenerative braking energy is released. At this time, due to the effect of the PID controller, the output PWM duty cycle becomes lower and lower, and the discharge effect becomes weaker and weaker. The discharge process is stopped until the bus voltage value detected in real time is less than or equal to the preset discharge voltage threshold.

[0037] Due to the characteristics of the above-mentioned discharge process, during the entire regenerative braking discharge process, the discharge effect will automatically adjust the discharge intensity according to the amount of regenerative energy, so as not to cause a large fluctuation in the bus voltage, thereby ensuring the working performance of the servo drive. In addition, there will be no excess power consumption due to discharge, thus ensuring the energy saving of the servo drive.

[0038] In the servo drive regenerative braking discharge control system described in the utility model, the PWM control unit further includes an alarm judgment module, which is arranged at the rear end of the PID controller module, and the alarm judgment module outputs a corresponding alarm signal after integrating the PWM duty cycle signal according to time. In the actual system discharge process, if the system is always in a discharge working state, the power tube module and the discharge resistor will be in a state of heating. Then, when the heat accumulates to a certain extent, it will affect the stability of the system, and even cause the power tube module or the discharge resistor to burn out. For this reason, an alarm judgment module is set in the utility model to form a protection mechanism for the discharge process. The protection mechanism in this embodiment is different from the discharge protection mechanism in the prior art. The discharge protection mechanism in the prior art is based on the discharge time length as the condition for triggering the alarm, that is, when the discharge time length exceeds the set length, the alarm is triggered and the servo drive stops working. The protection mechanism proposed in this embodiment is to trigger the alarm according to the accumulation of discharge energy under the premise of considering the discharge intensity. The details are as follows.

[0039] First define the parameters as follows:

[0040] PWM max : Indicates the maximum PWM duty cycle allowed for discharge;

[0041] PWM cont Indicates the PWM duty cycle allowed for continuous discharge;

[0042] PWM act : Indicates the PWM duty cycle during the actual discharge process;

[0043] T represents the maximum allowed continuous discharge time length;

[0044] H set Indicates the heat accumulation setting value;

[0045] H act Indicates the actual value of heat accumulation;

[0046] So the following formula:

[0047]

[0048] This formula represents the accumulated discharge energy at the maximum PWM duty cycle for T time when the set parameters are met. If the continuous discharge energy exceeds this value, the driver needs to take protective measures to stop discharging and trigger an alarm.

[0049] As for the discharge energy actually generated during the discharge process, there is the following formula:

[0050]

[0051] According to the above formula, when H act The value is greater than H set When the value reaches , it means that the accumulated discharge energy exceeds the maximum allowable discharge energy, and the alarm protection needs to be triggered.

[0052] It should be noted that: although the maximum continuous discharge time length T is set, this does not mean that the maximum continuous discharge time length is T. Because T is the maximum discharge time length under the maximum discharge intensity condition, if the actual discharge intensity is less than the maximum discharge intensity, the maximum discharge time length will be automatically adjusted according to the actual discharge intensity, and the actual time will be longer than T.

[0053] The servo drive regenerative braking discharge control system described in the utility model also includes a voltage setting module for presetting a discharge voltage threshold, and the output end of the voltage setting module is connected to the amplitude judgment module. The discharge voltage threshold set by the voltage setting module should be higher than the bus voltage value in static state and lower than the safety threshold of the bus voltage.

[0054] The servo drive regenerative braking discharge control system described in the utility model also includes a bus voltage detection module for real-time detection of the bus voltage value, and the output end of the bus voltage detection module is connected to the amplitude judgment module.

[0055] Although the implementation scheme of the utility model has been disclosed as above, it is not limited to the applications listed in the specification and implementation modes. It can be fully applied to various fields suitable for the utility model. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the utility model is not limited to the specific details and the illustrations shown and described herein.

Claims

1. A servo drive regenerative braking discharge control system, comprising a PWM control unit for controlling the power tube unit function module to turn on or off to connect or cut off the discharge resistance circuit, It is characterized in that The PWM control unit adjusts the currently output PWM duty cycle signal according to the difference between the bus voltage value detected in real time and the preset discharge voltage threshold value, so as to control the power tube unit function module to be turned on or off.

2. The servo drive regenerative braking discharge control system according to claim 1, It is characterized in that The power tube unit functional module includes a power tube driving module and a power tube module; The power tube driving module is connected to the output end of the PWM control unit, and outputs a turn-on instruction or a turn-off instruction to the power tube module according to the PWM duty cycle signal; The power tube module turns on or off the discharge resistance circuit according to the on instruction or off instruction of the power tube driving module.

3. The servo drive regenerative braking discharge control system according to claim 2, It is characterized in that The PWM control unit includes an amplitude judgment module and a PID controller module; The amplitude judgment module compares the bus voltage value detected in real time with the preset discharge voltage threshold and outputs the difference between the two; The PID controller module performs PID control adjustment according to the difference and outputs a corresponding PWM duty cycle signal.

4. The servo drive regenerative braking discharge control system according to claim 3, It is characterized in that The PWM control unit also includes an alarm judgment module; The alarm determination module outputs a corresponding alarm signal after integrating the PWM duty cycle signal according to time.

5. The servo drive regenerative braking discharge control system according to claim 3, It is characterized in that It also includes a voltage setting module for presetting a discharge voltage threshold, and an output end of the voltage setting module is connected to the amplitude judgment module.

6. The servo drive regenerative braking discharge control system according to claim 3, It is characterized in that It also includes a bus voltage detection module for real-time detection of bus voltage values, and the output end of the bus voltage detection module is connected to the amplitude judgment module.