Hoisting device for mounting building surface high-altitude dome inlaying steel beam
By designing a lifting device for steel beams embedded in high-altitude domes on the floor, using components such as I-beams, support rods and electric hoists, the problem of excessive tower crane occupation is solved, the installation efficiency and safety are improved, and the installation efficiency and safety are achieved. Construction at the same time with multiple working faces.
Patent Information
- Application Number
- CN202420789259.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-17
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-17
AI Technical Summary
The lifting method of installing single-layer mesh shell structures on the existing floor has problems such as excessive tower crane occupation and waste of machinery and labor. Especially when height and site are limited, it cannot be efficiently lifted, which increases safety risks. and duration.
Design a lifting device including I-beam, support rod, electric hoist and traction rope. By setting up lifting lugs and traction rope connection points on the I-beam, the balance and stability of the lifting device are achieved by using counterweights and support rods. Hoists are used for load adjustment, pulleys and traction ropes are used for flexible steering and hoisting, avoiding the tower cranes being directly involved in the installation of the inlayed steel beams.
It effectively reduces the occupation of tower cranes, improves the installation efficiency of embedded steel beams, saves construction period and manpower, reduces the safety risks of high-altitude transportation, and realizes simultaneous construction of multiple working faces.
Smart Images

Figure CN222099417U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a hoisting device for installing embedded steel beams on high-altitude domes of floors. Background Art
[0002] The installation of small steel beams embedded in single-layer grid shell structures on existing floors cannot be carried out by lifting with a car crane if the height and site are limited. If the weight of the component exceeds the limit of manual operation, it can only be lifted by a tower crane. Due to the characteristics of the tower crane, there can only be one tower crane within its coverage area. Usually, there are a large number of single-layer grid shell embedded steel beams. If a tower crane is used for lifting, a large number of tower cranes will inevitably be occupied. The tower crane is also the main lifting machinery for the roof. This construction method will inevitably generate a large amount of machinery and manpower waste. In response to the above problems and defects, a lifting device and method for installing single-layer grid shell structure embedded steel beams on building floors are proposed, which can well solve the above problems, avoid a large amount of high-altitude manpower transportation, reduce safety risks, and improve efficiency. Utility Model Content
[0003] The purpose of the utility model is to address the deficiencies of the existing technology and provide a lifting device for the installation of embedded steel beams for high-altitude domes on floors, comprising an I-beam, a plurality of lifting ears are provided on the forearms of the I-beam as lifting points and traction rope connection points; a counterweight is provided at the tail of the I-beam, a support rod is provided at the lower end of the middle part of the I-beam, the support rod comprises a main shaft and a sleeve, the sleeve is welded and fixed to the beam, the main shaft is welded and fixed to the base below the main shaft, a rib plate is provided at each welding node, the base is installed on the drum-shaped node of the through steel beam, a leveling rib plate is provided on the base, a tray is provided in the middle of the sleeve, and an electric hoist is installed on the tray.
[0004] Preferably, the main shaft and the base are welded by full penetration and rib connection, and the base is fixed by fillet welds with the leveling ribs and the drum-shaped nodes of the through-steel beam.
[0005] Preferably, the upper portion of the sleeve is connected to the I-beam, and a stiffening plate is provided at the node position to ensure that the node is firm.
[0006] Preferably, a hanging point is set every 500 mm on the front of the beam, a fixed pulley is hung, and a traction rope is set at the front end of the beam, and the traction rope is used for steering.
[0007] Preferably, the base, main shaft, sleeve, I-beam and counterweight are all made of Q235B.
[0008] Compared with the prior art, the beneficial effects of the present invention are as follows: after the through-steel beams of the single-layer lattice shell structure are installed and fixed, a temporary lifting device is set at the drum-shaped node thereof to lift the patched steel beams. In this way, the tower crane is only responsible for the transportation of components and the installation of larger components such as the through-steel beams. The patched steel beams are installed and put into place using the temporary lifting device, which avoids the occupation of the tower crane by the installation of the patched steel beams and increases the working surface for the installation of the patched steel beams, greatly improving work efficiency and saving construction period. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0010] Figure 1 This is a schematic diagram of the structure of the utility model.
[0011] In the figure: 1. Counterweight, 2. I-beam, 3. Casing, 4. Main shaft, 5. Base, 6. Casing reinforcement plate; 7. Electric hoist, 8. Through-beam drum node, 9. Traction rope. DETAILED DESCRIPTION
[0012] The technical solution of the present invention is described in detail below with reference to the accompanying drawings, but the protection scope of the present invention is not limited to the embodiments.
[0013] Reference Figure 1 , the installation conditions of this hoisting device: the installation order of single-layer lattice shell structure on the floor of high-altitude building is: the temporary support has been installed as required by the plan and has been measured and tested to be correct.
[0014] The edge-sealed steel beams, partitioned steel beams, and through-beams of the single-layer lattice shell structure are installed. The corresponding component nodes have been installed and welded. The butt welds are first-level full-penetration welds, and 100% have passed non-destructive testing. The cross-joint welds are second-level welds, and 20% of the random inspections have passed non-destructive testing. They have also been measured and positioned by a total station and found to be correct. A lifting device for installing embedded steel beams of a single-layer lattice shell structure on the floor of a high-altitude building is installed on the drum-shaped node 8 of the through-beam. The utility model is a lifting device for installing embedded steel beams for high-altitude domes on floors, comprising a base 5, a main shaft 4, a sleeve 3, an I-beam 2, a counterweight 1, an electric hoist 7, and its installation tray, a rib plate, and a guide pulley.
[0015] The base 5 is the main bearing device of the device. The main shaft 4 and the base 5 are welded with full penetration and ribs. The base 5 is installed on the drum-shaped node 8 of the through-steel beam. A leveling rib is provided on the base 5. The base 5 can be adjusted according to the angle of the drum-shaped node so that the base 5 is always in a horizontal state.
[0016] The support rod includes a main shaft 4 and a sleeve 3. The sleeve 3 is mounted on the main shaft 4. The central portion of the sleeve 3 is provided with an electric hoist 7 mounting platform, to which the electric hoist 7 is fixed. The upper portion of the sleeve 3 is connected to the I-beam 2 via a sleeve rib 6. Stiffeners are installed at the node position to ensure the node is firm. The electric hoist 7 should be designed and selected according to the overall requirements of the lifting load. Installation and commissioning are required. The wire rope of the electric hoist 7 changes the traction direction by changing the pulley. The two are on the same plane to ensure a smooth lifting connection.
[0017] An I-beam 2 is provided with a steel counterweight 1 at the rear end to ensure the balance of the I-beam 2 when unloaded and hoisted. The hoisting counterweight 1 must be calculated to ensure both the stability of the beam when unloaded and the balance of the load when loaded. Hanging points are set every 500mm at the front of the beam, and fixed pulleys are hung. During hoisting, the hanging points are selected according to the hoisting position. A traction rope 9 is set at the front end of the beam, which is used for steering. Multiple lifting lugs are set on the beam, and different lifting lugs are hung from pulleys to achieve the selection of the hoisting amplitude. The traction rope 9 connected to the end lugs can change the horizontal rotation direction.
[0018] Furthermore, the lifting device is arranged on the drum-shaped node of the single-layer lattice shell through-steel beam, and can realize the transportation of the patched steel beam within the coverage range of the beam through horizontal steering, eliminating the need for tower crane transportation and manual handling, saving time, labor and safety.
[0019] Furthermore, when the through steel beams of the single-layer lattice shell structure have been installed and fixed, multiple units can be arranged to achieve simultaneous construction of multiple working surfaces for the installation of the patched steel beams, which greatly saves construction time and does not occupy other lifting machinery.
[0020] Furthermore, the utility model is simple to manufacture, and the materials used are all ordinary H-shaped steel and ordinary pipes, and the reinforced plates are made of Q235B. The electric hoist 7 is sufficient for a rated load of 0.5 tons selected according to the lifting weight.
[0021] The steps of the present invention are as follows:
[0022] Step 1 ( Figure 1 ): The base 5 of the device is welded and fixed by installing a through steel beam, and the main shaft 4 is installed and welded on the base 5;
[0023] Step 2 ( Figure 1 ): Assemble the counterweight 1 and the sleeve 3 on the I-beam 2 according to the drawing, and install the fixed electric hoist 7 tray and the electric hoist 7 on the sleeve 3;
[0024] Step 3 ( Figure 1 ): Use the on-site tower crane to hoist the I-beam 2, casing 3, counterweight 1 and electric hoist 7 assembly onto the main shaft 4;
[0025] Step 4 Figure 1 ): Select the pulley lifting point according to the lifting distance, and change the horizontal installation direction through the traction rope 9 to realize the lifting of the embedded steel beam.
[0026] The utility model solves the problem of long-time occupation of lifting machinery during installation by simply assembling the lifting device on site, and can realize component transportation when the lifting equipment cannot cover and the transportation conditions are difficult, saving manpower and material resources and avoiding the danger of manual transportation.
[0027] As above, although the present invention has been shown and described with reference to specific preferred embodiments, it should not be interpreted as limiting the present invention itself. Various changes in form and details may be made without departing from the spirit and scope of the present invention as defined in the appended claims.
Claims
1. A hoisting device for installing a steel beam for a high-altitude dome on a floor, characterized in that: It includes an I-beam, and a plurality of lifting ears are arranged on the front arm of the I-beam as lifting points and traction rope connection points; a counterweight is arranged at the tail of the I-beam, and a support rod is arranged at the lower end of the middle part of the I-beam, and the support rod includes a main shaft and a sleeve, the sleeve is welded and fixed to the beam, the main shaft is welded and fixed to the base below the main shaft, and rib plates are arranged at each welding node, the base is installed on the drum-shaped node of the through steel beam, a leveling rib plate is arranged on the base, a tray is arranged in the middle of the sleeve, and an electric hoist is installed on the tray.
2. The hoisting device for installing a high-altitude dome steel beam according to claim 1 is characterized in that: The main shaft and the base are welded by full penetration and rib plate connection, and the base is fixed by fillet welds through the leveling rib plate and the drum-shaped node of the through steel beam.
3. The hoisting device for installing a high-altitude dome steel beam according to claim 2 is characterized in that: The upper part of the sleeve is connected to the I-beam, and a stiffening plate is arranged at the node position to ensure the node is firm.
4. The hoisting device for installing a high-altitude dome steel beam according to claim 3 is characterized in that: The front part of the cross beam is provided with hanging points every 500 mm, and a fixed pulley is hung thereon. A traction rope is provided at the front end of the cross beam, and steering is performed by utilizing the traction rope.
5. The hoisting device for installing a steel beam for embedding a high-altitude dome on a floor according to claim 4 is characterized in that: The materials of the base, main shaft, sleeve, I-beam and counterweight are all Q235B.