Hot water system with circulating preheating function
By designing a hot water system with circulating preheating function, using the first water supply pipe and the second water supply pipe to meet the flow demands in peak and off-peak periods respectively, the problems of insufficient water supply capacity and energy waste in the prior art are solved, and the problem of insufficient water supply capacity and waste of energy is realized Efficient utilization of hot water and improved user experience.
Patent Information
- Application Number
- CN202420639098.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-29
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-03-29
AI Technical Summary
The existing hot water system has insufficient water supply capacity during peak hours, and energy waste and heat loss due to excessive pipeline diameters during off-peak hours, affecting user experience and energy saving effects.
A hot water system with circulating preheating function is designed, and the first water supply pipe and the second water supply pipe are connected in parallel. The diameter of the first water supply pipe is larger than the second water supply pipe, which meets the flow demands in peak and non-peak hours respectively, and The circulating water flow is achieved through the circulating water pump and the circulating return pipe, and intelligent control is carried out in combination with the solenoid valve and the flow sensor.
Meet a large amount of hot water demand during peak hours, avoid energy waste during off-peak hours, achieve efficient utilization of hot water, and improve system flexibility and user experience.
Smart Images

Figure CN222103918U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of hot water systems, in particular to a hot water system with a circulation preheating function. Background Art
[0002] With the rapid development of modern buildings and the continuous improvement of people's living standards, hot water plays an increasingly important role in people's daily lives. Whether it is washing, cooking or other daily activities, hot water has become an indispensable necessity. Water heaters with circulation preheating function have become the first choice of consumers because of their advantages of "no need to wait for heating, instant heating". Circulation preheating usually refers to starting the circulation water pump to flow and heat the water in the circulation water loop (including hot water pipes and water heaters) so that the water temperature in the hot water pipes reaches the preset temperature.
[0003] In hot water systems such as hotels, schools and hospitals, 24 / 7 cycle preheating has become a common practice in the industry. The advantage of this method is that it can ensure the continuous supply and immediate availability of hot water, thereby meeting the high demand for hot water in these places. However, at the same time, it also brings a series of challenges and problems.
[0004] First, water consumption shows obvious imbalance in different time periods. During peak hours such as washing in the morning and bathing in the evening, water consumption surges, which places extremely high demands on the water supply capacity of the hot water system. Therefore, when selecting the diameter of the water supply pipe in the hot water system, the flow demand during these peak hours must be fully considered to ensure that the pipe can smoothly deliver enough hot water. However, during non-peak water consumption periods, the water flow in the pipe slows down, and an excessively large pipe diameter will not only waste resources, but also increase heat loss due to friction between the water flow and the pipe wall.
[0005] In addition, places such as hotels, schools and hospitals usually have many building units, high floors or long distances between water tanks. These factors have led to a significant increase in the length of hot water delivery pipelines. Hot water needs to pass through longer pipelines during the transmission process, which makes it easier to cause heat loss. This heat loss not only reduces the temperature of the hot water, affecting the user experience, but also increases energy consumption, which is not conducive to energy conservation and environmental protection. Utility Model Content
[0006] In view of the above problems, the purpose of the utility model is to overcome the deficiencies of the prior art and design a hot water system with a circulation preheating function.
[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a hot water system with a circulating preheating function, comprising a hot water storage tank and a water heater, the water heater is used to heat the water in the hot water storage tank, and also comprises a circulating water pump, a first water supply pipe, a second water supply pipe and a circulating return pipe, the hot water storage tank is provided with a water outlet and a water inlet, one end of the first water supply pipe and the second water supply pipe are connected in parallel with the water outlet through the circulating water pump, the other end of the first water supply pipe and the second water supply pipe are connected in parallel with the water inlet through the circulating return pipe, the diameter of the first water supply pipe is larger than the diameter of the second water supply pipe, the diameter of the first water supply pipe meets the flow demand of the hot water system during the peak water usage period, and the diameter of the second water supply pipe meets the flow demand of the hot water system during the non-peak water usage period.
[0008] As a preferred embodiment of the utility model, it also includes several water-using equipment, a first pipeline branch and a second pipeline branch, one end of the first pipeline branch is connected to the water-using equipment, the other end of the first pipeline branch is connected to the first water supply pipe, one end of the second pipeline branch is connected to the water-using equipment, and the other end of the second pipeline branch is connected to the second water supply pipe.
[0009] As a preferred embodiment of the utility model, it also includes a first pipeline valve and a second pipeline valve, the first pipeline valve is arranged at one end of the first water supply pipe connected to the circulating water pump, and the second pipeline valve is arranged at one end of the second water supply pipe connected to the circulating water pump.
[0010] As a preferred embodiment of the utility model, it also includes a first branch valve and a second branch valve, the first branch valve is arranged at one end of the first pipeline branch connected to the first water supply pipe, and the second branch valve is arranged at one end of the second pipeline branch connected to the second water supply pipe.
[0011] As a preferred embodiment of the utility model, it also includes a control terminal, the first pipeline valve, the second pipeline valve, the first branch valve and the second branch valve are solenoid valves, and the control terminal is electrically connected to the first pipeline valve, the second pipeline valve, the first branch valve and the second branch valve.
[0012] As a preferred embodiment of the utility model, it also includes a pipeline flow sensor, which is arranged between the circulating water pump and the water outlet.
[0013] As a preferred implementation manner of the present utility model, the pipeline flow sensor is electrically connected to the control terminal.
[0014] As a preferred embodiment of the utility model, it also includes a water supply pipeline check valve, which is arranged between the circulating water pump and the water outlet.
[0015] Compared with the prior art, the utility model has the following beneficial effects:
[0016] In the utility model, the hot water storage tank is provided with a water outlet and a water inlet for storing and supplying hot water. The water heater is responsible for heating the water in the hot water storage tank to ensure the supply of hot water. The circulating water pump, the first water supply pipe, the second water supply pipe and the circulating return pipe constitute the circulating preheating part of the system. The circulating water pump is used to drive the water to circulate in the system. One end of the first water supply pipe and the second water supply pipe is connected in parallel with the water outlet through the circulating water pump, and the other end is connected in parallel with the water inlet through the circulating return pipe. In this way, when the circulating water pump is working, the water in the hot water storage tank can flow out through the first water supply pipe or the second water supply pipe, and then flow back to the hot water storage tank after passing through the circulating return pipe, so as to realize the circulation of water.
[0017] In particular, the diameter of the first water supply pipe is larger than the diameter of the second water supply pipe. This design makes the flow rate of the first water supply pipe larger than the flow rate of the second water supply pipe. Specifically, the diameter of the first water supply pipe is designed to meet the flow rate demand of the hot water system during the peak water usage period, ensuring that sufficient hot water can be supplied during the peak period. The diameter of the second water supply pipe is designed to meet the flow rate demand of the hot water system during the non-peak water usage period, avoiding unnecessary energy waste during the non-peak period.
[0018] Through such a design, the hot water system of the utility model can not only meet a large amount of hot water demand during peak water usage periods, but also avoid energy waste during non-peak water usage periods, thereby achieving efficient use of hot water.
[0019] Additional aspects and advantages of the present invention will be given in part in the following description, and in part will become apparent from the following description, or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0021] Figure 1 It is a structural diagram of a hot water system with a circulating preheating function.
[0022] Figure 2 It is a structural schematic diagram of water-using equipment, a first pipeline branch and a second pipeline branch in a hot water system of the utility model.
[0023] Figure 3 It is a structural schematic diagram of a first pipeline valve and a second pipeline valve in a hot water system of the utility model.
[0024] Figure 4 It is a structural schematic diagram of a first branch valve and a second branch valve in a hot water system of the utility model.
[0025] Figure 5 It is a structural schematic diagram of a pipeline flow sensor in a hot water system of the utility model.
[0026] Figure 6 The utility model is a schematic diagram of the structure of a water supply pipeline check valve in a hot water system.
[0027] Reference numerals include:
[0028] Hot water storage tank 1, circulating water pump 2, first water supply pipe 3, second water supply pipe 4, circulating return pipe 5, water-using equipment 6, first pipeline branch 7, second pipeline branch 8, first pipeline valve 9, second pipeline valve 10, first branch valve 11, second branch valve 12, pipeline flow sensor 13, water supply pipeline check valve 14. DETAILED DESCRIPTION
[0029] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0030] like Figures 1 to 6 As shown, a hot water system with a circulating preheating function described in the utility model includes a hot water storage tank 1 and a water heater, the water heater is used to heat the water in the hot water storage tank 1, and also includes a circulating water pump 2, a first water supply pipe 3, a second water supply pipe 4 and a circulating return pipe 5, the hot water storage tank 1 is provided with a water outlet and a water inlet, one end of the first water supply pipe 3 and the second water supply pipe is connected in parallel with the water outlet through the circulating water pump 2, the other end of the first water supply pipe 3 and the second water supply pipe is connected in parallel with the water inlet through the circulating return pipe 5, the diameter of the first water supply pipe 3 is larger than the diameter of the second water supply pipe 4, the diameter of the first water supply pipe 3 meets the flow demand of the hot water system during the peak water use period, and the diameter of the second water supply pipe 4 meets the flow demand of the hot water system during the non-peak water use period.
[0031] In the utility model, the hot water storage tank 1 is provided with a water outlet and a water inlet for storing and supplying hot water. The water heater is responsible for heating the water in the hot water storage tank 1 to ensure the supply of hot water. The circulating water pump 2, the first water supply pipe 3, the second water supply pipe 4 and the circulating return pipe 5 constitute the circulating preheating part of the system. The circulating water pump 2 is used to drive water to circulate in the system. One end of the first water supply pipe 3 and the second water supply pipe 4 is connected in parallel with the water outlet through the circulating water pump 2, and the other end is connected in parallel with the water inlet through the circulating return pipe 5. In this way, when the circulating water pump 2 is working, the water in the hot water storage tank 1 can flow out through the first water supply pipe 3 or the second water supply pipe 4, and then flow back to the hot water storage tank 1 after passing through the circulating return pipe 5, so as to realize the circulation of water.
[0032] In particular, the diameter of the first water supply pipe 3 is larger than the diameter of the second water supply pipe 4. This design makes the flow rate of the first water supply pipe 3 larger than the flow rate of the second water supply pipe 4. Specifically, the diameter of the first water supply pipe 3 is designed to meet the flow rate demand of the hot water system during the peak water usage period, ensuring that sufficient hot water can be supplied during the peak period. The diameter of the second water supply pipe 4 is designed to meet the flow rate demand of the hot water system during the non-peak water usage period, avoiding unnecessary energy waste during the non-peak period.
[0033] Through such a design, the hot water system of the utility model can not only meet a large amount of hot water demand during peak water usage periods, but also avoid energy waste during non-peak water usage periods, thereby achieving efficient use of hot water.
[0034] Specifically, refer to Figure 2 As shown, it also includes several water-using equipment 6, a first pipeline branch 7 and a second pipeline branch 8, one end of the first pipeline branch 7 is connected to the water-using equipment 6, and the other end of the first pipeline branch 7 is connected to the first water supply pipe 3, one end of the second pipeline branch 8 is connected to the water-using equipment 6, and the other end of the second pipeline branch 8 is connected to the second water supply pipe 4.
[0035] First, several water-using devices 6 such as showers, wash basins, bathtubs, etc. are connected to the hot water system, and these devices are connected to the first water supply pipe 3 and the second water supply pipe 4 through the first pipeline branch 7 and the second pipeline branch 8. This design enables each water-using device 6 to directly obtain hot water from the hot water system, thereby improving the convenience and efficiency of hot water supply.
[0036] The first pipeline branch 7 is connected to the first water supply pipe 3. Since the first water supply pipe 3 has a large diameter and sufficient flow, it can meet the hot water demand of the water-using equipment 6 during the peak water consumption period. The second pipeline branch 8 is connected to the second water supply pipe 4. Since the second water supply pipe 4 has a small diameter and a moderate flow, it can meet the hot water demand of the equipment during non-peak water consumption period or with small water demand.
[0037] Through such a design, the system can flexibly adjust the flow rate and mode of hot water supply according to the water demand at different time periods. During the peak water use period, the system can provide sufficient hot water to the water-using equipment 6 through the first water supply pipe 3 and the first pipeline branch 7; and during the non-peak water use period, the system can provide the water-using equipment 6 with an appropriate amount of hot water through the second water supply pipe 4 and the second pipeline branch 8, thereby avoiding energy waste. In addition, this design also enhances the flexibility and scalability of the hot water system. As the number of water-using equipment 6 increases or decreases, the system can adapt to different hot water needs by adjusting the number and connection method of pipeline branches.
[0038] Specifically, refer to Figure 3 As shown, it also includes a first pipeline valve 9 and a second pipeline valve 10, wherein the first pipeline valve 9 is arranged at one end of the first water supply pipe 3 connected to the circulating water pump 2, and the second pipeline valve 10 is arranged at one end of the second water supply pipe 4 connected to the circulating water pump 2. Specifically, the first pipeline valve 9 is arranged at one end of the first water supply pipe 3 connected to the circulating water pump 2. The main function of this valve is to control the flow of the first water supply pipe 3. During the peak water use period, by opening the first pipeline valve 9, it can be ensured that the first water supply pipe 3 is unobstructed and sufficient hot water is provided for the water-using equipment 6. During non-peak periods or when the system needs maintenance, the water flow of the first water supply pipe 3 can be cut off by closing the first pipeline valve 9, so as to achieve the purpose of energy saving and flexible control. Similarly, the second pipeline valve 10 is arranged at one end of the second water supply pipe 4 connected to the circulating water pump 2. The main function of this valve is to adjust the flow of the second water supply pipe 4 to meet the hot water supply during non-peak water use periods or when the flow demand is small. By controlling the opening of the second pipeline valve 10, the flow and pressure of the second water supply pipe 4 can be effectively managed to ensure the stable operation of the system in different usage scenarios.
[0039] Specifically, refer to Figure 4 As shown, the first branch valve 11 and the second branch valve 12 are also included. The first branch valve 11 is arranged at one end of the first pipeline branch 7 connected to the first water supply pipe 3, and the second branch valve 12 is arranged at one end of the second pipeline branch 8 connected to the second water supply pipe 4. When a pipeline failure or equipment problem occurs, the corresponding first branch valve 11 or second branch valve 12 can be quickly closed to prevent hot water leakage or the expansion of the accident, thereby protecting the safety of the system and users.
[0040] Specifically, refer to Figure 4As shown, a control terminal is also included, wherein the first pipeline valve 9, the second pipeline valve 10, the first branch valve 11 and the second branch valve 12 are solenoid valves, and the control terminal is electrically connected to the first pipeline valve 9, the second pipeline valve 10, the first branch valve 11 and the second branch valve 12. The user can also remotely control each solenoid valve through the control terminal. For example, during peak water use, the user can open the first pipeline valve 9 and the first branch valve 11 through the control terminal to increase the flow of hot water supply; and during non-peak hours or when energy-saving operation is required, these valves can be closed or their opening can be reduced to reduce unnecessary energy consumption. In addition, the control terminal can also perform automatic control according to preset parameters and modes. For example, the system can be set to automatically open or close certain valves at specific time periods every day to adapt to water demand at different time periods. This automatic control can not only improve the operating efficiency of the system, but also reduce the tediousness and errors of manual operation.
[0041] In summary, adding a control terminal and designing each valve as a solenoid valve and electrically connecting it to the control terminal can make the hot water system more intelligent, automated and convenient. Such a design will bring users a more comfortable and efficient hot water experience.
[0042] Specifically, refer to Figure 5 As shown, it also includes a pipeline flow sensor 13, which is arranged between the circulating water pump 2 and the water outlet. The pipeline flow sensor 13 is electrically connected to the control terminal. The main function of the pipeline flow sensor 13 is to monitor the flow of hot water in the pipeline in real time and feed the data back to the control terminal. By accurately obtaining the flow information at the outlet of the circulating water pump 2, the system can more accurately understand the current hot water supply status and make corresponding adjustments and controls. The data of the pipeline flow sensor 13 can also be used for fault diagnosis and early warning of the system. If the pipeline flow sensor 13 detects an abnormal flow change, such as a sudden increase or decrease, it may mean that there is a leak, blockage or other fault in the system. At this time, the control terminal can issue an alarm to prompt the user or management personnel to check and repair.
[0043] Specifically, refer to Figure 6 As shown, it also includes a water supply pipeline check valve 14, which is arranged between the circulating water pump 2 and the water outlet.
[0044] The main function of the water supply pipeline check valve 14 is to prevent hot water from flowing back in the pipeline. When the circulating water pump 2 stops working or fails, if there is no water supply pipeline check valve 14, the hot water may flow back due to the pressure difference in the pipeline, causing the hot water system to become unstable or damaged. The existence of the water supply pipeline check valve 14 can effectively prevent the occurrence of such backflow phenomenon and protect the normal operation of the hot water system.
[0045] Specifically, when the circulating water pump 2 is working normally, the hot water flows smoothly to the water outlet under the action of the pump, and the water supply pipeline check valve 14 is in an open state, which will not cause any obstruction to the flow of hot water. However, once the circulating water pump 2 stops working or the water flow rate decreases to a certain level, the water supply pipeline check valve 14 can be quickly closed to cut off the backflow path of the hot water, ensuring the stability and safety of the hot water system.
[0046] In addition, the water supply line check valve 14 can also reduce energy waste and heat loss caused by backflow. When hot water flows back, it will not only waste energy, but also cause the temperature of hot water to drop, affecting the user's experience. With the water supply line check valve 14, this situation can be effectively avoided and the operating efficiency of the hot water system can be improved.
[0047] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
Claims
1. A hot water system with a circulating preheating function, comprising a hot water storage tank (1) and a water heater, wherein the water heater is used to heat water in the hot water storage tank (1), characterized in that: It also comprises a circulating water pump (2), a first water supply pipe (3), a second water supply pipe (4) and a circulating return pipe (5); the hot water storage tank (1) is provided with a water outlet and a water inlet; one end of the first water supply pipe (3) and the second water supply pipe are connected in parallel with the water outlet through the circulating water pump (2); the other end of the first water supply pipe (3) and the second water supply pipe are connected in parallel with the water inlet through the circulating return pipe (5); the diameter of the first water supply pipe (3) is greater than the diameter of the second water supply pipe (4); the diameter of the first water supply pipe (3) meets the flow demand of the hot water system during the peak water usage period; the diameter of the second water supply pipe (4) meets the flow demand of the hot water system during the non-peak water usage period.
2. A hot water system with a circulation preheating function according to claim 1, characterized in that: It also includes a plurality of water-using equipment (6), a first pipeline branch (7) and a second pipeline branch (8), wherein one end of the first pipeline branch (7) is connected to the water-using equipment (6), and the other end of the first pipeline branch (7) is connected to the first water supply pipe (3), one end of the second pipeline branch (8) is connected to the water-using equipment (6), and the other end of the second pipeline branch (8) is connected to the second water supply pipe (4).
3. A hot water system with a circulation preheating function according to claim 2, characterized in that: It also comprises a first pipeline valve (9) and a second pipeline valve (10), wherein the first pipeline valve (9) is arranged at one end of the first water supply pipe (3) connected to the circulating water pump (2), and the second pipeline valve (10) is arranged at one end of the second water supply pipe (4) connected to the circulating water pump (2).
4. A hot water system with a circulating preheating function according to claim 3, characterized in that: It also includes a first branch valve (11) and a second branch valve (12), wherein the first branch valve (11) is arranged at one end of the first pipeline branch (7) connected to the first water supply pipe (3), and the second branch valve (12) is arranged at one end of the second pipeline branch (8) connected to the second water supply pipe (4).
5. A hot water system with a circulation preheating function according to claim 4, characterized in that: It also includes a control terminal, wherein the first pipeline valve (9), the second pipeline valve (10), the first branch valve (11) and the second branch valve (12) are solenoid valves, and the control terminal is electrically connected to the first pipeline valve (9), the second pipeline valve (10), the first branch valve (11) and the second branch valve (12).
6. A hot water system with a circulation preheating function according to claim 5, characterized in that: It also comprises a pipeline flow sensor (13), wherein the pipeline flow sensor (13) is arranged between the circulating water pump (2) and the water outlet.
7. A hot water system with a circulation preheating function according to claim 6, characterized in that: The pipeline flow sensor (13) is electrically connected to the control terminal.
8. The hot water system with circulating preheating function according to claim 1, characterized in that: It also comprises a water supply pipeline check valve (14), wherein the water supply pipeline check valve (14) is arranged between the circulating water pump (2) and the water outlet.
