Lifting frame of navigation hole lifting trestle and navigation hole lifting trestle

By simplifying the design of the structure and lifting mechanism, the problems of high complexity and low control flexibility of the navigation hole-up trench are solved, and the rapid and accurate lifting of the bridge body is achieved, meeting the needs of efficient navigation and bridge construction in the waterway.

CN222119906UActive Publication Date: 2024-12-06CHINA RAILWAY 19TH BUREAU GRP EAST CHINA ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420351236.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-26
Publication Date
2024-12-06
Estimated Expiration
2034-02-26

AI Technical Summary

Technical Problem

The existing navigation holes enhance the trench structure has high complexity and low control flexibility, resulting in slow regulation speed, difficulty in responding to changes in shipping demand quickly, and there are safety hazards and insufficient adaptability.

Method used

Design a navigation hole lifting frame, adopting a simplified structure including the main support frame, support beam and lifting mechanism, which is anchored and fixed to the riverbed by steel pipe high piles and reinforced concrete, and combines flat links and oblique struts to form a rectangular cylinder structure to lift The mechanism uses a winch and a wire rope to achieve rapid lifting of the bridge.

Benefits of technology

It realizes rapid and accurate lifting of the bridge body, simplifies the structure, improves regulation efficiency, meets the dual needs of efficient navigation and bridge construction in busy waterways, and reduces safety risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222119906U_ABST
    Figure CN222119906U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of bridge construction, in particular to hoisting frames of a navigable hole hoisting trestle and the navigable hole hoisting trestle, the two hoisting frames are arranged on the two sides of a navigable river channel respectively, each hoisting frame comprises two main supporting frames, the two main supporting frames are arranged in a spaced mode, and the bottoms of the main supporting frames are fixed to a riverbed; the top platform is erected on the tops of the two main supporting frames, and the top platform is provided with a lifting mechanism used for lifting a bridge body of the trestle; the supporting cross beam is arranged between the two main supporting frames, and a lifting space used for containing a bridge body is defined by the supporting cross beam, the top platform and the two main supporting frames. The lifting trestle is used for overcoming the defects that in the prior art, a lifting trestle is high in structural complexity and low in operation and control flexibility, and the technical scheme is simple in structure and high in regulation and control efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge construction, in particular to a lifting frame of a navigation hole lifting trestle and a navigation hole lifting trestle. Background Art

[0002] As a temporary or semi-permanent bridge solution, the navigation channel lifting trestles play a key role during modern bridge construction, especially when building new bridges on busy waterways. To ensure that the normal navigation activities of the river below are not affected during the construction of the bridge, such lifting trestles are designed to be flexible and can be raised and lowered to accommodate ships of different sizes and tonnages.

[0003] However, the navigation hole lifting trestles currently on the market generally have problems such as high structural complexity, low reliability and insufficient technical maturity, which leads to poor controllability in practical applications, such as slow control speed and difficulty in responding quickly to changes in shipping demand. In addition, due to the complex mechanical structure and possible safety hazards caused by frequent operations, as well as the limited adaptability to special environmental conditions, the existing lifting trestles technology faces many challenges and needs for improvement. Utility Model Content

[0004] The utility model provides a lifting frame of a navigation hole lifting trestle and a navigation hole lifting trestle, which are used to solve the defects of the lifting trestle in the prior art that the structure is highly complex and the control flexibility is low, and realizes a technical solution with simple structure and high control efficiency.

[0005] The utility model provides a lifting frame for lifting a trestle in a navigation channel, wherein two lifting frames are respectively arranged on both sides of a navigable river channel, and the lifting frame comprises: two main support frames, which are arranged at intervals, and the bottoms of the main support frames are fixed to the riverbed; a top platform, which is erected on the tops of the two main support frames, and the top platform is provided with a lifting mechanism for lifting a bridge body of the trestle; a supporting crossbeam, which is arranged between the two main support frames, and the supporting crossbeam, the top platform and the two main support frames form a lifting space for accommodating the bridge body.

[0006] According to a lifting frame of a navigation hole lifting trestle provided by the utility model, the main support frame includes four steel pipe high piles, the bottoms of the steel pipe high piles are fixed to the riverbed through reinforced concrete anchoring structures; steel frame connecting structures are arranged between the steel pipe high piles to form a rectangular column structure.

[0007] According to the lifting frame of the navigation hole lifting trestle provided by the utility model, the steel frame connection structure includes a horizontal connecting rod; and a plurality of the horizontal connecting rods are evenly arranged between any two adjacent steel pipe high piles.

[0008] According to a lifting frame of a navigation hole lifting trestle provided by the utility model, the steel frame connection structure includes an oblique support rod; the oblique support rod is arranged between adjacent horizontal connecting rods, and both ends of the oblique support rod are obliquely connected to adjacent steel pipe high piles.

[0009] According to a lifting frame of a navigation hole lifting trestle provided by the utility model, both ends of the supporting crossbeam are respectively connected to the steel pipe high piles of the two main supporting frames; and steel pipe low piles are arranged between the supporting crossbeam and the riverbed.

[0010] According to a lifting frame for a navigation hole lifting trestle provided by the utility model, both ends of the supporting crossbeam are respectively provided with a toggle plate structure and a stirrup plate structure detachably installed on the toggle plate structure; in the installed state, a circular area is enclosed between the toggle plate structure and the stirrup plate structure, and the steel pipe high pile is clamped in the circular area.

[0011] According to a lifting frame of a navigation hole lifting trestle provided by the utility model, an arc-surface pad is arranged on the upper surface of the supporting crossbeam; and an arc-shaped supporting plate matching the shape of the arc-surface pad is arranged at the bottom of the bridge body.

[0012] According to a lifting frame of a navigation hole lifting trestle provided by the utility model, the top platform includes a top crossbeam and a top longitudinal beam; the top crossbeam is connected to the tops of the two main support frames; the top longitudinal beam is vertically cross-arranged with the top crossbeam.

[0013] According to a lifting frame of a navigation hole lifting trestle provided by the utility model, the lifting mechanism includes a winch, and a steel wire rope arranged between the winch and the bridge body; and / or, a guardrail is arranged along the edge of the top platform; and / or, a ladder is arranged on the side of at least one of the main support frames, and the top of the ladder extends to the top platform.

[0014] The utility model also provides a navigation hole lifting trestle, comprising a lifting frame of the navigation hole lifting trestle described in any one of the above implementation modes.

[0015] The lifting frame of the navigation hole lifting trestle provided by the utility model can lift the bridge body to a suitable position by adjusting the lifting mechanism, which can not only ensure the smooth passage of ships during navigation, but also quickly restore the trestle function when there are no ships passing, thus achieving a good combination of bridge function and navigation requirements. Among them, the two main support frames are firmly fixed on both sides of the riverbed to form a reliable basic support, and the lifting mechanism is integrated through the top platform, so that the lifting operation of the bridge body is centralized and integrated. The supporting crossbeam connects the main support frames on both sides to jointly construct a spatial structure that can accommodate the bridge body and ensure its stable lifting. The navigation hole lifting trestle and its lifting frame of the utility model reduce redundant components and unnecessary complex mechanical linkage links, which not only simplifies the overall structure, but also improves the control efficiency, so that the bridge body can be lifted and lowered quickly and accurately when the navigation hole needs to be opened or closed, thereby meeting the dual needs of efficient navigation and bridge construction on busy waterways. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the technical solutions in the present invention or the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0017] Figure 1 It is a structural schematic diagram of the navigation hole lifting trestle provided by the utility model;

[0018] Figure 2 This is one of the structural schematic diagrams of the lifting frame of the navigation hole lifting trestle provided by the utility model;

[0019] Figure 3 This is the second structural schematic diagram of the lifting frame of the navigation hole lifting trestle provided by the utility model;

[0020] Figure 4 It is a partial structural schematic diagram of a supporting crossbeam of a lifting frame of a navigation hole lifting trestle provided by the utility model;

[0021] Figure 5 It is a schematic diagram of the cross-sectional structure of the supporting beam of the lifting frame of the navigation hole lifting trestle provided by the utility model;

[0022] Figure 6 It is a structural schematic diagram of the bridge body of the navigation hole lifting trestle provided by the utility model;

[0023] Figure 7 It is a partial structural schematic diagram of the bridge body of the navigation hole lifting trestle provided by the utility model;

[0024] Figure 8It is a schematic diagram of the cross-sectional structure of the bridge body of the navigation hole lifting trestle provided by the utility model;

[0025] Fig. 9 It is a flow chart of a construction method of a large-span navigation hole lifting trestle provided by the utility model;

[0026] Fig.10 It is a construction state schematic diagram of the positioning of an engineering vessel in the construction method of the large-span navigation hole lifting trestle provided by the utility model;

[0027] Fig.11 It is a structural schematic diagram of a dragging and sliding track of a construction method for a large-span navigation hole lifting trestle provided by the utility model;

[0028] Fig.12 It is a schematic diagram of the coordination state of the dragging and sliding track and the guide beam in the construction method of the large-span navigation hole lifting trestle provided by the utility model;

[0029] Fig.13 It is a schematic diagram of the guide beam structure of the construction method of the large-span navigation hole lifting trestle provided by the utility model;

[0030] Fig.14 It is a schematic diagram of the guide beam assembly process of the construction method of the large-span navigation hole lifting trestle provided by the utility model;

[0031] Fig.15 It is a schematic diagram of the splicing structure of the guide beam and the bridge frame of the construction method of the large-span navigation hole lifting trestle provided by the utility model;

[0032] Fig.16 This is one of the schematic diagrams of the jacking stage of the construction method of the large-span navigation hole lifting trestle provided by the utility model;

[0033] Fig.17 This is the second schematic diagram of the jacking stage of the construction method of the large-span navigation hole lifting trestle provided by the utility model;

[0034] Fig.18 This is the third schematic diagram of the jacking stage of the construction method of the large-span navigation hole lifting trestle provided by the utility model;

[0035] Fig.19 This is the fourth schematic diagram of the jacking stage of the construction method of the large-span navigation hole lifting trestle provided by the utility model;

[0036] Fig. 20 This is the fifth schematic diagram of the jacking stage of the construction method of the large-span navigation hole lifting trestle provided by the utility model;

[0037] Fig.21This is the sixth schematic diagram of the jacking stage of the construction method of the large-span navigation hole lifting trestle provided by the utility model;

[0038] Fig. 22 It is a schematic diagram of the lifting state of the bridge frame of the construction method of the large-span navigation hole lifting trestle provided by the utility model;

[0039] Fig.23 This is one of the principle diagrams of the first power mechanism of the sliding and pushing system of the large-span navigation hole lifting trestle provided by the utility model;

[0040] Fig.24 This is the second schematic diagram of the first power mechanism of the sliding and pushing system of the large-span navigation hole lifting trestle provided by the utility model;

[0041] Fig.25 This is one of the principle diagrams of the second power mechanism of the sliding and pushing system of the large-span navigation hole lifting trestle provided by the utility model;

[0042] Fig.26 This is the second schematic diagram of the second power mechanism of the sliding and pushing system of the large-span navigation hole lifting trestle provided by the utility model;

[0043] Reference numerals:

[0044] 110, main support frame; 111, steel pipe high pile; 112, parallel rod; 113, diagonal brace; 114, steel pipe low pile; 120, top platform; 121, top beam; 122, top longitudinal beam; 123, winch; 130, support beam; 131, toggle plate structure; 132, stirrup plate structure; 133, curved pad; 210, main truss; 211, first upper chord; 212, first lower chord; 213, standard vertical rod; 214, standard diagonal rod; 215, bolt connection seat; 220, high shear truss; 221, second upper chord; 222, second lower chord; 230, bottom beam; 240 , bridge deck structure; 250, lifting support beam; 251, pulley base; 301, ground anchor; 302, concrete anchor; 310, drag sliding track; 311, flat roller; 312, rock; 313, leveling bearing; 320, guide beam; 321, auxiliary support diagonal rod; 322, transition segment; 323, upper deflection segment; 330, bridge frame; 331, counterweight component; 341, winch device; 342, first fixed pulley; 343, moving pulley; 344, first traction rope; 345, second traction rope; 346, fixed beam; 351, lifting device; 352, second fixed pulley; 353, third traction rope. DETAILED DESCRIPTION

[0045] In order to make the purpose, technical solution and advantages of the utility model clearer, the technical solution of the utility model will be clearly and completely described below in conjunction with the drawings in the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0046] In the description of the embodiments of the present utility model, it should be noted that the terms "center", "longitudinal", "lateral", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate the orientation or position relationship based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the embodiments of the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the embodiments of the present utility model. In addition, the terms "first", "second", and "third" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. It should also be noted that in the description of the present utility model, unless otherwise clearly specified and limited, the terms "set", "install", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection. For those skilled in the art, the specific meanings of the above terms in the present utility model can be understood according to the specific circumstances.

[0047] A navigation hole lifting trestle is a temporary or semi-permanent bridge structure, mainly used to ensure the navigability of the waters below during the construction of the bridge. This type of trestle is usually designed to be lifted so that large ships can pass through. Especially when it is necessary to build a bridge across a busy waterway, in order not to affect normal shipping activities, the construction party will build a temporary bridge or trestle at the bridge site and set up a navigation hole that can be raised or moved.

[0048] The technical solution of the utility model involves setting a navigation hole in a navigable river area reserved between existing piers on both sides of the river to lift the pier, so as to ensure the navigation needs of ships and vehicles.

[0049] Combine the following Figure 1-Figure 8 The specific implementation manner of the lifting frame of the navigation hole lifting trestle of the utility model is described.

[0050] The utility model provides a lifting frame for lifting a trestle in a navigation channel, wherein two lifting frames are respectively arranged on both sides of the navigable river channel, and the lifting frame comprises: two main support frames 110, the two main support frames 110 are arranged at intervals, and the bottoms of the main support frames 110 are fixed to the riverbed; a top platform 120, which is erected on the tops of the two main support frames 110, and the top platform 120 is provided with a lifting mechanism for lifting the bridge body of the trestle; a supporting crossbeam 130, which is arranged between the two main support frames 110, and the supporting crossbeam 130, the top platform 120 and the two main support frames 110 form a lifting space for accommodating the bridge body.

[0051] Specifically, the lifting frames of the navigation hole lifting trestle are installed on both sides of the navigable river, with one lifting frame on each side. The two lifting frames are symmetrically arranged and are fixedly connected to the riverbed respectively to ensure the stability of the overall structure. Among them, each lifting frame is composed of two main support frames 110, and the two main support frames 110 are erected on the riverbed in parallel and at a certain distance, serving as the foundation and main load-bearing member of the entire lifting frame. On the top of the two main support frames 110, a top platform 120 is built, which plays the role of bearing and installing the lifting mechanism. The lifting mechanism is specifically used to lift the trestle bridge body part, so that the navigation hole can be opened when a large ship needs to pass, and the bridge body can be lowered to restore the trestle connection function when there is no ship passing. A supporting crossbeam 130 is also provided between the two main support frames 110, and this crossbeam, the top platform 120 and the two main support frames 110 together constitute a space frame structure enclosing a lifting space.

[0052] In actual applications, when the bridge needs to be lowered to allow large ships to pass through the navigation hole, the lifting mechanism will raise the bridge, thereby raising the height of the bridge deck originally located at the navigation hole, and expanding the height space for ships to pass. When the bridge is lifted to a normal working state, the support beam 130 provides a stable and reliable support for the bridge, ensuring that the bridge deck remains at a predetermined height.

[0053] According to the lifting frame of the navigation hole lifting trestle provided by the utility model, the main support frame 110 includes four steel pipe high piles 111, the bottom of the steel pipe high piles 111 is fixed to the riverbed through the reinforced concrete anchor 302 solid structure; a steel frame connection structure is arranged between the steel pipe high piles 111 to form a rectangular column structure. The lifting frame of the navigation hole lifting trestle is rooted in the riverbed by the combination of the steel pipe high piles 111 and the reinforced concrete anchor 302, and a solid rectangular frame is constructed by the steel frame connection structure, which not only meets the requirements of the lifting function, but also ensures the reliability and durability of the structure in the water operation environment.

[0054] Specifically, the main support frame 110 uses four steel pipe piles 111 as the main load-bearing and supporting elements, and is firmly connected to the riverbed through a reinforced concrete anchor 302. A steel frame connection structure is set between the steel pipe piles 111 to enhance the overall rigidity and bearing capacity of the main support frame 110, so that the lifting frame can bear the weight of the bridge body and various dynamic loads during the construction process.

[0055] Furthermore, according to the lifting frame of the navigation hole lifting trestle provided by the utility model, the steel frame connection structure includes a horizontal connecting rod 112; a plurality of horizontal connecting rods 112 are evenly arranged between any two adjacent steel pipe high piles 111. Specifically, a plurality of horizontal connecting rods 112 are evenly arranged between every two adjacent steel pipe high piles 111. The horizontal connecting rods 112 are usually made of high-strength steel, and are arranged horizontally and connected to adjacent steel pipe high piles 111, thereby forming a stable horizontal connection network.

[0056] Further, according to the lifting frame of the navigation hole lifting trestle provided by the utility model, the steel frame connection structure includes a diagonal brace 113; the diagonal brace 113 is arranged between adjacent horizontal connecting rods 112, and the two ends of the diagonal brace 113 are obliquely connected to adjacent steel pipe high piles 111. As an important component of the lifting frame, the diagonal brace 113 mainly provides additional lateral support and torsional rigidity to ensure that the lifting frame remains stable when subjected to various complex loads.

[0057] By rationally arranging the system combining the diagonal braces 113 and the parallel connecting rods 112, the rigidity and stability of the entire lifting frame structure can be significantly improved, ensuring that during the process of lifting the pier bridge body, good working performance and safety can be maintained even in the face of multiple factors such as wind load, deadweight and dynamic construction load.

[0058] According to a lifting frame of a navigation hole lifting trestle provided by the utility model, both ends of the supporting beam 130 are respectively connected to the steel pipe high piles 111 of the two main supporting frames 110; and steel pipe short piles 114 are arranged between the supporting beam 130 and the riverbed. Specifically, in order to enhance the stability and bearing capacity of the supporting beam 130 and avoid excessive deflection or instability of the beam when subjected to force, the steel pipe short piles 114 are arranged between the supporting beam 130 and the riverbed. On the one hand, the steel pipe short piles 114 can increase the support points for the lower part of the supporting beam 130, reduce the cantilever length of the beam, and thus improve the rigidity of the beam itself; on the other hand, the steel pipe short piles 114 penetrate into the bottom soil of the riverbed, and transfer part of the load borne by the beam to the foundation, ensuring that the entire lifting frame system has sufficient safety reserves and stability during construction and operation.

[0059] Furthermore, according to a lifting frame of a navigation hole lifting trestle provided by the utility model, a toggle plate structure 131 and a stirrup plate structure 132 detachably mounted on the toggle plate structure 131 are respectively provided at both ends of the supporting crossbeam 130; in the installed state, a circular area is enclosed between the toggle plate structure 131 and the stirrup plate structure 132, and the steel pipe high pile 111 is clamped in the circular area. When the steel pipe high pile 111 is inserted into the circular area enclosed by the toggle plate and the stirrup plate, the stirrup plate tightly clamps the steel pipe high pile 111 with its own tensioning force, thereby ensuring the tightness and stability of the connection between the crossbeam and the steel pipe high pile 111. Not only can the load on the supporting crossbeam 130 be effectively transferred to the steel pipe high pile 111, but also because the stirrup plate is detachable, it is convenient for the lifting frame to have operational flexibility during installation, adjustment and maintenance.

[0060] According to a lifting frame of a navigation hole lifting trestle provided by the utility model, an arc-surface pad 133 is provided on the upper surface of the supporting crossbeam 130; and an arc-shaped supporting plate matching the shape of the arc-surface pad 133 is provided at the bottom of the bridge body.

[0061] Among them, in the non-lifting state, that is, when the bridge body is in normal use or in a static state after construction is completed, the arc pad 133 fits tightly with the arc support plate, and together they form a arc support structure. It can not only ensure that the bridge body is accurately placed in the predetermined position, and automatically achieve fine-tuning correction in the horizontal direction through the cooperation of the arc surface, but also cope with the deformation risk of the bridge body caused by force changes (such as vehicle loads, temperature changes, etc.). Specifically, the non-rigid cooperation between the arc pad 133 and the arc support plate can allow a slight displacement or rotation between each other to a certain extent, thereby absorbing and dispersing the impact force and shear force on the bridge body, and preventing it from being directly transmitted to the support frame to cause excessive stress or causing excessive deformation of the local structure. This flexible contact method helps to enhance the stability and durability of the overall structure, while reducing safety hazards caused by stress concentration.

[0062] According to the lifting frame of the navigation hole lifting trestle provided by the utility model, the top platform 120 includes a top cross beam 121 and a top longitudinal beam 122; the top cross beam 121 is connected to the top of the two main support frames 110; the top longitudinal beam 122 is vertically arranged to cross the top cross beam 121. Specifically, the top platform 120 is an important component of the entire lifting frame, and its internal structure includes the top cross beam 121 and the top longitudinal beam 122.

[0063] Among them, the top crossbeam 121 is installed on the top of the two main support frames 110, and is fixed to the main support frames 110 by welding, bolting or other reliable methods, playing the role of lateral support and stabilizing the bridge body. The top longitudinal beam 122 is arranged vertically and crosswise with the top crossbeam 121 to form a three-dimensional support network. It not only improves the rigidity and bearing capacity of the platform itself, but also can more evenly disperse the load transmitted by the bridge body. Moreover, the cross-arranged top crossbeam 121 and top longitudinal beam 122 make it easier to lay a working plane or install a lifting mechanism on the top platform 120.

[0064] According to a lifting frame of a navigation hole lifting pier provided by the utility model, the lifting mechanism includes a winch 123, and a steel wire rope arranged between the winch 123 and the bridge body; and / or, a guardrail is arranged along the edge of the top platform 120; and / or, a ladder is arranged on the side of at least one main support frame 110, and the top of the ladder extends to the top platform 120.

[0065] Among them, the winch 123 as a part of the lifting mechanism is connected to the bridge body through a steel wire rope. When the winch 123 is working, the lifting and lowering operation of the bridge body is realized by winding or releasing the steel wire rope. In the preferred design scheme, in order to ensure the balance and stability when lifting the bridge body and improve work efficiency, at least one winch 123 is usually set at the position corresponding to each main support frame 110. The winch 123 is connected to the bridge body through a steel wire rope or other load-bearing rigging, and works synchronously to jointly undertake the task of lifting or lowering the navigation hole. Each winch 123 can independently control its lifting speed and strength, but in actual operation, it is usually necessary to keep the actions of multiple winches 123 coordinated to ensure the stability and safety of the bridge body during the entire lifting process.

[0066] In addition, by setting a guardrail on the edge of the top platform 120, it is possible to prevent people working on the top platform 120 from accidentally falling, providing a relatively safe working environment for people working on the platform. A ladder is installed on the side of at least one main support frame 110, and the ladder preferably extends from the ground to the top platform 120, providing a convenient and safe passage for workers to reach the top platform 120 for various operations and maintenance operations.

[0067] Combine the following Figure 1-Figure 8 The specific implementation method of the bridge body of the navigation hole lifting trestle of the utility model is described.

[0068] The utility model provides a bridge body of a navigation hole lifting trestle, comprising: a plurality of main truss segments, wherein the plurality of main truss segments are sequentially connected to form a main truss portion of the bridge body, the main truss segments comprising main trusses 210 arranged in parallel on both sides of the bridge body; high shear segments, arranged at both ends of the main truss portion, the high shear segments comprising high shear trusses 220 arranged in parallel on both sides of the bridge body; a plurality of bottom cross beams 230 are respectively arranged between the main trusses 210 and between the high shear trusses 220; a bridge deck structure 240 of the bridge body is erected above the plurality of bottom cross beams 230.

[0069] Specifically, the main load-bearing structure of the bridge body is composed of a plurality of main truss segments, which are connected to each other in sequence to form the main truss of the bridge body. Each main truss segment contains a main truss 210 arranged parallel to both sides of the bridge body, which serves as the main support skeleton and is responsible for bearing the loads in the vertical and horizontal directions. The high shear segments at both ends of the main truss can enhance the bearing capacity and stability of the two ends of the bridge body when subjected to large shear forces. The high shear segments are also provided with high shear trusses 220 parallel to both sides of the bridge body, and the resistance to shear forces is optimized by providing high shear web bars. The bridge deck structure 240 of the bridge body is installed on the bottom crossbeam 230, and the bridge deck usually includes a carriageway, a sidewalk, and necessary railings and other facilities. The bridge deck structure 240 transfers the load to the main truss 210 and the high shear truss 220 at the bottom through the bottom crossbeam 230, ensuring that the entire trestle can safely bear traffic loads and other external forces during operation.

[0070] Among them, the segmented bridge body (main truss segment) is easy to transport to the site and quickly spliced ​​and installed, which greatly reduces the time and difficulty of on-site construction and improves the progress and efficiency of the project. The connection between the main truss segments can be high-strength bolt connection or welding. High shear segments are set at both ends of the main truss to enhance the stability of the bridge when it is subjected to large shear forces, especially in the navigation area. During the lifting or lowering of the bridge body, the high shear truss 220 can effectively resist lateral loads.

[0071] According to the bridge body of a navigation hole lifting trestle provided by the utility model, the main truss 210 includes a first upper chord 211, a first lower chord 212, a standard vertical rod 213 and a standard diagonal rod 214; the standard vertical rod 213 is vertically connected between the first upper chord 211 and the first lower chord 212, and a plurality of standard vertical rods 213 are evenly distributed in the length direction of the main truss 210; the standard diagonal rod 214 is obliquely arranged in a rectangular area surrounded by the first upper chord 211, the first lower chord 212 and the standard vertical rod 213. Specifically, this embodiment provides an implementation method of a specific layout structure of a main truss 210. Each main truss 210 on both sides of the bridge body is composed of a plurality of basic components, mainly including a first upper chord 211, a first lower chord 212, a standard vertical rod 213 and a standard diagonal rod 214.

[0072] Among them, the first upper chord 211 and the first lower chord 212 are the main force-bearing elements of the main truss 210. They are arranged in parallel at the upper and lower ends of the truss, and together determine the basic shape and span size of the truss. The standard vertical rod 213 is vertically connected between the first upper chord 211 and the first lower chord 212. Its function is to divide the space between the upper chord and the lower chord into multiple rectangular areas, and provide lateral support to enhance the bending rigidity and stability of the entire truss structure. These standard vertical rods 213 are evenly distributed along the length direction of the main truss 210 to ensure that the load can be evenly transferred to the upper and lower chords. The standard diagonal rod 214 is obliquely arranged in each rectangular area surrounded by the first upper chord 211, the first lower chord 212 and the standard vertical rod 213. This oblique arrangement enhances the overall stability and bearing capacity of the truss, especially the ability to resist shear force and torsion.

[0073] Preferably, the standard diagonal rod 214 can be connected with the first upper chord rod 211, the first lower chord rod 212 and the standard vertical rod 213 to form a triangular structure, and the stability principle of the triangle is used to further improve the mechanical properties of the main truss 210 under complex stress conditions. The rationally distributed first upper chord rod 211, the first lower chord rod 212, the standard vertical rod 213 and the standard diagonal rod 214 combined design not only ensures the strength and rigidity of the overall structure, but also enables the bridge body to maintain good stability and safety when bearing various loads.

[0074] Further, according to the bridge body of a navigation hole lifting trestle provided by the utility model, a bolt connection seat 215 is provided in the middle of the standard vertical rod 213; one end of the standard diagonal rod 214 is connected to the bolt connection seat 215, and the other end is welded or riveted to the first upper chord rod 211 or the first lower chord rod 212. Among them, the bolt connection seat 215 is a key component for detachable connection with other components, which is usually made of high-strength steel and is preset with bolt holes to facilitate the fastening of different parts together by bolts. The standard diagonal rod 214 plays an important role in enhancing the overall stability and transmitting shear force in the main truss 210. One end of the standard diagonal rod 214 can be connected to the bolt connection seat 215 in the middle of the standard vertical rod 213 by bolts, allowing the angle and position of the diagonal rod to be adjusted as needed, and facilitating later maintenance and replacement. The other end of the standard diagonal rod 214 is connected to the first upper chord rod 211 or the first lower chord rod 212 by welding or riveting, ensuring that there is enough strength between the two to transmit the force.

[0075] According to a bridge body of a navigation hole lifting trestle provided by the utility model, the high shear truss 220 includes a second upper chord 221 and a second lower chord 222; a plurality of vertically or obliquely arranged high shear web members are arranged between the second upper chord 221 and the second lower chord 222.

[0076] Among them, the second upper chord 221 is the main load-bearing member at the top of the high shear truss 220. It is located above the entire high shear truss 220, mainly bears axial tension and bending moment, and is effectively connected to the main truss 210 of the bridge body or other adjacent structures. Correspondingly, the second lower chord 222 is arranged at the bottom of the high shear truss 220, and also bears axial pressure and bending moment. The second upper chord 221 and the second lower chord 222 together constitute the basic skeleton of the high shear truss 220, which determines its basic geometric shape and bearing capacity. The high shear web can be a vertical web perpendicular to the bridge deck, or it can be an inclined web inclined according to the actual force requirements, which can enhance the high shear truss 220's resistance to shear force and overall stability.

[0077] High shear webs are specially designed structural members, usually used in bridges, piers or other large steel structures to withstand and transmit large shear forces. In the high shear truss 220, the high shear webs are rods arranged between the second upper chord 221 and the second lower chord 222. These rods can be arranged vertically (i.e., perpendicular to the direction of the bridge deck) or obliquely to enhance the resistance of the structure to horizontal loads (such as wind loads, seismic loads, and lateral impact forces generated when ships pass). The high shear webs absorb and transmit the shear forces acting on the bridge body in different directions through their own shear deformation, so that the entire high shear truss 220 can maintain sufficient rigidity and strength under complex load conditions, thereby ensuring the safe operation and long-term durability of the lifting pier.

[0078] According to the bridge body of a navigation hole lifting trestle provided by the utility model, the lower surface of the second lower chord 222 is provided with an arc-shaped support plate; the lifting frame of the navigation hole lifting trestle is provided with an arc-shaped pad 133 matching the shape of the arc-shaped support plate. Specifically, the second lower chord 222 is the main force-bearing member at the bottom of the high shear truss 220, and the lower surface thereof is provided with an arc-shaped support plate.

[0079] In order to ensure that the lifting frame can provide stable and precise support, a curved pad 133 matching the shape of the curved support plate is provided on the lifting frame. The pad also has a curved surface. When the bridge body is lowered into place, the curved pad 133 is tightly combined with the curved support plate under the second lower chord 222. The two together form a buffer and support system through a non-rigid contact method, which is not only conducive to the precise positioning between the bridge body and the lifting frame, but also can reduce the impact and vibration caused by hard contact during the lifting process of the bridge body, thereby improving the safety and stability of the entire lifting process.

[0080] According to a bridge body of a navigation hole lifting trestle provided by the utility model, the bridge deck structure 240 includes a plurality of rectangular panel members assembled and matched with each other; at both ends of the bridge body, the bridge deck structure 240 includes lap plates. Among them, the bridge deck structure 240 is mainly composed of a plurality of rectangular panel members assembled and matched with each other. These panel members can be made of prestressed concrete or other high-strength materials, preferably steel. The size of each rectangular panel member is standardized, which is convenient for production and on-site installation, and is spliced ​​with each other through special connection methods (such as bolt connection, welding, etc.) to form a continuous and stable bridge deck bearing layer. At both ends of the bridge body, that is, the position where it connects with the shore road or the original trestle structure, the bridge deck structure 240 is preferably provided with lap plates to achieve a smooth transition and effective connection between the new and old structures, and to ensure the continuity and comfort of the carriageway or sidewalk.

[0081] According to the bridge body of a navigation hole lifting trestle provided by the utility model, the high shear segment is provided with a lifting beam 250; the end of the lifting beam 250 has a lifting structure for setting a wire rope. The lifting beam 250 can be arranged across the bottom of the high shear segment to provide a convenient and efficient lifting support point for the bridge during the construction process. The lifting beam 250 is preferably made of high-strength steel and has sufficient bearing capacity and rigidity to ensure that the weight of the high shear segment can be stably supported during the lifting operation, and the safety and stability of the structure can be maintained throughout the lifting process.

[0082] The two ends (i.e., the ends) of the lifting beam 250 are provided with a lifting structure specially used for setting the wire rope. Such a structure may include a pre-buried hook, a lug, or a specially made welded part, etc., which can be firmly connected with the wire rope of the lifting mechanism, so as to accurately control the lifting and lowering action of the high shear segment through a winch 123 or a capstan.

[0083] According to the bridge body of a navigation hole lifting trestle provided by the utility model, the lifting joist 250 is installed at the bottom of the high shear truss 220 on both sides of the bridge body, and is perpendicular to the length direction of the high shear truss 220; the lifting structures at both ends of the lifting joist 250 are respectively located on the outside of the high shear truss 220 on both sides of the bridge body. The lifting joist 250 is installed at the bottom of the high shear truss 220 on both sides of the bridge body, and its arrangement direction is perpendicular to the longitudinal axis of the bridge. The lifting joist 250 spans under the high shear truss 220 along the width direction of the bridge deck, thereby providing a stable and direct lifting force point for the bridge body.

[0084] In order to ensure that the lifting mechanism of the lifting frame can be operated conveniently and safely, the lifting structures (such as hooks, ear plates or other specially designed connectors) at both ends of the lifting beam 250 are respectively located on the outside of the high shear truss 220 on both sides of the bridge body. This layout ensures that when using wire ropes or other rigging for lifting, no additional stress will be generated on the internal web members of the high shear truss 220, while providing sufficient working space so that the lifting machinery can efficiently and accurately control the lifting and lowering action of the high shear segment from the outside.

[0085] According to the bridge body of a navigation hole lifting trestle provided by the utility model, the lifting structure includes a pulley base 251 installed on the lifting joist 250 and a pulley member or a pulley block installed on the pulley base 251. Among them, the pulley base 251 is the basic part of the lifting structure, which is directly fixed to both ends of the lifting joist 250. The pulley base 251 is preferably made of high-strength material and has sufficient bearing capacity and stability.

[0086] The pulley or pulley block is mounted on the pulley base 251, and its function is to change the direction of the wire rope and reduce the resistance between the wire rope and the fixed structure during the lifting process through rolling friction. The pulley may be a single pulley for simply changing the direction of the wire rope; while the pulley block includes multiple pulleys, which can achieve a multi-stage deceleration and force increase effect. When performing the lifting action of the high shear segment, the lifting operation can be completed efficiently, safely and smoothly through the pulley or pulley block.

[0087] The utility model provides a navigation hole lifting trestle, which may include a lifting frame and a bridge body of the navigation hole lifting trestle of any one of the above implementation modes.

[0088] According to the preferred embodiment, the lifting frame is the core support and adjustment structure of the entire trestle, and is arranged on both sides of the navigable river in a bilaterally symmetrical arrangement. The main support frame 110 is composed of four steel pipe high piles 111, which are firmly fixed to the riverbed through a reinforced concrete anchor 302 solid structure, ensuring a solid and reliable foundation. The steel pipe high piles 111 are connected to each other by a steel frame connection structure, including a horizontal connecting rod 112 and a diagonal brace rod 113, forming a solid rectangular frame structure to ensure the overall rigidity and stability of the lifting frame.

[0089] The lifting mechanism of the lifting frame preferably adopts a design of a winch 123 in conjunction with a pulley block. At least one winch 123 is installed on each main support frame 110, and is matched with the arc-shaped support plate at the bottom of the bridge body through a special arc pad 133 to ensure uniform force and smooth transition when the bridge body is raised or lowered. In addition, the bridge body is preferably provided with a lifting joist 250 that matches the lifting mechanism of the lifting frame, spanning the bottom of the high shear segment and perpendicular to the longitudinal axis of the bridge body, with pulley bases 251 and pulleys or pulley blocks at both ends, so as to facilitate accurate and efficient bridge body lifting operations through rigging such as wire ropes.

[0090] The bridge body preferably adopts a modular design concept, and is composed of a plurality of main truss segments connected in sequence to form a main truss portion, each of which includes a first upper chord 211, a first lower chord 212, a standard vertical bar 213, and a standard diagonal bar 214 arranged in parallel, thereby enhancing the overall mechanical properties of the bridge body. A high shear segment is provided at the end of the main truss 210, including a second upper chord 221 and a second lower chord 222, and its shear resistance is enhanced by a high shear web bar.

[0091] The bridge deck structure 240 of the bridge body is preferably constructed of a plurality of mutually assembled rectangular panel members. To ensure seamless connection with the shore road or the existing bridge, lap plates can be provided at both ends of the bridge deck structure 240. At the same time, considering the convenience of lifting, the bottom of the high shear trusses 220 on both sides of the bridge body are provided with lifting joists 250 and their matching pulley systems for easy lifting.

[0092] To sum up the above, the navigation hole lifting trestle provided by the utility model not only improves the structural strength and stability of the navigation hole lifting trestle, but also greatly simplifies the difficulty of on-site construction, realizes fast and safe bridge lifting operation, thereby meeting the demand for flexible adjustment of the navigation hole height in busy waterways, ensuring the normal navigation of ships and ensuring the smooth progress of engineering projects.

[0093] Combine the following Figure 9-Figure 26 The specific implementation method of the construction method of the large-span navigation hole lifting trestle of the utility model is described.

[0094] The utility model provides a construction method for a large-span navigation hole lifting trestle, comprising: arranging steel pipe piles of a lifting frame at the end positions of the original trestle on both sides of the river; arranging a dragging and sliding track 310 on the bridge deck of the original trestle; assembling a guide beam 320 in sections, and pushing the guide beam 320 toward the opposite bank along the dragging and sliding track 310, so that part of the guide beam 320 is suspended above the river; splicing a bridge frame 330 of the navigation hole lifting trestle at the rear end of the guide beam 320 in sections, and gradually pushing it toward the opposite bank; gradually dismantling the guide beam 320 that reaches the opposite bank; positioning the two ends of the bridge frame 330 at the end positions of the original trestle on both sides of the river respectively; installing the lifting frame; and laying a bridge deck structure 240 on the bridge frame 330.

[0095] Specifically, the construction method of the large-span navigation hole lifting trestle includes the following steps:

[0096] The steps of setting steel pipe piles are as follows: First, solid steel pipe piles are driven or installed at the ends of the original trestle bridges on both sides of the river as the foundation structure of the lifting frame. Compared with traditional fixed foundations, steel pipe piles have the characteristics of fast construction speed, strong bearing capacity and less impact on the environment.

[0097] The installation steps of the dragging and sliding track 310 are to lay the dragging and sliding track 310 on the original trestle bridge deck, which provides guidance and support for the subsequent translation of the guide beam 320 and the bridge frame 330, avoids the complexity and safety hazards that may be caused by traditional lifting operations, and can effectively control the construction accuracy.

[0098] The guide beam 320 is assembled in sections and advanced in steps, and the guide beam 320 is prefabricated in sections according to the design requirements and assembled on site, and then gradually advanced toward the opposite bank through the sliding track. This construction method reduces the weight of a single hoisting, improves construction efficiency, and can adapt to complex construction site conditions.

[0099] The bridge frame 330 is spliced ​​and advanced in sections, and the bridge frame 330 of the navigation hole is spliced ​​section by section at the rear end of the guide beam 320 to lift the trestle, and the guide beam 320 is used to guide the bridge frame 330 to smoothly advance forward along the sliding track to a predetermined position. This method optimizes the transportation problem of large bridge components, and at the same time reduces the huge cost and technical challenges caused by one-time overall lifting.

[0100] In the steps of removing the guide beam 320 and placing the bridge body, as the bridge body frame 330 is continuously pushed forward, the guide beam 320 that has completed its mission can be gradually removed and recycled to reduce material waste. The two ends of the bridge body frame 330 are accurately located at the ends of the original trestle, realizing the effective connection between the new and old structures.

[0101] The lifting frame installation step is to install a specially designed lifting frame after the bridge frame 330 is in place, so as to adjust the height of the navigation hole as needed without affecting navigation.

[0102] The bridge deck structure 240 laying step, finally, completes the laying work of the bridge deck structure 240 on the stable bridge frame 330, ensuring that the entire trestle structure is safe, comfortable and durable.

[0103] The construction method of the large-span navigation hole lifting trestle of the utility model integrates advanced means such as modern prestressed concrete technology, modular assembly process, and sliding construction concept, and especially makes full use of the advantages of sliding construction, reduces the difficulty of lifting large components, greatly improves construction efficiency, reduces risks, saves resources, and has little impact on the surrounding environment, thereby achieving a dual improvement in technical and economic benefits.

[0104] In the process of constructing a large-span navigation hole lifting trestle, setting the steel pipe piles of the lifting frame is a key step. According to a construction method of a large-span navigation hole lifting trestle provided by the utility model, the steps of setting the steel pipe piles of the lifting frame at the end positions of the original trestle on both sides of the river include: setting at least two ground anchors 301 on the river bank, setting at least two concrete anchors 302 on the riverbed, moving the engineering ship used for constructing the steel pipe piles to the designated position, and connecting and positioning with the ground anchor 301 and the concrete anchor 302.

[0105] Specifically, at least two ground anchors 301 are first set on the river bank near the end position of the original trestle on both sides of the river, and at least two concrete anchors 302 are cast at appropriate positions on the riverbed, deep into the bottom soil layer of the riverbed, which can be a prestressed concrete structure or a reinforced concrete structure, designed to withstand large horizontal thrust and vertical load, to ensure that the entire lifting frame system has sufficient fixing strength in the underwater part. Subsequently, a special construction engineering ship is used to move to the designated position, which is usually the specific driving point of the steel pipe pile determined according to the design drawings. The engineering ship needs to be equipped with corresponding pile driving equipment and a device that can be connected and fixed with the ground anchor 301 and the concrete anchor 302. Finally, the engineering ship is firmly connected to the pre-set ground anchor 301 and the concrete anchor 302 by cables, chains or other high-strength connectors to achieve accurate positioning and stable support. In this way, when the steel pipe pile is driven, the engineering ship will not deviate from the predetermined position due to factors such as water flow and wind force, thereby ensuring the accurate installation of the steel pipe pile and the stability of the overall lifting frame structure. This construction method fully considers the characteristics of the river environment and adopts a double-layer anchoring system of land and riverbed, which effectively enhances the installation reliability of the lifting frame steel pipe piles and lays a solid foundation for the subsequent lifting trestle bridge body construction.

[0106] According to a construction method for a large-span navigation hole lifting trestle provided by the utility model, before the step of setting the dragging and sliding track 310 on the bridge deck of the original trestle, the method includes: leveling and widening the original trestle, and the width of the widened original trestle is sufficient to leave walking space for personnel on both sides of the dragging and sliding track 310. By leveling and widening the original trestle, not only is it ensured that the sliding track can function stably and efficiently, but also the safety requirements of the construction site are fully considered, providing a basic guarantee for improving the overall construction quality and efficiency of the trestle.

[0107] Specifically, when constructing a large-span navigation hole lifting trestle, the original trestle is fully tested for horizontality (i.e., "leveling") to ensure that its surface flatness meets the strict requirements for installing the sliding track. By accurately measuring and adjusting the ups and downs of the original trestle deck, the entire deck becomes a flat and evenly stressed working platform. Taking into account safety and operational convenience, after determining the specific location of the sliding track, it is preferred to appropriately widen the original trestle. That is, increase the width on both sides of the bridge body to ensure that sufficient walking space and equipment operation areas are left on both sides of the sliding track, so that construction personnel can perform various auxiliary work without interfering with the sliding process, while also providing sufficient safety distance to reduce accidental risks.

[0108] According to a construction method for a large-span navigation hole lifting trestle provided by the utility model, after the step of setting a dragging and sliding track 310 on the bridge deck of the original trestle, it includes: setting a flat roller 311 and a rocker 312 for sliding on the dragging and sliding track 310 and on the steel pipe piles, so as to realize the safe and efficient sliding of bridge components (such as guide beams 320, bridge frames 330, etc.) into place.

[0109] Among them, the flat roller 311 is preferably arranged on the sliding track to reduce the friction between the bridge components and the track. The flat roller 311 made of high-strength material can withstand a large load and help large structures slide smoothly by rolling. When the guide beam 320 or the bridge frame 330 assembled in sections is pushed along the sliding track, these flat rollers 311 can disperse and reduce the local stress caused by weight and movement, ensuring a smooth sliding process and minimizing damage to the track. The rock 312 (i.e., a steering pulley or guide device) arranged on the steel pipe pile or other supporting structure has the function of adjusting the direction of the structural member. During the jacking process, if there is a lateral offset or the direction of the bridge frame 330 needs to be fine-tuned, the rock 312 can adapt to and adjust this offset through its own rotational freedom, thereby ensuring that the entire bridge frame 330 is accurately in place according to the design requirements.

[0110] According to the construction method of a large-span navigation hole lifting trestle provided by the utility model, the steps of assembling the guide beam 320 in sections include: assembling the monolithic truss of the guide beam 320 on the horizontal ground; erecting the monolithic truss on the dragging and sliding track 310, and setting the auxiliary support diagonal rod 321 between the monolithic truss and the bridge deck; connecting the cross beam between the monolithic trusses on both sides, and removing the auxiliary support diagonal rod 321 to complete the installation of the single section of the guide beam 320. Through the above steps, the assembly and installation of a complete section of the guide beam 320 on the dragging and sliding track 310 are completed, laying the foundation for the subsequent section-by-section splicing of the bridge frame 330 and the advancement to the opposite bank.

[0111] Among them, the monolithic truss of the guide beam 320 is prefabricated and assembled on a flat and stable horizontal work surface, which includes precisely connecting the upper chord, lower chord, web and other related structural parts required by the guide beam 320 according to the design requirements to form an independent monolithic truss unit.

[0112] After the ground assembly of the monolithic truss is completed, it is safely erected using a crane or other lifting equipment, and is precisely placed on the pre-installed drag and slide rails 310. In order to ensure the stability and safety of the monolithic truss in the erected state, auxiliary supporting diagonal rods 321 are preferably temporarily arranged between the monolithic truss and the bridge deck, which can effectively prevent the truss from overturning or deforming before it is completely fixed.

[0113] After the monolithic trusses on both sides are placed at predetermined positions, a crossbeam is installed between the two monolithic trusses, and they are firmly connected by welding or bolting to form a complete segment of the guide beam 320. This process requires precise measurement and positioning to ensure the overall rigidity and uniform force of the guide beam 320.

[0114] After the cross beams are connected and the guide beam 320 segment structure is confirmed to be stable and reliable, the previously installed auxiliary support diagonal rods 321 are gradually removed. At this time, the single segment of the guide beam 320 has sufficient load-bearing capacity and self-stability, and can maintain its geometric shape and functional requirements without relying on temporary support. It is understandable that in order to improve the strength of the guide beam, an auxiliary support diagonal rod 321 can also be set between the single truss and the cross beam.

[0115] According to a construction method for a large-span navigation hole lifting trestle provided by the utility model, the steps of splicing the bridge frame 330 of the navigation hole lifting trestle in sections at the rear end of the guide beam 320 and gradually advancing it toward the opposite bank include: in the initial stage of splicing the bridge frame 330, splicing multiple sections of the bridge frame 330 at one time according to the spare length of the towing sliding track 310; and then splicing one section of the bridge frame 330 each time it is advanced by a distance greater than or equal to the length of a single section of the bridge frame 330.

[0116] Specifically, during the segmental splicing of the bridge frame 330, since the distance between the end of the initial guide beam 320 and the original pier or the shore is relatively large, multiple segments of the bridge frame 330 can be pre-spliced ​​at one time based on this spare length and the spatial conditions of the construction site, thereby effectively utilizing space resources and improving work efficiency.

[0117] As the bridge frame 330 is continuously advanced toward the opposite bank, a new bridge frame 330 segment needs to be spliced ​​onto the extended portion each time it is advanced by a certain distance (the distance is greater than or equal to the length of a single segment of the bridge frame 330) to maintain the weight of the frame on the track. The segment-by-segment splicing method ensures that sufficient structural stability and safety are always maintained during the construction process, and it is also convenient to control and adjust the accurate position of the bridge frame 330, so as to achieve smooth, safe, and efficient splicing and advancement of the bridge frame 330 under the support of the guide beam 320, until the entire bridge frame 330 is completely erected and located at the designated position on both sides of the river.

[0118] According to the utility model, a construction method for a large-span navigation hole lifting trestle bridge includes: when the bridge frame 330 is spliced ​​and the guide beam 320 has not reached the dragging and sliding track 310 on the opposite bank, a counterweight component 331 is preferably arranged at the tail of the bridge frame 330. The main function of the counterweight component 331 is to balance the potential instability factor caused by the front end of the bridge body being suspended by increasing the weight of the tail end of the bridge body, thereby avoiding the risk of imbalance of the bridge body due to uneven weight distribution.

[0119] During specific implementation, the counterweight component 331 can be made from local materials, making full use of the existing construction materials on site or the bridge deck structure 240 to be laid as a temporary counterweight. For example, rectangular panel pieces, prefabricated beam sections or other heavy materials that have not yet been installed on the bridge deck can be used as counterweights, which not only reduces the cost of additional acquisition and transportation of counterweight materials, but also improves construction efficiency. The design and application of the counterweight component 331 conforms to the effective application of structural mechanics principles in engineering practice, ensuring that the bridge frame 330 can maintain a stable state during the advancement process, thereby smoothly advancing the entire construction process.

[0120] According to a construction method of a large-span navigation hole lifting trestle provided by the utility model, the method includes: when the guide beam 320 reaches the dragging and sliding track 310 on the opposite bank and stably cooperates with the dragging and sliding track 310, the counterweight component 331 is removed. During the construction of the large-span navigation hole lifting trestle, the guide beam 320 is gradually pushed to the opposite bank through the sliding track and stably cooperates with the dragging and sliding track 310 on the opposite bank, which means that the bridge structure has spanned the entire river channel and has been supported on both sides. At this time, the part of the bridge frame 330 suspended above the river channel has been balanced by the support force provided by the guide beam 320 and the sliding track on the opposite bank, and no additional counterweight component 331 is needed to maintain the stability of the overall structure. Therefore, under the condition of ensuring that the guide beam 320 is firmly connected to the sliding track on the opposite bank and the bridge body is balanced, the temporary counterweight component 331 previously set at the tail of the bridge body can be safely removed to reduce the deadweight burden of the bridge body, and also create convenient conditions for the subsequent laying of the bridge deck structure 240 and other engineering processes. After removing the counterweight component 331, the bridge body can continue subsequent construction operations in a lighter state.

[0121] According to a construction method for a large-span navigation hole lifting trestle provided by the utility model, after the step of installing the lifting frame, the method includes: lifting the bridge frame 330 by the lifting frame; removing the flat roller 311 and the rock 312. Among them, the main function of the lifting frame is to adjust and control the height of the bridge body to meet the navigation requirements after the bridge frame 330 is installed. During the specific operation, the bridge frame 330 and the lifting frame are connected by a lifting mechanism (such as a winch 123, a hydraulic system, etc.), and the entire or part of the bridge frame 330 is smoothly lifted to a set height by the lifting frame, thereby creating enough space for the passage of ships. After the bridge frame 330 is successfully lifted into place, the flat roller 311 and the rock 312 equipment previously set on the sliding track and the steel pipe piles for assisting the movement of the bridge body and smooth guidance have completed their mission. At this time, the demolition work can be carried out.

[0122] In order to ensure a safe and stable connection between the lifting frame and the bridge frame 330, it is necessary to install mutually matching support structures at the corresponding positions of the lifting frame and the bridge frame 330. The support structure may include but is not limited to the arc support plate and arc pad 133 mentioned above. The arc support plate and the arc pad 133 are respectively located at designated positions under the bridge body and on the lifting frame so as to be able to bear and transfer the bridge body load to the lifting frame. According to a construction method for a large-span navigation hole lifting trestle provided by the utility model, after the steps of removing the flat roller 311 and the rocker 312, it includes: setting mutually matching support structures at the corresponding positions of the lifting frame and the bridge frame 330; lowering the bridge frame 330 to align the support structures in place.

[0123] Specifically, during the construction of the navigation channel lifting trestle, after the removal of the flat roller 311 and the rocking 312 equipment, it is preferred to set a matching support structure between the lifting frame and the bridge frame 330. The support structure includes but is not limited to an arc-shaped support plate and an arc-surface pad 133, which are accurately installed at a specific position of the lifting frame and a designed docking area at the lower part of the bridge frame 330.

[0124] Among them, by operating the lifting frame to lift the entire bridge frame 330 to a suitable height, it can not only ensure that there is enough space for precise adjustment when the bearings between the bridge body and the lifting frame are aligned in place, but also provide sufficient working space for on-site construction personnel to safely and efficiently perform assembly, calibration and other processes. After the bearing structure is fully ready, the engineering team will slowly and accurately lower the bridge frame 330 so that the arc support plate under the bridge body can perfectly fit and stably fit with the arc pad 133 on the lifting frame, thereby achieving effective connection and load transfer between the bridge body and the lifting frame. It can be understood that the arc support structure of the arc support plate and the arc pad 133 has a certain degree of automatic correction capability during the docking process.

[0125] According to the construction method of the large-span navigation hole lifting trestle in the preferred embodiment of the utility model, first, at the end positions of the original trestle on both sides of the river, steel pipe piles are positioned and installed by engineering ships as the foundation of the lifting frame. At the same time, ground anchors 301 and concrete anchors 302 are set on the river bank and riverbed to ensure that the lifting frame structure is stable and reliable.

[0126] Subsequently, a dragging sliding track 310 is laid on the original trestle bridge deck, and flat rollers 311 and rockers 312 are installed on the track and steel pipe piles for smooth movement and lateral offset adjustment of the guide beam 320 or the bridge frame 330. Next, the guide beam 320 monolithic truss is assembled in sections on the horizontal ground, and erected on the sliding track through auxiliary support diagonal rods 321, and then the cross beams are connected to form a complete guide beam 320 segment, and after removing the temporary support, it is gradually pushed forward.

[0127] When the guide beam 320 reaches the other bank and is stably matched, the bridge frame 330 is constructed by sliding across the river channel by splicing the guide beam 320 in sections. A counterweight component 331 is added to the suspended part to maintain balance until the guide beam 320 is successfully docked and provides effective support for the bridge body.

[0128] When the bridge frame 330 is assembled, the bridge is first lifted to a suitable height by the lifting frame to create sufficient space for the subsequent installation of the support structure. Then, matching support structures such as arc-shaped support plates and arc-surface pads 133 are arranged at corresponding positions of the lifting frame and the bridge frame 330, and ensure that they are accurately positioned.

[0129] Finally, temporary facilities such as the flat roller 311 and the rocker 312 that are no longer needed are removed, and the bridge frame 330 is lowered so that the support structure can fully bear the load. After completing the above steps, the bridge deck structure 240 can be laid on the bridge frame 330, thereby constructing a large-span navigation hole lifting trestle that can adjust the height of the navigation hole according to needs. During the entire construction process, safety, efficiency and operability were fully considered, which significantly improved the quality and speed of bridge construction.

[0130] Combine the following Figure 9-Figure 26 The specific implementation method of the sliding and pushing system of the large-span navigation hole lifting trestle of the utility model is described.

[0131] The utility model provides a sliding and pushing system for lifting a trestle with a large-span navigation hole, comprising: a dragging and sliding track 310, which is arranged on the bridge deck of the original trestle on both sides of the river channel and is used to support a bridge frame 330 to be pushed; a first power mechanism, which is used to provide power to move the bridge frame 330 along the dragging and sliding track 310, and the first power mechanism comprises a hoisting device 341, a first fixed pulley 342, a movable pulley 343 and a traction rope assembly, and the hoisting device 341 is arranged on the bridge deck of the original trestle. The first fixed pulley 342 is arranged on the first positioning structure which is relatively fixed to the towing sliding track 310; the traction rope assembly includes a first traction rope 344 and a second traction rope 345; the first traction rope 344 is connected between the movable pulley 343 and the bridge frame 330; one end of the second traction rope 345 is connected to the reel of the winch device 341, and the other end is connected to the first positioning structure, and the second traction rope 345 is sequentially matched with the pulley of the movable pulley 343 and the pulley of the first fixed pulley 342.

[0132] Specifically, the sliding and pushing system of the large-span navigation hole lifting trestle is a technical device used to translate the bridge frame 330 along the river to a predetermined position during the construction process. Among them, the dragging and sliding track 310 is laid on the bridge deck of the original trestle on both sides of the river, serving as the basic path to support the bridge frame 330 to be pushed, ensuring that the bridge can move stably along the predetermined direction. The first power mechanism is an important driving component of the entire system, mainly composed of a winch device 341, a first fixed pulley 342, a movable pulley 343 and a traction rope assembly. The winch device 341 is set on the bridge deck of the original trestle, responsible for providing sufficient power to pull the bridge frame 330. The traction rope assembly includes a first traction rope 344 and a second traction rope 345. Among them, the first traction rope 344 is directly connected between the movable pulley 343 and the bridge frame 330 to realize direct connection with the bridge frame 330; and one end of the second traction rope 345 is connected to the reel of the winch device 341, and the other end is fixed to the first positioning structure that is stationary relative to the towing sliding track 310. The second traction rope 345 is guided and force is transmitted through the pulleys on the movable pulley 343 and the first fixed pulley 342. In this way, the power of the winch device 341 is effectively and accurately applied to the bridge frame 330.

[0133] The sliding push system of the large-span navigation hole lifting trestle of the utility model plays a key role in the large-span navigation hole lifting trestle construction method mentioned above, especially in the pushing stage of the bridge frame 330. Compared with the traditional construction method that requires large-scale lifting equipment, the use of this sliding push system not only reduces the construction cost, but also improves the overall construction efficiency due to its efficient working mechanism, and has significant technical advantages.

[0134] According to a sliding push system for lifting a trestle with a large-span navigation hole provided by the utility model, the first positioning structure is a fixed beam 346 vertically connected between two tracks of the dragging sliding track 310. In practical applications, the first fixed pulley 342 is installed on the fixed beam 346, ensuring that when the moving pulley 343 moves along the sliding track, the traction rope assembly can achieve a smooth, stable and controlled force transmission process through the cooperation between the first fixed pulley 342 and the moving pulley 343. Among them, the first positioning structure not only provides the necessary mechanical support points for the entire sliding push system, but also ensures that the bridge frame 330 maintains an accurate direction and position during the pushing process, thereby effectively avoiding the safety risks that may be caused by the deviation or instability of the traction direction, and greatly improving the safety and efficiency of the overall construction. It can be understood that the first positioning structure can also be other positioning structures that are relatively fixed to the dragging sliding track 310 and do not interfere with the movement of the bridge frame 330.

[0135] According to the sliding and pushing system for lifting the trestle bridge with a large-span navigation hole provided by the utility model, the movable pulley 343 is provided with a connection hole; the first traction rope 344 passes through the connection hole, and the two ends are respectively connected to the single-side truss structure of the bridge frame 330. The connection hole of the movable pulley 343 has an automatic correction function. When traction is applied during the sliding process, the movable pulley 343 will move smoothly along the dragging sliding track 310 with the action of the traction rope, and can automatically adjust to the middle position of the single-side truss structure on both sides of the bridge frame 330.

[0136] Specifically, since the two ends of the first traction rope 344 are respectively fixed to the single-sided truss structures on both sides of the bridge frame 330, when the traction rope is pulled by the winch device 341, the movable pulley 343 will move along the track under the action of the pulley system, and at the same time drive the entire bridge frame 330 forward through the connecting hole. At this time, the movable pulley 343 can automatically maintain a centered state under the action of force based on the cooperation between the connecting hole and the first traction rope 344, ensuring that the single-sided truss structures on both sides of the bridge frame 330 are evenly stressed, avoiding deformation of the bridge or structural damage caused by uneven force. The design of the connecting hole on the movable pulley 343 is conducive to the precise control of the sliding jacking system and the balanced force of the bridge frame 330, providing a strong technical guarantee for the smooth construction of the large-span navigation hole lifting trestle.

[0137] According to the sliding jacking system of a large-span navigation hole lifting trestle provided by the utility model, a flat roller 311 for rolling support of a bridge frame 330 is arranged on the upper surface of a dragging sliding track 310; a steel pipe pile is arranged at the end of the original trestle facing the opposite bank, the bottom end of the steel pipe pile is fixed to the riverbed, and a rock 312 for rolling support of the bridge frame 330 is arranged on the top of the steel pipe pile. By ingeniously designing and applying the two rolling support mechanisms of the flat roller 311 and the rock 312, the construction method of the large-span navigation hole lifting trestle greatly improves the safety, accuracy and efficiency of the sliding jacking operation during the bridge construction process.

[0138] Specifically, the dragging and sliding track 310 is laid on the bridge deck of the original trestle on both sides of the river, and a flat roller 311 device is set on its upper surface. These flat rollers 311 are usually made of wear-resistant and strong bearing materials, which can provide rolling support for the bridge frame 330, effectively reduce the friction resistance during the sliding process, and enable the bridge frame 330 to move smoothly along the track under the action of traction. At the end position of the original trestle facing the opposite bank, a steel pipe pile driven into the bottom of the riverbed is pre-set as a stable foundation structure. A rock 312 is installed on the top of the steel pipe pile. The difference between the rock 312 and the flat roller 311 is that it can achieve lateral rolling movement. When the angle of the bridge frame 330 needs to be adjusted, the construction personnel can apply appropriate force from one side of the bridge frame 330, and use the rolling characteristics of the rock 312 to flexibly change the direction of the bridge frame 330, so as to ensure that the bridge can be accurately docked or in place at a preset angle. The sliding jacking system combines two rolling support methods, flat rolling 311 and rock rolling 312, which not only reduces the friction resistance of the bridge frame 330 during movement, but also greatly improves the flexibility and accuracy of the bridge construction phase, ensuring the efficient and safe construction of the large-span navigation channel lifting trestle.

[0139] According to the sliding push system for lifting a trestle with a large-span navigation hole provided by the utility model, a plurality of leveling supports 313 are arranged between the dragging sliding track 310 and the bridge deck of the original trestle, so that the dragging sliding track 310 extends in the horizontal direction. The leveling supports 313 effectively solve the technical difficulties of track laying in the implementation of the sliding push system for lifting a trestle with a large-span navigation hole, and improve the quality and safety of the overall project.

[0140] Specifically, since the original trestle bridge deck may have slight undulations or unevenness, the leveling bearing 313 can adapt to such terrain changes by adjusting its own height, thereby ensuring that the dragging and sliding track 310 installed thereon always remains in an ideal horizontal state. The weight of the entire dragging and sliding track 310 and the bridge frame 330 it carries are evenly distributed through multiple leveling bearings 313, avoiding local excessive force that causes structural damage or instability. The presence of the leveling bearing 313 helps to improve the construction accuracy during the sliding process, because the horizontal track is more conducive to the smooth movement of the bridge frame 330 along the predetermined path, preventing the bridge frame 330 from being offset or deformed due to the tilt of the track.

[0141] According to the utility model, a sliding push system for lifting a trestle with a large-span navigation hole is provided, which includes: a limit block, which is arranged on both sides of the dragging and sliding track 310 to limit the lateral displacement range of the bridge frame 330 relative to the dragging and sliding track 310; and / or a jack, which is arranged on at least one side of the dragging and sliding track 310 to apply a thrust or a pulling force for correcting the deviation to the bridge frame 330 by adjusting the ejection amount of the jack. In the sliding push system for lifting a trestle with a large-span navigation hole, in order to ensure that the bridge frame 330 maintains an accurate position and direction during the sliding process, a limit block and / or a jack can be used as a correction and positioning device.

[0142] The limit blocks are preferably arranged on both sides of the dragging and sliding track 310, and their main function is to limit and guide the lateral movement of the bridge frame 330. When the bridge frame 330 may deviate laterally due to uneven force or other factors during the sliding process, the limit blocks can play a blocking role to prevent the bridge frame 330 from deviating too far from the predetermined track, ensuring that the entire sliding process is carried out within a safe and controllable range.

[0143] As a tool for adjusting the output force, the jack is preferably arranged on at least one side of the dragging and sliding track 310. As required, the construction personnel can apply thrust or pull to the bridge frame 330 by adjusting the ejection amount of the jack, thereby realizing precise fine-tuning and correction of the position of the bridge frame 330. For example, if the bridge frame 330 is found to be slightly deflected, the direction of the bridge frame 330 can be effectively corrected by operating the jack to ensure that it is smoothly positioned according to the design requirements.

[0144] Preferably, the limit block and the jack together constitute the key safety measure in the sliding jacking system, which not only ensures the accuracy and stability of the sliding installation of the bridge frame 330, but also greatly improves the safety and efficiency of the project implementation.

[0145] According to the utility model, a sliding push system for lifting a trestle with a large-span navigation hole is provided, which includes a guide beam 320; the guide beam 320 is installed at the front end of a bridge frame 330 to cooperate with the dragging and sliding track 310 on the opposite bank in advance during the pushing process of the bridge frame 330. The guide beam 320 is installed at the front end of the bridge frame 330 to ensure that the bridge frame 330 can accurately and stably dock and cooperate with the dragging and sliding track 310 on the opposite bank during the sliding push process.

[0146] Specifically, the guide beam 320 is pre-installed at the front end of the bridge frame 330, and its main function is to guide and transition the bridge frame 330 during the sliding and pushing process to the opposite bank. Since the bridge frame 330 is usually large and heavy, it needs to be assembled in sections and pushed forward step by step when crossing the river. Therefore, a light but sufficiently rigid structure is required to be connected to the dragging and sliding track 310 on the opposite bank in advance before pushing.

[0147] When the bridge frame 330 has not yet completely reached the other bank, the guide beam 320 first moves to the other bank through the sliding device and accurately docks with the set drag sliding track 310. In this way, the guide beam 320 can ensure that the subsequent advancement process of the bridge frame 330 is carried out smoothly and accurately along the preset track, reducing the safety risks or additional adjustment costs caused by deviations. It not only simplifies the construction steps and improves the construction efficiency, but also fully considers the mechanical characteristics and safety requirements in the bridge construction process.

[0148] According to the sliding jacking system of a large-span navigation hole lifting trestle provided by the utility model, the guide beam 320 has a multi-segment structure, which includes a transition segment 322 located at the tail end of the guide beam 320 and an upper deflection segment 323 located at the head end of the guide beam 320; the transition segment 322 is provided with a mounting structure matching the front end of the bridge frame 330; the upper deflection segment 323 is bent and tilted upward relative to the main part of the guide beam 320. The guide beam 320 adopts a multi-segment structural design, which improves the flexibility and adaptability during the construction process.

[0149] Specifically, the transition segment 322 is located at the rear end of the guide beam 320 and has a mounting structure that matches the front end of the bridge frame 330, so that it can reliably dock with and be fixedly connected to the front end of the bridge frame 330, ensuring that the bridge frame 330 and the guide beam 320 form a stable whole, effectively transfer the load, and maintain the stability of the structure during the sliding process. The upper deflection segment 323 is located at the head end of the guide beam 320 (the end facing the opposite bank), and is bent and tilted upward relative to the main part of the guide beam 320. Due to the large span of the bridge, during the sliding process, the suspended part of the guide beam 320 may be affected by its own gravity and external forces and naturally sag or bend to a certain extent. At this time, the upper deflection segment 323 that is pre-bent and tilted upward can compensate for this potential drop, thereby ensuring that the guide beam 320 can smoothly cross to the opposite bank and accurately dock with the drag sliding track 310 on the opposite bank.

[0150] According to the utility model, a sliding push system for lifting a trestle with a large span navigation hole includes a second power mechanism for providing power to move the guide beam 320 along the dragging and sliding track 310 before installing the bridge frame 330; the second power mechanism includes a lifting device 351, a second fixed pulley 352 and a third traction rope 353; the second fixed pulley 352 is arranged on a second positioning structure relatively fixed to the dragging and sliding track 310; the third traction rope 353 is connected between the lifting device 351 and the guide beam 320, and the third traction rope 353 is matched with the pulley of the second fixed pulley 352. In addition to the first power mechanism for pushing the bridge frame 330, the sliding push system for lifting a trestle with a large span navigation hole also has a second power mechanism specially designed for moving the guide beam 320, and the two are used in different pushing stages respectively.

[0151] Specifically, the second fixed pulley 352 is fixed on the second positioning structure fixed relatively to the traction sliding track 310, providing guidance and support for the traction rope to ensure that it stably transmits the driving force. The third traction rope 353 is a key component for power transmission, one end of which is connected to the lifting device 351 and the other end is connected to the guide beam 320. Through the pulley system on the second fixed pulley 352, the force generated by the lifting device 351 is accurately and effectively transmitted to the guide beam 320, so that the guide beam 320 can move smoothly along the sliding track.

[0152] During the actual construction process, the first power mechanism and the second power mechanism play a role in different stages. When only the guide beam 320 needs to be moved, since the guide beam 320 has a relatively light weight and requires less driving force, a more flexible and convenient lifting device 351 and a second power mechanism can be used to complete the task. When the bridge frame 330 begins to be assembled, due to the large volume and increased weight of the overall structure, the site may not be able to meet the working space and load-bearing requirements required by the lifting device 351. At this time, it is necessary to use a first power mechanism with better mechanical properties and more suitable for pushing large components to perform the sliding and pushing work of the bridge frame 330.

[0153] Furthermore, according to the sliding jacking system for lifting a trestle with a large-span navigation hole provided by the utility model, the lifting device 351 can be a hook device of a crane. The crane at the construction site can perfectly cooperate with the second power mechanism to achieve the precise movement of the guide beam 320 on the dragging sliding track 310, and also plays a key role in the assembly stage of the guide beam 320.

[0154] Specifically, during the transportation, lifting and splicing of the guide beam 320 segments, the crane can efficiently complete the handling and positioning of each guide beam 320 segment with its lifting capacity and flexible operability. By adjusting the angle and length of the crane boom and the height of the hook, construction workers can accurately control the lifting, lowering and horizontal displacement of the guide beam 320 segment. The crane and its hook device play many important functions in the sliding jacking system of the large-span navigation hole lifting trestle. It not only meets the movement requirements of the guide beam 320 before and after installation, but also greatly simplifies and optimizes the assembly process of the guide beam 320, thereby significantly improving the overall construction efficiency and safety.

[0155] According to the sliding and pushing system for lifting the trestle bridge with a large-span navigation hole in the preferred embodiment of the utility model, first, the system includes a dragging and sliding track 310 set on the original trestle bridge deck, and a flat roller 311 is provided on the track surface to roll and support the bridge frame 330. The two ends of the track are fixed to the riverbed through steel pipe piles, and a rock 312 is configured at the top as an auxiliary support. In order to ensure the horizontal extension of the track, a plurality of leveling bearings 313 are installed between the track and the original trestle bridge deck. At the same time, limit blocks are set on both sides of the track to limit the lateral deviation of the bridge body, and jacks are equipped for correction and adjustment.

[0156] The power transmission of the sliding process is completed by the first power mechanism and the second power mechanism respectively. Among them, the first power mechanism is mainly responsible for the overall movement of the bridge frame 330, including the hoisting device 341, the movable pulley 343, the first fixed pulley 342 and the traction rope assembly (the first traction rope 344 and the second traction rope 345). The first traction rope 344 is connected to the single-sided truss structure of the bridge frame 330 by using the connection hole on the movable pulley 343, and the driving force is provided by the hoisting device 341 to realize the smooth sliding of the bridge along the track. Before installing the bridge frame 330, the system is also equipped with a guide beam 320 with a multi-segment structure, the tail end of which is provided with a transition segment 322, and the head end is designed as an upwardly bent and tilted upper deflection segment 323, so as to cooperate with the sliding track on the opposite bank in advance. The second power mechanism plays a key role in this stage. The hook device of the crane is used as a lifting device, combined with the second fixed pulley 352 and the third traction rope 353, to accurately control the guide beam 320 to move in place along the sliding track.

[0157] In summary, the sliding and pushing system for lifting the large-span navigation hole of this preferred embodiment cleverly integrates mechanical engineering and civil engineering technologies, adopts dual power mechanisms to work together, and combines a series of sophisticated support, guide and transmission components to effectively solve the problem of fast and accurate construction of large-span bridges in complex environments. Through such a design scheme, the construction efficiency is significantly improved, the construction cost is reduced, and the personal and facility safety during the construction process is guaranteed.

[0158] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "mode", "specific mode", or "some modes" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or mode are included in at least one embodiment or mode of the utility model embodiment. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or mode. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or modes in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or modes described in this specification and the features of the different embodiments or modes, without contradiction.

[0159] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the various embodiments of the utility model.

Claims

1. A lifting frame for lifting a trestle through a navigation hole, characterized in that: The two lifting frames are respectively arranged on both sides of the navigable river, and the lifting frames include: Two main support frames (110), the two main support frames (110) are arranged at intervals, and the bottoms of the main support frames (110) are fixed to the riverbed; A top platform (120) is erected on the top of the two main support frames (110), and the top platform (120) is provided with a lifting mechanism for lifting the bridge body of the trestle; A supporting crossbeam (130) is arranged between the two main supporting frames (110); the supporting crossbeam (130), the top platform (120) and the two main supporting frames (110) form a lifting space for accommodating the bridge body.

2. The lifting frame of the navigation hole lifting trestle according to claim 1 is characterized in that: The main support frame (110) comprises four steel pipe high piles (111), and the bottoms of the steel pipe high piles (111) are fixed to the riverbed via a reinforced concrete anchor (302) fixing structure; A steel frame connection structure is arranged between the steel pipe high piles (111) to form a rectangular column structure.

3. The lifting frame of the navigation hole lifting trestle according to claim 2 is characterized in that: The steel frame connection structure comprises a flat connecting rod (112); A plurality of parallel connecting rods (112) are evenly arranged between any two adjacent steel pipe high piles (111).

4. The lifting frame of the navigation hole lifting trestle according to claim 3 is characterized in that: The steel frame connection structure includes a diagonal brace (113); The diagonal bracing rod (113) is arranged between adjacent parallel connecting rods (112), and both ends of the diagonal bracing rod (113) are obliquely connected to adjacent steel pipe high piles (111).

5. The lifting frame of the navigation hole lifting trestle according to claim 2 is characterized in that: The two ends of the supporting crossbeam (130) are respectively connected to the steel pipe high piles (111) of the two main supporting frames (110); A short steel pipe pile (114) is arranged between the supporting cross beam (130) and the riverbed.

6. The lifting frame of the navigation hole lifting trestle according to claim 5, characterized in that: Both ends of the supporting crossbeam (130) are respectively provided with a toggle plate structure (131) and a stirrup plate structure (132) detachably mounted on the toggle plate structure (131); In the installed state, a circular area is enclosed between the toggle plate structure (131) and the stirrup plate structure (132), and the steel pipe high pile (111) is clamped in the circular area.

7. The lifting frame of the navigation hole lifting trestle according to claim 1, characterized in that: The upper surface of the supporting crossbeam (130) is provided with a curved pad (133); An arc-shaped support plate matching the shape of the arc-surface cushion block (133) is arranged at the bottom of the bridge body.

8. The lifting frame of the navigation hole lifting trestle according to claim 1, characterized in that: The top platform (120) includes a top cross beam (121) and a top longitudinal beam (122); The top crossbeam (121) is connected to the tops of the two main support frames (110); The top longitudinal beam (122) and the top cross beam (121) are arranged to cross each other vertically.

9. The lifting frame of the navigation hole lifting trestle according to claim 8, characterized in that: The lifting mechanism comprises a hoist (123) and a steel wire rope arranged between the hoist (123) and the bridge body; and / or, a guardrail is provided along the edge of the top platform (120); And / or, a ladder is provided on the side of at least one of the main support frames (110), and the top of the ladder extends to the top platform (120).

10. A navigation hole lifting trestle, characterized in that: A lifting frame for a navigation hole lifting trestle comprising any one of claims 1-9.