Hydraulic engineering construction device
By designing a water conservancy construction device with a detachable and connected floating cylindrical chain and a hollow cylindrical structure, the problem of difficulty in collecting river garbage after interception is solved, centralized collection and treatment of garbage is realized, and the stability and use efficiency of the device are improved.
Patent Information
- Application Number
- CN202420798334.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-17
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the existing water conservancy project, the garbage interception device in the river channel is difficult to collect effectively after the garbage is intercepted, and the floating nature of the float makes garbage recycling hindered, resulting in low collection efficiency.
A water conservancy engineering construction device is designed, including an intercepting unit. The intercepting unit is composed of a floating cylindrical chain, an intercepting net and a connecting component. The floating cylindrical chain can be detached and connected. The connecting component realizes the stability of adjacent intercepting units through a hollow cylindrical structure and a limit frame. Connect and separate to form a garbage collection gap and improve the centralized collection and treatment efficiency of garbage.
Through the coordination of the connecting barrel and the floating barrel chain, the stability and flexibility of the device are improved, centralized collection and transfer of garbage are realized, the post-processing process of garbage is simplified, and the efficiency of the device is improved.
Smart Images

Figure CN222120150U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of water conservancy projects, in particular to a water conservancy project construction device. Background Art
[0002] In water conservancy projects, garbage in rivers will pollute water resources and even block rivers, affecting the normal use of other water conservancy facilities. Therefore, it is increasingly important to clean up river garbage in a timely and effective manner.
[0003] The Chinese utility model patent with application number "CN202222555360.0" discloses the following scheme: "An interception float for water conservancy and hydropower engineering, including a plurality of floats for intercepting surface garbage, both ends of the floats are recessed inward, one end of the float is equipped with a plug-in part through a movable shaft, and the other end of the float is equipped with a stretching part through a movable shaft, and the stretching part is provided with a snap part used in conjunction with the plug-in part. By setting the snap part and the plug-in part, the adjacent floats are used in conjunction with the snap part and the plug-in part to form an interception line by integral installation, the bolts pass through the through opening, and the corresponding abutment plates are also Through the opening, the abutment plate is rotated to abut against the gusset plate to restrain each other, so as to achieve the purpose of installation and facilitate operation. "This scheme only intercepts and collects garbage by connecting with the float. After the garbage interception is completed and in the subsequent garbage collection, the garbage is mostly gathered on the inside of the float. At the same time, the garbage and the float are also floating in real time. The above-mentioned float can only be fixedly connected between adjacent floats and cannot easily change the connection state between adjacent floats. When collecting garbage, the float even becomes an obstacle to "blocking" garbage collection, making it difficult to collect the garbage inside the float. Utility Model Content
[0004] In order to solve the problems of the prior art, the utility model provides a water conservancy project construction device.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] A water conservancy project construction device comprises: interception units, the number of which is at least two, adjacent interception units are detachably connected, and the distance between adjacent interception units is adjustable;
[0007] The interception unit consists of:
[0008] The buoy chain is a chain-like structure consisting of at least two buoys, with adjacent buoys connected end to end;
[0009] The interception net is fixed in the middle of the lower part of the buoy. The interception net extends from one end of the lower part of the buoy to the other end. The interception net is a mesh structure.
[0010] A connecting assembly is located at the end of the buoy chain, and the connecting assembly floats on the water surface;
[0011] The connection components include:
[0012] The first connecting cylinder is a hollow cylindrical sealing structure fixed to one end of the buoy chain;
[0013] Connecting tube 2 is fixed to the other end of the buoy chain.
[0014] Connecting tube 1 includes:
[0015] The cylinder is a hollow cylindrical structure;
[0016] The limiting frame is fixed on the rear side of the cylinder and is close to the outer edge of the cylinder.
[0017] The connecting assembly also includes: a bottom flange fixed to the lower part of the inner side surface of the cylinder, and a bottom flange hole is provided on the bottom flange.
[0018] The buoy is a hollow long cylindrical structure, the cross section of the buoy is in a "∩" shape, and the arc surface faces upward.
[0019] A flange 1 is fixed near the middle of one side of the buoy, and a flange hole 1 is provided through the flange 1. A flange 2 is fixed near the middle of the other side of the buoy, and a flange hole 2 is provided on the flange 2.
[0020] A convex plate is fixed on the lower end surface of the buoy, the convex plate is close to the central axis of the lower end surface of the buoy, there are two convex plates and they are symmetrically arranged at the lower part of the buoy, and threading holes are formed through the convex plates.
[0021] The front side, rear side, upper side, lower side and outer side of the cylinder are all planar structures, the inner side is an arc-shaped surface with a "ノ"-shaped cross section, and the projection of the upper side of the cylinder toward the lower side covers the lower side.
[0022] A gap is formed between the connecting tube 1 of the intercepting unit and the connecting tube 2 of the adjacent intercepting unit.
[0023] The limiting frame of the connecting tube 1 and the limiting frame of the connecting tube 2 are connected via a frame plate.
[0024] The frame plate is in a "Π"-shaped structure, spanning between the limiting frame of the first connecting tube and the limiting frame of the second connecting tube.
[0025] The cross section of the limiting frame is in a "∟" shape, and a limiting frame hole is provided through the upper part of the limiting frame.
[0026] Compared with the prior art, the utility model has the following beneficial effects: it is convenient for the centralized collection of the garbage collected by the interception units in the later stage; on the one hand, the overall stability is improved by the cooperation of the connecting cylinder 1 and the connecting cylinder 2 with the buoy chain; on the other hand, the connecting cylinder 1 and the connecting cylinder 2 serve as the "intermediate body" for the external connection of the buoy chain; the connecting cylinder 1 and the connecting cylinder 2 can realize both the stable connection of the adjacent interception units and the separation of the adjacent interception units, thereby forming a gap for garbage collection; the garbage collected by the interception units is transferred and processed in a centralized manner through the gap; during use, the adjacent interception units can be "divided" and "combined" at appropriate positions according to the garbage collection situation; "and" means the connection of the adjacent interception units, and "divided" means that a gap can be formed at this position, thereby facilitating the collection of garbage at the front position of the interception unit from the rear position of the interception unit, thereby improving the flexibility of the use of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Other features, objectives and advantages of the present invention will become more apparent by reading the detailed description of non-limiting embodiments made with reference to the following drawings.
[0028] Figure 1 It is a schematic diagram of the structure of the utility model.
[0029] Figure 2 It is a schematic diagram of the structure of the interception unit in the utility model.
[0030] Figure 3 This is a schematic diagram of the buoy structure in the utility model. Figure 1 .
[0031] Figure 4 This is a schematic diagram of the buoy structure in the utility model. Figure 2 .
[0032] Figure 5 This is a schematic diagram of the structure of the connecting tube in the utility model. Figure 1 .
[0033] Figure 6 This is a schematic diagram of the structure of the connecting tube in the utility model. Figure 2 .
[0034] Figure 7 yes Figure 1 Enlarged structural diagram at A in the middle.
[0035] Figure 8 It is a schematic diagram of the structure of the middle frame plate of the utility model.
[0036] Fig. 9 yes Figure 2 Schematic diagram of the structure at point C in the middle.
[0037] Fig.10 It is a schematic diagram of the structure of the utility model in use state.
[0038] Fig.11 It is a schematic diagram of the collecting bag structure in the utility model.
[0039] Among them: 100, interception unit; 110, buoy chain; 111, buoy; 1111, flange one; 11111, flange hole one; 1112, flange two; 11121, flange hole two; 1121, bolt; 1122, nut; 120, interception net; 130, connecting assembly; 131, connecting tube one; 1311, cylinder body; 1312, limiting frame; 13121, limiting frame hole; 1313, bottom flange; 13131, bottom flange hole; 1314, frame plate; 132, connecting tube two; 113, convex plate; 1131, threading hole; 133, notch; 1315, outlet; 200, collecting bag. DETAILED DESCRIPTION
[0040] The present invention is further described in detail below through embodiments. The embodiments are only used to illustrate the present invention and do not limit the scope of the present invention.
[0041] A water conservancy project construction device comprises: interception units 100, the number of which is at least two, adjacent interception units 100 are detachably connected, and the distance between adjacent interception units 100 is adjustable; by detachably connecting the end and tail of the interception units 100, different numbers of interception units 100 can be selected for combination, so that the overall length of the water conservancy project construction device can be controlled to meet the interception length requirements of interception areas of different areas, and at the same time, the distance between adjacent interception units 100 is adjustable. In this way, when it is necessary to transfer garbage in the interception area, the adjacent interception units 100 can be controlled at a selected position (selected according to the situation) to form a gap 133 (discussed later), so that the garbage gathered by the interception units 100 in the interception area can be collected more concentratedly at the rear of the gap 133.
[0042] The interception unit 100 comprises:
[0043] The buoy chain 110 is a chain-like structure, which is composed of at least two buoys 111. Adjacent buoys 111 are connected end to end. The buoys 111 are hollow long cylindrical structures, which are blow-molded from PVC plastic particles. The cross-section of the buoy 111 is in the shape of "∩", and its arc surface faces upward. The buoys 111 can float on the water surface, and the adjacent buoys 111 are hinged together, so that the adjacent buoys 111 can move relative to each other to a certain extent, and the buoys 111 are used to float and shift on the water surface. The buoy chain 110 composed of the buoys 111 forms a main body for intercepting surface garbage, and the garbage floating on the water surface can be gradually gathered together by the buoy chain 110, which is conducive to later collection.
[0044] The interception net 120 is fixed in the middle position of the lower part of the buoy 111. The interception net 120 extends from one end of the lower part of the buoy 111 to the other end. The interception net 120 is a mesh structure. The interception net 120 is a prior art and a metal net or a polyethylene net can be selected. When the lower part of the buoy 111 is connected to the interception net 120, when the buoy 111 floats on the water, the interception net 120 fixed at its lower part is naturally drooping, and the interception net 120 is in an expanded state. The interception net 120 cooperates with the buoy 111 to complete the collection of garbage on the water surface.
[0045] The connecting component 130 is located at the end of the buoy chain 110. The connecting component 130 floats on the water surface. On the one hand, it serves as a connecting intermediate between two adjacent buoy chains 110, that is, the two adjacent buoy chains 110 are connected through the connecting component 130. On the other hand, the connecting component can provide a certain buoyancy to the buoy chain 110. At the same time, the buoyancy exists on both sides of the buoy chain 110, which is conducive to the stable floating of the buoy chain 110. Furthermore, when several interception units 100 are combined together, the connecting component 130 can serve as the two ends of the "combination" of the interception unit 100. The stable fixation of the "combination" of the entire interception unit 100 can be achieved by fixing the connecting component 130 (such as fixing the connecting component 130 separately on the shore).
[0046] A flange 1111 is fixed near the middle of one side of the buoy 111, and a flange hole 11111 is provided on the flange 1111; a flange 2 1112 is fixed near the middle of the other side of the buoy 111, and a flange hole 2 11121 is provided on the flange 2 1112; adjacent buoys 111 are connected via flanges, such as a flange hole 11111 of a flange 1111 of a buoy and a flange hole 2 11121 of a flange 2 1112 of another buoy 111 are correspondingly arranged and then connected via bolts 1121, the bolts 1121 pass through the flange hole 11111 and the flange hole 2 11121, the bottom of the bolts 1121 is fixed by nuts 1122, the flange 1111 and the flange 2 1112 can be relatively rotated to a certain extent under the action of the bolts 1121, and the flange 1111 and the flange 2 1112 can be moved to a certain extent in the vertical direction ( Fig. 9 as shown).
[0047] A convex plate 113 is fixed on the lower end surface of the buoy 111, and the convex plate 113 is close to the central axis of the lower end surface of the buoy 111. There are two convex plates 113 and they are symmetrically arranged at the lower part of the buoy 111. A threading hole 1131 is formed through the convex plate 113. When in use, a wire (not shown in the figure) is passed through the threading hole 1131 and the upper part of the interception net 120 to achieve the connection between the interception net 120 and the lower part of the buoy 111.
[0048] See also Figure 2 , 56. The connection component 130 includes:
[0049] The connecting cylinder 131 is a hollow cylindrical sealing structure fixed to one end of the buoy chain 110;
[0050] The second connecting tube 132 is fixed to the other end of the buoy chain 110. The structure of the second connecting tube 132 is consistent with that of the first connecting tube 131. The second connecting tube 132 is symmetrically arranged with the first connecting tube 131. Both the first connecting tube 131 and the second connecting tube 132 can float on the water surface. The first connecting tube 131 and the second connecting tube 132 are fixed to the two ends of the buoy chain 110. The first connecting tube 131 and the second connecting tube 132 cooperate to increase the buoyancy of the buoy chain 110 on the one hand, and on the other hand, by controlling the first connecting tube 131 and the connecting tube The second 132 can control the buoy chain 110 of the interception unit 100 to connect with the buoy chain 110 of the adjacent interception unit 100. At the same time, by controlling the distance between the connecting tube 1 131 or the connecting tube 2 132 of different interception units 100 and the connecting tube 1 131 or the connecting tube 2 132 of the adjacent interception unit 100, the distance between the adjacent interception units 100 can be controlled to form a gap 133 between the adjacent interception units 100; and then the subsequent garbage collection is carried out through the gap 133.
[0051] The connecting tube 131 includes:
[0052] The cylinder 1311 is a hollow cylindrical structure, and its front side, rear side, upper side, lower side and outer side are all plane structures, and its inner side is an arc surface with a "ノ"-shaped cross section. The projection of the upper side of the cylinder 1311 toward the lower side covers the lower side. The upper wide and lower narrow structure of the cylinder 1311 is conducive to the cylinder 1311 floating on the water surface. At the same time, the plane structure (vertical) of the outer side of the cylinder 1311 is conducive to the garbage to move backward through the outer side of the cylinder 1311 (through the gap 133) in the later stage;
[0053] The limiting frame 1312 is fixed on the rear side of the cylinder 1311 and is close to the outer side edge of the cylinder 1311. The cross section of the limiting frame 1312 is in a "∟" shape. The upper part of the limiting frame 1312 is provided with a limiting frame hole 13121;
[0054] The interception unit 100 is connected with the connection tube 1 131 or the connection tube 2 132 of the other interception unit 100 through the connection tube 1 131 or the connection tube 2 132. For example, when the connection tube 1 131 of one interception unit 100 is close to the connection tube 2 132 of another interception unit 100, the limit frame 1312 on the connection tube 1 131 corresponds to the limit frame 1312 on the two limit frame holes 1312, and then the bolts are passed through the two limit frame holes 13121 and then fixed by bolts to achieve the connection tube 1 131 or the connection tube 2 132 being tightly fixed and connected;
[0055] The bottom flange 1313 is fixed to the lower part of the inner side surface of the cylinder 1311, and a bottom flange hole 13131 is provided on the bottom flange 1313; the cylinder 1311 is fixedly connected to the flange 1 1111 or the flange 2 1112 of the buoy 111 through the bottom flange 1313, and the two are specifically connected by bolts;
[0056] Preferably, when a gap 133 is formed between the connecting tube 1 131 (outer side) of the intercepting unit 100 and the connecting tube 2 132 (outer side) of the adjacent intercepting unit 100, the limiting frame 1312 of the connecting tube 1 131 and the limiting frame 1312 of the connecting tube 2 132 are connected by a frame plate 1314 ( Figure 7 ), the frame plate 1314 is in a "Π"-shaped structure, which spans between the limit frame 1312 of the connecting tube 131 and the limit frame 1312 of the connecting tube 2 132, the frame plate 1314 is detachably connected to the connecting tube 131 and the connecting tube 2 132, a round hole is provided on one side of the frame plate 1314, and one side of the frame plate 1314 is fixedly connected to the upper part of the limit frame 1312 of the connecting tube 1 131 by means of bolts (screws), a round hole is provided on the other side of the frame plate 1314, and the other side of the frame plate 1314 is fixedly connected to the upper part of the limit frame 1312 of the connecting tube 2 132 by means of bolts (screws), the bolts (screws) pass through the round hole and the limit frame hole 13121, the frame plate 1 314 is detachably fixedly connected with the connecting tube 1 131 and the connecting tube 2 132. In this way, when the connecting tube 1 131 of the intercepting unit 100 and the connecting tube 2 132 of the adjacent intercepting unit 100 are separated, the two can be connected through the frame plate 1314 and the distance between the two can be controlled, that is, the length of the gap 133 can be controlled according to the needs of use; through the cooperation of the frame plate 1314 with the connecting tube 1 131 and the connecting tube 2 132, both the connection of adjacent intercepting units 100 and the control of the distance between adjacent intercepting units 100 can be achieved, and the length of the gap 133 can be changed in time by changing the frame plate 1314 of different lengths, thereby meeting the garbage collection needs in different situations.
[0057] After the frame plate 1314 is disassembled from the connecting tube 1 131 and the connecting tube 2 132, the connecting tube 1 131 and the connecting tube 2 132 can be tightly and fixedly connected again through the limiting frame 1312; when the outer side surface of the connecting tube 1 131 and the outer side surface of the connecting tube 2 132 are tightly fitted, the limiting frame 1312 (limiting frame hole 13121) of the connecting tube 1 131 of the intercepting unit 100 is aligned with the limiting frame 1312 (limiting frame hole 13121) of the connecting tube 2 132, and at this time, the connecting tube 1 131 and the connecting tube 2 132 are fixedly connected by bolts (screws).
[0058] Working principle: at least two buoys 111 are connected to form a buoy chain 110, and connecting tubes 131 and 131 are connected at both ends of the buoy chain 110 to form an interception unit 100. The buoy chain 110, connecting tubes 131 and 131 float on the water surface. At this time, the interception net 120 is vertically flattened below the buoy chain 110, connecting tubes 131 and 131, and the interception unit 100 floats on the water surface as a whole; several interception units 100 are connected end to end into a whole to intercept and collect garbage in a certain area on the water surface; when the garbage gathered in front of several interception units 100 connected end to end needs to be collected, a suitable position (near the middle) can be selected, and the gap near the middle is conducive to the collection of garbage at the position of the interception units 100 on both sides in the later stage, and then the gap 133 is formed by changing the distance between adjacent interception units 100, and the connecting tube of the interception unit 100 is connected through the frame plate 1314. The limiting frame 1312 of the first connecting tube 131 is connected to the limiting frame 1312 of the second connecting tube 132 of the adjacent intercepting unit 100, and the frame plate 1314 is fixed between the limiting frame 1312 of the first connecting tube 131 and the limiting frame 1312 of the second connecting tube 132. An outlet 1315 is formed between the frame plate 1314 and the limiting frame 1312 of the first connecting tube 131 and the limiting frame 1312 of the second connecting tube 132, that is, an outlet 1315 is formed between the frame plate 1314 and the limiting frame 1312 of the first connecting tube 131 and the limiting frame 1312 of the second connecting tube 132, that is, the frame plate 1314 is set up on an intercepting unit An outlet 1315 is formed between the limiting frame 1312 of the connecting tube 1 131 of the unit 100 and the limiting frame 1312 of the connecting tube 2 132 of another intercepting unit 100. The outlet 1315 is in a "Π" shape. A collecting bag 200 is arranged at the rear of the outlet 1315. The inlet of the collecting bag 200 is in a rectangular structure. The collecting bag 200 can be made of a plastic mesh cloth, which is matched and fixed on the outlet 1315. Specifically, the front end of the collecting bag 200 is bundled with the outlet 1315.
[0059] Then, the connection components 130 (connection tube 1 131 or connection tube 2 132 at the end) of the interception units 100 at both ends are adjusted simultaneously so that the interception units 100 are in a "︶" shape as a whole, which is conducive to the movement of garbage toward the gap 133. The garbage moves through the gap 133 to the outlet 1315 and is finally collected in the collection bag 200.
[0060] When the collection bag 200 is not used, a garbage collection ship (not shown) can be placed close to the gap 133 . At this time, personnel can transfer the garbage at the gap 133 to the garbage collection ship to complete the collection of the garbage in the interception unit 100 .
[0061] In the description of the present utility model, it needs to be understood that the directions or positional relationships indicated by terms such as "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" are directions or positional relationships of the device or equipment in normal use.
Claims
1. A water conservancy project construction device, characterized in that: include: The number of the interception units is at least two, the adjacent interception units are detachably connected, and the distance between the adjacent interception units is adjustable; The interception unit consists of: The buoy chain is a chain-like structure consisting of at least two buoys, with adjacent buoys connected end to end; The interception net is fixed in the middle of the lower part of the buoy. The interception net extends from one end of the lower part of the buoy to the other end. The interception net is a mesh structure. A connecting assembly is located at the end of the buoy chain, and the connecting assembly floats on the water surface; The connection components include: The first connecting cylinder is a hollow cylindrical sealing structure fixed to one end of the buoy chain; Connecting tube 2 is fixed to the other end of the buoy chain. Connecting tube 1 includes: The cylinder is a hollow cylindrical structure; The limiting frame is fixed on the rear side of the cylinder and is close to the outer edge of the cylinder.
2. The water conservancy project construction device according to claim 1, characterized in that: The connecting assembly also includes: a bottom flange fixed to the lower part of the inner side surface of the cylinder, and a bottom flange hole is provided on the bottom flange.
3. The water conservancy project construction device according to claim 2, characterized in that: The buoy is a hollow long cylindrical structure, the cross section of the buoy is in a "∩" shape, and the arc surface faces upward.
4. The water conservancy project construction device according to claim 3, characterized in that: A flange 1 is fixed near the middle of one side of the buoy, and a flange hole 1 is provided through the flange 1. A flange 2 is fixed near the middle of the other side of the buoy, and a flange hole 2 is provided on the flange 2.
5. The water conservancy project construction device according to claim 4, characterized in that: A convex plate is fixed on the lower end surface of the buoy, the convex plate is close to the central axis of the lower end surface of the buoy, there are two convex plates and they are symmetrically arranged at the lower part of the buoy, and threading holes are formed through the convex plates.
6. The water conservancy project construction device according to claim 5, characterized in that: The front side, rear side, upper side, lower side and outer side of the cylinder are all planar structures, the inner side is an arc-shaped surface with a "ノ"-shaped cross section, and the projection of the upper side of the cylinder toward the lower side covers the lower side.
7. The water conservancy project construction device according to claim 6, characterized in that: A gap is formed between the connecting tube 1 of the intercepting unit and the connecting tube 2 of the adjacent intercepting unit.
8. The water conservancy project construction device according to claim 7, characterized in that: The limiting frame of the first connecting tube and the limiting frame of the second connecting tube are connected via a frame plate.
9. The water conservancy project construction device according to claim 8, characterized in that: The frame plate is in a "Π"-shaped structure, spanning between the limiting frame of the connecting tube one and the limiting frame of the connecting tube two.
10. The water conservancy project construction device according to claim 9, characterized in that: The cross section of the limit frame is in a "∟" shape, and a limit frame hole is provided through the upper part of the limit frame.
