By installing locking parts and positioners on the roof of the building, combining the limiting parts and elastic clamps, the problems of inaccurate positioning and pollution of the wire box are solved, and the stable fixation of the wire box is achieved and the prevention of floating is ensured, which ensures the wire joints Clean and stable.
Patent Information
- Application Number
- CN202420792849.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-17
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The lack of positioning structure in existing wire boxes during construction, resulting in inaccurate positioning and are susceptible to the influence of concrete pouring, resulting in contamination and floating in the wire boxes.
Design a new type of wire box positioning device, including locking parts and locators installed on the roof of the building, fixing the locators through screws and nuts, the wire box body is mounted on the locators, and the limiting parts and elastic cards are installed on the inner wall. to ensure the fixation of the wire box and prevent floating.
Accurate positioning of the wire box is achieved to prevent concrete pouring and floating, and ensure the clean and stable wire joints.
Smart Images

Figure CN222127585U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of wire box positioning, and in particular, to a novel wire box positioning device. Background Art
[0002] During the construction of conventional project structures, wire conduits are pre-buried on the top of the building, and wire boxes are pre-buried at the joints of the wire conduits for use as wire connectors. The existing wire boxes are directly buckled into the roof of the building, lacking a positioning structure for the wire boxes, which can easily lead to inaccurate positioning. At the same time, during the pouring of concrete on the top of the building, the wire boxes are easily affected by the pouring of concrete, resulting in slight floating. As a result, concrete will leak into the wire box, causing internal contamination of the wire box and affecting the wire connectors. For this reason, we have proposed a new wire box positioning device. Summary of the invention
[0003] In order to overcome the existing deficiencies, an embodiment of the present application provides a novel positioning device for an electrical wire box, which can solve the problem that the above-mentioned electrical wire box lacks a positioning structure.
[0004] The technical solution adopted by the embodiment of the present application to solve its technical problems is: a new type of wire box positioning device, including a locking piece installed on the building roof, a locator is slidably sleeved on the locking piece, the locking piece locks the locator on the building roof, the locator is sleeved on the wire box body, the wire box body is placed on the building roof, and a limiting piece is installed on the inner wall, and the limiting piece is clamped with the locator.
[0005] In a specific embodiment, the locking member includes a screw rod installed on the top plate of the building, a nut is threadedly connected to the screw rod, the positioner is slidably sleeved on the screw rod, and the nut fixes the positioner on the top of the building.
[0006] In a specific embodiment, a through hole is opened in the middle of the positioner, and the screw rod is arranged through the through hole.
[0007] In a specific embodiment, a gasket is also sleeved on the screw rod, the gasket is placed on the top of the positioner, and the nut is pressed on the gasket.
[0008] In a specific embodiment, the positioner is a rubber block, and the rubber block is arranged in contact with the bottom of the inner wall of the wire box body.
[0009] In a specific implementation manner, a plurality of elastic clamps are installed on the top of the positioner, and the limiting member is a plurality of clamping blocks, and the plurality of clamping blocks are respectively clamped with a plurality of elastic clamps.
[0010] In a specific embodiment, the elastic clamp includes a fixed block fixedly installed on the top of the positioner, the top of the fixed block is fixedly connected to an arc block, the top of the arc block is fixedly connected to a contact block, and the clamping block is clamped with the arc block and the contact block.
[0011] In a specific embodiment, the arc-shaped block is elastically arranged.
[0012] The advantages of the embodiments of the present application are: by installing a locking piece on the building roof, putting the locator on the locking piece, and fixing the locator on the building roof through the locking piece, the wire box body can be put on the locator to achieve positioning of the wire box body on the building roof. At the same time, the wire box body is placed on the building roof, so that when pouring concrete on the building roof, concrete can be prevented from pouring into the wire box body. By installing a limit piece on the inner wall of the wire box body and installing an elastic clip on the top of the locator, the wire box body can be clamped on the locator, thereby preventing the wire box body from floating up during the concrete pouring process. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 A schematic diagram of the main structure of a novel wire box positioning device provided in an embodiment of the present application;
[0014] Figure 2 A schematic diagram of a front cross-sectional structure of a novel wire box positioning device provided in an embodiment of the present application;
[0015] Figure 3 A schematic diagram of the structure of the separation of the wire box body and the positioner in the novel wire box positioning device provided in the embodiment of the present application;
[0016] Figure 4 A schematic diagram of the disassembled structure of a novel wire box positioning device provided in an embodiment of the present application;
[0017] Figure 5 for Figure 2 A partial enlarged view of point A in the middle.
[0018] In the figure: 10-locking piece; 110-screw; 120-nut; 130-gasket; 20-positioner; 210-through hole; 30-electrical box body; 40-limiting piece; 410-clamping block; 50-elastic clamping piece; 510-fixed block; 520-arc block; 530-contact block. DETAILED DESCRIPTION
[0019] The technical solution in the embodiment of the present application is to solve the problem that the above-mentioned wire box lacks a positioning structure, and the overall idea is as follows:
[0020] Embodiment 1:
[0021] See also Figure 1-5 A novel wire box positioning device includes a locking member 10 installed on a building roof, a locator 20 is slidably sleeved on the locking member 10, the locking member 10 locks the locator 20 on the building roof, a wire box body 30 is sleeved on the locator 20, the wire box body 30 is placed on the building roof, and a limiting member 40 is installed on the inner wall thereof, the limiting member 40 is clamped with the locator 20, specifically, a wire tube and a wire box body 30 are pre-buried on the top of the building, the wire box body 30 is connected to the wire tube, and its specific connection structure is the prior art, so that the wire terminal is placed on the wire box body The body 30 is used for wiring between wires. In the present application, before pouring concrete on the top of the building, the locking piece 10 is first installed on the building roof, so that the locator 20 can be fixed on the building roof through the locking piece 10, so that the wire box body 30 can be sleeved on the locator 20 to achieve the positioning purpose of the wire box body 30. At the same time, the wire box body 30 is snap-connected with the locator 20 through the limiter 40 to strengthen the connection strength between the wire box body 30 and the locator 20 to prevent the wire box body 30 from floating up when pouring concrete.
[0022] See also Figure 4 The locking member 10 includes a screw rod 110 installed on the top plate of the building, and a nut 120 is threadedly connected to the screw rod 110. The positioner 20 is slidably mounted on the screw rod 110, and the nut 120 fixes the positioner 20 on the top of the building. A through hole 210 is opened in the middle of the positioner 20, and the screw rod 110 is arranged through the through hole 210. When setting, the screw rod 110 is installed on the top plate of the building in the existing technology. The through hole 210 on the positioner 20 is used to be sleeved on the screw rod 110, and then the nut 120 is connected to the screw rod 110 to fix the positioner 20 on the top plate of the building, so as to facilitate the sleeve of the wire box body 30 on the positioner 20.
[0023] See also Figure 4 A gasket 130 is also sleeved on the screw rod 110, and the gasket 130 is placed on the top of the locator 20, and the nut 120 is pressed on the gasket 130. Furthermore, a gasket 130 is also placed on the top of the locator 20, so that the gasket 130 is sleeved on the screw rod 110 and pressed on the gasket 130 through the nut 120 to tighten the locator 20.
[0024] See also Figure 4The positioner 20 is a rubber block, which is arranged in contact with the bottom of the inner wall of the wire box body 30. It should be noted that the specific shapes of the rubber block and the wire box body 30 can be designed according to needs so that the shape of the rubber block is compatible with the shape of the inner wall of the wire box body 30. In the present application, the rubber block and the wire box body 30 are both arranged in a quadrangular shape, and the bottom layer of the wire box body 30 is opened so that the wire box body 30 can be put on the rubber block. In addition, the shape of the rubber block and the wire box body 30 can also be round or square.
[0025] See also Figure 4 and 5 A plurality of elastic clips 50 are installed on the top of the locator 20, and the limiting member 40 is a plurality of clip blocks 410. The plurality of clip blocks 410 are respectively connected with the plurality of elastic clips 50. When setting, after the wire box body 30 is sleeved on the locator 20, the plurality of clip blocks 410 are respectively connected with the plurality of elastic clips 50, thereby strengthening the connection strength between the wire box body 30 and the locator 20 to prevent the wire box body 30 from floating up due to the concrete pouring process on the top of the building.
[0026] See also Figure 5 The elastic clamp 50 includes a fixed block 510 fixedly mounted on the top of the positioner 20, the top of the fixed block 510 is fixedly connected to an arc block 520, the top of the arc block 520 is fixedly connected to a contact block 530, the clamping block 410 is clamped with the arc block 520 and the contact block 530, the arc block 520 is elastically arranged, and in the specific arrangement, the side wall of the contact block 530 is arranged in an arc shape, so that the clamping block 410 squeezes the arc surface of the contact block 530, so that the contact block 530 is squeezed to move to one side, so that the clamping block 410 can move into the arc block 520, and at the same time, the clamping block 4 The arc surface of 10 is matched with the arc surface of the arc block 520, so that when the arc surface of the card block 410 moves to fit the arc surface of the arc block 520, the contact block 530 and the arc block 520 will be reset to achieve the card connection with the card block 410, thereby strengthening the connection strength between the wire box body 30 and the positioner 20, so that the wire box body 30 will not float up, and when the wire box body 30 is pulled upward by hand, the card block 410 can move upward to squeeze the contact block 530, so that the card block 410 and the arc block 520 and the contact block 530 are separated.
[0027] When using this application:
[0028] After the installation position of the wire box body 30 on the building roof is designed, the screw rod 110 is installed in the building roof, the positioner 20 is put on the screw rod 110 and placed on the building roof, and then the gasket 130 is put on the screw rod 110 and placed on the positioner 20, and then the nut 120 is connected to the screw rod 110 so that the nut 120 is pressed on the gasket 130 to fix the positioner 20 on the building roof. After that, the wire box body 30 can be put on the positioner 20, and at the same time, the downward movement of the clamping block 410 will squeeze the contact block 530, so that the clamping block 410 moves to a state of being in contact with the arc block 520, thereby strengthening the connection strength between the wire box body 30 and the positioner 20, thereby facilitating the positioning of the wire box body 30 and preventing concrete from being poured into the wire box body 30 during the concrete pouring process.
[0029] It should be noted that the specific model specifications of the positioner 20 and the wire box body 30 need to be selected and determined according to the actual specifications of the device, and the specific selection calculation method adopts the existing technology in the field, so it will not be described in detail.
[0030] Finally, it should be noted that: Obviously, the above embodiments are only examples for clearly explaining the present invention, and are not intended to limit the implementation methods. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from this are still within the scope of protection of the present invention.
Claims
1. A novel wire box positioning device, characterized in that: The invention comprises a locking member (10) installed on the building roof, a locator (20) is slidably sleeved on the locking member (10), the locking member (10) locks the locator (20) on the building roof, a wire box body (30) is sleeved on the locator (20), the wire box body (30) is placed on the building roof, and a limiting member (40) is installed on the inner wall of the wire box body, and the limiting member (40) is clamped with the locator (20).
2. The novel wire box positioning device as claimed in claim 1 is characterized in that: The locking member (10) comprises a screw rod (110) mounted on a top plate of a building, a nut (120) being threadedly connected to the screw rod (110), the positioner (20) being slidably sleeved on the screw rod (110), and the nut (120) fixing the positioner (20) on the top of the building.
3. The novel wire box positioning device as claimed in claim 2 is characterized in that: A through hole (210) is provided in the middle of the positioner (20), and the screw rod (110) is arranged through the through hole (210).
4. The novel wire box positioning device as claimed in claim 2 is characterized in that: A gasket (130) is also sleeved on the screw rod (110), the gasket (130) is placed on the top of the positioner (20), and the nut (120) is pressed on the gasket (130).
5. The novel wire box positioning device as claimed in claim 1 is characterized in that: The positioner (20) is a rubber block, and the rubber block is arranged in contact with the bottom of the inner wall of the wire box body (30).
6. The novel wire box positioning device according to any one of claims 1 to 5, characterized in that: A plurality of elastic clamping members (50) are installed on the top of the positioner (20), and the limiting member (40) is a plurality of clamping blocks (410). The plurality of clamping blocks (410) are respectively clamped with the plurality of elastic clamping members (50).
7. The novel wire box positioning device as claimed in claim 6, characterized in that: The elastic clamp (50) comprises a fixed block (510) fixedly mounted on the top of the positioner (20), the top of the fixed block (510) is fixedly connected to an arc block (520), the top of the arc block (520) is fixedly connected to a contact block (530), and the clamping block (410) is clamped with the arc block (520) and the contact block (530).