Artificial board with drainage structure

By setting up drainage and fixing mechanisms on the artificial board, its drainage function in the wall partition area is realized, and the problem of insufficient convenience of artificial boards in the prior art is solved, and the convenience of use and scope of application are improved.

CN222140548UInactive Publication Date: 2024-12-10HENGSHUI BIDE WOOD IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420835302.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-22
Publication Date
2024-12-10
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When used as decoration materials, existing artificial boards lack drainage structure, resulting in poor convenience when used in specific parts that require wall partitions and need to be used in conjunction with pipelines.

Method used

A artificial board with a drainage structure is designed. By providing a drainage mechanism and a fixing mechanism, including a drainage pipe, a rubber ring, a connector, a snap ring, a fixed column, a fixing groove and a sealing plug, multiple artificial boards are allowed to be spliced ​​and combined and combined. Reinforce to achieve drainage function.

Benefits of technology

It increases the scope of application and convenience of use of artificial boards, reduces the difficulty of splicing, and improves the overall practicality and functionality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222140548U_ABST
    Figure CN222140548U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of artificial boards, and discloses an artificial board with drainage structures, which comprises a main body mechanism, drainage mechanisms are fixedly arranged on two sides in the main body mechanism, fixing mechanisms are clamped on two sides of the upper end of the main body mechanism, and each drainage mechanism comprises a drainage pipe. According to the utility model, the drainage mechanism and the fixing mechanism are arranged, so that a user can insert and splice a plurality of artificial boards through the connecting columns and the connecting holes during use, insert the fixing columns into the first fixing holes and the second fixing holes after the insertion and splicing are completed, and nail the fixing pins into the fixing grooves through tools; the connecting positions of the device are reinforced, the multiple artificial boards are combined and connected for use through the drainage pipes and the connectors, and the rubber rings are combined with the clamping rings for reinforcement, so that the drainage function during use of the device is achieved, the application range of the device is enlarged, and the practicability and convenience of the device during overall use are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of artificial boards, in particular to an artificial board with a drainage structure. Background Art

[0002] The existing patent (publication number: CN205310966U) discloses "an artificial board, which relates to the technical field of decoration materials, and includes an upper layer, a lower layer and a core layer. The upper layer and the lower layer are respectively located above and below the core layer. The upper end surface of the upper layer is coated with a silicone oil anti-corrosion layer, and a flame retardant layer is sandwiched between the core layer and the upper layer. A material tube is provided in the middle of the core layer, and there is at least one material tube. The material tube is filled with activated carbon, and a sealing cover is provided at the mouth of the material tube. The artificial board has a simple structure, is green and environmentally friendly, has low cost, has a good flame retardant effect and can reduce the incidence of fire; the anti-corrosion layer increases the service life of the artificial board; the material tube is filled with activated carbon to absorb the bad odor caused by the decoration, reducing the harm caused by the bad odor to the human body, thereby creating a good living or office environment for people, and is suitable for large-scale promotion."

[0003] During the process of realizing the present utility model, the inventor discovered that the prior art has the following problems: when existing artificial boards are used as decoration materials, they usually play the role of wall partitions. Walls in some specific parts of buildings usually need to have drainage functions. Most of the existing artificial boards do not have drainage structures and need to be used in conjunction with pipes, which makes them inconvenient.

[0004] Therefore, the utility model provides a man-made board with a drainage structure to solve the problems raised in the above background technology. Utility Model Content

[0005] The utility model aims to solve the shortcomings existing in the prior art and proposes an artificial board with a drainage structure. The artificial board is provided with a drainage mechanism and a fixing mechanism. When using the artificial board, the user can first plug and splice a plurality of artificial boards through the connecting column and the connecting hole. After the plugging and splicing is completed, the fixing column is inserted through the first fixing hole and the second fixing hole, and the fixing pin is nailed into the fixing groove by a tool to reinforce the connection of the device. The plurality of artificial boards are combined and connected for use through the drainage pipe and the connecting head, and are reinforced by a rubber ring combined with a clamping ring to realize the drainage function when the device is used, increase the application range of the device, and improve the practicality and convenience of the device when used as a whole.

[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0007] A man-made board with a drainage structure comprises a main body, drainage mechanisms are fixedly arranged on both sides of the main body, and fixing mechanisms are clamped and arranged on both sides of the upper end of the main body;

[0008] The drainage mechanism comprises a drainage pipe, a rubber ring is fixedly arranged on the outer surface of the upper end of the drainage pipe, a connector is fixedly arranged on the bottom end of the drainage pipe, and two clamping rings are fixedly arranged on the inner surface of the connector;

[0009] Through the above technical scheme, by providing a main body mechanism, it is convenient for users to splice and combine multiple artificial boards for use. By providing a drainage mechanism, it is beneficial to realize the drainage function when the device is used. By providing a fixing mechanism, it is convenient for users to connect multiple artificial boards and reinforce them.

[0010] Furthermore, a first sealing plug is clamped on the upper end of the drain pipe, a branch pipe is fixedly arranged on the upper front end of the drain pipe, and a second sealing plug is clamped on the front end of the branch pipe;

[0011] The above technical solution makes it easy for users to connect the device with other drainage structures for combined use.

[0012] Furthermore, the fixing mechanism comprises a fixing column, a fixing groove is formed at the front end of the fixing column, and a fixing pin is clamped inside the fixing groove;

[0013] The above technical solution is helpful to improve the stability of the fixed connection between multiple artificial panels.

[0014] Furthermore, the main body mechanism comprises a main body plate, and connecting columns are fixedly arranged on both sides of the upper end of the front side of the main body plate;

[0015] The above technical solution is conducive to realizing the basic use functions of the device and is convenient for users to splice and combine multiple artificial panels.

[0016] Furthermore, a first fixing hole is formed through the middle of the front side of each of the connecting columns;

[0017] The above technical solution makes it easy for users to assemble and fix multiple devices as a whole.

[0018] Furthermore, connection holes are provided on both sides of the bottom surface of the main body plate, and a second fixing hole is provided through the middle position of the front of the two connection holes;

[0019] The above technical solution makes it convenient for users to combine and assemble multiple devices for use.

[0020] Furthermore, the main body plate includes a waterproof layer, a reinforcement layer is fixedly provided on the outer surface of the waterproof layer, and a protective layer is fixedly provided on the outer surfaces of the two reinforcement layers;

[0021] The above technical solution is helpful to realize the basic use function of the device as a wood-based panel and improve the functionality of the device as a whole when in use.

[0022] The utility model has the following beneficial effects:

[0023] 1. The utility model proposes an artificial board with a drainage structure. Compared with the existing artificial boards, the artificial board is provided with a drainage mechanism inside. When using it, the user can combine and connect multiple artificial boards through a drainage pipe and a connector, and reinforce them by a rubber ring combined with a clamping ring. After the fixation is completed, the user can remove the first sealing plug or the second sealing plug according to the usage situation, and connect other drainage structures with the drainage pipe or branch pipe for use, so as to realize the drainage function of the device when in use, increase the application range of the device, and improve the practicability of the device when in use as a whole.

[0024] 2. The utility model proposes an artificial board with a drainage structure. Compared with the existing artificial boards, the artificial board is provided with a fixing mechanism at its upper end. When using it, the user can first plug and splice multiple artificial boards through connecting columns and connecting holes. After the plug-in and splicing are completed, the fixing column is inserted into the first fixing hole and the second fixing hole, and the fixing pin is nailed into the fixing groove through a tool to reinforce the connection of the device, reduce the difficulty of splicing when the device is used, and improve the convenience of the device when used. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is an axonometric schematic diagram of the utility model;

[0026] Figure 2 It is a front view schematic diagram of the utility model;

[0027] Figure 3 It is a front cross-sectional schematic diagram of the utility model;

[0028] Figure 4 It is an axonometric schematic diagram of the fixing mechanism of the utility model;

[0029] Figure 5 It is a structural schematic diagram of the main body plate of the utility model.

[0030] Legend:

[0031] 1. Drainage mechanism; 2. Fixing mechanism; 3. Main body mechanism; 101. First sealing plug; 102. Rubber ring; 103. Drain pipe; 104. Second sealing plug; 105. Branch pipe; 106. Connector; 107. Snap ring; 201. Fixing column; 202. Fixing groove; 203. Fixing pin; 301. First fixing hole; 302. Connecting column; 303. Main body plate; 304. Second fixing hole; 305. Connecting hole; 30301. Protective layer; 30302. Reinforcement layer; 30303. Waterproof layer. DETAILED DESCRIPTION

[0032] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0033] Reference Figure 1-5 , an embodiment provided by the utility model:

[0034] A man-made board with a drainage structure comprises a main body 3, drainage mechanisms 1 are fixedly arranged on both sides of the main body 3, and fixing mechanisms 2 are clamped and arranged on both sides of the upper end of the main body 3;

[0035] The drainage mechanism 1 includes a drainage pipe 103, a rubber ring 102 is fixedly provided on the outer surface of the upper end of the drainage pipe 103, a connecting head 106 is fixedly provided on the bottom end of the drainage pipe 103, two clamping rings 107 are fixedly provided on the inner surface of the connecting head 106, a first sealing plug 101 is clamped on the upper end of the drainage pipe 103, a branch pipe 105 is fixedly provided on the upper end of the front face of the drainage pipe 103, and a second sealing plug 104 is clamped on the front end of the branch pipe 105.

[0036] The provision of the drain pipe 103 and the branch pipe 105 facilitates the function of connecting the device with other drainage structures when in use. The provision of the connector 106 and two snap rings 107 in the connector 106, combined with the rubber ring 102 on the outer surface of the drain pipe 103, facilitates the combined connection function of the device when in use. The provision of the first sealing plug 101 and the second sealing plug 104 facilitates sealing when part of the device is not in use, thereby ensuring the use effect.

[0037] The fixing mechanism 2 comprises a fixing column 201 . A fixing groove 202 is formed at the front end of the fixing column 201 . A fixing pin 203 is clamped inside the fixing groove 202 .

[0038] The fixing column 201 is provided to facilitate the user to reinforce the connection position between the two artificial boards during use, and the fixing strength of the connection is further improved by inserting the fixing pin 203 into the fixing groove 202.

[0039] The main body mechanism 3 includes a main body plate 303, connecting columns 302 are fixedly provided on both sides of the upper end of the front side of the main body plate 303, and first fixing holes 301 are penetrated in the middle position of the front side of the two connecting columns 302, connecting holes 305 are provided on both sides of the bottom surface of the main body plate 303, and second fixing holes 304 are penetrated in the middle position of the front side of the two connecting holes 305, and the main body plate 303 includes a waterproof layer 30303, and a reinforcing layer 30302 is fixedly provided on the outer surface of the waterproof layer 30303, and a protective layer 30301 is fixedly provided on the outer surface of the two reinforcing layers 30302.

[0040] The provision of connecting columns 302 and connecting holes 305 facilitates the user to splice multiple main panels 303 for use; the provision of first fixing holes 301 and second fixing holes 304 facilitates the realization of the reinforced connection function when the device is used; the provision of a waterproof layer 30303, a reinforcing layer 30302 and a protective layer 30301 facilitates the realization of the basic use function of the device as an artificial board.

[0041] Working principle: When using the device, the user can select a suitable number of the devices for combined use. When combining, the user can first insert the connecting column 302 into the connecting hole 305. After inserting the connecting hole 305, insert the fixing column 201 into the first fixing hole 301 and the second fixing hole 304. After the insertion is completed, insert the fixing pin 203 into the fixing groove 202 through a tool to complete the connection of multiple devices. When combining, the user needs to first remove the first sealing plug 101 and insert the rubber ring 102 on the outer surface of the drain pipe 103 into the middle of the two clamping rings 107 of the connecting head 106 to complete the connection between the drain pipes 103. When it is necessary to connect other drainage structures on the outer surface of the device, the user can remove the second sealing plug 104 and connect the drainage structure to the branch pipe 105 for use.

[0042] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A man-made board with a drainage structure, comprising a main body (3), characterized in that: Drainage mechanisms (1) are fixedly arranged on both sides of the interior of the main body mechanism (3), and fixing mechanisms (2) are clamped and arranged on both sides of the upper end of the main body mechanism (3); The drainage mechanism (1) comprises a drainage pipe (103), a rubber ring (102) is fixedly provided on the outer surface of the upper end of the drainage pipe (103), a connecting head (106) is fixedly provided on the bottom end of the drainage pipe (103), and two clamping rings (107) are fixedly provided on the inner surface of the connecting head (106).

2. The artificial board with drainage structure according to claim 1, characterized in that: The upper end of the drainage pipe (103) is clamped with a first sealing plug (101), the upper front end of the drainage pipe (103) is fixedly provided with a branch pipe (105), and the front end of the branch pipe (105) is clamped with a second sealing plug (104).

3. The artificial board with drainage structure according to claim 1, characterized in that: The fixing mechanism (2) comprises a fixing column (201), a fixing groove (202) is provided at the front end of the fixing column (201), and a fixing pin (203) is clamped inside the fixing groove (202).

4. The artificial board with drainage structure according to claim 1, characterized in that: The main body structure (3) comprises a main body plate (303), and connecting columns (302) are fixedly arranged on both sides of the upper end of the front side of the main body plate (303).

5. The artificial board with drainage structure according to claim 4, characterized in that: A first fixing hole (301) is provided through the middle of the front sides of the two connecting posts (302).

6. The artificial board with drainage structure according to claim 4, characterized in that: Both sides of the bottom surface of the main body plate (303) are provided with connection holes (305), and a second fixing hole (304) is provided through the middle position of the front side of the two connection holes (305).

7. The artificial board with drainage structure according to claim 4, characterized in that: The main body plate (303) comprises a waterproof layer (30303), a reinforcement layer (30302) is fixedly provided on the outer surface of the waterproof layer (30303), and a protective layer (30301) is fixedly provided on the outer surfaces of the two reinforcement layers (30302).