Anti-blocking V-cone flowmeter

By setting up a rotating groove and dredging assembly inside the housing of the V-cone flowmeter, the drive mechanism drives the rotating plate and dredging plate to rotate and move, and the inclined partition plate is driven to unblock the blockage in the gap between the shell and the cone, the existing solution is solved The blockage problem caused by the inability to move the thread in the technology improves the measurement efficiency and quality of the flowmeter.

CN222144219UActive Publication Date: 2024-12-10CLP HUACHEN (TIANJIN) PRECISION MEASURING INSTR CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202323420766.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-15
Publication Date
2024-12-10
Estimated Expiration
2033-12-15

AI Technical Summary

Technical Problem

The existing anti-blocking V-cone flowmeter cannot move forward and backward, and cannot move the connection between the flowmeter shell and the cone, resulting in the shell blockage and affecting the flow measurement.

Method used

An anti-blocking assembly including a driving mechanism and a dredging mechanism is designed. By providing a rotating groove and a dredging plate inside the housing, the drive mechanism is used to drive the rotating plate and dredging plate to rotate and move, and the inclined partition plate is driven to drive the tilt partition to the gap between the housing and the cone. clearance at the location.

Benefits of technology

The flow measurement efficiency and measurement quality of the V-cone flowmeter are improved, ensuring accurate measurement of the medium flow, and solving the blockage problem.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222144219U_ABST
    Figure CN222144219U_ABST
Patent Text Reader

Abstract

The anti-blocking V-cone flowmeter comprises a V-cone flowmeter body, the V-cone flowmeter body is composed of a shell, a cone and an anti-blocking assembly, the cone is fixedly installed in the shell, and the anti-blocking assembly is arranged at the rear end of the cone in the shell and used for dredging the interior of the shell. A rotating groove is formed in a shell on the V-cone flowmeter, a dredging assembly is installed in the rotating groove, so that a driving mechanism on the dredging assembly is started, a rotating plate on a dredging mechanism is driven to rotate, a dredging plate movably installed on the inner side of the rotating plate rotates and moves, and the dredging plate moves while rotating; a plurality of inclined partition plates installed on the dredging plate rotate and movably dredge blockage in the gap between the shell and the cone, and the medium flow measurement efficiency and measurement quality of the V-cone flowmeter are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of instrumentation equipment, in particular to an anti-blocking V-cone flowmeter. Background Art

[0002] The V-cone flowmeter is a flow measuring instrument, which is mainly used for flow measurement of liquid, gas and steam. The V-cone flowmeter is divided into two forms: integrated and split. It uses the throttling effect of the V-cone in the flow field to measure the flow by detecting the upstream and downstream pressure difference. Compared with ordinary throttling parts, it changes the throttling layout from center hole throttling to annular throttling. The V-cone flowmeter is composed of a V-cone block and a differential pressure transmitter. Since the gap between the V-cone block inside the V-cone flowmeter and the inner wall of the shell is small, it is easy to cause the V-cone flowmeter to be blocked at the large diameter of the V-cone block when it is in use, which is not convenient to use.

[0003] In the existing anti-blocking V-cone flowmeter (an anti-blocking V-cone flowmeter with application number 202222160474.5), the anti-blocking mechanism drives the gear to rotate through a motor to rotate the thread to dredge the V-cone flowmeter, but the rotating thread cannot move forward and backward, thereby failing to dredge the connection between the flowmeter casing and the cone in a mobile manner, causing the V-cone flowmeter casing to be blocked, affecting the flow measurement of the medium by the V-cone flowmeter. Utility Model Content

[0004] In view of the above-mentioned defects or shortcomings in the prior art, it is desired to provide an anti-blocking V-cone flowmeter to solve the technical problem that the threads on the anti-blocking mechanism of the existing anti-blocking V-cone flowmeter cannot move forward and backward, thereby making it impossible to mobilise and clear the connection between the flowmeter housing and the cone, thereby causing the V-cone flowmeter housing to be blocked, affecting the flow measurement of the medium by the V-cone flowmeter.

[0005] According to the technical solution provided in the embodiment of the present application, an anti-blocking V-cone flowmeter includes a V-cone flowmeter body, which is composed of a shell, a cone and an anti-blocking component, the cone is fixedly installed inside the shell, and the anti-blocking component is arranged at the rear end of the cone in the shell, and is used for dredging inside the shell;

[0006] The anti-blocking component includes a driving mechanism and a clearing mechanism. A chassis is vertically fixedly installed on the top of the shell. The driving mechanism is fixedly installed in the chassis, and the second gear on the driving mechanism is fixedly connected to the rotating plate on the clearing mechanism, so that the driving mechanism drives the clearing mechanism to rotate, so that the clearing mechanism can clear the gap between the shell and the cone.

[0007] Furthermore, the driving mechanism includes a rotating driving member, a first gear and a second gear, the second gear is meshingly connected to the first gear, and the first gear is fixedly connected to an output end on the rotating driving member, so that the rotating driving member drives the rotating plate on which the second gear is fixedly installed to rotate.

[0008] Furthermore, the dredging mechanism includes the rotating plate and the dredging plate, an annular rotating groove is provided inside the outer shell, the rotating plate is movably installed in the rotating groove, and the dredging plate is movably installed inside the rotating plate, so that the dredging plate is driven to rotate when the rotating plate rotates, so as to dredge the blockage in the gap between the outer shell and the cone.

[0009] Furthermore, two corresponding movable grooves are provided inside the rotating plate, and two sliders are provided on the outside of the dredging plate, so that each slider can move along each movable groove, so that the dredging plate fixed with the slider can move along the inside of the outer shell, so that the dredging plate can dredge the blockage in the gap between the outer shell and the cone.

[0010] Furthermore, a plurality of partitions are fixedly connected to the inside of the dredging plate, and the plurality of partitions are arranged in parallel and at intervals on the inner side of the dredging plate, so that the plurality of partitions can dredge the blockage in the gap between the outer shell and the cone.

[0011] Furthermore, several of the partitions are installed on the inner side of the dredging plate in an arc-shaped structure, and several of the partitions are fixedly installed in the dredging plate in an inclined state, so that the dredging plate can dredge the blockage in the gap between the shell and the cone.

[0012] To sum up, the beneficial effects of the present application are as follows: when in use, a rotating groove is set inside the outer shell of the V-cone flowmeter, and a dredging assembly is installed in the rotating groove, so that the driving mechanism on the dredging assembly is started, thereby driving the rotating plate on the dredging mechanism to rotate, so that the dredging plate movably installed on the inner side of the rotating plate is rotated and moved, so that the dredging plate moves while rotating, so that a number of inclined partitions installed on the dredging plate are rotated and moved to dredge the blockage in the gap between the outer shell and the cone, thereby improving the flow measurement efficiency and measurement quality of the V-cone flowmeter for the medium. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Other features, objects and advantages of the present application will become more apparent by reading the detailed description of non-limiting embodiments made with reference to the following drawings:

[0014] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0015] Figure 2This is a schematic diagram of the cross-sectional structure of the utility model;

[0016] Figure 3 This is a schematic diagram of the exploded structure of the utility model;

[0017] Figure 4 It is a schematic diagram of the anti-blocking mechanism structure of the utility model.

[0018] Numbers in the figure: V-cone flowmeter body - 100, shell - 110, chassis - 111, rotating groove - 112, cone - 120, anti-blocking component - 130, driving mechanism - 131, second gear - 1311, rotating driving member - 1312, first gear - 1313, dredging mechanism - 132, rotating plate - 1321, moving groove - 13211, dredging plate - 1322, slider - 13221, partition - 13222. DETAILED DESCRIPTION

[0019] The present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the relevant utility model, rather than to limit the utility model. It is also necessary to explain that, for ease of description, only the parts related to the utility model are shown in the accompanying drawings.

[0020] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0021] A V-cone flow meter with an anti-blocking structure Figure 1-Figure 4 As shown, it includes a V-cone flowmeter body 100, which is composed of a shell 110, a cone 120 and an anti-blocking component 130. The cone 120 is fixedly installed inside the shell 110, and the anti-blocking component 130 is arranged at the rear end of the cone 120 in the shell 110, and is used for unblocking the inside of the shell 110; the anti-blocking component 130 includes a driving mechanism 131 and an unblocking mechanism 132. A chassis 111 is vertically fixedly installed on the top of the shell 110, the driving mechanism 131 is fixedly installed in the chassis 111, and the second gear 1311 on the driving mechanism 131 is fixedly connected with the rotating plate 1321 on the unblocking mechanism 132, so that the driving mechanism 131 drives the unblocking mechanism 132 to rotate, so that the unblocking mechanism 132 can unblock the connection between the shell 110 and the cone 120.

[0022] When in use, a rotating groove 112 is set inside the shell 110 of the V-cone flowmeter, and a clearing assembly 130 is installed in the rotating groove 112, so that the driving mechanism 131 on the clearing assembly 130 is started, thereby driving the rotating plate 1321 on the clearing mechanism 132 to rotate, so that the clearing plate 1322 movably installed on the inner side of the rotating plate 1321 is rotated and moved, so that the clearing plate 1322 moves while rotating, so that a plurality of inclined partitions 13222 installed on the clearing plate 1322 are rotated and moved to clear the blockage in the gap between the shell 110 and the cone 120, thereby improving the flow measurement efficiency and measurement quality of the V-cone flowmeter for the medium.

[0023] As a preferred embodiment, please refer to Figure 3 and Figure 4 The driving mechanism 131 includes a rotating driving member 1312, a first gear 1313 and a second gear 1311. The second gear 1311 is meshedly connected to the first gear 1313, and the first gear 1313 is fixedly connected to the output end of the rotating driving member 1312, so that the rotating driving member 1312 drives the first gear 1313 to rotate, so that the second gear 1311 meshedly connected to the first gear 1313 rotates, thereby driving the rotating plate 1321 fixedly mounted with the second gear 1311 to rotate, so that the driving mechanism 131 drives the dredging mechanism 132 to rotate, and dredges the blockage in the gap between the housing 110 and the cone 120, thereby improving the anti-blocking efficiency of the V-cone flowmeter.

[0024] As a preferred embodiment, please refer to Figure 2 and Figure 4 The dredging mechanism 132 includes a rotating plate 1321 and a dredging plate 1322. An annular rotating groove 112 is provided inside the outer shell 110. The rotating plate 1321 is movably installed in the rotating groove 112, and the dredging plate 1322 is movably installed inside the rotating plate 1321. When the rotating plate 1321 rotates under the drive of the driving mechanism 131, the dredging plate 1322 is driven to rotate, so that the dredging plate 1322 can dredge the blockage in the gap between the outer shell 110 and the cone 120.

[0025] As a preferred embodiment, please refer to Figure 4 Two corresponding moving grooves 13211 are also provided inside the rotating plate 1321, and two sliders 13221 are correspondingly provided on the outer side of the dredging plate 1322. Each slider 13221 moves along each moving groove 13211, so that when the rotating plate 1321 rotates, the dredging plate 1322 fixedly mounted with the slider 13221 moves along the curve of the moving groove 13211, so that the dredging plate 1322 moves inside the shell 110, so that the dredging plate 1322 can dredge the blockage in the gap between the shell 110 and the cone 120.

[0026] As a preferred embodiment, please refer to Figure 4 A plurality of partitions 13222 are fixedly connected to the inside of the dredging plate 1322. The plurality of partitions 13222 are arranged in parallel and at intervals on the inner side of the dredging plate 1322 so that the plurality of partitions 13222 can dredge the blockage in the gap between the shell 110 and the cone 120.

[0027] As a preferred embodiment, please refer to Figure 3 and Figure 4 A plurality of partitions 13222 are installed in an arc-shaped structure on the inner side of the dredging plate 1322, and a plurality of partitions 13222 are fixedly installed in the dredging plate 1322 in an inclined state, so that the dredging plate 1322 can dredge the blockage in the gap between the shell 110 and the cone 120.

[0028] The working principle of the utility model is:

[0029] When in use, a rotating groove 112 is provided inside the housing 110 of the V-cone flowmeter, and a dredging assembly 130 is installed in the rotating groove 112, so that the driving mechanism 131 on the dredging assembly 130 is started, and the rotating driving member 1312 on the driving mechanism 131 drives the first gear 1313 to rotate, so that the first gear 1313 drives the meshing second gear 1311 to rotate synchronously, thereby driving the dredging mechanism 132 fixedly mounted with the second gear 1311 to rotate, thereby driving the rotating plate 1321 on the dredging mechanism 132 to rotate along the inside of the housing 110. The rotating groove 112 is set to rotate, so that the clearing plate 1322 movably installed on the inner side of the rotating plate 1321 rotates and moves along the arc-shaped structure moving groove 13211 set on the rotating plate 1321, so that the clearing plate 1322 moves along the inside of the shell 110 while rotating, so that a plurality of inclined partitions 13222 installed on the clearing plate 1322 rotate and move to clear the blockage in the gap between the shell 110 and the cone 120, thereby improving the flow measurement efficiency and measurement quality of the V-cone flowmeter for the medium and the anti-blocking efficiency of the V-cone flowmeter.

[0030] The above description is only an explanation of the preferred embodiments of the present application and the technical principles and other schemes used. At the same time, the scope of the utility model involved in the present application is not limited to the technical scheme formed by a specific combination of the above technical features, but also includes other technical schemes formed by any combination of the above technical features or their equivalent features without departing from the concept of the utility model. For example, the above features are replaced with the technical features with similar functions disclosed in the present application (but not limited to) to form a technical scheme.

Claims

1. An anti-blocking V-cone flowmeter, characterized by: The invention comprises a V-cone flowmeter body (100), which is composed of a housing (110), a cone (120) and an anti-blocking assembly (130); the cone (120) is fixedly installed inside the housing (110), and the anti-blocking assembly (130) is arranged at the rear end of the cone (120) inside the housing (110) and is used for clearing the inside of the housing (110); The anti-blocking component (130) comprises a driving mechanism (131) and a dredging mechanism (132); a chassis (111) is vertically fixedly installed on the top of the housing (110); the driving mechanism (131) is fixedly installed in the chassis (111); and a second gear (1311) on the driving mechanism (131) is fixedly connected to a rotating plate (1321) on the dredging mechanism (132), so that the driving mechanism (131) drives the dredging mechanism (132) to rotate, so that the dredging mechanism (132) dredges the gap between the housing (110) and the cone (120).

2. The anti-blocking V-cone flowmeter according to claim 1 is characterized in that: The driving mechanism (131) comprises a rotating driving member (1312), a first gear (1313) and a second gear (1311), wherein the second gear (1311) is meshingly connected with the first gear (1313), and the first gear (1313) is fixedly connected with an output end of the rotating driving member (1312), so that the rotating driving member (1312) drives the rotating plate (1321) on which the second gear (1311) is fixedly mounted to rotate.

3. The anti-blocking V-cone flowmeter according to claim 1 is characterized in that: The dredging mechanism (132) comprises the rotating plate (1321) and the dredging plate (1322); an annular rotating groove (112) is provided inside the housing (110); the rotating plate (1321) is movably installed in the rotating groove (112); and the dredging plate (1322) is movably installed inside the rotating plate (1321), so that when the rotating plate (1321) rotates, the dredging plate (1322) is driven to rotate, and is used to dredge the blockage in the gap between the housing (110) and the cone (120).

4. The anti-blocking V-cone flowmeter according to claim 3 is characterized in that: Two corresponding moving grooves (13211) are also provided inside the rotating plate (1321), and two sliders (13221) are correspondingly provided outside the dredging plate (1322), so that each of the sliders (13221) can move along each of the moving grooves (13211), so that the dredging plate (1322) fixedly mounted with the sliders (13221) can move along the inside of the outer shell (110), so that the dredging plate (1322) can dredge the blockage in the gap between the outer shell (110) and the cone (120).

5. The anti-blocking V-cone flowmeter according to claim 3 is characterized in that: A plurality of partitions (13222) are also fixedly connected to the inside of the dredging plate (1322), and the plurality of partitions (13222) are arranged in parallel and at intervals on the inner side of the dredging plate (1322), so that the plurality of partitions (13222) can dredge the blockage in the gap between the shell (110) and the cone (120).

6. The anti-blocking V-cone flowmeter according to claim 5 is characterized in that: A plurality of the partitions (13222) are installed in an arc-shaped structure on the inner side of the dredging plate (1322), and a plurality of the partitions (13222) are fixedly installed in the dredging plate (1322) in an inclined state, so that the dredging plate (1322) can dredge the blockage in the gap between the shell (110) and the cone (120).

Citation Information

Patent Citations

  • Anti-blocking V-cone flowmeter

    CN217953586U