Movable safety fixing tool
By introducing support fixing devices and storage adjustment devices into safe fixing tooling, the problem of adjustment of steel rope movement range and overall length is solved, the working ability and practicality of bridge construction is improved, and efficient operation is ensured under different circumstances .
Patent Information
- Application Number
- CN202420895050.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-26
- Publication Date
- 2024-12-17
- Estimated Expiration
- 2034-04-26
AI Technical Summary
The existing safe fixing tooling is difficult to adjust the moving range and overall length of the steel rope, resulting in a reduction in working ability and practicality under different circumstances.
A mobile safe fixing tool is designed, including a support fixing device and storage adjustment device. Through structures such as outer sleeves, inner columns, rubber extrusion blocks, screws and storage boxes, the staff can adjust and prevent the moving range of the steel rope. and overall length.
It improves the working ability and practicality of work clothes, can better meet work needs in different situations, and enhances safety and flexibility.
Smart Images

Figure CN222183091U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of bridge erection machine construction, and in particular relates to a mobile safety fixing tool. Background Art
[0002] The bridge erection machine is a device that places the prefabricated beams on the prefabricated bridge piers. The bridge erection machine belongs to the category of cranes because its main function is to lift the beams, transport them to the location and then put them down.
[0003] 1. Most of the current safety fixing tools have the problem of being inconvenient to adjust the moving range of the steel rope and to prevent the movement of the steel rope when necessary, which makes it difficult to meet the work needs in different situations, thereby reducing the working capacity of the tooling; 2. The above-mentioned public patent has the problem of being unable to adjust the overall length of the steel rope when necessary, thereby reducing the practicality of the tooling. Utility Model Content
[0004] In order to solve the problems raised in the above background technology, the utility model provides a mobile safety fixing tool, which has the characteristics of high working capacity and strong practicality.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a mobile safety fixing tool, including a fixing frame, wherein two fixing frames are provided, a second screw is threadedly installed on one side of the fixing frame near the edge, a splint is installed on one side of the second screw and located on the inner side of the fixing frame through a bearing, a rotating plate is installed on the side of the second screw away from the splint, a safety belt is provided below the two fixing frames, a steel rope is installed on one side of the safety belt, a supporting fixing device is installed between the two fixing frames, and the safety belt and the supporting fixing device are connected by a storage and adjustment device.
[0006] Preferably, the supporting and fixing device includes an outer sleeve, a fixing assembly, screws, an inner cylinder, an outer frame and threaded holes, the outer sleeves are installed on both sides adjacent to each other between the two fixing frames, the inner sides of the two outer sleeves are provided with an inner cylinder, the top of the outer sleeves is provided with screws threadedly, a plurality of threaded holes are provided on the top of the inner cylinder, the outer frame is provided on the outside of the two outer sleeves and above the steel rope, and the fixing assemblies are installed on the top and bottom of the outer frame and on one side of the steel rope.
[0007] Preferably, the fixing assembly includes a rubber extrusion block, a first knob and a first screw, the first screw is threadedly installed on the top and bottom of the outer frame and on one side of the steel rope, the rubber extrusion block is installed on the side of the first screw close to the outer sleeve and on the inner side of the outer frame through a bearing, and the first knob is installed on the side of the first screw away from the rubber extrusion block.
[0008] Preferably, the inner width of the outer frame is equal to the outer width of the rubber extrusion block.
[0009] Preferably, the storage and adjustment device includes a storage box, a second knob, a screw rod and a clamping frame. The storage box is installed below the outer frame and located outside the top of the steel rope. Screw rods are installed on both sides of the storage box through bearings. The second knob is installed on the side of the screw rod away from the storage box, and the clamping frame is installed on the outside of the screw rod through threads.
[0010] Preferably, the storage and adjustment device further comprises a rubber strip, and the rubber strip is installed on both sides adjacent to each other between the two clamping frames.
[0011] Compared with the prior art, the beneficial effects of the utility model are:
[0012] 1. The utility model provides a supporting and fixing device so that the staff can adjust the moving range of the steel rope to a certain extent through the cooperation of structures such as the outer sleeve and the inner cylinder when necessary, and the staff can prevent the movement of the steel rope through the cooperation of structures such as the first screw and the rubber extrusion block when necessary, so as to better meet the work needs in different situations and thus improve the working capacity of the tooling.
[0013] 2. The utility model provides a storage and adjustment device so that the staff can store the excess part of the steel rope when necessary through the cooperation of the storage box and the clamping frame and other structures, thereby adjusting the overall length of the steel rope to a certain extent, better meeting the work needs in different situations, and thus improving the practicality of the tooling. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a three-dimensional diagram of the utility model;
[0015] Figure 2 It is a three-dimensional cutaway view of the utility model;
[0016] Figure 3 It is a three-dimensional cutaway view of the supporting and fixing device of the utility model;
[0017] Figure 4 It is a three-dimensional cutaway view of the storage and adjustment device of the utility model.
[0018] In the figure: 1. fixing frame; 2. supporting fixing device; 21. outer sleeve; 22. fixing assembly; 221. rubber extrusion block; 222. first knob; 223. first screw; 23. screw; 24. inner cylinder; 25. outer frame; 26. threaded hole; 3. safety belt; 4. steel rope; 5. storage adjustment device; 51. storage box; 52. second knob; 53. screw; 54. clamping frame; 55. rubber strip; 6. splint; 7. second screw; 8. rotating plate. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0020] Example 1
[0021] See also Figure 1-4 The utility model provides the following technical solutions: a mobile safety fixing tool, including a fixing frame 1, two fixing frames 1 are provided, a second screw rod 7 is threadedly installed at the edge position of one side of the fixing frame 1, a clamping plate 6 is installed at one side of the second screw rod 7 and located at the inner side of the fixing frame 1 through a bearing, a rotating plate 8 is installed at the side of the second screw rod 7 away from the clamping plate 6, a safety belt 3 is provided below the two fixing frames 1, a steel rope 4 is installed on one side of the safety belt 3, a supporting fixing device 2 is installed between the two fixing frames 1, and the safety belt 3 and the supporting fixing device 2 are connected through a storage and adjustment device 5.
[0022] Specifically, the supporting and fixing device 2 includes an outer sleeve 21, a fixing component 22, a screw 23, an inner cylinder 24, an outer frame 25 and a threaded hole 26. The outer sleeves 21 are installed on both sides adjacent to each other between the two fixing frames 1, the inner sides of the two outer sleeves 21 are provided with inner cylinders 24, the top of the outer sleeves 21 is provided with screws 23 through threads, and the top of the inner cylinder 24 is provided with multiple threaded holes 26, the outer frame 25 is provided on the outside of the two outer sleeves 21 and above the steel rope 4, and the fixing components 22 are installed on the top and bottom of the outer frame 25 and on one side of the steel rope 4.
[0023] By adopting the above technical solution, the staff can adjust the moving range of the steel rope 4 to a certain extent through the cooperation of the outer sleeve 21 and the inner column 24 and other structures when necessary, so as to better meet the working needs in different situations.
[0024] Specifically, the fixing assembly 22 includes a rubber extrusion block 221, a first knob 222 and a first screw 223. The first screw 223 is threadedly installed on the top and bottom of the outer frame 25 and on one side of the steel rope 4. The rubber extrusion block 221 is installed on the side of the first screw 223 close to the outer sleeve 21 and on the inner side of the outer frame 25 through a bearing, and the first knob 222 is installed on the side of the first screw 223 away from the rubber extrusion block 221.
[0025] By adopting the above technical solution, the staff can prevent the steel rope 4 from moving when necessary through the cooperation of the first screw rod 223 and the rubber extrusion block 221 and other structures, thereby better meeting the work needs in different situations.
[0026] Specifically, the inner width of the outer frame 25 is equal to the outer width of the rubber extrusion block 221 .
[0027] By adopting the above technical solution, the tooling can ensure that the inner side of the outer frame 25 and the outer side of the rubber extrusion block 221 can be in close contact with each other, thereby preventing the rubber extrusion block 221 from deviating during the movement.
[0028] When this embodiment is used, when the work of the bridge-building machine requires the use of tooling, the staff screws the two screws 23 in the supporting fixing device 2 to disengage it from the threaded hole 26 on the inner cylinder 24, and then the staff pulls the two outer sleeves 21 to move, thereby adjusting the overall length of the two outer sleeves 21 and the inner cylinder 24, and then adjusting the movable range of the steel rope 4, and then the staff reversely rotates the two screws 23 to connect them with the corresponding threaded holes 26, and then the staff clamps the two fixing frames 1 on the protective wall, and then rotates the two rotating plates 8 respectively, thereby driving the two second screws 7 to rotate respectively, the second screw 7 is threadedly connected to the fixing frame 1, the second screw 7 is bearing-connected to the clamping plate 6, and the outer top surface of the clamping plate 6 is tightly attached to the inner top surface of the fixing frame 1, so the two second screws 7 respectively drive the two clamping plates 6 to move, and then cooperate with the two fixing frames 1 to move the protective wall The two fixing frames 1 are clamped to fix the positions of the two fixing frames 1. The staff members wear the safety belts 3 and then use them to prevent the staff members from accidentally falling when working at high altitudes. When it is necessary to prevent the steel rope 4, the outer frame 25 and other structures from moving outside the two outer sleeves 21 and the inner column 24, the staff members before work or other staff members during work respectively turn the first knobs 222 in the two fixing assemblies 22, thereby driving the two first screw rods 223 to rotate. The first screw rod 223 is threadedly connected to the outer frame 25, and the first screw rod 223 is bearing-connected to the rubber extrusion block 221. Therefore, the two first screw rods 223 drive the two rubber extrusion blocks 221 to move, thereby clamping the outer sleeve 21 or the inner column 24, thereby fixing the position of the outer frame 25, thereby preventing the steel rope 4, the outer frame 25 and other structures from moving outside the two outer sleeves 21 and the inner column 24.
[0029] Example 2
[0030] The difference between this embodiment and embodiment 1 is that the storage and adjustment device 5 includes a storage box 51, a second knob 52, a screw rod 53 and a clamping frame 54. The storage box 51 is installed below the outer frame 25 and at a position outside the top of the steel rope 4. The screw rod 53 is installed on both sides of the storage box 51 through bearings. The second knob 52 is installed on the side of the screw rod 53 away from the storage box 51, and the clamping frame 54 is installed on the outside of the screw rod 53 through threads.
[0031] By adopting the above technical solution, the staff can store the excess part of the steel rope 4 when necessary through the cooperation of the storage box 51 and the clamping frame 54, so as to adjust the overall length of the steel rope 4 to a certain extent, so as to better meet the work needs in different situations.
[0032] Specifically, the storage and adjustment device 5 further includes a rubber strip 55 , and the rubber strips 55 are installed on both sides adjacent to each other between the two clamping frames 54 .
[0033] By adopting the above technical solution, the tooling can enhance the friction between the clamping frame 54 and the steel rope 4 through the rubber strip 55, thereby ensuring that the two clamping frames 54 can clamp the steel rope 4 normally and better meet the work needs.
[0034] When this embodiment is in use, when it is necessary to adjust the overall length of the steel rope 4, the staff puts the excess part of the steel rope 4 into the storage box 51 in the storage adjustment device 5, and then rotates the two second knobs 52 respectively, thereby driving the two screw rods 53 to rotate. The screw rods 53 are threadedly connected to the clamping frame 54, and the inner bottom surface of the clamping frame 54 and the outer bottom surface of the storage box 51 are tightly attached to each other, so the two screw rods 53 drive the two clamping frames 54 and the rubber strips 55 thereon to move, and then clamp the steel rope 4, preventing the part of the steel rope 4 in the storage box 51 from leaving the storage box 51, thereby adjusting the overall length of the steel rope 4 to better meet the work needs in different situations.
[0035] The working principle and use process of the utility model are as follows: when the work of the bridge erecting machine requires the use of a tool, the worker screws the two screws 23 in the supporting fixture 2 to disengage it from the threaded hole 26 on the inner column 24, and then the worker pulls the two outer sleeves 21 to move, thereby adjusting the overall length of the two outer sleeves 21 and the inner column 24, and then adjusting the movable range of the steel rope 4, and then the worker rotates the two screws 23 in the opposite direction to connect them with the corresponding threaded holes 26, and then the worker clamps the two fixing frames 1 on the protective wall, and then rotates the two rotating plates 8 respectively, thereby driving the two second The screw rod 7 rotates, the second screw rod 7 is threadedly connected to the fixing frame 1, the second screw rod 7 is bearing-connected to the clamping plate 6, and the outer top surface of the clamping plate 6 is in close contact with the inner top surface of the fixing frame 1, so the two second screw rods 7 respectively drive the two clamping plates 6 to move, and then cooperate with the two fixing frames 1 to clamp the protective wall, thereby fixing the positions of the two fixing frames 1. The staff can wear the safety belt 3 and then use it to prevent the staff from accidentally falling when working at high altitudes. When it is necessary to prevent the steel rope 4 and the outer frame 25 and other structures from moving outside the two outer sleeves 21 and the inner column 24, the staff should wear the safety belt 3 before work. The operator or other staff members rotate the first knobs 222 in the two fixing components 22 respectively during work, thereby driving the two first screws 223 to rotate. The first screws 223 are threadedly connected to the outer frame 25, and the first screws 223 are bearing-connected to the rubber extrusion blocks 221. Therefore, the two first screws 223 drive the two rubber extrusion blocks 221 to move, thereby clamping the outer sleeve 21 or the inner cylinder 24, thereby fixing the position of the outer frame 25, thereby preventing the steel rope 4 and the outer frame 25 from moving outside the two outer sleeves 21 and the inner cylinder 24; when it is necessary to adjust the steel rope 4 When the overall length is adjusted, the staff puts the excess part of the steel rope 4 into the storage box 51 in the storage adjustment device 5, and then rotates the two second knobs 52 respectively, thereby driving the two screw rods 53 to rotate. The screw rods 53 are threadedly connected to the clamping frame 54, and the inner bottom surface of the clamping frame 54 and the outer bottom surface of the storage box 51 are tightly attached to each other, so the two screw rods 53 drive the two clamping frames 54 and the rubber strips 55 thereon to move, and then clamp the steel rope 4, preventing the part of the steel rope 4 in the storage box 51 from leaving the storage box 51, thereby adjusting the overall length of the steel rope 4 to better meet the work needs in different situations.
[0036] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A mobile safety fixing tool, comprising a fixing frame, characterized in that: The fixing frames are provided with two, a second screw is installed at the edge position of one side of the fixing frame through a thread, a clamp is installed at one side of the second screw and at a position located on the inner side of the fixing frame through a bearing, a rotating plate is installed at the side of the second screw away from the clamp, a safety belt is arranged below the two fixing frames, a steel rope is installed on one side of the safety belt, a supporting and fixing device is installed between the two fixing frames, and the safety belt and the supporting and fixing device are connected by a storage and adjustment device.
2. A mobile safety fixing tool according to claim 1, characterized in that: The supporting and fixing device includes an outer sleeve, a fixing assembly, a screw, an inner cylinder, an outer frame and threaded holes. The outer sleeves are installed on both sides adjacent to each other between the two fixing frames, the inner sides of the two outer sleeves are provided with an inner cylinder, the top of the outer sleeves is provided with a screw through a thread, a plurality of threaded holes are provided on the top of the inner cylinder, the outer frame is provided on the outside of the two outer sleeves and above the steel rope, and the fixing assembly is installed on the top and bottom of the outer frame and on one side of the steel rope.
3. A mobile safety fixing tool according to claim 2, characterized in that: The fixing assembly includes a rubber extrusion block, a first knob and a first screw. The first screw is threadedly installed on the top and bottom of the outer frame and on one side of the steel rope. The rubber extrusion block is installed on the side of the first screw close to the outer sleeve and on the inner side of the outer frame through a bearing, and the first knob is installed on the side of the first screw away from the rubber extrusion block.
4. A mobile safety fixing tool according to claim 3, characterized in that: The inner width of the outer frame is equal to the outer width of the rubber extrusion block.
5. The mobile safety fixing tool according to claim 3, characterized in that: The storage and adjustment device includes a storage box, a second knob, a screw rod and a clamping frame. The storage box is installed below the outer frame and located outside the top of the steel rope. Screw rods are installed on both sides of the storage box through bearings. The second knob is installed on the side of the screw rod away from the storage box, and the clamping frame is installed on the outside of the screw rod through threads.
6. A mobile safety fixing tool according to claim 5, characterized in that: The storage and adjustment device also includes a rubber strip, and the rubber strips are installed on both sides adjacent to each other between the two clamping frames.