Offshore photovoltaic pile foundation positioning frame
By using offshore photovoltaic pile foundation positioning frame in offshore photovoltaic project, using the combination of guide components and positioning components, the problem of inaccurate pile foundation positioning is solved, efficient positioning of pile foundation and smooth overall lifting of photovoltaic brackets is achieved, and the Construction efficiency.
Patent Information
- Application Number
- CN202420152670.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-22
- Publication Date
- 2024-12-17
- Estimated Expiration
- 2034-01-22
AI Technical Summary
In offshore photovoltaic projects, the positioning of pile foundation construction in the existing technology is not accurate enough, resulting in difficulty in lifting the photovoltaic brackets and components as a whole, affecting construction efficiency.
A offshore photovoltaic pile foundation positioning frame is designed, including guide components and positioning components. The verticality and coordinate positioning accuracy of the pile foundation are improved through four cylinders and positioning modules, and the leveling device and GPS/Beidou positioning system are used to ensure the pile foundation. Accurate location.
It improves the accuracy and construction efficiency of pile foundation positioning, ensures the smooth overall lifting of photovoltaic brackets and components, and improves construction efficiency.
Smart Images

Figure CN222183338U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of electric power building construction, in particular to an offshore photovoltaic pile foundation positioning frame. Background Art
[0002] As the country's new energy power generation projects enter a stage of rapid development, various types of power generation projects are also increasing, and land resources are becoming increasingly scarce. Among them, offshore new energy power generation projects will become the main battlefield in the future. At present, the foundations of offshore photovoltaic projects mostly use prestressed concrete pipe piles or steel pipe piles, and the photovoltaic brackets are basically hoisted as a whole. During the installation of fixed photovoltaic brackets, the position and verticality accuracy of the pile foundation are very high. Any deviation will affect the overall hoisting of the bracket and components, and affect the component layout and power generation efficiency.
[0003] However, in actual engineering applications, in complex offshore environments, pile foundation construction is currently carried out by directly performing pile driving and other pile foundation construction operations after rough positioning through the positioning system on the pile-driving ship.
[0004] In the prior art, the pile driving operation method of roughly positioning the piles through the positioning system on the pile-driving ship does not strictly control the pile position coordinates and the verticality of the pile body. The position of the pile foundation is prone to large deviations, resulting in the inability to smoothly carry out the overall lifting of the photovoltaic bracket and photovoltaic modules, which seriously affects the construction efficiency. Utility Model Content
[0005] In view of the above-mentioned deficiencies in the prior art, the offshore photovoltaic pile foundation positioning frame provided by the utility model can improve the accuracy of pile foundation positioning, ensure the smooth overall lifting of subsequent photovoltaic brackets and photovoltaic components, and improve construction efficiency.
[0006] The offshore photovoltaic pile foundation positioning frame provided by the utility model includes a truss and also includes:
[0007] A guide assembly is arranged on the truss, and the guide assembly includes four cylinders, which are respectively arranged at four corners of the truss, and the cylinders are fixedly connected to the truss, and the axial direction of the cylinders is arranged along the vertical direction, and the upper and lower ends of the cylinders are opened for inserting the pile foundation;
[0008] The positioning assembly comprises a positioning platform, which is arranged on the truss and fixedly connected to the truss. A positioning module is arranged on the positioning platform. The orientation relationship between the positioning module and the four cylinders is relatively fixed, and the positioning module is used to locate the coordinates of the four cylinders.
[0009] Preferably, the shape of the inner wall of the cylinder matches the shape of the pile foundation.
[0010] Preferably, the inner diameter of the cylinder matches the outer diameter of the pile foundation.
[0011] Preferably, at least two positioning modules are provided and are symmetrically arranged on the positioning platform.
[0012] Preferably, the distance between the positioning module and two adjacent cylinders is equal, and the positioning module and the two adjacent cylinders form an isosceles triangle position relationship.
[0013] Preferably, a leveler is provided on the positioning platform, and the leveler is arranged between two of the positioning modules, and the leveler is used to project horizontal lasers in the directions of the four cylinders.
[0014] Preferably, the four corners of the positioning platform are each provided with lifting ears, and the lifting ears are fixedly connected to the positioning platform.
[0015] Preferably, a locking structure is provided on one side of the truss, and the locking structure comprises a connecting rod, a length direction of which is parallel to the length direction of the truss, and the connecting rod is detachably connected to the truss.
[0016] Preferably, a plurality of pontoons are provided at the bottom of the truss, and the pontoons are fixedly connected to the truss.
[0017] Compared with the prior art, the offshore photovoltaic pile foundation positioning frame provided by the utility model has the following beneficial effects:
[0018] The utility model arranges a guide assembly on the truss, and the axes of the four cylinders in the guide assembly are arranged in the vertical direction. When in use, the pile foundations are respectively inserted into the corresponding cylinders. The cylinders can limit the pile foundations, and the verticality of the pile foundations is improved in the process of pressing the piles downward. The coordinates and elevation of the pile foundations are positioned by the positioning assembly, thereby improving the positioning accuracy of the pile foundation construction and improving the construction efficiency of the subsequent overall lifting of the photovoltaic bracket and the photovoltaic assembly. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0020] Figure 2 It is a top view of the utility model;
[0021] Figure 3 It is the front view of the utility model;
[0022] Figure 4 It is a right side view of the utility model;
[0023] Figure 5 It is a schematic diagram of the locking structure of the utility model.
[0024] Description of reference numerals:
[0025] 1. Cylinder; 2. Truss; 3. Floating box; 4. Connecting rod; 5. Clamp; 6. Positioning module; 7. Positioning platform; 8. Lifting eye; 9. Leveling instrument. DETAILED DESCRIPTION
[0026] The following is combined with Figures 1 to 5 , the specific implementation methods of the utility model are described in detail, but it should be understood that the protection scope of the utility model is not limited by the specific implementation methods.
[0027] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0028] In addition, in the description of this application, "plurality" means two or more than two. The terms "first" and "second" are used for descriptive purposes only and should not be understood as suggesting or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the feature.
[0029] Example 1
[0030] The offshore photovoltaic pile foundation positioning frame provided in this embodiment includes a truss 2, a guide assembly, and a positioning assembly.
[0031] Among them, the guide assembly is arranged on the truss 2 for guiding the pile foundation, and the guide assembly includes four cylinders 1, which are respectively arranged at the four corner positions of the truss 2, and the axial direction of the cylinder 1 is arranged along the vertical direction. The cylinder 1 is fixedly connected to the truss 2, and the upper and lower ends of the cylinder 1 are arranged to be openings for inserting the pile foundation from top to bottom; the positioning assembly is arranged on the truss 2 for positioning the coordinates of the four cylinders 1.
[0032] The cylinder 1 is connected with the truss 2 to ensure the integrity of the device and eliminate errors in the pile pressing process; the inner wall shape of the cylinder 1 matches the shape of the pile foundation, and the inner diameter of the cylinder 1 matches the designed outer diameter of the pile foundation. The pile foundation can be inserted into the guide hole inside the cylinder 1 to perform the pile pressing operation, which can improve the verticality of the pile foundation. At the same time, the coordinates of the four cylinders 1 are positioned by the positioning assembly. Since the pile foundation is inserted into the cylinder 1, the coordinates of the pile foundation can also be positioned by the positioning assembly.
[0033] In this embodiment, the positioning component includes a positioning platform 7, which is arranged on the truss 2 and fixedly connected to the truss 2. A positioning module 6 is arranged on the positioning platform 7. There is a fixed azimuth relationship between the positioning module 6 and the four cylinders 1. The positioning module 6 has a GPS or Beidou positioning system. The GPS or Beidou positioning system can be used to determine the coordinates and elevation of the positioning module 6 on the operating platform. Since there is a fixed azimuth relationship between the positioning module 6 and the four cylinders 1, when the coordinates and elevation of the positioning module 6 are determined, the coordinates and elevation of the cylinder 1 can also be determined.
[0034] In order to further improve the accuracy of positioning, two positioning modules 6 are provided in this embodiment, and the two positioning modules 6 are symmetrically arranged on the positioning platform 7. Each positioning module 6 forms an isosceles triangle position relationship with two adjacent cylinders 1. Using multiple positioning modules can perform point verification, make positioning more accurate, and reduce errors.
[0035] Furthermore, a leveler 9 is provided on the positioning platform 7 , and the leveler 9 is used to project horizontal lasers in the directions of the four cylinders 1 .
[0036] A fixed three-legged bracket is arranged in the center of the operating platform plate, and a leveling instrument 9 is mounted on the three-legged bracket. During the pile foundation construction, according to the designed sinking depth or exposed height, the height of the pile can be accurately determined by projecting the laser of the leveling instrument 9 onto the pile body, so that each group of piles can be kept at the same height, reducing the impact on the bracket installation.
[0037] How to use this embodiment
[0038] The offshore photovoltaic pile foundation positioning frame provided in this embodiment is positioned by the positioning module 6 when in use. The truss 2 is first fixed at the set position, and the pile foundation is inserted into the four cylinders 2 respectively to perform pile foundation pressing operation. When approaching the design elevation, the pile pressing speed is slowed down, and the horizontal laser projected by the sweeper 9 finally determines that the height of the pile foundation reaches the design pile top elevation, that is, the pile foundation construction is completed, and the subsequent pile positions are constructed in sequence. After each group of pile positions are constructed, the fixation of the truss 2 is removed, and the device is moved to the next group of positions, and the above steps are repeated to perform pile foundation operations.
[0039] Example 2
[0040] On the basis of Example 1, the offshore photovoltaic pile foundation positioning frame provided in this embodiment is provided with lifting ears 8 at the four corners of the positioning platform 7 to facilitate the adjustment of the overall position of the device during the construction process so as to make the positioning of the positioning frame more accurate. The lifting ears 8 are fixedly connected to the positioning platform 7. When in use, according to the positioning coordinates of the positioning module 6, the crane can adjust the position of the truss 2 as a whole through the four lifting ears 8.
[0041] After the position of the truss 2 is adjusted and determined, in order to facilitate fixing the position of the truss 2, a locking structure is set on one side of the truss 2, and the locking structure includes a connecting rod 4. The length direction of the connecting rod 4 is parallel to the length direction of the truss 2. The connecting rod 4 is used to connect to the pile-driving ship. A detachable connecting structure is set on the truss 2. The detachable connecting structure is used to fix the connecting rod 4. The detachable connecting structure can select fasteners such as clamps.
[0042] A fixed structure parallel to the length of the hull is provided on one side of the piling vessel. The structure is cylindrical and its diameter matches the size of the clamp. After the positioning module is accurately positioned at the designed position, the clamp is finally fastened and connected.
[0043] In order to improve stability, a plurality of pontoons 3 are fixedly arranged at the bottom of the truss 2. During the process of hoisting and positioning the truss 2, the truss 2 can be ensured to float on the water surface. At the same time, with the help of the locking structure, the positioning time of the truss 2 can be greatly shortened and the positioning efficiency can be improved. The pontoon device can prevent the truss 2 from being submerged in water, improve the overall stability of the truss 2 and not be affected by water waves.
[0044] How to use this embodiment
[0045] The offshore photovoltaic pile foundation positioning frame provided in this embodiment is mainly used in the pile foundation measurement and layout stage. When in use, according to the relationship between the operating range position of the pile driving ship and the designed pile foundation azimuth coordinates, the pile driving ship positioning system is used to accurately locate the position of the pile driving ship, and the anchor is tightened and locked. The truss 2 is placed parallel to the pile driving ship at a certain position away from the pile driving ship by a crane, and the initial position of the auxiliary device is preliminarily determined by the pile driving ship positioning system. The truss 2 is preliminarily connected and fixed with the pile driving ship, and the positioning module 6 on the positioning platform 7 is then accurately adjusted to the designed position by the positioning system and finally fixed with the pile driving ship. The pile foundation is inserted into the cylinder 1 for pile foundation pressing operation. When approaching the design elevation, the pile pressing speed is slowed down, and the pile foundation is determined to reach the designed pile top elevation by the horizontal laser projected by the sweeper, that is, the pile foundation construction is completed, and the subsequent pile positions are constructed in sequence. After each group of pile positions are completed, the connection point with the pile driving ship is removed, and the device is hoisted to the next group of positions, and the above steps are repeated to perform pile foundation operations. It can meet the needs of on-site construction and ensure technicality, economy and rationality.
[0046] The above disclosure is only a preferred specific embodiment of the present invention, but the embodiments of the present invention are not limited thereto, and any changes that can be conceived by technicians in this field should fall within the protection scope of the present invention.
Claims
1. An offshore photovoltaic pile foundation positioning frame, comprising a truss (2), characterized in that: Also includes: A guide assembly is arranged on the truss (2), the guide assembly comprises four cylinders (1), the four cylinders (1) are respectively arranged at four corner positions of the truss (2), the cylinders (1) are fixedly connected to the truss (2), the axial direction of the cylinder (1) is arranged along the vertical direction, and the upper and lower ends of the cylinder (1) are open for inserting into the pile foundation; The positioning assembly comprises a positioning platform (7), wherein the positioning platform (7) is arranged on the truss (2) and is fixedly connected to the truss (2); a positioning module (6) is arranged on the positioning platform (7), and the orientation relationship between the positioning module (6) and the four cylinders (1) is relatively fixed, so as to be used for positioning the coordinates of the four cylinders (1).
2. The offshore photovoltaic pile foundation positioning frame according to claim 1, characterized in that: The shape of the inner wall of the cylinder (1) matches the shape of the pile foundation.
3. The offshore photovoltaic pile foundation positioning frame according to claim 1, characterized in that: The inner diameter of the cylinder (1) matches the outer diameter of the pile foundation.
4. The offshore photovoltaic pile foundation positioning frame according to claim 1, characterized in that: At least two positioning modules (6) are provided, and are symmetrically arranged on the positioning platform (7).
5. The offshore photovoltaic pile foundation positioning frame according to claim 4, characterized in that: The distance between the positioning module (6) and the two adjacent cylinders (1) is equal, and the positioning module (6) and the two adjacent cylinders (1) form an isosceles triangle position relationship.
6. The offshore photovoltaic pile foundation positioning frame according to claim 1, characterized in that: A leveler (9) is provided on the positioning platform (7), and the leveler (9) is arranged between two positioning modules (6). The leveler (9) is used to project horizontal lasers in the direction of the four cylinders (1).
7. The offshore photovoltaic pile foundation positioning frame according to claim 1, characterized in that: Lifting ears (8) are provided at the four corner positions of the positioning platform (7), and the lifting ears (8) are fixedly connected to the positioning platform (7).
8. The offshore photovoltaic pile foundation positioning frame according to claim 1, characterized in that: A locking structure is provided on one side of the truss (2), wherein the locking structure comprises a connecting rod (4), the length direction of which is parallel to the length direction of the truss (2), and the connecting rod (4) is detachably connected to the truss (2).
9. The offshore photovoltaic pile foundation positioning frame according to claim 1, characterized in that: A plurality of buoyancy boxes (3) are arranged at the bottom of the truss (2), and the buoyancy boxes (3) are fixedly connected to the truss (2).