Glass handrail combined member

By using components such as aluminum alloy surface pipe handrails and zinc steel rectangular pipe columns, the fixed components are hidden and the construction process is optimized, and the problems of exposed components and long construction cycles in the existing glass railing design are solved, achieving a more overall appearance design and Efficient construction process.

CN222207033UActive Publication Date: 2024-12-20ELITE ARCHITECTURAL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420974428.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-07
Publication Date
2024-12-20
Estimated Expiration
2034-05-07

AI Technical Summary

Technical Problem

The existing glass railing design has exposed fixed components during construction, resulting in the incomplete facade effect, and the embedded U-trough design needs to wait for the civil engineering decoration surface to be installed after completion, resulting in a long construction period.

Method used

Using aluminum alloy surface pipe handrails, zinc steel rectangular pipe columns, zinc steel open pipes, zinc steel U-shaped parts, U-shaped joints and self-tapping screws and other components, pre-installed zinc steel U-shaped parts provide installation space for civil engineering decoration surfaces, hiding Fix the components and achieve rapid installation through expansion screws and self-tapping screws to reduce construction interference and time delays.

Benefits of technology

The overall appearance design of the glass railing is more integrated and modern, shortens the construction cycle, improves construction efficiency and safety, and reduces the risk of glass fracture.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222207033U_ABST
    Figure CN222207033U_ABST
Patent Text Reader

Abstract

The utility model relates to a glass handrail combined component which comprises an aluminum alloy face pipe handrail, a zinc steel rectangular pipe stand column, a zinc steel opening pipe used for clamping tempered laminated glass, a zinc steel U-shaped piece, a U-shaped connector, a self-tapping screw, a zinc steel embedded plate and an expansion screw. The expansion screws penetrate through the zinc steel rectangular pipe stand columns and the zinc steel buried plates to be locked on a main body structure of the balcony so that the zinc steel rectangular pipe stand columns can be perpendicularly arranged on the main body structure. The lower end face of the zinc steel U-shaped piece abuts against a main body structure of the balcony, the side end face of the zinc steel U-shaped piece is locked on the zinc steel rectangular pipe stand column through a self-tapping screw, the upper end face of the zinc steel U-shaped piece locks the zinc steel opening pipe through a self-tapping screw, and an opening of the zinc steel opening pipe faces upwards. Due to the fact that a plurality of construction stages can be conducted at the same time, the total construction time is shortened, the construction efficiency is improved, and cost and time are saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a glass railing combined component. Background Art

[0002] At present, glass railings are widely used as enclosure components in the construction industry to meet the aesthetic needs of residential facades. There are two main types of common glass railing designs: one is the fixing method using stainless steel glass clamps, connectors, and fixings, and the other is the fixing method using pre-embedded zinc steel U-channel rear glass panels.

[0003] First, the fixing method of stainless steel glass clamps, connectors and fixings is adopted. Under this design, the fixing components of the glass railing are exposed, and the stainless steel components are obviously exposed on the facade, resulting in the facade effect being not integrated and unified.

[0004] Secondly, the glass panel is fixed after the pre-embedded zinc steel U-groove. This design requires the U-groove to be pre-embedded in advance, and the glass panel can be installed after the civil decoration surface is completed, which leads to the cross-construction process on site and a long construction period.

[0005] While the above two designs meet the basic functions, they have certain objective defects and are not enough to meet the owners' requirements for improving aesthetics and product quality. Utility Model Content

[0006] The utility model aims to improve the construction efficiency and enhance the overall appearance of the building through a glass railing assembly component.

[0007] The purpose of the utility model is achieved in this way:

[0008] A glass railing assembly component, comprising an aluminum alloy surface tube handrail, a zinc steel rectangular tube column, a zinc steel open tube for clamping tempered laminated glass, a zinc steel U-shaped piece, a U-shaped joint, self-tapping screws, a zinc steel embedded plate and expansion screws, wherein the zinc steel embedded plate is pre-buried in the main structure of the balcony;

[0009] The expansion screws pass through the zinc steel rectangular tube columns and the zinc steel embedded plates and are locked on the main structure of the balcony, so that the zinc steel rectangular tube columns are vertically arranged on the main structure;

[0010] The lower end face of the zinc steel U-shaped part is against the main structure of the balcony, the side end face of the zinc steel U-shaped part is locked on the zinc steel rectangular tube column by self-tapping screws, and the upper end face of the zinc steel U-shaped part is locked on the zinc steel open tube by self-tapping screws, and the opening of the zinc steel open tube faces upward;

[0011] The aluminum alloy surface tube handrail is provided with a tempered laminated glass connection area and a zinc steel rectangular tube column connection area, and the tempered laminated glass connection area is provided with a clamping groove for clamping the tempered laminated glass, and the opening of the clamping groove faces downward;

[0012] The U-shaped joint is locked in the connection area of ​​the zinc steel rectangular tube column by self-tapping screws, the opening of the U-shaped joint faces downward, the upper end of the zinc steel rectangular tube column is inserted into the inner cavity of the U-shaped joint, and the self-tapping screws pass through the U-shaped joint to lock the zinc steel rectangular tube column;

[0013] The clamping groove and the zinc steel open pipe are located on the same straight line.

[0014] Application of pre-installed zinc steel U-shaped parts: Compared with the traditional embedded zinc steel U-channel, the pre-installed zinc steel U-shaped parts provide installation space for the civil decoration surface, effectively isolating the main structure from the zinc steel open pipe. This design allows the civil decoration surface to be completed independently without being affected by the installation of the glass railing, thus optimizing the construction process.

[0015] Less construction disruption: Since the main structure and glass railing installation do not interfere with each other, the construction phases can be planned more flexibly, reducing time delays caused by waiting for specific construction phases to be completed.

[0016] Shortened construction period: Since multiple construction stages can be carried out simultaneously, the overall construction time is shortened, which improves construction efficiency and saves costs and time.

[0017] The purpose of the utility model can also be solved by the following technical measures:

[0018] Furthermore, it also includes a cushion block, which is arranged in the zinc steel open tube.

[0019] Support and protection: The pad provides a stable support point for the lower end of the tempered laminated glass, reducing the movement of the glass inside the zinc steel open tube and increasing the stability of the overall structure. This support method helps prevent the glass from shaking or slipping under wind pressure or other external forces.

[0020] Shock-absorbing effect: The pads can absorb and cushion a certain amount of impact, especially in severe weather or accidental impact events, providing additional protection and reducing the risk of glass breakage.

[0021] The beneficial effects of the utility model are as follows:

[0022] The utility model uses zinc steel open pipe, aluminum alloy surface pipe handrail and zinc steel rectangular pipe column to form a glass railing composite component, and all fixed components are cleverly hidden (such as Figure 1), thus avoiding the exposure of fixed components, and then the zinc steel open tube and aluminum alloy surface tube handrails clamp the tempered laminated glass. The tempered laminated glass is clamped firmly, providing a cleaner and more modern appearance.

[0023] Compared with the traditional embedded zinc steel U-channel, the pre-installed zinc steel U-shaped parts of the utility model provide installation space for the civil decoration surface, effectively isolating the main structure from the zinc steel open pipe. This design allows the civil decoration surface to be completed independently without being affected by the installation of the glass railing, thus optimizing the construction process. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 Schematic diagram of glass railing.

[0025] Figure 2 This is a cross-sectional view of the glass railing.

[0026] Figure 3 for Figure 2 A magnified view of part A.

[0027] Figure 4 for Figure 2 Enlarged view of part B.

[0028] Figure 5 It is a schematic diagram of the connection between the zinc-steel U-shaped part 5 and the zinc-steel open pipe 4.

[0029] Figure 6 It is a schematic diagram of the aluminum alloy surface tube handrail 1. DETAILED DESCRIPTION

[0030] The utility model is further described below in conjunction with the accompanying drawings and embodiments:

[0031] Example, combined with Figures 1 to 6 As shown, a glass railing includes an aluminum alloy surface tube handrail 1, a zinc steel rectangular tube column 2, at least one piece of tempered laminated glass 3, a zinc steel open tube 4, a zinc steel U-shaped piece 5, a U-shaped joint 6, a self-tapping screw 7, a zinc steel buried plate 8 and an expansion screw 9, characterized in that:

[0032] The zinc steel embedded plate 8 is embedded in the main structure 10 of the balcony;

[0033] The expansion screws 9 pass through the zinc steel rectangular tube column 2 and the zinc steel embedded plate 8 and are locked on the main structure 10 of the balcony, so that the zinc steel rectangular tube column 2 is vertically arranged on the main structure 10;

[0034] The lower end surface of the zinc steel U-shaped part 5 is against the main structure 10 of the balcony, the side end surface of the zinc steel U-shaped part 5 is locked on the zinc steel rectangular tube column 2 by self-tapping screws 7, and the upper end surface of the zinc steel U-shaped part 5 is locked to the zinc steel open tube 4 by self-tapping screws 7, and the opening of the zinc steel open tube 4 faces upward;

[0035] The lower end of the tempered laminated glass 3 is inserted into the zinc steel open tube 4 through the opening, and the self-tapping screw 7 passes through the zinc steel open tube 4 and abuts against the tempered laminated glass 3, so that the zinc steel open tube 4 clamps the tempered laminated glass 3;

[0036] The aluminum alloy surface tube handrail 1 is provided with a tempered laminated glass connection area 11 and a zinc steel rectangular tube column connection area 12, the tempered laminated glass connection area 11 is provided with a clamping groove 111, the U-shaped joint 6 is locked in the zinc steel rectangular tube column connection area 12 by a self-tapping screw 7, the opening of the U-shaped joint 6 faces downward, the upper end of the zinc steel rectangular tube column 2 is inserted into the inner cavity of the U-shaped joint 6, and the self-tapping screw 7 passes through the U-shaped joint 6 to lock the zinc steel rectangular tube column 2;

[0037] The upper end of the tempered laminated glass 3 is inserted into the clamping groove 111 , and the clamping groove 111 clamps the tempered laminated glass 3 , so that the aluminum alloy surface tube handrail 1 clamps the tempered laminated glass 3 .

[0038] Furthermore, it also includes a cushion block 100 , which is disposed in the zinc steel open tube 4 , and the lower end of the tempered laminated glass 3 abuts against the cushion block 100 .

[0039] Furthermore, the gap between the tempered laminated glass 3 and the zinc steel open tube 4 is filled with a foam rod 200 , and the gap between the tempered laminated glass 3 and the aluminum alloy surface tube handrail 1 is filled with a foam rod 200 .

[0040] Furthermore, the gap between the tempered laminated glass 3 and the zinc steel open tube 4 above the foam rod 200 is filled with sealant 300, and the gap between the tempered laminated glass 3 and the aluminum alloy surface tube handrail 1 above the foam rod 200 is filled with sealant 300.

[0041] Furthermore, the gaps between adjacent tempered laminated glasses 3 are filled with transparent silicone weather-resistant structural adhesive 400 .

Claims

1. A glass railing assembly component, comprising an aluminum alloy surface tube handrail (1), a zinc steel rectangular tube column (2), a zinc steel open tube (4) for clamping a tempered laminated glass (3), a zinc steel U-shaped piece (5), a U-shaped joint (6), a self-tapping screw (7), a zinc steel embedded plate (8) and an expansion screw (9), characterized in that: The zinc steel embedded plate (8) is pre-embedded in the main structure (10) of the balcony; The expansion screws (9) pass through the zinc steel rectangular tube columns (2) and the zinc steel embedded plates (8) and are locked onto the main structure (10) of the balcony, so that the zinc steel rectangular tube columns (2) are vertically arranged on the main structure (10); The lower end surface of the zinc steel U-shaped member (5) is against the main structure (10) of the balcony, the side end surface of the zinc steel U-shaped member (5) is locked on the zinc steel rectangular tube column (2) by means of self-tapping screws (7), and the upper end surface of the zinc steel U-shaped member (5) is locked on the zinc steel open tube (4) by means of self-tapping screws (7), and the opening of the zinc steel open tube (4) faces upward; The aluminum alloy surface tube handrail (1) is provided with a tempered laminated glass connection area (11) and a zinc steel rectangular tube column connection area (12), the tempered laminated glass connection area (11) is provided with a clamping groove (111) for clamping the tempered laminated glass (3), and the opening of the clamping groove (111) faces downward; The U-shaped joint (6) is locked in the zinc steel rectangular tube column connection area (12) by means of a self-tapping screw (7), the opening of the U-shaped joint (6) faces downward, the upper end of the zinc steel rectangular tube column (2) is inserted into the inner cavity of the U-shaped joint (6), and the self-tapping screw (7) passes through the U-shaped joint (6) to lock the zinc steel rectangular tube column (2); The clamping groove (111) and the zinc steel open pipe (4) are located on the same straight line.

2. The glass railing assembly according to claim 1, characterized in that: It also includes a cushion block (100), wherein the cushion block (100) is arranged in the zinc steel open pipe (4).