Adjustable water meter group supporting device
Through the adjustment of the upper, middle and base prefabricated parts stacking and horizontal adjustment components of the adjustable water meter support device, the low installation efficiency problems caused by cement pier solidification time and foundation tilt are solved, and the rapid water meter group is achieved Installation and high quality pre-installation.
Patent Information
- Application Number
- CN202420835987.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-19
- Publication Date
- 2024-12-20
- Estimated Expiration
- 2034-04-19
AI Technical Summary
The existing water meter piers are built with cement and bricks, which makes it take time for cement to solidify, and it is impossible to install and build the piers at the same time. The cement piers have high requirements for the foundation, and it is difficult to level the foundation after the foundation is inclined, resulting in the meter piers. Low quality and low installation efficiency.
The adjustable water meter group support device is adopted to adjust the height through stacking of upper seat, middle seat and base prefabricated parts, and adjust the level with horizontal adjustment components to achieve rapid installation. The device includes a fixed connection between the upper seat, the middle seat and the base, and the adjustment screw holes and bolts are provided at the base, and the bolts are adjusted by a measuring instrument to ensure the level of the piers.
The installation efficiency and quality of the water meter set are improved, the installation process of the piers is optimized, the level and overall strength of the piers are ensured, and rapid installation and pre-installation are achieved.
Smart Images

Figure CN222211841U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water service tools, in particular to an adjustable water service meter group supporting device. Background Art
[0002] At present, the water meter piers are made of cement and bricks to support the entire set of water meter components. Since it takes a certain amount of time for the cement to solidify and reach the usable strength, it is impossible to install the meter accessories and construct the piers at the same time. In addition, the cement piers have high requirements for the foundation and are difficult to level after the foundation is tilted, resulting in low quality of the meter group and low installation efficiency. Utility Model Content
[0003] The utility model aims to solve at least one of the technical problems existing in the prior art. To this end, the utility model proposes an adjustable water meter group support device, which can adjust the height of the piers by stacking the pier prefabricated parts such as the upper seat, the middle seat and the base, and adjust the level with the horizontal adjustment component to achieve the rapid installation of the water meter group.
[0004] According to the first aspect of the utility model, the adjustable water meter group support device includes an upper seat, a middle seat and a base arranged in sequence from top to bottom, and the upper seat, the middle seat and the base are fixedly connected by a first fixing screw. The upper seat is used to install the water meter group, and several middle seats are provided to correspond to different meter group installation heights. A horizontal adjustment component is provided at the bottom of the base, and the horizontal adjustment component includes an adjustment screw hole provided at the bottom of the base, and an adjustment bolt connected to the base, the adjustment bolt is inserted into the adjustment screw hole, and the adjustment bolt is rotated to extend into or extend out of the adjustment screw hole to adjust the horizontality of the base.
[0005] According to the adjustable water meter group support device of the embodiment of the utility model, there are at least the following beneficial effects: the upper seat, the middle seat and the base are all pier prefabricated parts that can be mass-produced. When installing the meter group, they are pre-installed on the base through the first fixing screw. According to the meter group installation height requirement, an approximate number of middle seats are selected and stacked on the base, and positioned and connected by the first fixing screw. Finally, after the upper seat is installed, the overall levelness of the pier is measured by using a level measuring instrument, and the adjustment bolts of the horizontal adjustment component are adjusted according to the measuring instrument data to ensure the levelness of the pier, and then the entire pier is reinforced to complete the pre-installation of the pier. At the same time, the meter group can be pre-installed and debugged. After the pier is installed and the height and level are debugged, the meter group is installed. By stacking the pier prefabricated parts such as the upper seat, the middle seat and the base to adjust the pier height, and adjusting the level with the help of the horizontal adjustment component, the water meter group can be quickly installed, the meter group installation efficiency is improved, and the use is optimized.
[0006] According to some embodiments of the utility model, at least two groups of the level adjustment components are provided, and the two groups of the level adjustment components are symmetrically arranged at the bottom of the base.
[0007] According to some embodiments of the utility model, three groups of the horizontal adjustment components are provided, and the three groups of the horizontal adjustment components are evenly and equidistantly arranged at the bottom of the base.
[0008] According to some embodiments of the utility model, the adjusting bolt is connected with a positioning ring piece, the base is provided with a corresponding positioning ring groove, the adjusting screw hole is located at the midpoint of the positioning ring groove, and when the adjusting bolt is inserted into the adjusting screw hole, the positioning ring piece is inserted into the positioning ring groove.
[0009] According to some embodiments of the present invention, a second fixing screw is commonly provided through the middle portion of the upper seat and the middle portion of the middle seat to strengthen the connection between the upper seat and the middle seat.
[0010] According to some embodiments of the utility model, a pre-installed groove is provided on the top of the upper seat, and the pre-installed groove is arranged around the second fixing screw. A nut preform module is embedded in the pre-installed groove, and the nut preform module includes a fixing nut located at the top, and the fixing nut rotates to move toward the upper seat to lock the nut preform module and the upper seat.
[0011] According to some embodiments of the present invention, the top of the second fixing screw is connected to the third fixing screw via a different diameter column nut connector, and the third fixing screw is connected to the pipe bracket of the meter group.
[0012] According to some embodiments of the present invention, the second fixing screw is connected to a height fine-adjusting screw via the nut preform module, and the height fine-adjusting screw is connected to the third fixing screw via the different-diameter column nut connector.
[0013] According to some embodiments of the utility model, the top of the base and the top of the middle seat are both provided with positioning grooves, and the bottoms of the upper seat and the middle seat are both provided with positioning protrusions corresponding to the positioning grooves, and the positioning protrusions are snapped into the positioning grooves to position and install the upper seat, the middle seat and the base.
[0014] According to some embodiments of the present utility model, the positioning protrusion is a conical block, and the positioning groove is a corresponding conical groove.
[0015] Additional aspects and advantages of the present invention will be given in part in the following description, and in part will become apparent from the following description, or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The present invention is further described below with reference to the accompanying drawings and embodiments, wherein:
[0017] Figure 1 It is a schematic diagram of an adjustable water meter group supporting device according to an embodiment of the utility model.
[0018] Figure markings: upper seat 100; pre-installed groove 101; first fixing screw 110; second fixing screw 120; middle seat 200; base 300; horizontal adjustment assembly 400; adjusting screw hole 410; positioning ring groove 411; adjusting bolt 420; positioning ring plate 421; nut preform module 500; fixing nut 510; different diameter column nut connector 600; pipe bracket 700; third fixing screw 710; positioning protrusion 800; positioning groove 900. DETAILED DESCRIPTION
[0019] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0020] In the description of the present invention, it should be understood that descriptions involving orientation, such as up, down, front, back, left, right, etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0021] In the description of the present utility model, "several" means one or more, "more" means more than two, "greater than", "less than", "exceed" etc. are understood to exclude the number itself, and "above", "below", "within" etc. are understood to include the number itself. If there is a description of "first" or "second", it is only used for the purpose of distinguishing the technical features, and cannot be understood as indicating or implying the relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.
[0022] In the description of the utility model, unless otherwise clearly defined, the words such as setting, installing, connecting, etc. should be understood in a broad sense, and the technical personnel in the relevant technical field can reasonably determine the specific meaning of the above words in the utility model in combination with the specific content of the technical solution. In the description of the utility model, the description of the reference terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in combination with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner. In the description of the specification, the description of the reference terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in combination with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
[0023] At present, the water meter piers are made of cement and bricks to support the entire set of water meter components. Since it takes a certain amount of time for the cement to solidify and reach the usable strength, it is impossible to install the meter accessories and construct the piers at the same time. In addition, the cement piers have high requirements for the foundation and are difficult to level after the foundation is tilted, resulting in low quality of the meter group and low installation efficiency.
[0024] For this purpose, refer to Figure 1The utility model discloses an adjustable water meter group supporting device, including an upper seat 100, a middle seat 200 and a base 300 arranged in sequence from top to bottom, wherein the upper seat 100, the middle seat 200 and the base 300 are fixedly connected by a first fixing screw 110, the upper seat 100 is used to install the water meter group, and a plurality of middle seats 200 are provided to correspond to and match different meter group installation heights, and a horizontal adjustment component 400 is provided at the bottom of the base 300, and the horizontal adjustment component 400 includes an adjusting screw hole 410 arranged at the bottom of the base, and an adjusting bolt 420 connected to the base, the adjusting bolt 420 is inserted into the adjusting screw hole 410, and the adjusting bolt 420 is rotated to extend into or extend out of the adjusting screw hole 410 to adjust the horizontality of the base 300. It is easy to understand that the upper seat 100, the middle seat 200 and the base 300 are all prefabricated piers that can be mass-produced. When installing the meter group, they are pre-installed on the base 300 through the first fixing screw 110. According to the installation height requirements of the meter group, the middle seat 200 is selected in an approximate number and stacked on the base 300. The first fixing screw 110 is used to position and connect. Finally, after the upper seat 100 is installed, the level of the entire pier is measured by using a level meter. According to the data of the measuring instrument, the adjustment bolt 420 of the horizontal adjustment component 400 is adjusted to ensure the level of the pier, and then the entire pier is reinforced to complete the pre-installation of the pier. At the same time, the meter group can be pre-installed and debugged. After the pier is installed and the height and level are debugged, the meter group is installed. By stacking the pier prefabricated parts such as the upper seat 100, the middle seat 200 and the base 300, the pier height is adjusted, and the level is adjusted in conjunction with the horizontal adjustment component 400, the water meter group can be quickly installed, the meter group installation efficiency is improved, and the use is optimized.
[0025] Reference Figure 1 It should be noted that at least two groups of level adjustment components 400 are provided, and the two groups of level adjustment components 400 are symmetrically arranged at the bottom of the base 300 to jointly support the entire pier and facilitate the adjustment of the level. Further, three groups of level adjustment components 400 are provided, and the three groups of level adjustment components 400 are evenly arranged at the bottom of the base 300 at equal distances, thereby further ensuring the stability of the base 300 and the level of the entire pier.
[0026] Reference Figure 1, the adjusting bolt 420 is connected with a positioning ring piece 421, the base is provided with a corresponding positioning ring groove 411, the adjusting screw hole 410 is located at the midpoint of the positioning ring groove 411, when the adjusting bolt 420 is inserted into the adjusting screw hole 410, the positioning ring piece 421 is inserted into the positioning ring groove 411, the cooperation of the positioning ring piece 421 and the positioning groove 900 can assist the user to quickly install the horizontal adjustment component 400, and can play a certain limiting role in the adjustment process, preventing the adjusting bolt 420 from completely slipping off the adjusting screw hole 410, thereby optimizing the operation of adjusting the horizontality. It should be noted that the positioning ring piece 421 will not hinder the user from turning the adjusting bolt 420, so as to ensure the convenience of adjusting the horizontality.
[0027] Reference Figure 1 A second fixing screw 120 is commonly provided in the middle of the upper seat 100 and the middle of the middle seat 200 to strengthen the connection between the upper seat 100 and the middle seat 200, thereby strengthening the connection stability between the middle seat 200 and the upper seat 100, and further strengthening the overall strength of the pier.
[0028] Reference Figure 1 The top of the upper seat 100 is provided with a pre-installed groove 101, which is provided around the second fixing screw 120. The pre-installed groove 101 is embedded with a nut preform module 500, and the nut preform module 500 includes a fixing nut 510 located at the top, and the fixing nut 510 rotates to move toward the upper seat 100 to lock the nut preform module 500 and the upper seat 100. Further, the top of the second fixing screw 120 is connected to a third fixing screw 710 through a different diameter column nut connector 600, and the third fixing screw 710 is connected to a pipe bracket 700 of the meter group.
[0029] Optionally, in some embodiments, the second fixed screw 120 is connected to a height fine-adjustment screw through a nut preform module 500, and the height fine-adjustment screw is connected to the third fixed screw 710 through a different-diameter column nut connector 600, which can assist the user in fine-adjusting the height of the table group. Therefore, when facing special height requirements, there is no need to remake the preforms due to changing the thickness of preforms such as the middle seat 200 and the upper seat 100.
[0030] Reference Figure 1 The top of the base 300 and the top of the middle seat 200 are both provided with positioning grooves 900, and the bottoms of the upper seat 100 and the middle seat 200 are both provided with positioning protrusions 800 corresponding to the positioning grooves 900. The positioning protrusions 800 are snapped into the positioning grooves 900 to position and install the upper seat 100, the middle seat 200 and the base 300, so as to realize the rapid positioning and stacking of the middle seat 200, the base 300 and the upper seat 100, and further improve the installation efficiency.
[0031] Optionally, the positioning protrusion 800 is a conical block, and the positioning groove 900 is a corresponding conical groove.
[0032] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in the relevant technical field without departing from the purpose of the present invention.
Claims
1. An adjustable water meter support device, characterized in that: include: The upper seat, the middle seat and the base are arranged in sequence from top to bottom, and the upper seat, the middle seat and the base are fixedly connected by a first fixing screw. The upper seat is used to install a water meter group, and several middle seats are provided to correspond to and match different installation heights of the meter groups. A horizontal adjustment component is provided at the bottom of the base, and the horizontal adjustment component includes an adjustment screw hole provided at the bottom of the base, and an adjustment bolt connected to the base, and the adjustment bolt is inserted into the adjustment screw hole. The adjustment bolt is rotated to extend into or extend out of the adjustment screw hole to adjust the horizontality of the base.
2. The adjustable water meter support device according to claim 1, characterized in that: At least two groups of the level adjustment components are provided, and the two groups of the level adjustment components are symmetrically arranged at the bottom of the base.
3. The adjustable water meter support device according to claim 2, characterized in that: The level adjustment components are provided in three groups, and the three groups of level adjustment components are evenly and equidistantly arranged at the bottom of the base.
4. The adjustable water meter assembly support device according to claim 3, characterized in that: The adjusting bolt is connected with a positioning ring piece, the base is provided with a corresponding positioning ring groove, the adjusting screw hole is located at the midpoint of the positioning ring groove, and when the adjusting bolt is inserted into the adjusting screw hole, the positioning ring piece is inserted into the positioning ring groove.
5. The adjustable water meter assembly support device according to claim 1, characterized in that: A second fixing screw is commonly provided through the middle portion of the upper seat and the middle portion of the middle seat to strengthen the connection between the upper seat and the middle seat.
6. The adjustable water meter support device according to claim 5, characterized in that: A pre-installed groove is provided on the top of the upper seat, and the pre-installed groove is provided around the second fixing screw. A nut preform module is embedded in the pre-installed groove, and the nut preform module includes a fixing nut located at the top. The fixing nut rotates to move toward the upper seat to lock the nut preform module and the upper seat.
7. The adjustable water meter assembly support device according to claim 6, characterized in that: The top of the second fixing screw is connected to a third fixing screw via a different diameter column nut connector, and the third fixing screw is connected to a pipe bracket of the meter group.
8. The adjustable water meter support device according to claim 7, characterized in that: The second fixing screw is connected to a height fine-adjusting screw via the nut preform module, and the height fine-adjusting screw is connected to the third fixing screw via the different-diameter column nut connector.
9. The adjustable water meter assembly support device according to claim 1, characterized in that: The top of the base and the top of the middle seat are both provided with positioning grooves, and the bottoms of the upper seat and the middle seat are both provided with positioning protrusions corresponding to the positioning grooves, and the positioning protrusions are snapped into the positioning grooves to position and install the upper seat, the middle seat and the base.
10. The adjustable water meter assembly support device according to claim 9, characterized in that: The positioning protrusion is a conical block, and the positioning groove is a corresponding conical groove.