Refining barrel preheating furnace
By designing a uniform barrel preheating furnace, using the preheating chamber and ring hook in the furnace body, the problem of poor preheating effect when replacing the uniform barrel by the feeder is solved, and the explosion and yield loss of uniform barrel are avoided. And through the design of energy saving and regulation board, the safety and stability of the replacement process is ensured.
Patent Information
- Application Number
- CN202323513011.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-22
- Publication Date
- 2024-12-24
- Estimated Expiration
- 2033-12-22
AI Technical Summary
The existing feeder lacks a preheating furnace when replacing the uniform barrel, resulting in poor preheating effect, causing explosion of the uniform barrel and loss of yield.
A uniform barrel preheating furnace is designed, including furnace body, preheating chamber, ring hook, circulation tube, electric heating block, fixed plate, elastic coil, connecting plate, auxiliary cover, draw rope, installation rod and adjustment plate, through The preheating chamber inside the furnace body preheats the uniform barrel, uses ring hooks to facilitate handling, the circulation pipe recovers heat, electric heating blocks provide heating, elastic coils and auxiliary covers reduce heat loss, and the adjustment plate adjusts the inner diameter to avoid impact.
It effectively avoids explosion of uniform barrels during replacement, improves preheating effect, saves energy, ensures stability of output, and avoids impact caused by excessive inner diameter of the preheating chamber through the adjustment plate.
Smart Images

Figure CN222226165U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of glass production, in particular to a material mixing barrel preheating furnace. Background Art
[0002] In glass production, a glass feeder refers to a device used in a glass production line to transport glass raw materials to a glass melting furnace for melting. In the current process of producing glass products, a mixing barrel is used as a stirring device above the bowl. At this time, the mixing barrel not only plays a stirring role, but also plays a feeding role.
[0003] However, when the existing feeder replaces the mixing barrel, there is no preheating furnace. It is directly placed in the feeder for preheating, and the preheating effect is not achieved. After replacement, the mixing barrel will burst, resulting in a loss of production.
[0004] Therefore, in view of this, the existing structure and defects are studied and improved, and a mixing barrel preheating furnace is provided. Utility Model Content
[0005] The utility model aims to provide a sparging barrel preheating furnace to solve the problems raised in the above background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a material mixing barrel preheating furnace, comprising a furnace body and a preheating chamber, a material mixing barrel body is vertically arranged inside the furnace body, and a ring hook is connected to the top of the material mixing barrel body, a circulation pipe is annularly installed inside the furnace body, and a tight heat-insulating sealing ring is arranged outside the circulation pipe, an electric heating block joint is installed on the right side of the furnace body, and a base is installed at the lower end of the furnace body, and a preheating chamber is arranged inside the furnace body.
[0007] Furthermore, a fixed plate is installed on the upper end surface of the furnace body, and an elastic roll is installed on the rear side of the fixed plate.
[0008] Furthermore, the rear end of the elastic roll is connected to a connecting plate, and the rear end of the connecting plate is installed with a pull rope.
[0009] Furthermore, an auxiliary cover is installed at the end of the connecting plate, and the size of the auxiliary cover is larger than the size of the preheating chamber.
[0010] Furthermore, a limiting ring is arranged outside the pull rope, and the end of the pull rope is connected to a pedal.
[0011] Furthermore, a mounting rod is installed on the inner wall of the preheating chamber, and a clamping rod is mounted on the outside of the mounting rod.
[0012] Furthermore, an adjustment plate is installed at the end of the clamping rod, and the number of the clamping rod and the adjustment plate is set to four groups.
[0013] The utility model provides a sizing drum preheating furnace, which has the following beneficial effects:
[0014] 1. The utility model preheats the barrel of the material mixing barrel through the preheating chamber inside the furnace body, so as to avoid the barrel of the material mixing barrel from bursting due to poor preheating effect when it is replaced on the feeder, and to avoid loss of production. The ring hook facilitates the transportation and movement of the barrel of the material mixing barrel during processing. The circulation pipe is arranged around the preheating chamber inside the furnace body, and can be used for heat recovery of the preheating chamber.
[0015] 2. The utility model uses the auxiliary cover to seal the preheating chamber when no material mixing barrel is placed in the preheating chamber, thereby reducing heat loss and saving energy. The foot pedal is driven by the pull rope to pull the auxiliary cover on the preheating chamber to open. The elastic roll is stretched when the auxiliary cover is opened. After the external force is removed, the elastic roll drives the auxiliary cover back to the top of the preheating chamber by its own rebound force. The mounting rod is used for the clamping installation of the clamping rod. The adjusting plate can adjust the inner diameter in the preheating chamber without affecting the preheating material mixing barrel, so as to avoid collision caused by excessive gap between the material mixing barrel and the inside of the preheating chamber when taking it out. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a schematic diagram of the main structure of a material mixing drum preheating furnace of the utility model;
[0017] Figure 2 This is a top view structural diagram of a connecting plate-foot pedal of a sparging barrel preheating furnace of the utility model;
[0018] Figure 3 The utility model is a schematic diagram of the top view structure of the mounting rod-adjusting plate of the material mixing drum preheating furnace.
[0019] In the figure: 1. furnace body; 2. material mixing barrel body; 3. ring hook; 4. circulation pipe; 5. airtight heat-insulating seal ring; 6. electric heating block joint; 7. base; 8. preheating chamber; 9. connecting plate; 10. elastic roll; 11. connecting plate; 12. auxiliary cover; 13. pull rope; 14. limit ring; 15. foot pedal; 16. mounting rod; 17. clamping rod; 18. adjustment plate. DETAILED DESCRIPTION
[0020] The following is a further detailed description of the implementation of the present invention in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but cannot be used to limit the scope of the present invention.
[0021] like Figure 1As shown, a scrambler barrel preheating furnace comprises a furnace body 1 and a preheating chamber 8, a scrambler barrel body 2 is vertically arranged inside the furnace body 1, the preheating chamber 8 inside the furnace body 1 preheats the scrambler barrel body 2, so as to avoid the scrambler barrel body 2 from bursting due to poor preheating effect when the scrambler barrel body 2 is replaced on the feeder, and to avoid loss of production, and a ring hook 3 is connected to the top of the scrambler barrel body 2, the ring hook 3 is convenient for carrying and moving the scrambler barrel body 2 during processing, a circulation pipe 4 is annularly installed inside the furnace body 1, the circulation pipe 4 is arranged around the preheating chamber 8 inside the furnace body 1, and can be used for heat recovery of the preheating chamber 8, and a tight heat-insulating sealing ring 5 is arranged on the outside of the circulation pipe 4, an electric heating block joint 6 is installed on the right side of the furnace body 1, and a base 7 is installed at the lower end of the furnace body 1.
[0022] like Figure 2 As shown, a preheating chamber 8 is provided inside the furnace body 1, a fixed plate 9 is installed on the upper end surface of the furnace body 1, and an elastic roll 10 is installed on the rear side of the fixed plate 9. The elastic roll 10 is stretched when the auxiliary cover 12 is opened. After the external force is removed, the elastic roll 10 drives the auxiliary cover 12 to cover the top of the preheating chamber 8 by its own resilience. The rear end of the elastic roll 10 is connected with a connecting plate 11, and a pull rope 13 is installed at the rear end of the connecting plate 11. The auxiliary cover 12 is installed at the end of the connecting plate 11. The auxiliary cover 12 plays a sealing role when the mixing barrel body 2 is not placed in the preheating chamber 8, thereby reducing heat loss and saving energy. The size of the auxiliary cover 12 is larger than the size of the preheating chamber 8. A limiting ring 14 is arranged on the outside of the pull rope 13, and a foot pedal 15 is connected to the end of the pull rope 13. The foot pedal 15 is stepped on to drive the pull rope 13 to pull the auxiliary cover 12 to open on the preheating chamber 8.
[0023] like Figure 3 As shown, a mounting rod 16 is installed on the inner wall of the preheating chamber 8, and the mounting rod 16 is used for the clamping installation of the clamping rod 17, and the clamping rod 17 is clamped and installed on the outside of the mounting rod 16, and an adjustment plate 18 is installed on the end of the clamping rod 17, and the number of the clamping rod 17 and the adjustment plate 18 is set in four groups. The adjustment plate 18 can adjust the inner diameter in the preheating chamber 8 without affecting the preheating mixing barrel 2, so as to avoid collision caused by excessive gap between the mixing barrel 2 and the inside of the preheating chamber 8 when taking out.
[0024] In summary, the mixing barrel preheating furnace firstly Figure 1-Figure 3In the structure shown in the figure, the furnace body 1 is installed on the side of the feeder. Before the scrambler barrel body 2 is put on the machine, it is placed in the preheating chamber 8 inside the furnace body 1 for preheating work, so as to avoid the scrambler barrel body 2 from bursting due to poor preheating effect when it is replaced on the feeder, and to avoid loss of production. The ring hook 3 facilitates the installation of the hanger to assist the transportation and movement of the scrambler barrel body 2. When the scrambler barrel body 2 is placed in the preheating chamber 8, the foot pedal 15 is stepped on to drive the pull rope 13 to pull the auxiliary cover 12 on the preheating chamber 8 to open, so that the scrambler barrel body 2 can be placed in the preheating chamber. 8 is preheated, at this time the elastic coil 10 is stretched when the auxiliary cover 12 is opened, and after the external force of the foot pedal 15 is removed, the elastic coil 10 drives the auxiliary cover 12 to cover the top of the preheating chamber 8 through its own resilience. At this time, the auxiliary cover 12 plays a sealing role on the top of the preheating chamber 8, which reduces heat loss and saves energy. The adjustment plate 18 can also be installed on the inner side of the mounting rod 16 according to the size of the barrel 2 of this batch of material mixing barrels, and the inner diameter of the preheating chamber 8 can be adjusted to avoid collision caused by excessive gap between the barrel 2 and the internal part of the preheating chamber 8 when taking out the material mixing barrel.
[0025] The embodiments of the present invention are provided for the purpose of illustration and description, and are not intended to be exhaustive or to limit the present invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described to better illustrate the principles and practical applications of the present invention, and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.
Claims
1. A sparging drum preheating furnace, comprising a furnace body (1) and a preheating chamber (8), characterized in that: A material mixing barrel (2) is vertically arranged inside the furnace body (1), and a ring hook (3) is connected to the top of the material mixing barrel (2). A circulation pipe (4) is annularly installed inside the furnace body (1), and a heat-insulating sealing ring (5) is arranged outside the circulation pipe (4). An electric heating block connector (6) is installed on the right side of the furnace body (1), and a base (7) is installed at the lower end of the furnace body (1). The preheating chamber (8) is arranged inside the furnace body (1).
2. A sparger preheating furnace according to claim 1, characterized in that: A fixed plate (9) is installed on the upper end surface of the furnace body (1), and an elastic roll (10) is installed on the rear side of the fixed plate (9).
3. A sparger preheating furnace according to claim 2, characterized in that: The rear end of the elastic roll (10) is connected to a connecting plate (11), and a pull rope (13) is installed at the rear end of the connecting plate (11).
4. A sparger preheating furnace according to claim 3, characterized in that: An auxiliary cover (12) is installed at the end of the connecting plate (11), and the size of the auxiliary cover (12) is larger than the size of the preheating chamber (8).
5. A sparger preheating furnace according to claim 3, characterized in that: A limiting ring (14) is arranged outside the pull rope (13), and the end of the pull rope (13) is connected to a foot pedal (15).
6. A sparger preheating furnace according to claim 1, characterized in that: A mounting rod (16) is installed on the inner wall of the preheating chamber (8), and a clamping rod (17) is mounted on the outside of the mounting rod (16).
7. A sparger preheating furnace according to claim 6, characterized in that: An adjustment plate (18) is installed at the end of the clamping rod (17), and the number of the clamping rod (17) and the adjustment plate (18) is four sets.
