Multi-connecting-rod steel bar distributing device for wind power anchor bolts

Through the cooperation of design support components, hoisting components and transmission components, the problem of difficulty in distributing wind power anchor bolts is solved, efficient distributing and transfer are achieved, labor intensity is reduced and equipment life is improved.

CN222248966UActive Publication Date: 2024-12-27NINGBO DAZHI MACHINE TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323639055.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-12-27
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

During the production and processing process, wind power anchor bolts cannot be supplied with a vibrating plate, and cannot be clamped directly with a robot, which makes it difficult to divide the material and requires an efficient distributor device.

Method used

A wind power anchor bolt multi-link steel rod material distribution device is designed, including a support assembly, a hoisting assembly and a transmission assembly. The wind power anchor bolt's material distribution operation is realized through the flip assembly and a hoisting device, and multiple hoisting assembly are used. It is distributed in an equidistant array with the transmission assembly to ensure that each part is subjected to uniform stress and improve material dispensing efficiency.

Benefits of technology

It realizes efficient material distribution and transfer of wind power anchor bolts, reduces the labor intensity of staff, improves material distribution efficiency, and extends the service life of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222248966U_ABST
    Figure CN222248966U_ABST
Patent Text Reader

Abstract

The utility model provides a wind power anchor bolt multi-connecting-rod steel bar distributing device which comprises a distributing mechanism, the distributing mechanism comprises a supporting assembly, a jacking assembly and a transmission assembly, the supporting assembly is provided with a first steel bar feeding position and a second steel bar feeding position, and a height difference exists between the second steel bar feeding position and the first steel bar feeding position; the jacking assembly is arranged on the supporting assembly; the transmission assembly comprises a material turning assembly and a jacking device. Wherein the material overturning assembly is arranged on the supporting assembly in a lifting mode through a jacking device, and when the material overturning assembly descends to the lowest position, the material overturning assembly is lower than the first steel bar feeding position; the wind power anchor bolt multi-connecting-rod steel bar distributing device is simple in structure, the working intensity of workers can be relieved, the distributing efficiency of wind power anchor bolts can be improved, the operation stability degree of the wind power anchor bolt multi-connecting-rod steel bar distributing device can be improved, and the service life of the wind power anchor bolt multi-connecting-rod steel bar distributing device can be prolonged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of material distribution devices, in particular to a material distribution device for wind power anchor multi-link steel bars. Background Art

[0002] With the development of science and technology, wind power generation projects are developing rapidly in my country. Wind power anchor assembly is an important fastening accessory in wind turbine assembly. Its main function is to connect the wind turbine to the foundation to ensure the stability and safe operation of the wind turbine.

[0003] However, in the production and processing of wind power anchor bolts, due to their large size and heavy weight, it is impossible to use a vibration plate to feed the material. In addition, since the wind power anchor bolts are piled together, it is impossible to directly use a robot to clamp out one wind power anchor bolt at a time for production. Therefore, it is urgently necessary to provide a wind power anchor bolt multi-link steel bar dividing device. Utility Model Content

[0004] The problem solved by the utility model is how to provide a wind power anchor multi-link steel bar material distribution device in view of the deficiencies of the above-mentioned prior art.

[0005] In order to solve the above problems, the utility model provides a wind power anchor multi-link steel bar material distribution device, including a material distribution mechanism, which includes: a support component, a jacking component and a transmission component.

[0006] The support assembly is provided with a first steel bar loading position and a second steel bar loading position, and a height difference is provided between the second steel bar loading position and the first steel bar loading position;

[0007] The lifting assembly is arranged on the supporting assembly;

[0008] The transmission assembly includes a material turning assembly and a lifting device;

[0009] Among them, the material turning assembly is raised and lowered on the supporting assembly through a lifting device. When the material turning assembly is lowered to the lowest point, the material turning assembly is lower than the first steel rod upper material position; when the material turning assembly is raised to the highest point, the material turning assembly is higher than the second steel rod upper material position.

[0010] Preferably, the first steel bar loading position and the second steel bar loading position are provided with a certain slope.

[0011] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: when it is necessary to perform material separation operation on the wind turbine anchor bolts, the bundled wind turbine anchor bolts are manually unbundled, and the upper computer sends a loading instruction. The wind turbine anchor bolt reaches the first steel bar loading position and rolls along the first steel bar loading position to the junction of the second steel bar loading position. At this time, the jacking assembly drives the wind turbine anchor bolt to be jacked to the second steel bar loading position and rolls along the second steel bar loading position to the turning assembly. At this time, the turning assembly descends to the lowest point, and the turning assembly is driven to rise to the highest point by the jacking device, and the wind turbine anchor bolt is raised to the top of the supporting assembly to complete the material separation operation on the wind turbine anchor bolt.

[0012] In any of the above technical solutions, the jacking assembly includes: a jacking bracket, a first jacking cylinder;

[0013] The jacking bracket is arranged on the supporting assembly;

[0014] The output end of the first lifting cylinder is connected to the lifting bracket.

[0015] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: the first lifting cylinder is fixedly installed on the support assembly through the lifting bracket, which is conducive to the first lifting cylinder to lift the wind power anchor bolt.

[0016] In any of the above technical solutions, the material turning assembly includes: a material turning shaft, a material turning plate, a first connecting rod, a second connecting rod, a first rotating arm and a guide plate;

[0017] The turning shaft is fixed on the supporting assembly through a fixing device;

[0018] Preferably, the fixing device can be any one of a bolt, a pin, etc.;

[0019] The turning plate is fixedly mounted on the support assembly, and the turning plate and the support assembly are fixedly connected via a first pin shaft;

[0020] The first end of the first connecting rod is connected to the turning plate;

[0021] The first end of the second connecting rod is connected to the material turning shaft, and the second end of the second connecting rod is connected to the second end of the first connecting rod;

[0022] The first rotating arm is arranged on the turning shaft;

[0023] The guide plate is mounted on the support assembly.

[0024] Compared with the prior art, the technical effect achieved by adopting this technical scheme is as follows: the turning shaft is fixed on the support assembly by a fixing device, so that it is firmly installed on the support assembly, the turning plate is fixedly installed on the upper surface of the material position on the second steel rod, and is fixedly connected by the first pin shaft, so that the connection between the turning plate and the support assembly is tighter, one end of the turning plate is connected to the first end of the first connecting rod, the second end of the first connecting rod is connected to the first end of the second connecting rod, the second end of the second connecting rod is connected to the first rotating arm, and the first rotating arm is arranged on the turning shaft. In this way, the material distribution operation of the wind power anchor bolt can be completed through the cooperation between the turning plate, the first connecting rod, the second connecting rod and the turning shaft.

[0025] In any of the above technical solutions, the jacking device includes: a second support frame, a second jacking cylinder, a second rotating arm and a third connecting rod;

[0026] The lower end of the second support frame is installed and fixed on the support assembly;

[0027] The output end of the second lifting cylinder is connected to the second supporting frame;

[0028] The second rotating arm is arranged on the material turning shaft;

[0029] The first end of the third connecting rod is connected to the second rotating arm, and the second end of the third connecting rod is connected to the second lifting cylinder.

[0030] Compared with the existing technology, the technical effect achieved by adopting this technical solution is: the second lifting cylinder is fixed to the support assembly through the second support frame, and the second lifting cylinder and the turning assembly cooperate with the second rotating arm through the third connecting rod, which can effectively complete the material distribution operation of the wind power anchor bolt.

[0031] In any of the above technical solutions, a first limiting protrusion is provided at the end of the second steel rod at the upper material position.

[0032] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: when the wind power anchor bolt rolls to the end of the second steel rod upper material position, the first limiting protrusion can prevent the wind power anchor bolt from falling.

[0033] In any of the above technical solutions, a second limiting protrusion is provided at the end of the turning plate.

[0034] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: when the wind power anchor bolt rolls to the end of the turning plate, the second limiting protrusion can prevent the wind power anchor bolt from falling.

[0035] In any of the above technical solutions, a limiting groove is provided in the middle of one end of the guide plate.

[0036] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: when the wind power anchor bolt is lifted to the guide plate by the lifting device, the limiting groove provided on the guide plate can prevent the wind power anchor bolt from falling.

[0037] In any of the above technical solutions, a first support frame for supporting the guide plate is provided at the lower end of the guide plate;

[0038] The first support frame includes: a first base and a first supporting side plate;

[0039] The first base is installed and fixed on the surface of the supporting component;

[0040] The lower end of the first supporting side plate is fixedly mounted on the first base.

[0041] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: the side wall at the lower end of the guide plate is supported by a second supporting side plate, the second supporting side plate is fixedly mounted on the upper surface of the second base, the second base is mounted on the surface of the supporting assembly, and through the arrangement of the second base and the second supporting side plate, the guide plate is firmly mounted on the supporting assembly, avoiding problems such as instability and looseness of the guide plate during operation of the device.

[0042] In any of the above technical solutions, the second support frame includes: a second base and a second support side plate;

[0043] The second base is installed and fixed on the supporting assembly;

[0044] The second supporting side plate is installed and fixed on the second base, and one side of the second supporting side plate is fixedly connected to the second lifting cylinder.

[0045] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: the second supporting side plate is used to support the side wall of the lower end of the second lifting cylinder, the upper end of the second supporting side plate is fixedly connected to the lower end of the second lifting cylinder, the lower end of the second supporting side plate is fixedly mounted on the second base, and the second base is fixedly mounted on the support assembly, and the second lifting cylinder is more firmly mounted on the support assembly through the mutual cooperation between the second base and the second supporting side plate.

[0046] In any of the above technical solutions, the number of jacking assemblies and transmission assemblies is multiple, and the multiple jacking assemblies and the multiple transmission assemblies are distributed in an equidistant array.

[0047] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: Since the wind turbine anchor is long and heavy, by setting the number of jacking assemblies and transmission assemblies to multiple, and the multiple jacking assemblies and the multiple transmission assemblies are arranged in an equidistant array, during the material distribution process, the force on each part of the wind turbine anchor is uniform, the pressure on the jacking assemblies and the transmission assemblies is reduced, the material distribution speed of the wind turbine anchor is accelerated, the material distribution efficiency is improved, and the jacking assemblies and the transmission assemblies can be effectively prevented from being damaged due to the excessive weight of the wind turbine anchor during long-term use.

[0048] After adopting the technical solution of the utility model, the following technical effects can be achieved:

[0049] (1) The utility model provides a wind power anchor bolt multi-link steel bar material distribution device, which can facilitate the material distribution operation of the wind power anchor bolt through the mutual cooperation between the support component, the jacking component, and the transmission component, realize the material distribution of the wind power anchor bolt, and is conducive to the material distribution and transfer of the wind power anchor bolt, reducing the labor intensity of the staff and improving the efficiency of the wind power anchor bolt distribution;

[0050] (2) The utility model provides a multi-link steel bar material distribution device for wind turbine anchor bolts. Since wind turbine anchor bolts are heavy and long, multiple lifting assemblies and transmission assemblies are provided and distributed in an equidistant array, so that each lifting assembly and each transmission assembly is subjected to uniform force, which can effectively prevent the lifting assembly and the transmission assembly from being affected by the weight of the wind turbine anchor bolt. This can effectively improve the material distribution efficiency of the wind turbine anchor bolts and also improve the service life of the multi-link steel bar material distribution device for wind turbine anchor bolts. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] Figure 1 It is a three-dimensional schematic diagram of the structure of the utility model;

[0052] Figure 2 It is a three-dimensional schematic diagram of the structure of the utility model;

[0053] Figure 3 It is a schematic top view of the structure of the utility model;

[0054] Figure 4 It is a schematic side view of the structure of the utility model;

[0055] Figure 5 For this utility model Figure 2 A magnified view of the structure at center A;

[0056] Figure 6 For this utility model Figure 2 A magnified view of the structure at B in the middle;

[0057] Description of reference numerals:

[0058] 1- Material distribution mechanism;

[0059] 11- Support assembly;

[0060] 12-transmission assembly; material turning assembly (121); lifting device (122); material turning shaft (1211); material turning plate (1212); first pin shaft (1212a); first connecting rod (1213); second connecting rod (1214); first rotating arm (1215); guide plate (1216); second support frame (1221); second lifting cylinder (1222); first rotating arm (1223); first support frame (1217); first base (1217a); first supporting side plate (1217b); second base (1221a); ​​second supporting side plate (1221b); second pin shaft (1221c). DETAILED DESCRIPTION

[0061] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, specific embodiments of the present invention are described in detail below with reference to the accompanying drawings.

[0062] Refer to the following Figures 1 to 6 The technical solutions of some embodiments of the present invention are described.

[0063] like Figures 1 to 3 As shown, the utility model provides a wind power anchor multi-link steel bar material distribution device, including a material distribution mechanism 1, the material distribution mechanism 1 includes: a support component 11, a lifting component, and a transmission component 12; the support component 11 is provided with a first steel bar upper material position and a second steel bar upper material position, and a height difference is provided between the second steel bar upper material position and the first steel bar upper material position; the lifting component is arranged on the support component 11; the transmission component 12 includes a turning component 121 and a lifting device 122;

[0064] Among them, the material turning component 121 can be raised and lowered on the supporting component 11 through the jacking device 122. When the material turning component 121 descends to the lowest point, the material turning component 121 is lower than the first steel rod upper material position; when the material turning component 121 is raised to the highest point, the material turning component 121 is higher than the second steel rod upper material position.

[0065] Preferably, the first steel bar loading position and the second steel bar loading position are provided with a certain slope.

[0066] Specifically, when it is necessary to perform material separation operations on the wind turbine anchor bolts, the bundled wind turbine anchor bolts are manually unbundled, and the upper computer sends a loading instruction. The wind turbine anchor bolt reaches the first steel bar loading position and rolls along the first steel bar loading position to the junction of the second steel bar loading position. At this time, the jacking assembly drives the wind turbine anchor bolt to rise to the second steel bar loading position, and rolls along the second steel bar loading position to the turning assembly. The turning assembly is driven by the jacking device to rise to the highest point, and the wind turbine anchor bolt is raised to above the supporting assembly to complete the material separation operation on the wind turbine anchor bolt.

[0067] Embodiment 1:

[0068] This embodiment provides a wind power anchor multi-link steel bar material distribution device. In addition to the technical features of the above embodiments, the wind power anchor multi-link steel bar material distribution device of this embodiment further includes the following technical features:

[0069] The jacking assembly includes: a jacking bracket and a first jacking cylinder;

[0070] The lifting bracket is arranged on the supporting assembly 11;

[0071] The output end of the first lifting cylinder is connected to the lifting bracket.

[0072] Specifically, the first lifting cylinder is fixedly mounted on the support assembly 11 through a lifting bracket, which is beneficial for the first lifting cylinder to lift the wind power anchor bolt.

[0073] Embodiment 2:

[0074] This embodiment provides a wind power anchor multi-link steel bar material distribution device. In addition to the technical features of the above embodiments, the wind power anchor multi-link steel bar material distribution device of this embodiment further includes the following technical features:

[0075] like Figure 6 As shown, the material turning assembly 121 includes: a material turning shaft 1211, a material turning plate 1212, a first connecting rod 1213, a second connecting rod 1214, a first rotating arm 1215 and a guide plate 1216;

[0076] The turning shaft 1211 is fixed on the supporting assembly 11 through a fixing device;

[0077] Preferably, the fixing device is a combination of a bearing and a bolt;

[0078] Specifically, it is fixed by bearing support and fastened by bolts;

[0079] Among them, a flat washer and an elastic washer are provided between the bearing and the bolt;

[0080] The flipping plate 1212 is fixedly mounted on the support assembly 11, and a first pin shaft 1212a is provided at one end of the lower end of the flipping plate 1212, and the flipping plate 1212 is fixedly connected to the support assembly 11 through the first pin shaft 1212a;

[0081] Preferably, an elastic retaining ring is provided between the first pin shaft 1212a and the supporting assembly 11;

[0082] The first end of the first connecting rod 1213 is connected to the turning plate 1212;

[0083] The first end of the second connecting rod 1214 is connected to the material turning shaft 1211, and the second end of the second connecting rod 1214 is connected to the second end of the first connecting rod 1213;

[0084] The first rotating arm 1215 is disposed on the turning shaft 1211;

[0085] The guide plate 1216 is mounted on the support assembly 11 .

[0086] Specifically, the turning shaft 1211 is installed and fixed on the support assembly 11 through a fixing device, so that it is firmly installed on the support assembly 11, the turning plate 1212 is fixedly installed on the support assembly 11, and is fixedly connected by the first pin shaft 1212a, so that the connection between the turning plate 1212 and the support assembly 11 is tighter, the first end of the first connecting rod 1213 is connected to the turning plate 1212, the second end of the first connecting rod 1213 is connected to the second end of the second connecting rod 1214, the first end of the second connecting rod 1214 is connected to the first rotating arm 1215, the first rotating arm 1215 is arranged on the turning shaft, and the first rotating arm 1215 is also arranged and installed on the turning shaft 1211, so that the material distribution operation of the wind power anchor bolt can be completed through the cooperation between the turning plate 1212, the first connecting rod 1213, the second connecting rod 1214 and the turning shaft 1211.

[0087] Among them, the flat washers and elastic washers arranged between the bearings and the bolts and the elastic retaining rings arranged at the lower end of the first pin shaft 1212a can effectively buffer the friction between the flipping plate and the supporting assembly 11 during the operation of the device, thereby reducing the noise of the device during operation.

[0088] Embodiment 3:

[0089] This embodiment provides a wind power anchor multi-link steel bar material distribution device. In addition to the technical features of the above embodiments, the wind power anchor multi-link steel bar material distribution device of this embodiment further includes the following technical features:

[0090] like Figure 5 As shown, the lifting device 122 includes: a second support frame 1221, a second lifting cylinder 1222, a second rotating arm 1223 and a third connecting rod 1224;

[0091] The lower end of the second support frame 1221 is mounted and fixed on the support assembly 11;

[0092] The output end of the second lifting cylinder 1222 is connected to the second support frame 1221;

[0093] The second rotating arm 1223 is disposed on the turning shaft 1211;

[0094] One end of the third connecting rod 1224 is disposed on the second rotating arm 1223 , and the other end of the third connecting rod 1224 is connected to the second lifting cylinder 1222 .

[0095] Specifically, the second lifting cylinder 1222 is fixed to the support assembly 11 through the second support frame 1221, and the second lifting cylinder 1222 and the turning assembly 121 cooperate with the first rotating arm 1223 through the third connecting rod 1224, which can effectively complete the material distribution operation of the wind power anchor bolt.

[0096] Embodiment 4:

[0097] This embodiment provides a wind power anchor multi-link steel bar material distribution device. In addition to the technical features of the above embodiments, the wind power anchor multi-link steel bar material distribution device of this embodiment further includes the following technical features:

[0098] The loading position end of the second steel rod is provided with a first limiting protrusion.

[0099] When the wind power anchor bolt rolls to the end of the second steel rod upper material position, the first limiting protrusion can prevent the wind power anchor bolt from falling.

[0100] Embodiment 5:

[0101] This embodiment provides a wind power anchor multi-link steel bar material distribution device. In addition to the technical features of the above embodiments, the wind power anchor multi-link steel bar material distribution device of this embodiment further includes the following technical features:

[0102] A second limiting protrusion is provided at the end of the turning plate 1212.

[0103] When the wind turbine anchor bolt rolls to the end of the turning plate, the second limiting protrusion can prevent the wind turbine anchor bolt from falling.

[0104] Embodiment 6:

[0105] This embodiment provides a wind power anchor multi-link steel bar material distribution device. In addition to the technical features of the above embodiments, the wind power anchor multi-link steel bar material distribution device of this embodiment further includes the following technical features:

[0106] A limiting groove is arranged in the middle of one end of the guide plate.

[0107] When the wind power anchor bolt is lifted to the guide plate by the lifting device, the limiting groove provided on the guide plate can prevent the wind power anchor bolt from falling.

[0108] Embodiment 7:

[0109] This embodiment provides a wind power anchor multi-link steel bar material distribution device. In addition to the technical features of the above embodiments, the wind power anchor multi-link steel bar material distribution device of this embodiment further includes the following technical features:

[0110] like Figure 5As shown, a first support frame 1217 for supporting the guide plate 1216 is provided at the lower end of the guide plate 1216, and the first support frame 1217 includes: a first base 1217a, a first supporting side plate 1217b;

[0111] The first base 1217a is installed and fixed on the surface of the supporting assembly 11;

[0112] The lower end of the first supporting side plate 1217b is fixedly mounted on the first base 1217a.

[0113] Specifically, the lower end side wall of the guide plate 1216 is supported by a second supporting side plate 1217b, and the second supporting side plate 1217b is fixedly mounted on the upper surface of the second base 1217a. The second base 1217a is mounted on the surface of the support assembly. Through the arrangement of the second base 1217a and the second supporting side plate 1217b, the guide plate 1216 is firmly mounted on the support assembly 11, avoiding problems such as instability and looseness of the guide plate during operation of the device.

[0114] Among them, the second supporting side plate 1217b can be an independent component that is installed on the upper surface of the second base 1217a by welding, bonding, etc. after independent processing and molding, or it can be an integrated component directly obtained on the upper surface of the second base 1217a by stamping, cutting, injection molding, etc.

[0115] Embodiment 8:

[0116] This embodiment provides a wind power anchor multi-link steel bar material distribution device. In addition to the technical features of the above embodiments, the wind power anchor multi-link steel bar material distribution device of this embodiment further includes the following technical features:

[0117] like Figure 5 As shown, the second support frame 1221 includes: a second base 1221a and a second supporting side plate 1221b;

[0118] The second base 1221a is installed and fixed on the supporting assembly 11;

[0119] The second supporting side plate 1221 b is installed and fixed on the second base 1221 a , and one side of the second supporting side plate 1221 b is fixedly connected to the second lifting cylinder 1222 .

[0120] Preferably, one side of the second supporting side plate 1221b is fixedly connected to the second lifting cylinder 1222 by using a second pin shaft 1221c, and an elastic retaining ring is provided between the second pin shaft 1221c and the second supporting side plate 1221b.

[0121] The second supporting side plate 1221b is used to support the side wall at the lower end of the second lifting cylinder 1222, and the upper end of the second supporting side plate 1221b is fixedly connected to the lower end of the second lifting cylinder 1222 by a second pin shaft 1221c, and the lower end of the second supporting side plate 1221b is fixedly mounted on the second base 1221a, and the second base 1221a is mounted and fixed on the support assembly 11. The second lifting cylinder 1222 is more firmly mounted on the support assembly 11 through the mutual cooperation between the second base 1221a and the second supporting side plate 1221b.

[0122] Among them, the second supporting side plate 1221b can be an independent component that is installed on the upper surface of the second base 1221a by welding, bonding, etc. after independent processing and molding, or it can be an integrated component directly obtained on the upper surface of the second base 1221a by stamping, cutting, injection molding, etc.

[0123] The elastic retaining ring arranged at the lower end of the second pin shaft 1221c can effectively buffer the friction between the second pin shaft 1221c and the second supporting side plate 1221b during the operation of the device, thereby reducing the noise of the device during operation.

[0124] Embodiment 5:

[0125] This embodiment provides a wind power anchor multi-link steel bar material distribution device. In addition to the technical features of the above embodiments, the wind power anchor multi-link steel bar material distribution device of this embodiment further includes the following technical features:

[0126] like Figure 1 and Figure 2 As shown, the number of the lifting components and the transmission components 12 are both multiple, and the multiple lifting components and the multiple transmission components 12 are distributed in an equidistant array.

[0127] Specifically, since the wind turbine anchor is long and heavy, the number of jacking assemblies and transmission assemblies 12 is set to be multiple, and the multiple jacking assemblies and multiple transmission assemblies 12 are arranged in an equidistant array. During the material distribution process, the various parts of the wind turbine anchor are subjected to uniform force, and the pressure on the jacking assemblies and transmission assemblies is reduced, thereby accelerating the material distribution speed of the wind turbine anchor and improving the material distribution efficiency.

[0128] In view of the above, when in use, the bundled wind turbine anchor bolts are manually unbundled, and the upper computer sends a loading instruction. The wind turbine anchor bolt reaches the first steel bar loading position. Since the first steel bar loading position is set at a certain angle and the action of gravity, the wind turbine anchor bolt rolls to the end of the first steel bar loading position. At this time, the first lifting cylinder drives the wind turbine anchor bolt to be lifted to the second steel bar loading position. Since the second steel bar loading position is set at a certain angle and the action of gravity, the wind turbine anchor bolt rolls to the first limit protrusion. Since the flipping plate and the second steel bar loading position are misaligned and partially overlapped, the wind turbine anchor bolt just falls on the flipping plate. Due to the action of gravity, the wind turbine anchor bolt rolls along the flipping plate to the second limit protrusion. The second lifting cylinder drives the wind turbine anchor bolt to be lifted to the guide plate, and the wind turbine anchor bolt is accurately placed in the limit groove of the guide plate to complete the material distribution operation. In addition, since the wind turbine anchor is long and heavy, by setting the number of jacking components and transmission components to be multiple, and the multiple jacking components and multiple transmission components are arranged in an equidistant array, the various parts of the wind turbine anchor are subjected to uniform force during the material distribution process, and the pressure on the jacking components and transmission components is reduced, which not only improves the material distribution efficiency, but also effectively prevents the jacking components and transmission components from being damaged due to the excessive weight of the wind turbine anchor during long-term use.

[0129] Although the present invention is disclosed as above, the present invention is not limited thereto. Any person skilled in the art can make various changes and modifications without departing from the spirit and scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the scope defined by the claims.

Claims

1. A wind power anchor multi-link steel bar distribution device, comprising: The material distribution mechanism (1) is characterized in that the material distribution mechanism (1) comprises: A support assembly (11), wherein the support assembly (11) is provided with a first steel rod loading position and a second steel rod loading position, and a height difference is provided between the first steel rod loading position and the second steel rod loading position; A lifting assembly, the lifting assembly being arranged on the supporting assembly (11); A transmission assembly (12), the transmission assembly (12) comprising a material turning assembly (121) and a lifting device (122); The material turning assembly (121) is arranged on the support assembly (11) so that it can be raised and lowered by the lifting device (122); when the material turning assembly (121) is lowered to the lowest position, the material turning assembly (121) is lower than the upper material position of the first steel rod; when the material turning assembly (121) is raised to the highest position, the material turning assembly (121) is higher than the upper material position of the second steel rod.

2. The wind power anchor multi-link steel bar distribution device according to claim 1 is characterized in that: The lifting assembly comprises: A lifting bracket, the lifting bracket being arranged on the supporting assembly (11); A first lifting cylinder, wherein an output end of the first lifting cylinder is connected to the lifting bracket.

3. The wind power anchor multi-link steel bar distribution device according to claim 1 is characterized in that: The material turning component (121) comprises: A material turning shaft (1211), wherein the material turning shaft (1211) is mounted and fixed on the support assembly (11) via a fixing device; a material turning plate (1212), the material turning plate (1212) being fixedly mounted on the support assembly (11), the material turning plate (1212) and the support assembly (11) being fixedly connected via a first pin shaft (1212a); A first connecting rod (1213), wherein a first end of the first connecting rod (1213) is connected to the turning plate (1212); a second connecting rod (1214), wherein a first end of the second connecting rod (1214) is connected to the material turning shaft (1211), and a second end of the second connecting rod (1214) is connected to a second end of the first connecting rod (1213); A first rotating arm (1215), wherein the first rotating arm (1215) is arranged on the material turning shaft (1211); A guide plate (1216), wherein the guide plate (1216) is mounted on the support assembly (11).

4. The wind power anchor multi-link steel bar distribution device according to claim 3 is characterized in that: The lifting device (122) comprises: A second support frame (1221), the second support frame (1221) being mounted and fixed on the support assembly (11); A second lifting cylinder (1222), wherein an output end of the second lifting cylinder (1222) is connected to the second support frame (1221); a second rotating arm (1223), wherein the second rotating arm (1223) is arranged on the material turning shaft (1211); A third connecting rod (1224), wherein a first end of the third connecting rod (1224) is connected to the second rotating arm (1223), and a second end of the third connecting rod (1224) is connected to the second lifting cylinder (1222).

5. The wind power anchor multi-link steel bar distribution device according to claim 1, characterized in that: The upper material position end of the second steel rod is provided with a first limiting protrusion.

6. The wind power anchor multi-link steel bar distribution device according to claim 3, characterized in that: The end of the turning plate (1212) is provided with a second limiting protrusion.

7. The wind power anchor multi-link steel bar distribution device according to claim 3, characterized in that: A limiting groove is provided in the middle of one end of the guide plate (1216).

8. The wind power anchor multi-link steel bar distribution device according to claim 3, characterized in that: A first support frame (1217) for supporting the guide plate (1216) is provided at the lower end of the guide plate (1216), and the first support frame (1217) comprises: A first base (1217a), the first base (1217a) being mounted and fixed on the surface of the support assembly (11); A first supporting side plate (1217b), wherein the first supporting side plate (1217b) is fixedly mounted on the first base (1217a).

9. The wind power anchor multi-link steel bar distribution device according to claim 4, characterized in that: The second support frame (1221) comprises: a second base (1221a), the second base (1221a) being mounted and fixed on the support assembly (11); A second supporting side plate (1221b), wherein the second supporting side plate (1221b) is installed and fixed on the second base (1221a), and one side of the second supporting side plate (1221b) is fixedly connected to the second lifting cylinder (1222).

10. The wind power anchor multi-link steel bar distribution device according to any one of claims 1 to 9, characterized in that: The jacking components and the transmission components (12) are both provided in plural numbers, and the jacking components and the transmission components (12) are distributed in an equidistant array.